Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutSolr-20-2167 •., City of Arcadia, CA Permit NO. SOLR-20-2167
Development Services Department Permit Type:Solar
240 West Huntington Drive,Post Office Box 60021
Arcadia,CA 91066-6021 Work Classification:Solar-Residential
(626)574-5416 Permit Status:Issued
ARCADIA Issue Date: 12/29/2020 Expiration: 12/29/2021
Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number
338 GENOA ST Arcadia,CA 91006-3929 5779019128
Contacts
CLAUS AGGER NIELSEN Owner TLP ELECTRIC INTEGRATIONS INC DBA: Contractor
338 GENOA ST,ARCADIA,CA 91006 INFINITY SOLAR*
2460 N GLASSELL ST STE A,ORANGE,CA 92865
(714)921-8168 824287
Description:ROOF MOUNTED SOLAR SYSTEM 25 MODULES/ Valuation: $0.00 Tenant
MICROINVERTERS, 1 LOADCENTER.DERATE TO 175 AMP
Total Sq Feet: 0.00 Plan Check# Plan#
Fees Amount Payments Amount Paid
Building Plan Check Fee Residential $100.00 Total Fees $341.20
Distribution Panel $16.48 Cash/Receipt q REC-06419-20 $341.20
Electrical Permit Issuance Fee $47.01
Inverters $77.78 Amount Due: $0.00
Panels $82.45
Residential Services up to 400 amps 516.48
Solid Waste Management Fee 2 $1.00
Total: $341.20
CALLS FOR INSPECTIONS
Request for inspection by telephone at 626-574-5450. Leave a message
( 4 ' requesting the address,timeframe and what inspection item is needed.
FrL (-1
This permit/plan review expires by time limitation and becomes null and
void if the work authorized by the permit is not commenced within 180 days
from the date of issuance or if the permit is not obtained within 180 days
from the date of plan submittal.This permit expires and becomes null and
void if any work authorized by this permit is suspended or abandoned for 180
consecutive days or if no progressive work has been verified by a City of
Arcadia building inspector for a period of 180 consecutive days.
T
PlEED
OM C
December 29, 2020
Issued By: Date
December 29,2020 Page 1 of 1
.F A•
c,,,_t,O&G..♦
4 : '• PERMIT/PLAN REVIEW APPLICATION
e® Development Services Department,240 West Huntington Drive,Post Office Box 60021
�0m•.i,rNoBe• Arcadia, CA 91066-6021,(626) 574-5416,Fax (626) 447-9173
City of
Arcadia
LICENSED CONTRACTOR'S DECLARATION WORKERS'COMPENSATION DECLARATION
❑ I hereby affirm under penalty of perjury that I am licensed under provisions of I hereby affirm under penalty of perjury one of the following:
Chapter 9(commencing with Section 7000,of Division 3 of the Business and
Professions Code,and my license is in full force and effect. ❑ I have and will maintain a certificate of consent to self-insure for workers'
License Class License No. Exp. Date compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
Signature of Contractor
OWNER-BUILDER DECLARATION ❑ I have and will maintain workers'compensation insurance,as required by Section
❑ I hereby affirm under penalty of perjury that I am exempt from the Contractors 3700 of the Labor Code,for the performance of the work for which this permit
License Law for the following reason(Section 7031.5,Business and Professions is issued.My workers'compensation insurance carrier and policy numbers are:
Code.Any city or county which requires a permit to construct,alter,improve, Carrier
demolish,or repair any structure,prior to its issuance,also required the applicant
Policy Number
for such permit to file a signed statement that he or she is licensed pursuant to the
provisions of the Contractors License Law(Chapter 9(commencing with Section (Thins section need not be completed if the permit is for one hundred dollars or less)
7000)of Division 3 of the Business and Professions Code)or that he or she is
exempt there from and the basis for the alleged exemption. Any violation of ❑ I certify that in the performance of the work for which this permit is issued,I shall
Section 7031.5 by any applicant for a permit subjects the applicant to a civil not employ any person in any manner so as to become subject to the workers'
penalty of not more than five hundred dollars($500)): compensation Laws of California,and agree that if I should become subject to the
workers'compensation provisions of Section 3700 of the Labor Code,I shall
❑I, as owner of the property, or my employees with wages as their sole forthwith comply with those provisions.
compensation,will do the work,and the structure is not intended or offered for
sale(Section 7044,Business and Professions Code:The Contractors License Date Signature
Law does not apply to an owner of property who builds or improves thereon,
or who does such work himself or herself or through his or her own
employees,provided that such improvements are not intended or offered for WARNING: Failure to secure Workers'Compensation coverage is unlawful,
sale.If,however,the building or improvement is sold within one(1)year of and shall subject an employer to criminal penalties and civil fines up to one
completion,the owner-builder will have the burden of proving that he or she hundred thousand dollars($100,000),in addition to the cost of compensation,
did not build or improve for the purpose of sale). damages as provided for in Section 3706 of the Labor Code, interest, and
attorney's fees.
❑I, as owner of the property, am exclusively contracting with licensed
contractors to construct the project(Section 7044,Business and Professions
Code:The Contractors License Law does not apply to an owner of property CONSTRUCTION LENDING AGENCY
who builds or improves thereon,and who contracts for such projects with a I hereby affirm under penalty of perjury that there is a construction lending agency
contractor(s)licensed pursuant to the Contractors License Law). for the performance of the work for which this permit is issued (Section 3097,
Civil Code).
❑ I am exempt under Section 7044,Business and Professions Code,for this reason:
Lender's Name
Date Signature Lender's Address
IMPORTANT: APPLICATION IS HEREBY MADE TO THE BUILDING OFFICIAL FOR A PERMIT SUBJECT TO THE CONDITIONS AND
RESTRICTIONS SET FORTH ON THIS APPLICATION AND THE FOLLOWING:
1. The City's approved plans and permit inspection card must remain on the job site for use by City inspection personnel.
2. Final inspection of the work authorized by this permit is required.A Certificate of Occupancy must be obtained prior to use and occupancy of new buildings
and structures.
3. Per South Coast Air Quality Management District(AQMD)regulations,renovation and remodeling work that results in the removal,stripping,or altering
of asbestos containing materials requires an asbestos survey and removal prior to disturbing the asbestos. Please contact AQMD at(909) 396-2000 for
further information.
Name Title
PRINT NAME
I certify that I have read this application and state that the above information is correct and that I am the owner or duly authorized agent of the owner.
I agree to comply with all City ordinances and State Laws relating to building construction. I hereby authorize representatives of the City of
Arcadia to enter upon the above-mentioned property for inspection purposes.
Signature Date _._
PERMIT/PLAN REVIEW APPLICATION
Development Services Department, 240 West Huntington Drive, Post Office Box 60021
Arcadia, CA 91066-6021, (626) 574-5416, Fax (626) 447-9173
110/111 ONLINE PERMIT/PLAN REVIEW APPLICATION
ARCADIA Job Site Address: 5f/
LICENSED CONTRACTOR'S DECLARATION WORKERS'COMPENSATION DECLARATION
❑ I hereby affirm under penalty of perjury that I am licensed under provisions of I hereby affirm under penalty of perjury one of the following:
Chapter 9(commencing with Section 7000,of Division 3 of the Business and
Professions Code,and my license is in full force and effect. ❑ I have and will maintain a certificate of consent to self-insure for workers'
License Class Lic nse No Exp. Date compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
Signature of Contractor
OWNER-BUILDER CLARATION ® I have and will maintain workers'compensation insurance,as required by Section
❑I hereby affirm under penalty of perjury that I am exempt from the Contractors 3700 of the Labor Code,for the performance of the work for which this permit
License Law for the following reason(Section 7031.5, Business and Professions is issued.My workers'compensation insurance carrier and policy numbers are:
Code.Any city or county which requires a permit to construct, alter, improve, Carrier Starnet Insurance Co
demolish,or repair any structure,prior to its issuance,also required the applicant BN UWC0137148
for such permit to file a signed statement that he or she is licensed pursuant to the Policy Number
provisions of the Contractors License Law(Chapter 9(commencing with Section (This section need not be completed if the permit is for one hundred dollars or less)
7000)of Division 3 of the Business and Professions Code) or that he or she is
❑ 1 certify that in the performance of the work for which this permit is issued.I shall
exempt there from and the basis for the alleged exemption. Any violation of
Section 7031.5 by any applicant for a permit subjects the applicant to a civil not employ any person in any manner so as to become subject to the workers'
penalty of not more than five hundred dollars($500)): compensation Laws of California.and agree that if I should become subject to the
workers'compensation provisions of Section 3700 of the Labor Code.I shall
❑1, as owner of the property, or my employees with wages as their sole forthwith comply with those provisions.
compensation,will do the work,and the structure is not intended or offered for
sale(Section 7044, Business and Professions Code:The Contractors License Date
INI101111011111111111.1111
Law does not apply to an owner of property who builds or improves thereon,
or who does such work himself or herself or through his or her own
employees, provided that such improvements are not intended or offered for WARNING: Failure to secure Workers'Compensation coverage is unlawful,
sale. If, however,the building or improvement is sold within one(1)year of and shall subject an employer to criminal penalties and civil fines up to one
completion,the owner-builder will have the burden of proving that he or she hundred thousand dollars($100,000),in addition to the cost of compensation,
did not build or improve for the purpose of sale). damages as provided for in Section 3706 of the Labor Code, interest, and
attorney's fees.
❑I, as owner of the property, am exclusively contracting with licensed
contractors to construct the project (Section 7044, Business and Professions
Code:The Contractors License Law does not apply to an owner of property CONSTRUCTION LENDING AGENCY
who builds or improves thereon.and who contracts for such projects with a I hereby affirm under penalty of perjury that there is a construction lending agency
contractor(s)licensed pursuant to the Contractors License Law). for the performance of the work for which this permit is issued (Section 3097,
Civil Code).
❑ I am exempt under Section 7044,Business and Professions Code,for this reason:
Lender's Name
Date Signature Lender's Address_
IMPORTANT: APPLICATION IS HEREBY MADE TO THE BUILDING OFFICIAL FOR A PERMIT SUBJECT TO THE CONDITIONS AND
RESTRICTIONS SET FORTH ON THIS APPLICATION AND THE FOLLOWING:
1. The City's approved plans and permit inspection card must remain on the job site for use by City inspection personnel.
2. Final inspection of the work authorized by this permit is required.A Certificate of Occupancy must be obtained prior to use and occupancy of new buildings
and structures.
3. Per South Coast Air Quality Management District(AQMD)regulations,renovation and remodeling work that results in the removal,stripping,or altering
of asbestos containing materials requires an asbestos survey and removal prior to disturbing the asbestos. Please contact AQMD at(909)396-2000 for
further information.
Name _ Title _
PRINT NAME
I certify that I have read this application and state that the above information is correct and that I am the owner or duly authorized agent of the owner.
I agree to comply with all City ordinances and State Laws relating to building construction. I hereby authorize representatives of the City of
Arcadia to enter upon the above-mentioned property for inspection purposes.
Spnae Date 12/29/2020
m2 w Y R
^ �G z 0 a s a `a Q
p
�J Y W x a �u
�'
Nommil:
g €i V CO r R " W NGS.-bm rc
:: ! co W Na d_ p f aa LL L:z ::b •• £ O
o w .. IIy a 0e Q a Z `0d�_`k. • > f'�
N' . E Z O Z /A Z ����I.�3b - o O
. e = A 0 E . lig `a/ w a
Y
Z 0
w w rn rn a U
a ¢ a w W U W w o
2 rnC7 CO a IX Y x 0 0
CO O U
W W J W W J W 0 W 0 Z U
W
10
I- W ..J r w ..J r W .._j W N LL
WQ Ot-K WO 0±‹
Wo 0t<
= in
LLD F u. Dw U-
8
srag F a g F.kggFdID2F W
L _ Di
oO
O 44'
N
w
O a
U cc
>
o
Q LL U V
cc 1
. . . . . . Ta
1
® i ® 1
/�.,,
■ ® ■ ■ r ■ ■ ■ N.-
• ------•-•-• -■ — — --� — — — — . 1
• • J ■ °j —� Wry
a azw
• SOU
W U W a
X00
cc O w a a
K w W a
w Z._N
r ¢z.-
'us $%?
N
w
x
I..
Z
o
W w
Z
Z I-
<a 0 CC
a Z N u' O
U w O X W r Z CJ h to 0 ~ y LL Q .
H W Z 0 OI- = K Iii W O n Z 00 0 f1
O U U w z 0,- �u z .6 j �0 0 io V -m =� II
Z J 0 Z U C U W O m 3 z ,-� W IL'ILJ j. O
W Z 0 w O , 10 0 I- Q 2 J J y u o W o�X�a� J
J a U D U w W_U w 0 W W I-ffi U• 5 � W Z oN a
2 a N a Z =2 1a. 2 z Wu- wo�Z�ry� O Ids V
b 0 w K-....2._.--.0 0 o J Oo w U W a O
olDI IT —�Y .-ni ei si 6t radio
PLAN CHECK REVIEW - RESPONSE LETTER
Date: [12.23.2020]
Address: [338 GENOA ST,ARCADIA, CA 91006]
Project: [Claus Agger-Nielsen]
Plan Review Notes/Comments:
Building:
1. Is there a spec sheet for the microinverter LG LM 320UE-A2? I only found the spec sheet for LG 365 MIC-N5.
Cloud spec sheet when resubmitting.
Planning:
1. There are a total of six buildings on the parcel. They need to provide a complete site plan (below) and identify
which building is 338 Genoa. It appears that it's the building identified below.And the driveway is incorrectly
labeled as Genoa.
Response:
Building:
1. Attached Permit Pack have a clouded inverter model (see snippet below). The LG 365 MIC-N5 is the module
here and given the spec sheet of it, there is the inverter model LM320UE-A2.
LG NeON'2 ACe
LG365M1C-N5
General Data _
Cells - 6x10
Cell Vendor — IG —
Cell Type Monoc alllneM-type
Number of Busttars ---- ----_-_—'- 12 EA(Multi Wire Bother)
Dimmswns(1 1c W c H) 1,700 x 1,D16 x 40 mm
Weght 1931g/43 Rn
Me<hanual lest Load ---- 5,400Pa(Front)/4,000Pa(Rea-)
Cooling Natural Convection-No Fats
Enclosure Environmental Rating Outdoor-NEMA 250 type 6(Moo Inverter)
Operatktg Ambient Temperature -40-.65C(-40
Storage Temperature 40-.90C(-40-.194'F)
Glass 2.13mt(Tempered Glass whit HIiTransmissian
Mtt-Reflects Coating
Frame Anodued Aluminium
Inverter Model LM32011E-A2
(Grid Support Utility Interactive)
•Metharsul Test Load 5.400pa/4,000pa based o.,IEC 612'5 2:201•
(Test Load-Desgn load a Safety rat-tea(c1 5))
Planning:
2. Attached photos are the ones to verify which of the 6 building is the 338 Genoa, at first photo provided we can
see above the 338 Genoa that there are modules installed similar to what we can see on the second photo.
Therefore, we can verify that the red box marked is the 338 Genoa.
n\
E Ne'•` 1
e. r. I.:
111/ /
4
c � 338( ..pSt.Arcad
' ., 1/ iii fTT1
1 N. t 'err_ 7 / . ,-... i i
_ -.-td s
_a 1 0 1
' ►
' 'e- .—
loos te ^
►- .
/1(
IF"'
' rs►-1 r
r'' r- r
r
Should you have any additional questions, please feel free to contact me.
Kindest regards,
Aj Villanueva
Senior PV Designer I Solar Deployed LLC
Phone: (209)671-2001
-116
Ala W ENG/NEER/NG, /NC_
131.i/dBW Fnsnd/y i: On ime
111
Claus Agger-Neilsen Photovoltaic System
338 Genoa Street
Arcadia, CA 91006
Job No. 20-1115-PV
11/17/2020
��O Q�pfESS/p
tv
ti 2 i
W 4• :: • T
CC 1 ., . •0/21 z
/lir CI V it.
F OF CAS\F
43020 Blackdeer Loop, Ste. 204, Temecula, CA 92590
Phone: (951) 506-6507, Fax: (951) 506-6743
ngwengineering@gmail.com
Wind Loading:
Basic wind speed, V(mph) = 130 Zone E (MFRS) _ -39.0 psf
Risk Category = II Zone F (MFRS) = -25.1 psf
Exposure Category = C Zone G (MFRS)= -27.1 psf
Roof Type = Gable Zone 1(Components & Cladding) = -71.2 psf
Gable Roof(7 - 20 deg) = 20.6 psf
Gravity Loads:
ROOF (R): Solar Panels:
Roof Pitch 3.0 :12 Module: LG 365 Q1C-A5
Concrete Tile 10.3 psf Width 40.0 in
5/8" Sheathing 2.1 psf Length 66.9 in
Roof framing 4.4 psf Total weight 40.8 lb
R-30 Insulation 0.5 psf Panel Area 465 sf
5/8" Drywall 2.8 psf Weight(SP):
Misc. 0.9 psf Solar Panels 2.3 psf
DL= 21.0 psf Misc. 0.7 psf
LL= 20.0 psf DL 3.0 psf
DL at Solar array= 21.0 psf (not including panels)
Rafters/Top chord (R2):
Roof Pitch 3.0 :12 Mount spacing 6.0 ft
Concrete Tile 10.3 psf Panel Orientation Portrait Landscape
5/8" Sheathing 2.6 psf Trib Area to mounts 16.73 sf 10.00 sf
Rafters 2.2 psf Dead Load 50.19 lb 30.00 lb
Misc 0.1 psf
DL= 15.2 psf
LL= 20.0 psf
EXTERIOR WALL(EW): Project Data:
5/8" Sheathing 2.0 psf Roof area 2,170 sf
Framing 2.5 psf EW length 190 ft
1/2" Drywall 2.2 psf IW length 190 ft
Sheathing 1.1 psf Wall Height 8.0 ft
R-14 Insulation 0.2 psf Story Count 2
0.0 psf Module count 25
DL= 8.0 psf
20-1115-PV 11/17/2020 Page 1
•
Beam No. 1: CHECK(E)RAFTER
Adjacent members are expected to share the point loads from the solar panels.Ignore(conservative).
Length=14 ft,Unbraced Length=1 ft No roof live load reduction taken.
Use(1)2x8 Douglas Fir#2'Shear ratio=29%'Bending Ratio=98%,Beam is OK
Distributed Loads: REACTIONS(0,L,Lr):
From 0'to 6.5: w1=1.33'Roof 2={20.216 plf D,0 plf L,26.6 plf Lr} Ra=(101,0,133). Rb=(31,0.40)
From 6.5to 11.5': w2=1.33'Rafter DL=20.216 plf D,0 pd L,0 elf Lr Ra=(37,0,0), RB=(65,0,0)
From 11.5'to 14.5': w3=1.33'Roof 2=20.216 plf D,0 plf L.26.6 plf Lr Ra=(5,0,6), RB=(56.0,74)
Point Loads;
A18': P1=(17)sp+(207)W=51 Ib D,0 lb L,207 lb W Ra=(21,0,88), RB=(30,0,119)
At 11': P2=(17)sp+(207)W=51 Ib D,0 lb L,207 Ib W Ra=(10,0,44), RB=(41,0,163)
Reaction la: Max brg=445 lb Min brg Length=0.48 In Reaction 1b: Max brg=619 lb Min brg Length=0.67 in
Ra=(174,0,271) Rb=(223,0,396)
Use(1)2x8 Douglas Fir S2
Geometry: b=1.5 in, d=7.25 in, A=10.875 inA2, Sx=13.14 inn, be=47.63 in.4
Material Base Properties: E=1.6x10^6 psi,Fb=900 psi,Fv=180 psi,Fc(perp)=625 psi.Fc//=0 psi.Ft=575 psi
Shear Stess Factors: Cm=1,Ci=1. Bending Stress Factors: Cf=1.2,CL=0.99,Cb=1.15,Ci=1,Cm=1,Cr=1.15
0:Vu=-213 lb at 0',fv=29,Fv=162,ratio=l9%,OK Main:max 4=-0.34 in at 7.175'=U501
CD=0.9 Mu=757 lb-ft at 8.05'.fb=691,Fb=1106.55,ratio=63%,OK
D+W(using.6W):Vu=-595Ib at 14',fv=82,Fv=288,ratio=29%,OK Main:max d=-0.91 in at 7.175'=U184
Cd=1.6 Mu=2106 Ib-ft at 8.05',Mcant=-6 lb-ft,fb=1923,F'b=1967.2,ratio=98%,OK
— —V
Deflection
20-1115-PV 11/17/2020 Page 2
Beam No.2: CHECK(E)RAFTER
Adjacent members are expected to share the point loads from the solar panels.Ignore(conservative).
Length=13 ft,Unbraced Length=1 ft No roof live load reduction taken.
Use(1)2x8 Douglas Fir#2'Shear ratio=32%'Bending Ratio=93%,Beam is OK
plstrlbuted Loads: REACTIONS(D,L,Lr}:
From 0'to 11':w1=1.33'Rafter DL={20.216 plf D,0 plf L,0 plf Lr} Ra=(129,0,0), Rb=(94,0,O)
From 11'to 13': w2=1.33'Roof 2=20.216 plf D,0 plf L,26.6 plf Lr Ra={4,0,5), RB=(37,0,49)
P211112011
At 1': P1=(17)sp+(207)W=51 lb D,0 lb L,207 lb W Ra=(47,0,191), RB={4,0,16}
At4': P2=(17)sp+(161)W=51 lb Ci,0lbL,1611bW Ra={35,0,111}, RB=(16.0,50)
At 7': P3=(17)sp+(161)Ir=51 lb D,0 lb L,161 lb W Ra={23,0,74}, RB={28,0,87}
At10': P4=(17)sp+(161)1r=51 lb D,0 lb L,161 lb W Ra={11,0,37}, RB={40,0,124}
Reaction 2a: Max brg=667 Ib Min brg Length=0.72 In Reaction 2b: Max brg=5451b Mln brg Length=0.59 In
Ra=(249,0,4181 Rb=(219,0,326)
Use(1)2x8 Douglas Fir 42
Geometry: b=1.5 in, d=7.25 in, A=10.875 in"2, Sx=13.14 in"3, be=47.63 in"4
Material Base Properties: E=1.6x10"6 psi,Fb=900 psi,Fv=180 psi,Fc(perp)=625 psi,Fc//=0 psi,Ft=575 psi
Shear Stess Factors: Cm=1,Ci=1. Bendng Stress Factors: Cf=1.2,CL=0.99,Cb=1.15,Ci=1,Cm=1,Cr=1.15
D:Vu=246 Ib at 0',fv=34,Fv=162,rata=21%,OK Main:max A=-0.32 in at 6.5'=U495
Co=0.9 Mu=794lb-ftat7.15',fb=725,Fb=1106.55,ratio=66%,OK
D+W(using.6W):Vu=667 lb at 0',fv=92,F'v=288,ratio=32%,OK Main:max G=-0.79 in at 6.5'=L/198
Cd=1.6 Mu=2001 lb-ft at 6.9875,Mcant=0 lb ft,fb=1827,Fb=1967.2,ratio=93%,OK
.
- -v
--M
Deflection
20-1115-PV 11/17/2020 Page 3
CHECK DEAD LOAD INCREASE COMPARED TO LIVE LOAD
*ASSUME ROOF LL CANNOT OCCUR AT SOLAR PANEL LOCATIONS
(E) Roof dead load =21 psf
Solar panel dead load = 3 psf
Roof live load =20 psf
New dead load = RDL+ SP
New dead load = 24 psf
CD= .9(for DL only)
CD= 1.25(when considering LL)
New dead load = 26.67 psf (E) RDL+ RLL = 32.8 psf
0.9 1.25
26.67 psf < 32.8 psf —> OK
Increased dead load imposes lower stress ratio than (E)dead + live loads
20-1115-PV 11/17/2020 Page 4
CHECK SEISMIC LOAD INCREASE:
TRIBUTARY AREAS:
Roof area =2170 sq. ft. =2170 sq. ft. RDL = 21 psf
Exterior wall area = 1520 sq. ft., consider upper 1/2 = 760 sq. ft. EW = 8 psf
Interior wall area = 1520 sq. ft., consider upper 1/2 = 760 sq. ft. IW = 9 psf
Solar panel area =465 sq. ft. SP = 3 psf
Solar panel quantity= 25
Roofing weight reduction at panels =0 lb.
DEAD LOAD AT ROOF:
(E) Dead load = (Roof area)*RDL+1/2(EW area)*EW+1/2(IW area)*IW
(E) Dead load = 58490 lb
SP Dead load = Solar panel area*SP
SP Dead load = 1394 lb
(N) Dead load =(E) Dead load +SP Dead load
(N) Dead load = 59,884 lb
Consider 50%of(E)trib roof DL:
Seismicsp DLLsp 1394 lbs.
Seismic(E) DI-(E) 29245 lbs.
= 0.05 5% increase
Dead load increase:510%, OK
20-1115-PV 11/17/2020 Page 5
Wind Loading
Envelope Procedure(ASCE 7-16,Ch 28),Method 2
Risk Category II Table 1.5-1 Enclosure Classification= Enclosed Building
Basic wind speed,V(mph) 130 Fig.26.5-1B
Exposure Category C Sec.26.7.3 __
Wind Directionality Factor(Ka) 0.85 Table 26.6-1j „Y, s n,,
No Topographic Irregularity per 28.6-1
gUr ld) s"adal) s F14 = sWinuwo
HU,K1 NA 0 '
x/Ln Kz NA 0 r �, 1 AIM. in
e?
zJLh,K3 NA 0 ESCARPMENT 2-0 RIDGE OR 34)AXISYMMETRICAL HLL
Topographic factor Kn 1.00 1011°
otos
IF.-
....41
. tta..t(•-i+ '0 fid'
' 0000,
,_ -,...,...._!��;•11 1 1
ii,..,-00- ,,t,, ,,,
Wind Zone W1: - T 1=>---__40,a,151 _.�.
Mean Roof Ht.(ft) 18.9 1 1%1�� /,=
Height&exp.adj.factor A 1.21 Figure 28.6-1 - "
Roof Pitch 3 :12 = 14 degrees
Sub Zone A B C D E F G H EoH GOH
Poo(Fig.28.6-1) 33.0 -11.5 22.0 -6.6 -32.2 -20.7 -22.4 -15.9 -45.1 -35.3 staight line interpolation
Wind Pressure=A•Kn•ps30 40.0 -13.9 26.6 -8.0 -39.0 -25.1 -27.1 -19.2 -54.6 -42.7
Roof Type: Gable
See next page p Prager P(Psf) Pmount(Ib)
Zone 1 Components&Cladding: -71.2 from eq. (30.3-1) P= -71.2 psf -71.2 x 16.73 sf= -1192
(Must not be less that 16 psf) 20.6 from eq. (30.3-1) P= 20.6 psf , 20.6 x 16.73 sf= 344
20-1115-PV 11/17/2020 Page 6
C&C Design Wind Pressures, Gable Roof (7 - 20 deg)
Design wind pressure for exterior components & cladding
Wind Uniform Lateral Load (psf):
ASCE 7-16, Chapter 30:
Risk Category= I I
Exposure Category= C
Height above ground = 18.875 ft
Enclosure Class = Enclosed Building
Velocity pressure
qh = qz=0.00256 KzKz1KdKeV2 eqn (26.10-1)
Kz = 0.89 Table 26.10-1
Kzt= 1.00
Kd = 0.85
Ke = 1.00 Conservative
V = 130 mph
qh = 32.68 psf
Design Wind Pressures
p =gh[GCP-Gco] C&C Design Wind Pressures, eqn(30.3-1)
GCp = varies by zone, see below
GCpi = 0.18 , -0.18 table 26.13-1
C&C Pressures
GCp , GCp p (psf) Gable Roof(7 -20 deg)
-1.3 , 0.87 -48.37 , 34.32 wall corner zones(5) Fig. 30.3-1
-1.05 , 0.87 -40.20 , 34.32 wall middle zones(4) Fig. 30.3-1
-3 , 0.45 -103.93 , 20.59 roof corner zones(3) Fig. 30.3-2B
-2 , 0.45 -71.25 , 20.59 roof edge zones(2) Fig. 30.3-2B
-2 , 0.45 -71.25 , 20.59 roof middle zones(1) Fig. 30.3-2B
-4 , 0 -136.62 , 10.00 overhang corners(3) Fig. 30.3-2B
-3.2 , 0 -110.47 , 10.00 overhang middles(2 &1) Fig. 30.3-2B
20-1115-PV 11/17/2020 Page 7
CHECK WIND UPLIFT
Max Dead load per bracket = (Solar panel width/2*bracket spacing*Solar panel DL)
Bracket spacing = 6 ft
Dead load per bracket = 50.19 lbs
60% DL = 30.11 lbs
U = -71.25 psf (use wind zone "1")
U' = U*.6 = -42.75 psf
Trib area for wind load = Solar panel length/2*bracket spacing
Trib area for wind load =16.73 sq. ft.
Net Wind Uplift = Trib area*U'+60% DL
Net Wind Uplift = -685.1 lbs
Use Solar Roof Hook Mount
Max allowable uplift per manufacturer = 836.4 lb., FS = 2.5
Max allowable uplift > total uplift, OK
Check 5/16" Lag screws (Min 2.5" embedment into (E) Beam)
Lag withdrawal (W') = W(Emb depth)(1.6)
W (per inch of embedment) for a 5/16" bolt = 266 lb. (per NDS table 12.2A)
Lag withdrawal (W') = 1064 lb.
W' > Net Wind uplift, OK
20-1115-PV 11/17/2020 Page 8
ALL TILE ROOF HOOK
FOR SIDE MOUNT RAILS; ADJUSTABLE 091A1R
Part # Box Quantity Screw Size
C, (1) OT
17585 10 Hooks N/A 41.:� (fi r
rr.
17586 1 Hook N/A
17587 10 Hooks; 20 Screws 5/16" x 3"
17588 1 Hook; 2 Screws 5/16" x 3"
17589 10 Hooks; 20 Screws #14 x 3"
17618 1 Hook; 2 Screws #14 x 3"
,-• . /
i
)
` •V .. . ,t..,. ,,,, , •
Letter Description Size/Length
A Mounting Screw Slot 9mm x 18mm
B Rail Slot Size 10mm x 71 mm
C Length of Roof Hook 179.5mm
D Bottom End to Top End 190.3mm- 198.5mm
E Thickness 6mm Use our#14 or 5/16" A
- — Solar Mounting Screws
F Adjustability Range 34mm-42mm
54mm 0000
., .r _ 0CD000
II3 1 25.0 m
18mm
147mm
B flf3mm
D
Rail Slot Accepts
5/16"or 3!8'Bolts
95°
���:. ® F 8.770_mmm 0 I =21mm 38.50mm f
C 8.70mm 120mm
t . 140mm . 1 E
5830 Las Positas Road, Livermore CA 94551 I 3948 Airway Drive, Rock Hill SC 29732
20-1115-PV Phone: (844) 671-6045 I Fax:184107613975 I www.solarroofhook.com Page 9
SolarRoofHook is a division of Quickscrews International Corp.
(1)LAIR
OT
i
vu.(
.
January 23, 2014
To whom this may concern,
SolarRoofHook is committed to excellence. All of our parts were tested by a third party test facility for the
following.
1. Uplift test
2. Downward load test
3. Water Proof-QuickBOLT only
AME Research facility had a current engineer license per the State of California in 2012 and 2013.
Terrapin Testing had a current engineer license per the State of California in 2011.
The following is an excerpt from:
CALIFORNIA BOARD FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS
guide to Engineering & Land Surveying for City and County Officials
Page 12, Line 27
27. If the license has expired between the time the engineering documents were
prepared and the time when the local agency's review is performed, do the
documents need to be re-sealed by a licensee with a current license?(B&P Code
§§ 6733, 6735, 6735.3, 6735.4)
As long as the license was current at the time the engineering documents
were prepared, the documents do not need to be re-sealed prior to review by
the local agency. However, any changes(updates or modifications) to the
documents that are made following the review by the local agency would
have to be prepared by a licensed engineer with a current license and those
changes would have to be signed and sealed.
We trust the information provided will alleviate any request for the test reports submitted to have a stamp
from the current year.
Respectfully,
Rick Gentry
V.P. of Sales & Marketing
5830 Las Positas Rd I Livermore, CA 94551
Phone: (844)-671-6045 I Fax: (800)-689-7975
www.solarroofhook.com
20-1115-PV 11/17/2020 Page 10
•
APPLIED Ki.ATER0QLS o ENOONEERONO3o Oa©o
980 41st Street Tel: (510) 420-8190
Oakland, CA 94608 FAX: (510) 420-8186
e-mail: info@appmateng.com
September 17, 2015
Mr. Rick Gentry
SolarRoofHook Project Number 115727C
a division of Quickscrews International Corp
5830 Las Positas Road
Livermore, CA 94583
Subject: QS# 17585—All Tile Roof Hook 90° Laboratory Load Testing
Dear Mr. Gentry:
As requested,Applied Materials& Engineering, Inc. (AME)has completed load-testing the All Tile
Roof Hook 90° (see Appendix A, Figure 1). The purpose of our testing was to evaluate the compressive
tensile(uplift) and shear(parallel to rafter) load capacity of the All Tile Roof Hook 90° attached to a
2"x4" Douglas Fir Rafter using two 5/16"0x3" screws.
SAMPLE DESCRIPTION
Mockup samples were assembled in our laboratory on August 31, 2015. Mockup configuration consisted
of three 12" long rafters at 4.5"o.c., screwed to 1/2" Structural I plywood. All Tile Roof Hook 90° is
attached through the plywood into a rafter with two fasteners installed at the farthest end.
TEST PROCEDURES & RESULTS
1. Compressive Load Test
A total of three tests were conducted for compressive load capacity on September 11, 2015 using a
United Universal testing machine. Samples were rigidly attached to the testing machine and a
compressive load was applied to the hook. The samples were loaded in compression at a constant rate of
axial deformation of 0.09 in. /min. without shock until the hook was bent and came in contact with the
test board; displacement at maximum load was recorded. Based on the above testing, the average
maximum compression load of the All Tile Roof Hook 90°attached to a 2"x4" Douglas Fir rafter using
two 5/16"0x3" screws was determined to be 395 lbf. Detailed results are provided in Table I. Test setup
and mode of failure are provided in Appendix B, Figure 1.
The specific gravity and moisture content of the rafter was tested in accordance with ASTM D2395,
Method A (oven-dry). The specific gravity and moisture content were determined to be 0.379 and
10.0%, respectively.
20-hgclFtv 12 11/17/2020 &PPU B ACTEROALO C aOORE