Loading...
HomeMy WebLinkAboutSOLR-20-2148 City of Arcadia, CA Permit NO. SOLR-20-2148 Development Services Department Permit Type:Solar 240 West Huntington Drive,Post Office Box 60021 Arcadia,CA 91066-6021 Work Classification:Solar-Residential (626)574-5416 Permit Status:Issued ARCADIA Issue Date: 12/23/2020 Expiration: 12/23/2021 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number 184 W DUARTE RD Arcadia,CA 91007-6920 5782004001 Contacts ZHANG,BOTAO AND WU,YUQIN Owner True Power Solar Contractor 184 W Duarte RD,Arcadia,CA 91007 201 Clark AVE, Pomona,CA 91767 (626)446-9532 (714)676-8888 970591 �.y Description: ROOF MOUNTED SOLAR SYSTEM 18 Valuation: $ 0.00 Tenant MODULES/OPTIMIZERS AND 1 INVERTER Total Sq Feet: 0.00 Plan Check# Plan# Fees Amount Payments Amount Paid Building Plan Check Fee Residential $100.00 Total Fees $324.72 Distribution Panel $16.48 Cash/Receipt#REC-06394-20 $324.72 Electrical Permit Issuance Fee $47.01 - Amount Due: $0.00 Inverters $77.78 Panels $82.45 Solid Waste Management Fee 2 $1.00 Total: $324.72 12-2-7_2,,o2C) CALLS FOR INSPECTIONS 1„ Request for inspection by telephone at 626-574-5450. Leave a message requesting the address,timeframe and what inspection item is needed. This permit/plan review expires by time limitation and becomes null and void if the work authorized by the permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days from the date of plan submittal.This permit expires and becomes null and void if any work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of Arcadia building inspector for a period of 180 consecutive days. ez COMPLETED December 23, 2020 Issued By: Date December 23,2020 Page 1 of 1 OF AI Gp.S,FOR,y,1 PERMIT/PLAN REVIEW APPLICATION 441.1' Development Services Department, 240 West Huntington Drive,Post Office Box 60021 '0�° „°tN Arcadia, CA 91066-6021, (626)574-5416,Fax (626)447-9173 City of Arcadia LICENSED CONTRACTOR'S DECLARATION WORKERS'COMPENSATION DECLARATION ❑ I hereby affirm under penalty of perjury that I am licensed under provisions of I hereby affirm under penalty of perjury one of the following: Chapter 9(commencing with Section 7000,of Division 3 of the Business and Professions Code,and my license is in full force and effect. ❑ I have and will maintain a certificate of consent to self-insure for workers' License Class License No. Exp. Date compensation, as provided for by Section 3700 of the Labor Code, for the Signature of Contractor performance of the work for which this permit is issued. OWNER-BUILDER DECLARATION ❑ I have and will maintain workers'compensation insurance,as required by Section ❑ I hereby affirm under penalty of perjury that I am exempt from the Contractors 3700 of the Labor Code,for the performance of the work for which this permit License Law for the following reason(Section 7031.5,Business and Professions is issued.My workers'compensation insurance carrier and policy numbers are: Code.Any city or county which requires a permit to construct,alter,improve, Carrier demolish,or repair any structure,prior to its issuance,also required the applicant for such permit to file a signed statement that he or she is licensed pursuant to the Policy Number provisions of the Contractors License Law(Chapter 9(commencing with Section (This section need not be completed if the permit is for one hundred dollars or less) 7000)of Division 3 of the Business and Professions Code)or that he or she is exempt there from and the basis for the alleged exemption. Any violation of ❑ I certify that in the performance of the work for which this permit is issued,I shall Section 7031.5 by any applicant for a permit subjects the applicant to a civil not employ any person in any manner so as to become subject to the workers' penalty of not more than five hundred dollars($500)): compensation Laws of California,and agree that if 1 should become subject to the workers'compensation provisions of Section 3700 of the Labor Code,I shall ❑I, as owner of the property, or my employees with wages as their sole forthwith comply with those provisions. compensation,will do the work,and the structure is not intended or offered for sale(Section 7044,Business and Professions Code:The Contractors License Date Signature Law does not apply to an owner of property who builds or improves thereon, or who does such work himself or herself or through his or her own employees,provided that such improvements are not intended or offered for WARNING: Failure to secure Workers'Compensation coverage is unlawful, sale.If,however,the building or improvement is sold within one(1)year of and shall subject an employer to criminal penalties and civil fines up to one completion,the owner-builder will have the burden of proving that he or she hundred thousand dollars($100,000),in addition to the cost of compensation, did not build or improve for the purpose of sale). damages as provided for in Section 3706 of the Labor Code, interest, and attorney's fees. ❑I, as owner of the property, am exclusively contracting with licensed contractors to construct the project(Section 7044,Business and Professions Code:The Contractors License Law does not apply to an owner of property CONSTRUCTION LENDING AGENCY who builds or improves thereon, and who contracts for such projects with a I hereby affirm under penalty of perjury that there is a construction lending agency contractor(s)licensed pursuant to the Contractors License Law). for the performance of the work for which this permit is issued (Section 3097, Civil Code). ❑ I am exempt under Section 7044,Business and Professions Code,for this reason: Lender's Name Date Signature Lender's Address IMPORTANT: APPLICATION IS HEREBY MADE TO THE BUILDING OFFICIAL FOR A PERMIT SUBJECT TO THE CONDITIONS AND RESTRICTIONS SET FORTH ON THIS APPLICATION AND THE FOLLOWING: 1. The City's approved plans and permit inspection card must remain on the job site for use by City inspection personnel. 2. Final inspection of the work authorized by this permit is required.A Certificate of Occupancy must be obtained prior to use and occupancy of new buildings and structures. 3. Per South Coast Air Quality Management District(AQMD)regulations,renovation and remodeling work that results in the removal,stripping,or altering of asbestos containing materials requires an asbestos survey and removal prior to disturbing the asbestos. Please contact AQMD at(909)396-2000 for further information. Name Title PRINT NAME I certify that I have read this application and state that the above information is correct and that I am the owner or duly authorized agent of the owner. I agree to comply with all City ordinances and State Laws relating to building construction. I hereby authorize representatives of the City of Arcadia to enter upon the above-mentioned property for inspection purposes. Signature Date BOTAO ZHANG-6.660kW DC, 6.000kW AC, 6.128kW CEC AC RATING ROOF PLAN NOTE:ALL EXPOSED EQUIPMENT/CONDUIT SHALL BE PAINTED TO MATCH FROM JUNCTION BOX TO ROOF EAVE EMT TYPE CONDUIT WILL RUN OVER THE ROOF AT 3 1/2" THE ROOF OR WALL HEIGHT,THEN UNDER THE EAVE TO PV EQUIPMENT NOTE:EXISTING ROOF TILE TO BE MAINTAINED PHOTOVOLTAIC SYSTEM _ W P.OOUp0.TE ___---- 18 SUNPOWER SPR X22-370 DC 1 SOLAREDGE TECHNOLOGIES ; 18"FIRE SETBACKS SE6000H-US(240V) / / I FIRE SPRINKLERS NO PROPERTY UNE 43' TOTAL AREA OF ROOF (SQ.FT) 1758 TOTAL ARRAY AREA(SQ.FT) 315.6950 TOTAL AREA OF ARRAY COVERED IN THE ROOF(%) 17.96 I II:Ar ' TRUE POWER S O L A R I 121 :11i ADOREf5:201 CLARK AVE,POMONA,U 91767 PHONE NUNUER:(71/(676-8888 CI CUB:/970591 LICENCE TYP 6C46 f I CUSTOMER INFORMATION 36"FIRE SETBACKS 154'-6" El NAME:BOTAO ZHANG El CI SOLAR ARRAY:1 B ADDRESS:184 W.DUARTE ROAD, (18)SUNPOWER SPR X22-370 DCMODULES `� ARCADIA,CALIFORNIA 91007 (18)SOLAREDGE P400 POWER OPTIMIZER I 1T-3" pp. 0 -2'-4" ROOF PITCH:20° 34.128152,-118.038479 ORIENTATION:268" El APN:578-200-4001 DRIVE WAY " 13 AHI:CA-CITY OF ARCADIA PHOTOVOLTAIC ARRAY ON THE ROOF .�. _ //,Ar A.-i:•, I PRN NUMBER:TPW-20198 -- - l I CONTRACTOR SIGNALT/U/IRr�tEr:�t�- I STRING CONFIGURATION � � // (E)SUB PANEL(INTERIOR) 25' BRANCH DETAILS CONDUIT RUN A 9 MODULES ROOF PLAN (N)PV INVERTER(EXTERIOR) - B 9 MODULES DESIGNER/CHECKED BY: (N)AC DISCONNECT(EXTERIOR) SRI/BH \\\ 60'-30' (E)MAIN SERVICE PANEL(EXTERIOR) POOL SCALE:AS NOTED REV:A SCALE:1"=20'-0" , DATE:11/30/20 T-2 SAM ENGINEERING 3333 S.BREA CANYON RD.STE 104 DIAMOND BAR,CA 91765 Structural Calculations for: Botao Zhang Residence 6.66 kW DC Photovoltaic Array Addition 184 W. Duarte Rd. Arcadia, CA 91007 Owner/Developer: True Power Solar 201 Clark Ave. Pomona, CA 91767 December 2, 2020 Job#: 20-1241 ESS lc --PEEN--�'� I Q M .�� `45 I p. ars nz �,9T CfV \��.0- FoF CAl\W Page 1 of 4 SAM ENGINEERING 3333 S.BREA CANYON RD.STE 104 DIAMOND BAR,CA 91765 SOLAR RESIDENTIAL ROOF/BUILDING CHECK Check Photovoltaic Array Addition-2019 California Building Code(CBC) Gravity Design Loads: Roof Type: Comp shingle over 1/2"sheathing over rafters over 5/8"gypsum board Live Load: 20.0 psf Dead Load: Roofing Material: 2.0 psf Sheathing: 1.5 psf Roof Framing Members: 2.5 psf Drywall: 1.5 psf Insulation: 1.0 psf Miscellaneous: 1.5 psf Solar Array&Rack System 2 68 psf ----Additional Load Applied Roof Dead Load w/o Solar Array= 10.00 psf Over<50%of Roof Area Roof Dead Load at Solar Array= 12.68 psf Total Roof Load w/o Solar Array= 30.0 psf Total Roof Load at Solar Array= 32.7 psf Area of Solar Array Addition(for gravity check)= 316 ft2(324 sqft of existing panels) Total Area of Affected Rafters(for gravity check)= 2376 ft2 Area of Solar Array Addition(for seismic check)= 316 ft2 Total Area of Affected Roof(for seismic check)= 2376 ft2 Check Additional Gravity Loads on Rafters: Total Load Increase at Affected Rafters= 0.36 psf %of Total Load Increase= 1.19% < 5.0% OK Per CBC 3403A.3 Additional Solar Array Weight is Structurally Acceptable Check Additional Gravity Loads on Lateral Resisting System: Dead Load Increase at Entire Roof= 0.36 psf %Dead Load Increase on Entire Roof= 3.56% < 10.0% OK Per CBC 3403A.4 Additional Solar Array Lateral Load is Structurally Acceptable Page 2 of 4 Sht: El SAM ENGINEERING Date: 3333 S.BREA CANYON RD.STE 104 #: DIAMOND BAR,CA 91765 A: ROOF MOUNTED SOLAR PANELS Earthquake Design per ASCE 7-16- 13.3.1 Design Parameters Site Class= D Per Table 1613A.3.2 Latitude,deg Longitude,deg Short Period S.A.,SS= 1.957 2015 NEHRP Provisions 34.1281 -118.0384 Site Coefficient,Fa= 1.20 Table 1613A.3.3(1) Sms=FaSs= 2.35 EQ 16A-37 SDs=2/3 Sms= 1.57 EQ 16A-39 Importance Factor,1p= 1.00 Section 13.1.3 Height of Equipment,z= 12.00 ft Height of Roof,h= 12.00 ft Weight of Panels to each Mount,Wp= 41.00 lbs a = 1.00 Table 13.6-1 Rp= 2.50 Table 13.6-1 Determine Fp,Seismic Design Force(STRENGTH LEVEL1 Fp=(0.4apSDSWp)(1+2z/h)/(Rp/Ip)= 31 lbs EQ 13.3-1 [Not Greater Than:] Fp=1.6SosWplp= 103 lbs EQ 13.3-2 [Not Less Than:] Fp=0.3SDSWPIp= 19 lbs EQ 13.3-3 Use Fp= 31 lbs at each Roof Mount Bracket Page 3 of 4 - SAM ENGINEERING She: W, Date: 3333 S.BREA CANYON RD.STE 104 _ #: DIAMOND BAR,CA 91765 A: - ROOF MOUNTED SOLAR PANELS Components and Cladding-Wind Load Design per ASCE 7-16, 29.4.4- h<60 ft Design Parameters Design Wind Velocity(3s Gust),V= 110 mph Wind Exposure= C Mean Panel Height= 12.00 ft Total Effective Area of Typical Array= 316 ft2 Panel Area to Each Support= 12.00 ft2 Angle of Panels= 20 degrees(worst case) a= 3 ft(3ft.Min.) Determine Wind Force at Each Roof Mount qh=0.00256 K,K11 Kd V2 I= 13.4 psf Load case 0.6•11h K,= 0.85 Table 26.10-1,Page 268 K„= 1.0 Figure 26.8-1,Page 267 Kd= 0.85 Table 26.6-1,Page 266 1= 1.00 Y=U" v=180" GCp(Zone 1)= 0.50 -2.00 Per Figures 30.3-2A thru 30.3-2AI GCP(Zone 2)= 0.50 -2.80 Per Figures 30.3-2A thru 30.3-2A GCP(Zone 3)= 0.70 -3.60 NO PANELS IN ZONE 3 YE= 1.50 29.4-7 page 327 Ya 0.70 Figure 29.4-8 Page 331 (+)P=qh(GCp)(YE)(Y,)= 10.0 -39.5 psf,Positive Wind(10 psf min)-Worst Case Lateral Load at Each Mount= 41 -162 lbs Compression/Uplift at Each Mount= 113 -445 lbs Roof Mount is attached to roof sheathing&roof members w/(1)5/16"x 3.5" Lag Screw at 48" Max.on center w/ Min.2.5"thread embed per TRUE POWER SOLAR. Allowable Loads for 5/16" Diameter Lag Screw per the 2018 NDS: (Table 11.2A) Withdrawl= 266 lb/in x 2.5"embed x (Cd=1.6)= 1064 lbs (Table 11K) Shear= 120 lb x (Cd=1.6)= 192 lbs SOLAR ARRAY ATTACHMENT METHOD IS STRUCTURALLY ACCEPTABLE. Page 4 of 4 • i SUNP WERTM 11/19/2020 Attn.: To Whom It May Concern re: Job EDWARD SHYU: 29 EAST ORANGE GROVE AVENUE, ARCADIA, CALIFORNIA 91006 The following calculations are for the structural engineering design of the photovoltaic panels. After review, I certify that the roof structure has sufficient structural capacity for the applied PV loads. All PV mounting equipment shall be designed and installed per manufacturer's approved installation specifications. If you have any questions, don't hesitate to contact. Sincerely, Heinrich A. Villanueva, PE Heinric MNmkfi A Vlllanuevs Of.E `gyp. VIL/e" Design Criteria: g Code: 2019 California Building Code NO. 80828 - m ASCE 7-16 \°- Ea3.31-21 Live Load: 20 psf � •� �; Ult Wind Speed: 110 mph Exposure Cat: C Ground Snow: 0 psf 2125 E Katella Ave#220,Anaheim, CA 92806 1714.787.3850 -Date :11/19/2020 Job Code: EDWARD SHYU SUN PC WE R2of6 Structrure Geometry: Mean Roof Height, hn = 13 ft Eave Height, he = 8 ft Buiding Length, L = 106 ft Building Width, B = 79 ft Module Area = 17.5 ft2 Roof Properties: Roof 1 Roof Pitch (deg) = 15 Roofing Type= Clay Tile Sheathing Type= 5/8 OSB Sheathing Wood Species= Doug Fir-Larch#2 Wood Fb (psf) = 129600 Wood Fv(psf) = 25920 Wood E (psf) = 230400000 Wood Lag Withdrawal (lb/in) = 266 Framing Type= 2x10 Rafter Framing OC Spacing(in.) = 24 Section Thickness, b(in.) = 1.50 Section Depth, d (in.) = 9.25 Section Modulus,Sx (in.^3) = 21.39 Beam Span (ft) = 8 Pen Trib Width (ft) = 2.55 Rail Span (ft) = 4.00 CD (Wind) = 1.6 CD (Snow) = 1.15 Cts= 1.10 CM= 1.0 Ct= 1.0 Ct= 1.0 CF = 1.1 CfU = 1.0 Ci= 1.0 C = 1.15 Mallowable wind (Ib-ft) = 3572 Mallowable snow(Ib-ft) = 2567 2125 E Katella Ave#220,Anaheim, CA 92806 1714.787.3850 Date :11/19/2020 Job Code: EDWARD SHYU SUNP W 3 of Dead Load: Clay Tile 12.0 5/8 OSB Sheathing 2.0 2x10 Rafter @ 24" OC 1.6 Misc(Insulation etc) 1.0 Total Roof 1 DL 16.6 psf PV DL 2.8 psf Roof 1 Roof_Dist_DL= 32 M Roof Dist DL= 256 Def Roof Dist DL= 0.0016 PV_uni Dist DL= 5 M_PV_uni_Dist_DL= 43 Def PV uni Dist DL= 0.0003 Total uni DL= 37 M Total uni_DL= 300 Def Total uni DL= 0.0018 Rail Down DL= 7 Rail_M_DL= 14 Pens_Down_DL= 28 Pens Side DL= 7 Wind Load: Ultimate Wind Speed = 110 mph Directionality Factor, kd = 0.85 Topographic Factor, kzt = 1 Velocity Pressure Exposure Factor, kz= 0.85 Ground Elevation Factor, ke = 1.00 Velocity Pressure, qz= 22.35 Array Edge Factor, yE = 1.5 2125 E Katella Ave#220,Anaheim,CA 92806 1714.787.3850 Date :11/19/2020 Job Code: EDWARD SHYU SUNP W4of6 Solar Equalization Factor,ya = 0.75 Roof 1 External Pressure Up,GCp_1= -2.00 External Pressure Up,GCp_2= -2.60 External Pressure Up,GCp_3= -3.10 External Pressure Down, GCp= 0.60 Design Pressure Up, p_1= -50.29 Design Pressure Up, p_2 = -65.38 Design Pressure Up, p_3 = -77.95 Design Pressure Down, p= 16.00 uni_Dist_W_up= -101 M_uni_Dist_W_up= -805 Def uni_Dist_W_up= -0.0049 uni Dist Wdown = 32 Muni Dist Wdown = 256 Def uni Dist Wdown = 0.0016 Module_Up_W1= -50 Module_Up_W2 = -65 Module Down W= 16 Rail_Up_W1= -128 Rail_Up_W2= -167 Rail Down W= 41 Rail_M_Up_W1= -257 Rail_M_Up_W2 = -334 Rail M Down W= 82 Pens_Up_W1= -514 Pens_Up_W2= -668 Pens Down W= 163 Module Check(Service Level): Roof 1 Down = 16 psf < 125 psf OK Roof 1 Up z1 = 30 psf < 62 psf OK 2125 E Katella Ave#220,Anaheim, CA 92806 1714.787.3850 Date :11/19/2020 Job Code: EDWARD SHYU SUNP W5of6 Roof 1 Up z2 = 39 psf < 62 psf OK Rail Check(LRFD): Roofl 1.4D : 19 lb-ft < 548 lb-ft OK Roof1 1.2D+ 1.65+0.5W : 58 lb-ft < 548 lb-ft OK Roof1 1.2D+0.5S+ 1.0W : 98 lb-ft < 548 lb-ft OK Roof1 0.9D+ 1.0W (Up z1) : 244 lb-ft < 548 lb-ft OK Roofl 0.9D+ 1.0W(Up z2) : 321 lb-ft < 548 lb-ft OK Attachment Check(ASD): Roofl 1.0D+0.6W : 126 lbs < 829 lbs OK Roof1 1.0D+0.75*[1.0S+0.6W] : 101 lbs < 829 lbs OK Roof1 1.0D+ 1.05 : 28 lbs < 829 lbs OK Roof1 0.6D+0.6W (Up z1) : 292 lbs < 681 lbs OK Roof1 0.6D+0.6W (Up z2) : 384 lbs < 681 lbs OK Attachment Lateral Check(ASD): Roof1 1.0D+ 1.0S : 7 lbs < 533 lbs OK Lag Screw Uplift Check(ASD): 5/16" Lag Screw Withdrawl Value= 266 lbs Lag Screw Penetration = 2.5 in. Roof1 0.6D+0.6W (Up zl) : 292 lbs < 665 lbs OK Roof1 0.6D+0.6W(Up z2) : 384 lbs < 665 lbs OK Framing Check(ASD): Roof1 uni 1.0D+0.6W : 453 lb-ft < 3572 lb-ft OK Roof1 uni 1.0D+0.75*[1.05+0.6W] : 415 lb-ft < 3572 lb-ft OK Roof1 uni 1.0D+ 1.0S : 300 lb-ft < 2567 lb-ft OK Roof1 uni 0.6D+0.6W (Up z1) : 303 lb-ft < 3572 lb-ft OK 2125 E Katella Ave#220,Anaheim, CA 92806 1714.787.3850 Date :11/19/2020 Job Code: EDWARD SITYU SUN PC W E R 6of6 Seismic Check: Stucco 10.0 psf 2x4 Studs @ 16" 2.0 psf Gypsum 3.0 psf Misc. (Insulation, etc.) 2.0 psf Total Wall DL= 17 psf Total Wall Area = 2960 ft^2 Total Wall W= 50320 lbs Existing Weight Total Roof DL= 17 psf Total Roof Area = 8374 ft^2 Total Roof W= 138923 lbs Existing Weight PV Panel W= 46 lbs Number of Panels = 12 Total PV W= 546 lbs Additional Weight %increase= (Wexisting+Wadditional)/Wexisting = 0% OK The increase in weight as a result of the solar system is less than 10%of the existing structure and therefore no further seismic analysis is required. Limits of Scope of Work and Liability The calculations produced for this dwelling's assessment are only for the proposed solar panel installation referenced in the stamped plan set and were made according to generally recognized structural anlaysis standards and procedures. 2125 E Katella Ave#220,Anaheim, CA 92806 1714.787.3850