Loading...
HomeMy WebLinkAboutUntitled Cit`, Arcadia, �of CA `,�;�r Permit NO.SOLR=20-0999'_ S City a*r ; Development Services Department Permit,Type.Solar` t 240 West Huntington Drive,Post Office Box 60021 Arcadia,CA 91066-6021 Work Classification Solar"-Residential Over 10 KV ,, ; (626)574-5416 Permit°Status:Issued A RC,3tt IA Issue Date•07/07/2020 I Expiration: 07/07/2021 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number 1118 S FOURTH AVE Arcadia,CA 91006-4220 5780004019 Contacts YANG,JIANGZHOU AND BAI,WEN Owner SOLARMAX RENEWABLE ENERGY Contractor 1118 S FIRST AVE PROVIDER INC* 3080 E 12th,Riverside,CA 92507 (951)300-0788 972048 -azzzlourarAumuz, I.,. , ^maw. =„a sem: w-cea.arx., air -. •ayst� Description:ROOF MOUNTED SOLAR SYSTEM 32 MODULES 32 Valuation: $ 0.00 Tenant OPTIMIZERS 1 INVERTER Total Sq Feet: 0.00 Plan Check# Plan# Fees Amount Payments Amount Paid Building Plan Check Fee Residential $50.00 Total Fees $308.24 Electrical Permit Issuance Fee $47.01 Cash/Receipt#REC-04903-20 $308.24 Fire Plan Check Fee Residential $50.00 Amount Due: $0.00 Inverters $77.78 Panels $82.45 Solid Waste Management Fee 2 $1.00 Total: $308.24 Ci% Flefi�� 7-2 o-2a D CALLS FOR INSPECTIONS ft A L- er< Request for inspection by telephone at 626-574-5450. Leave a message requesting the address,timeframe and what inspection item is needed. This permit/plan review expires by time limitation and becomes null and void if the work authorized by the permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days from the date of plan submittal.This permit expires and becomes null and void if any work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of r i, Arcadia building inspector for a period of 180 consecutive days. July 07, 2020 Issued By: Date July 07,2020 Page 1 of 1 U~4 oF ARC 1F Rvi,94o - . PERMIT/PLAN REVIEW APPLICATION o j� Development Services Department,240 West Huntington Drive,Post Office Box 60021 , Arcadia, CA 91066-6021, (626) 574-5416,Fax(626) 447-9173 City of Arcadia LICENSED CONTRACTOR'S DECLARATION WORKERS'COMPENSATION DECLARATION ❑ I hereby affirm under penalty of perjury that I am licensed under provisions of I hereby affirm under penalty of perjury one of the following: Chapter 9(commencing with Section 7000,of Division 3 of the Business and Professions Code,and my license is in full force and effect. ❑ I have and will maintain a certificate of consent to self-insure for workers' License Class License No. Exp. Date compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. Signature of Contractor OWNER-BUILDER DECLARATION IDI have and will maintain workers'compensation insurance,as required by Section ❑ I hereby affirm under penalty of perjury that I am exempt from the Contractors 3700 of the Labor Code,for the performance of the work for which this permit License Law for the following reason(Section 7031.5,Business and Professions is issued.My workers'compensation insurance carrier and policy numbers are: Code.Any city or county which requires a permit to construct,alter,improve, Carrier demolish,or repair any structure,prior to its issuance,also required the applicant for such permit to file a signed statement that he or she is licensed pursuant to the Policy Number provisions of the Contractors License Law(Chapter 9(commencing with Section (This section need not be completed if the permit is for one hundred dollars or less) 7000) of Division 3 of the Business and Professions Code)or that he or she is exempt there from and the basis for the alleged exemption. Any violation of ❑ I certify that in the performance of the work for which this permit is issued,I shall Section 7031.5 by any applicant for a permit subjects the applicant to a civil not employ any person in any manner so as to become subject to the workers' penalty of not more than five hundred dollars($500)): compensation Laws of California,and agree that if I should become subject to the workers'compensation provisions of Section 3700 of the Labor Code,I shall IDI, as owner of the property, or my employees with wages as their sole forthwith comply with those provisions. compensation,will do the work,and the structure is not intended or offered for sale(Section 7044,Business and Professions Code:The Contractors License Date Signature Law does not apply to an owner of property who builds or improves thereon, _ or who does such work himself or herself or through his or her own employees,provided that such improvements are not intended or offered for WARNING: Failure to secure Workers'Compensation coverage is unlawful, sale.If,however,the building or improvement is sold within one(1)year of., and shall subject an employer to criminal penalties and civil fines up to one completion,the owner-builder will have the burden of proving that he or she hundred thousand dollars($100,000),in addition to the cost of compensation, did not build or improve for the purpose of sale). damages as provided for in Section 3706 of the Labor Code, interest, and attorney's fees. ❑I, as owner of the property, am exclusively contracting with licensed _ - contractors to construct the project(Section 7044,Business and Professions Code:The Contractors License Law does not apply to an owner of property CONSTRUCTION LENDING AGENCY; who builds or improves thereon,and who contracts for such projects with a I hereby affirm under penalty of perjury that there is a construction lending agency contractor(s)licensed pursuant to the Contractors License Law). for the performance of the work for which this permit is issued (Section 3097, Civil Code). ❑ I am exempt under Section 7044,Business and Professions Code,for this reason: - Lender's Name Date Signature Lender's Address IMPORTANT: APPLICATION IS HEREBY MADE TO THE BUILDING OFFICIAL FOR A PERMIT SUBJECT TO THE CONDITIONS AND RESTRICTIONS SET FORTH ON THIS APPLICATION AND THE FOLLOWING: 1. The City's approved plans and permit inspection card must remain on the job site for use by City inspection personnel. 2. Final inspection of the work authorized by this permit is required.A Certificate of Occupancy must be obtained prior to use and occupancy of new buildings and structures. 3. Per South Coast Air Quality Management District(AQMD)regulations,renovation and remodeling work that results in the removal,stripping,or altering of asbestos containing materials requires an asbestos survey and removal prior to disturbing the asbestos.Please contact AQMD at(909)396-2000 for further information. Name Title PRINT NAME I certify that I have read this application and state that the above information is correct and that I am the owner or duly authorized agent of the owner. I agree to comply with all City ordinances and State Laws relating to building construction. I hereby authorize representatives of the City of Arcadia to enter upon the above-mentioned property for inspection purposes. Signature Date ar SOLAR NIAX RENEWABLE jy' ENERGY PROVIDER INC _`� 3093 12TH STREET. RIVERSIDE CA 02502 TEL:(051)393L]33• FA%(OSt)2t3= �� ' CI.ASSOLi58C-10 J (N)SOLAR ARRAY " L.)-,:, LIC..1E OWATIAOLIP NC.MR 9V11. .. � . yrs acmuTnL o®1■ Cr It Il6FECTIVE SMARM 011.0 MOIL IIMOJT DE IMRE '"�` fmaeo DoMM i SUMS DRIVEWAY A .f.4apowa rY'r. DAVID BINGNEN HSU UC.HOLDER'S SIG.- .. .. 1 .I ' Fronl'Of ReciAence '� .r � - � " 1118 S.4TH AVENUE' `+i :` o S 11om54aa Op:, � Le=o 1®®® Z w "lW c�ovia DRIVEWAY / 0�] • .� N€ cNo rl s �_.. NEW KRALOY JBOX (N)SOLAR ARRAY o �a . (E)400A SPLIT BUS MAIN PANEL. ' `1 t7. EXISTING 200/200A WAIN U) J PV MODULES' r:: 5 ' -T; SERVICE PANEL'240V 1PH TOP FED.&UTILITY'METER'AZIMUTHS 180 NEW 60A UNFUSED AC O 'DISCONNEC T 240V"NEMA_3R a 1MATEIALROLLED COMP. m NEE7600HUS:IVERTERSTORY 2 STORY N, 2/16P020 INVERTER SE7600H-US 575SS01019 `NVER1 tit QTY 1 ; .. .. m^o Nr 2 STORY w5ue LG550Rovs PROJECT NOTES Bw .. .. - NAROw FAST Aar 6. P SITE PLAN scnlE:I/16^=r-o^ ACGOIA • CALCULATIONS FOR SOLAR PHOTOVOLTAIC PANELS: Owner: Wen Bai . - Address: 1118 S 4thAvenue,Arcadia, CA 91006 INDEX TO CALCULATIONS Sheet Item 1-2 Wind parameters 3-4 Seismic-parameters and:determination of FP 5-6 design loads, roofmember check, wind uplift check,.deflection 7 attachment check, rail span check 8 lateral check Engineering Calculations Performed.By: Doug Engineering 20271 Lighthouse Lane, Huntington Beach, CA 92646 949-285-5104 Engineering Calculations For:. Solar Max Renewable Energy Provider, Inc. • 3080 12th Street, Riverside, CA 92507 (951) 300-0788 Project Number SMX-6757 Date: 3/16/2020 �Qp�OFESS/p Qsc NOM*4C7*e. .. yam BASIS FOR DESIGN c7 4:. C N Z 69163. CODE: • 2019 California Building Code �o EXP,06-30-2020 . . . ASCE:7-16 LIVE LOADS CtVII. -� ROOF • 20.0 psf SNOW O.O psf ASCE 7-16 FLUSH MOUNTED SOLAR.PANELS Type of Roof Hip Roof Slope--0=Angle ofplane of roof from horizontal; in-degrees. 0= 10 deg . Mean Roof Height-Eave height will be used for 0:.<= 10deg .. h.=.. 22 ft • Building:dimensions s1.= 30 ft s2= . 40 ft a= 10%of least horizontal dimension or 0.4h,whichever is smaller,:but not less than 4%of the least . horizontal direction or 3 ft a= 3 ft B= Horizontal dimension of building normal to wind direction; in ft. • B 30 ft Horizontal dimension of building Attachment Spacing ` Effective Area A= 7 ft2 P := gh(GCP)(YE)(Ya) 29.4-7 FIGURE 30.3-2E Components &Cladding h<=60 ft: External Pressure Coefficients, (GCp),for. Enclosed and Partially Enclosed Buildings -Hip roofs 7<=20deg(Roof) FIGURE 30.3-2F Components& Cladding h<=60 ft:External Pressure Coefficients, (GCp),for Enclosed and Partially Enclosed Buildings-Hip roofs 7<=20deg(Overhang) ROOF OVERHANG Velocity pressure Exposure Coefficients (GCp)down = 0:7 . 0:7 ._ Kzt = (GCp)upzl _ -1;69 -2:19 : Kd = . 0.85 . • (GCp)upz2r -2:27 -2.9 Ki 0.85 GC 2e = -2:56 • -2:92 ( P)uzP Ke-7 1 (GCp)upz3 -2.56 -3::52 : YE 1.5 . Ya = 0.86 V 110. mph: qh = . 0.00256KiKztKdKeV2 qh = 22.4psf p = 28.896 *(GCp) 1 ASCE 7-16 • Diagrams _ la 3 0 i p , I/ k_ I ` v � I QI Q 'I hful .I h I .. . � .D .� .I l I ELEVATION .. . 0 la,l PLAN Notation Wind Pressures Wind Down-All Zones 20:2 psf 10 psf, MIN ROOF OVERHANG Zone 1 48.83psf. -63.28 psf Zone 2r 65.59 psf -83.8 psf Zone 2c -73:97 psf -84.38 psf Zone 3 -73.97 psf -101.71 psf All panels are in Zones 1 and 2e ROOF OVERHANG Use -65.59 psf -84.38 psf 0.6*W -39:4 psf ' -50:6 psf 2 • ASCE 7-16 . Soil Site Class = D Seismic Use Group = SS = 2:568 Mapped Spectral.Response acceleration in short periods S1 = 0:979 Mapped Spectral Response,acceleration at one second periods Table 1613.2.3(1) Values of Site Coefficient Fa. SITE CLASS ,SS<0.25. SS=0.5 : SS=0.75 SS= 1:0 . SS>1:25 SS>1.5 A 0:8 :. 0.8 0.8 0.8 0.8 : 0.8. B :0.9 : 0.9. 0:9 0.9 : 1.0 . 1.0 C . 1.3 1.3 :. 1.2: . 1.2 1.2 1.2 D 1:6. 1.4 1:2 1.1 1:0 1.0 E 2.4. 1.7 1:3. F - - - Fa= 1.000 (interpolated) SMS= Fa*SS= 2.568 Table 1613.2:3(2) Values of Site Coefficient Fv SITE CLASS . S1<0.1 ,. S1=0.2 S1=0.3 S1= 0.4 S1>0.5 S1>0.6 A . _ 0:8' . 0.8. 0.8 0.8 0.8 0.8 B 0.8 0.8 0.8 0.8 0.8 0.8 C 1:5' : 1.5 1:5 1:5 1.5 : 1.4. D 2:4 2.2 2.0 1.6 1.5 1.7 E 4.2 - F - - - Fv= 1.700 (interpolated) SM1 = Fv*S1 = 1.664 SDS.=2/3*SMS= 1.712 SD1 =2/3*SM1 = 1.110 SDS RISK CATEGORY SD1 RISK CATEGORY > I;ll I III IV > 1, 11 I . III I . . IV. 0 A AA OA A . A. 0:167 B B C 0.067 B. BC 0.33' C C D 0.133 C C. . . . D 0.5 . .D . D D 02 .D : D .D. Seismic Design Category= E 3 • ASCE 7-16 Seismic Use Group = I Seismic Design Category E = 1 SS = 2.568 S1 = 0.979 SMS = 2.568 SM1 = 1.664 R = 6.5 Height = 11.375 T= 0.035*hn^.75 = 0.21679 r(Reliability/Redundancy Factor) = 1 SDS = 1.712 SD1 = 1.110 (ASCE 7-16 12.8-2) CS= SDS/(R/I) = 0.2634 W (ASCE 7-16 12.8-3) CS<= SD1/[(R/I)T] = 0.787 W (ASCE 7-16 12.8-5) CS>_ .01 = 0.01 W If S1>0.6g (ASCE 7-16 12.8-5) Cs>= 0.5*S1/[R/I] = 0.075 W V(controls) = 0.2634 W Determine Fpfor seismic loading on attachments Seismic Load on Nonstructural Components Spacing of attachments 4 ft Tributary width of attachments= 1/2 Panel length= 33.2 in. Ap= 11.1 ft` PV unit weight including racking= 3 psf Wp= 33.2 Ib Other mechanical/electrical components ap= 1 • Fp=0.4apSDS*Wp/(Rp/Ip)(1+2z/h) 45.47 lb 13.3-1 Rp= 1.5 1p= 1 Fp<= 1.6SDS*IPWp 90.94 lb 13.3-2 SDS = 1.712 Wp= 33.2 lb Fp>=0.3SDS*IPWp 17.05 lb 13.3-3 z= 22ft : h= 22 ft 4 PROJECT: PV Panels for Wen Bal SHEET: 5 OF 8 CLIENT: Solar Max.Renewable Energy Provider,li DATE: 3/16/2020 BY: Doug Engineering DE JOB NO.: SMX-6757 DESIGN LOADS Dead Loads Uplift Roof 0.6WL ROLLED COMP 4.0 psf 0.6WL Zone1 and 2c -39.4 psf,MIN 10 PSF 5/8" Ply shtg 1.9 Overhang -50.6 psf Rf Frm'g 2.8 :PWLdown= 20.2 psf 12.1 psf, MIN 10 PSF Misc. 1.5 Uplift. 0.6DL+0.6WL (N) PV System 3:0 Zone 1 0.6*3=39.4 -37.6 psf Zone 2 0.6*3-50.6 -48.8 psf Total DL 13.2 psf.. . Downward . DL+0.6WL LL 20:0 psf PDL+WL= 15.1 psf SNOW 0.0 - psf Rafter Check Existing 2x12 RAFTERS @ 16"o.c Spacing 1.33 ft Trib panel width= 4 ft E: 1500000 psi Fb= 900*1*1.15 . 1035 psi 178.0 in^4 Manowwind= 4366 ft-lb Span1 21.00 ft MallowLL= 3411 ft-lb Span2 0.00 ft See below for Wind Uplift loads Span3 0.00 ft due to concentated loads at attachments Span4 0.00 ft (Distance Wind `Mmax Wind P= to Att. Load Trib W Uplift wind(ft- Down PVDL P=DL+WL Pts) a b R1 (Ib) R2(lb (psf) (ft) (Ib) Ib) (Ib) . (lb) (lb) 2:50 1 . 3.00 3.00 18.00 225.1 37.5 39.4 4.0 262.7 675. 80.67 20.0 100.7 2 5.33 5.33 15.67 196.0. 66.7 39.4 4.0 262.7 1045 80.67 20.0 100.7 3 6:33 6.33 14.67 183.4 79.2 39.4 4.0 262.7 .1162 80.67 20.0 100.7 4 8.67 ' 8.67 . 12.33 154.3 108.4 39.4 4.0 262.7. 1337 80.67. 20.0. 100.7 9.17 Span 1 Uniform DL 21.00 85.7 85.7 6.1 psf 1.3 8.2 plf . 449.8 Reactions at Span1 844.5 377.5 Negative values are uplift reactions Mmaxwindup= 3005 ft-lb<4366 ft-lb OK Mmaxwinddown= 2105 ft-lb<4366 ft-lb OK For DL+LL including the PV system weight point loads w= 40.3 plf P= 20.0 lb Morax= 2459 ft-lb<3411 ft-lb OK Deflection Check DDS=5wL4/(384EI) (5*13.2*21^4)*1728 = 0.288 in • = L/ 873.6 OK 384*1.5E6*178 • PROJECT: PV Panels for Wen Bai SHEET 6 _ OF 8 CLIENT: Solar Max Renewable Energy Provider;Ii DATE: 3/16/2020 BY: Doug Engineering DE JOB NO.: SMX-6757 DESIGN LOADS Dead Loads Uplift Roof 0.6WL. CONC. FLAT TILE 9.0 psf 0.6WL Zone1 and 2c -39.4 psf, MIN 10 PSF 5/8" Ply shtg 1.9 Overhang - -50.6 psf Rf Frm'g 2.8 PwLdown= 20.2 psf 12.1 psf, MIN 10 PSF Misc. . . 1.5 Uplift 0.6DL+0.6WL (N) PV System 3.0. Zone 1 0.6*3=39.4 -37.6 psf Zone 2 0.6*3-50.6 -48.8 psf Total DL 18.2 . 'psf. Downward DL+0.6WL LL 20:0 psf : PDL+WL_ 15.1 psf SNOW 0.0' psf Rafter Check Existing 2x8 RAFTERS @ 16"o.c Spacing 1.33 ftTrib panel width= 6 ft E - 1500000 psi Fb= 900*1.2*1.15 . 1242 psi 47.6.in^4 Ma1iowwind= 2176 ft-lb Span1 9.25 ft MaliowLL= 1700 ft-lb Span2 0.00 ft See below for Wind Uplift loads Span3 0:00 ft due to concentated loads at attachments Span4 0.00 ft (Distance Wind Mmax Wind P= to Att. Load Trib W Uplift wind(ft- Down PVDL P=DL+WL Pts) a . b R1 (Ib) R2(lb (psf) (ft) (Ib) Ib) . (Ib) (Ib) (lb) -t50 1 -0.50 -0.50 9.75 885:4 -45.4 50.6 6.0 840:0. -420 200.9 49.8 250.7 2 3.03 3.03: 622 439.6 214.5 39.4 6.0 654.0 . 1333 200.9 49.8 250.7 4.03 Span 1 Uniform DL 9.25 56.2 56.2 9.1 psf 1.3 12.2 plf 130.1 Reactions at Span1 1381.2 225.3 Negative values are uplift reactions Mmaxwindup= 837 ft-lb<2176 ft-lb OK • Mmaxwinddown= 612 ft-lb<2176 ft-lb OK For DL+LL including the PV system weight point loads w= 46.9 plf P= 49.8 lb Mmax=. 567 ft-lb< 1700 ft-lb OK Deflection Check DDL=5wL4/(384EI) (5*18.2*9.25^4)*1728 = 0.056 in = L/ 1984.0 OK 384.*1.5E6*47.6 PROJECT: PV Panels for:Wen Bai .. - SHEET: 7 : OF. 8 : CLIENT: Solar Max Renewable Energy Provider,Inc.: DATE: 3/16/2020 - BY: Doug.Engineering DE JOB NO.: SMX-6757 - CHECK SCREW.ATTACHMENTS FOR WIND UPLIFT ' . Pwi,pu t= 262:7 lb 5/16"Lag with min 2.5". penetration for:each attachment Table 12.2A.=NDS-Lag Screw Withdrawal Values For 5/16 Lag into.5G wood • 266 lb_ Allowablewind load= 1.6.2.5`266 1064 lb >: . - 262:7 lb OK CHECK SCREW ATTACHMENTS FOR SHEAR DUE TO SEISMIC Fp Fp= 45,47 Ib ,. Roof slope/module tilt . 10 deg Shear= Fp*cos( 10 )= • 44.8 lb :Fp sin(ang) Tension= Fp`sin(. - 10 )= 7.9:lb Fp cos(ang) Table 11K-NDS Z= 190 lb - Cp= 1.6 Z= Z'CD= 304 Ib> 44.78 lb OK Withdrawal capacity W' 1064 lb Interaction Equation ft/Fi+f)F„ 0.254 + 0:147= 0.401 < 1 OK RAIL SPAN CHECK Everest Railing Check-Gable/Hip Roof Load for half a panel=2:T W= 57.78 plf Per the Everest Engineering for 110 mph,0 psi:.snow,and 10.deg roof slope,the max span for Crossrail48-X is 77":forArray.Interior Panels and 64"for Array Array:Edge panels Use Crossrail48=X PV Rails with a spacing'of 72".o.c.:Max.for attachment points,typ. Maximum Rail Spans(Inches) Everest Solar 484 flush-Mount Dual Rail,Enclosed Hip/Gable Roof 30-60ft,72 Ceil(P)Rail Only Ground Exposure Wind Speed-> : : 110 mph . Snow Load 'Cate or g y Panel Angle Roof Zone-> 1' ; 1 . . 2e 2r 2n 3e 3r 0 to 7 Array.Interior 90 82. 73 73 73 62 62 : :. Array Edge 89 70 ' . 60 . 60 60 50 50 .. 7 to 20 Array Interior 77 : 77 77 64 64 64 : 58 • •Array:Edee 64 64. 64 52 52 52 47 : 0 psf C 20 to 27 Array Interior 85 85 85 71 71 71 68 Array;Edge. 73 73 : .73 57 57 57 55. 27 to 45 Array Interior 79 79 : 79 79 76 70 76 • . - Array Edge 68 68 68 68: 64 . 57 64 45 to:90 Array Interior 90 90 86 86 86 86 86 Array Edge. . 80 . 60' 74 74 74 74 74 PROJECT: PV Panels for Wen Bai SHEET: 8 OF 8 - CLIENT:Solar Max Renewable Energy Provider, Inc. DATE: 3/16/2020r. . BY: Doug Engineering DE JOB NO.: SMX-6757 LATERAL ANALYSIS DETERMINE ADDITIONAL LOAD COMPARED TO EXISTING FOR LATERAL LOADING Aroofexisting= = 6096 sf Wpanel= 37.7 lb Wroofexisting= 10.2*6096 = 62179 lb 32 *Wpanel = 1206.4 lb Wwaliexisting= 15*80*4 = 4800 lb Wrestofarray= 560 lb Wexisting= 66979 lb Warray= 1766.4 lb V= 0.263W Vraofexisting= 17616 lb Existing Total Lateral Force Vroofwpanels= 18080 lb New Total Later Force % increase= 18080 *100%-100% = 3% increase which results in less than a 10% increase in the 17616 stress of existing lateral resisting elements OK ev Rte. ,� r Wv :j-.)'d A s er• %.;.;;_..;,*:,„, cfie? t5•q AFFIDAVIT SELF-CE TIFICATION FOR COMPLIANCE OF SMOKE ALARMS AND CARBON MA NOXIDE ALARMS Property Address: ll/ i Fe 'P- -/ 4-✓`& Permit Number: . :3,1_,e.- 20-fi t Brief Job Description: -c.`YJY fl oa/--rte 4-2- Number of smoke alarms installed: 7 Number of carbon monoxide alarms installed: "2- When alterations, repairs or additions requiring a permit occur, or sleeping rooms are created, Smoke alarms shall be installed in each sleeping. room, and outside each separate sleeping area in the immediate vicinity of the bedrooms, and on each additional story of the dwelling, including basements and habitable attics as required by Section R314 of the 2016 California Residential Code (CRC) and California Health and Safety Code Section 13113.7. For dwellings or sleeping units containing fuel burning appliances or having attached garages, carbon monoxide alarms shall be installed outside each separate sleeping area in the immediate vicinity of the bedrooms, and on each additional story- of the dwelling, including basements as required by Section R315 of the of the 2016 California Residential Code (CRC). Multi-purpose alarms (combination carbon monoxide and smoke alarms) may be used. All alarms shall comply with requirements for listing and approval by the Office of the State Fire Marshal. http://osfm.fire.ca:qov/licensinglistings/licenselistinq bml searchcotest.php As owner of the above referenced property, I hereby certify thatthe smoke alarms and carbon monoxide alarms have been installed in accordance with the manufacturer's instructions and in compliance with the code sections referenced above. I declare under penalty of perjury that the foregoing is true and correct, and that this declaration was executed on (Date) ?JZ?/2o222 at Arcadia, Calif<i rnia. Own is Name (printed/typed): (�v-' gA l . Signature of Owner: (J\A A-. This affidavit must be returned to the City of Arcadia inspector prior to final inspection Sig' 0,KE ALAR';'. a CAR: 0 , 0 ,OXID LA-NI i •cATIOI\I Guest Room g 0 Bathroom U Storage Family Room Garage —...7_ FIRST FLOOR PLAN 410= SMOKE ALARM 111 = CARBON MONOXIDE ALARfVf. ' [ 1 . RO Mstr.. .. Bath _ A Master Bedroom Dining Room Kitchen ---- Bath Hail Closet _ Closet Closet Fancily Room BedroomC) 0 r- Bedroom SECOND FLOOR PLAN r O=Si 3 BSE AL •\'-',,;': / o C : t �0N ',;,ONOXIDE \ \,j