Loading...
HomeMy WebLinkAboutSOLR-21-1064 City of Arcadia, CA Permit NO.SOLR-21-1064 Development Services Department Permit Type:Solar 240 West Huntington Drive,Post Office Box 60021 Work Classification:Solar Residential Arcadia,CA 91066-6021 ' (626)574-5416 Permit Status:Issued ARCADIA Issue Date:06/15/20211 Expiration: 06/16/2022 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number 1335 CALIFORNIA ST Arcadia,CA 91006-3791 5773016097 Contacts JOHN MARSHALL Owner SOLARMAX RENEWABLE ENERGY Contractor PROVIDER INC* (626)262-0939 3080 E 12th,Riverside,CA 92507 (951)300-0788 972048 Description:ROOF MOUNTED SOLAR SYSTEM 16 Valuation: $ 0.00 Tenant MODULES/MICROINVETERS,COMBINER BOX, 200 AMP SERVICE UPGRADE Total Sq Feet: 0.00 Plan Check# Plan# l Fees Amount Payments Amount Paid Building Plan Check Fee Residential $100.00 Total Fees $341.20 Distribution Panel $16.48 Cash/Receipt#REC-07930-21 $341.20 Electrical Permit Issuance Fee $47.01 Amount Due: $0.00 Inverters $77.78 Panels $82.45 Residential Services up to 400 amps 516.48 Solid Waste Management Fee 2 $1.00 Total: $341.20 7- ,--2.-' I CALLS FOR INSPECTIONS 514 � Request for inspection by telephone at 626-574-5450. Leave a message pudirL requesting the address,timeframe and what inspection item is needed. This permit/plan review expires by time limitation and becomes null and void if the work authorized by the permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days from the date of plan submittal.This permit expires and becomes null and void if any work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of 1;--i--1 COMPLETED Arcadia building inspector for a period of 180 consecutive days. June 15, 2021 • Issued By:Jeff Wang Date June 16,2021 Page 1 of 1 4 !40. PERMIT/PLAN REVIEW APPLICATION �l�' Development Services Department,240 West Huntington Drive,Post Office Box 60021 °'\ � Arcadia, CA 91066-6021,(626)574-5416, Fax (626) 447-9173 • City of Arcadia LICENSED CONTRACTOR'S DECLARATION WORKERS'COMPENSATION DECLARATION ❑ I hereby affirm under penalty of perjury that I am licensed under provisions of I hereby affirm under penalty of perjury one of the following: Chapter 9(commencing with Section 7000,of Division 3 of the Business and Professions Code,and my license is in full force and effect. ❑ I have and will maintain a certificate of consent to self-insure for workers' License Class License No. Exp. Date compensation, as provided for by Section 3700 of the Labor Code, for the Signature of Contractor performance of the work for which this permit is issued. OWNER-BUILDER DECLARATION ❑ I have and will maintain workers'compensation insurance,as required by Section ❑ I herebyaffirm under 3700 of the Labor Code,for the performance of the work for which this permit penalty of perjury that I am exempt from the Contractors is issued.My workers'compensation insurance carrier and policy numbers are: License Law for the following reason(Section 7031.5,Business and Professions Code.Any city or county which requires a permit to construct,alter,improve, Carrier demolish,or repair any structure,prior to its issuance,also required the applicant for such permit to file a signed statement that he or she is licensed pursuant to the Policy Number provisions of the Contractors License Law(Chapter 9(commencing with Section (This section need not be completed if the permit is for one hundred dollars or less) 7000)of Division 3 of the Business and Professions Code)or that he or she is exempt there from and the basis for the alleged exemption. Any violation of ❑ I certify that in the performance of the work for which this permit is issued,I shall Section 7031.5 by any applicant for a permit subjects the applicant to a civil not employ any person in any manner so as to become subject to the workers' penalty of not more than five hundred dollars($500)): compensation Laws of California,and agree that if I should become subject to the workers'compensation provisions of Section 3700 of the Labor Code,I shall ❑I, as owner of the property, or my employees with wages as their sole forthwith comply with those provisions. compensation,will do the work,and the structure is not intended or offered for sale(Section 7044,Business and Professions Code:The Contractors License Date Signature Law does not apply to an owner of property who builds or improves thereon, or who does such work himself or herself or through his or her own employees,provided that such improvements are not intended or offered for WARNING: Failure to secure Workers'Compensation coverage is unlawful, sale.If,however,the building or improvement is sold within one(1)year of and shall subject an employer to criminal penalties and civil fines up to one completion,the owner-builder will have the burden of proving that he or she hundred thousand dollars($100,000),in addition to the cost of compensation, did not build or improve for the purpose of sale). damages as provided for in Section 3706 of the Labor Code, interest, and attorney's fees. 0 I, as owner of the property, am exclusively contracting with licensed contractors to construct the project(Section 7044,Business and Professions Code:The Contractors License Law does not apply to an owner of property CONSTRUCTION LENDING AGENCY who builds or improves thereon,and who contracts for such projects with a I hereby affirm under penalty of perjury that there is a construction lending agency contractor(s)licensed pursuant to the Contractors License law). for the performance of the work for which this permit is issued (Section 3097, Civil Code). ❑ I am exempt under Section 7044,Business and Professions Code,for this reason: Lender's Name Date Signature Lender's Address IMPORTANT: APPLICATION IS HEREBY MADE TO THE BUILDING OFFICIAL FOR A PERMIT SUBJECT TO THE CONDITIONS AND RESTRICTIONS SET FORTH ON THIS APPLICATION AND THE FOLLOWING: 1. The City's approved plans and permit inspection card must remain on the job site for use by City inspection personnel. 2. Final inspection of the work authorized by this permit is required.A Certificate of Occupancy must be obtained prior to use and occupancy of new buildings and structures. 3. Per South Coast Air Quality Management District(AQMD)regulations,renovation and remodeling work that results in the removal,stripping,or altering of asbestos containing materials requires an asbestos survey and removal prior to disturbing the asbestos.Please contact AQMD at(909)396-2000 for further information. Name Title PRINT NAME I certify that I have read this application and state that the above information is correct and that I am the owner or duly authorized agent of the owner. I agree to comply with all City ordinances and State Laws relating to building construction. I hereby authorize representatives of the City of Arcadia to enter upon the above-mentioned property for inspection purposes. Signature Date y K 1 ,' rctfj @exr,!b Y 4 900t8VJVIQVJ2lV �, qo ° Y 1332115 VIN J IOVOIN£6 8 i villiiiiiiiralw.rx e 6660-a9a-sag ati .. -Y xC11! �Q 11VHS2idW NHOf b q W •• 1 R fQQ x s MOd W31SAS DiV11OAOiOHd W lOS { - ill g r" " 4!"'�e b c MNK s SI VIS W31SAS 03SOdOUd :1.331'01:1d i 3 4 S e- £ 3 1 , "1 c o 7:..t.::. .74 z.,:: 't.: .,,; !...i.....•.....:7,,,.,:•.3.: -,r- 7... • ,_71 i. •.......... "::::: .::!"..:..:.' Z..":.' il:::...-.Li.' ::: • : ...,.7_, ,....... r. , ----: 5'..:- 2: c---•..—c_ .1.i....::-.-7 -;.,,,_ ..._;:-(,.. :::;1::: .1;-: 1 2: O •• .... .: .E is -; 2.. : : g..:':--::: .:-.7' M. cc a F V . z ;„E.<::N\---\-\). a ,9-,fSf -- - z V f u v L L g a, 4k > I a aka �Z a, C4 cd 14.,,L G um u� W S W .. o a 1 o o 1t, / M ),- g g cc Q cc 5 2 z J, CALCULATIONS FOR SOLAR PHOTOVOLTAIC PANELS: Owner: John Marshall Address: 335 California Street,Arcadia, CA 91006 INDEX TO CALCULATIONS Sheet Item 1-2 Wind parameters 3-4 Seismic parameters and determination of Fp 5 design loads, roof member check, wind uplift check, deflection 6 attachment check, rail span check 7 lateral check Engineering Calculations Performed By: Doug Engineering 20271 Lighthouse Lane, Huntington Beach, CA 92646 949-285-5104 Engineering Calculations For: Solar Max Renewable Energy Provider, Inc. 3080 12th Street, Riverside, CA 92507 (951) 300-0788 Project Number: SMX-7839 Date: 5/20/2021 _no ESSION4, BASIS FOR DESIGN `,,J ; e4g' CODE: 2019 California Building Code • '! 3 TrA ASCE 7-16 LIVE LOADS %).EXP. 06/30/22ROOF 20.0 psf OFC p4,"te SNOW 0.0 psf ASCE 7-16 FLUSH MOUNTED SOLAR PANELS Type of Roof Gable Roof Slope-0 =Angle of plane of roof from horizontal, in degrees 0= 26 deg Mean Roof Height-Eave height will be used for 0 <= 10deg h= 22 ft Building dimensions s1 = 30 ft s2 = 40 ft a= 10% of least horizontal dimension or 0.4h, whichever is smaller, but not less than 4% of the least horizontal direction or 3 ft a = 3ft B = Horizontal dimension of building normal to wind direction, in ft. B= 30 ft Horizontal dimension of building Attachment Spacing Effective Area A= 13 ft2 p = clh(GCp)(YE)(Ya) 29.4-7 FIGURE 30.3-2C Components& Cladding h<= 60 ft: External Pressure Coefficients, (GCp), for Enclosed and Partially Enclosed Buildings -Gable roofs 20<=27deg Velocity pressure Exposure Coefficients ROOF OVERHANG Wind Exposure C (GCp)down = 0.51 0.51 Kzt = 1 (GCp)upzl = -1.5 -2 Kd = 0.85 (GCp)upz2e = -1.5 -2 KZ = 0.85 (GCp)upz2n = -2.37 -2.92 Ke = 1 (GCp)upz2r = -2.37 -2.92 YE = 1 (GCp)upz3e = -2.37 -3.42 Ya = 0.75 (GCp)upz3r = -2.76 -3.63 V = 110 mph qh = 0.00256KZKztKdKeV2 qh = 22.4 psf p = 16.8 *(GCp) 1 ASCE 7-16 Diagrams 1a 1 111.t;1 111 �._. Pi.. K.R..ift t t t t I I I I t t t t t MI 1 1 1 t t I I i t t i t B i t I I t t I t ELEVATION 0 70 40-16 PLAN Notation a= 10%of least horizontal dimension or 0.4h,whichever is smaller,hut not less than either 4%of least horizontal dimension or 3 ft(0.9 m).If an overhang exists.the edge distance shall be measured from the outside edge of the overhang.The horizontal dimensions used to compute the edge distance shall not include any overhang distances. B=Horizontal dimension of building measured normal to wind direction,in ft(in). h=Mean roof height,in ft(m). 0=Angle of plane of roof from horizontal,in degrees. Wind Pressures Wind Down -All Zones 8.6 psf 10 psf, MIN ROOF OVERHANG Zone 1 -25.2 psf -33.6 psf Zone 2e -25.2 psf -33.6 psf Zone 2n -39.82 psf -49.06 psf Zone 2r -39.82 psf -49.06 psf Zone 3e -39.82 psf -57.46 psf Zone 3r -46.37 psf -60.98 psf All panels are in Zones 1 and 2e ROOF OVERHANG Use -25.2 psf -33.6 psf 0.6*W -15.1 psf -20.2 psf 2 ASCE 7-16 Soil Site Class = D Seismic Use Group = I SS = 2.568 Mapped Spectral Response acceleration in short periods S1 = 0.979 Mapped Spectral Response acceleration at one second periods Table 1613.2.3(1) Values of Site Coefficient Fa SITE CLASS SS< 0.25 SS= 0.5 SS= 0.75 SS= 1.0 SS>1.25 SS>1.5 A 0.8 0.8 0.8 0.8 0.8 0.8 B 0.9 0.9 0.9 0.9 1.0 1.0 C 1.3 1.3 1.2 1.2 1.2 1.2 D 1.6 1.4 1.2 1.1 1.0 1.0 E 2.4 1.7 1.3 - - - F - - - - - - Fa= 1.200 (interpolated) SMS= Fa*SS = 3.082 Min. 1.2 per 11.4.3 Table 1613.2.3(2) Values of Site Coefficient Fv SITE CLASS S1< 0.1 S1=0.2 S1= 0.3 S1= 0.4 S1>0.5 S1>0.6 A 0.8 0.8 0.8 0.8 0.8 0.8 B 0.8 0.8 0.8 0.8 0.8 0.8 C 1.5 1.5 1.5 1.5 1.5 1.4 D 2.4 2.2 2.0 1.6 1.5 1.7 E 4.2 - - - - - F - - - - - - Fv= 1.700 (interpolated) SM1 = Fv*S1 = 1.664 SDS =2/3*SMS= 2.054 SD1 =2/3*SM1 = 1.110 SDS RISK CATEGORY SD1 RISK CATEGORY > I, Il I Ill I IV > 1, 11 I Ill I IV 0 A A A 0 A A A 0.167 B B C 0.067 B B C 0.33 C C D 0.133 C C D 0.5 D D D 0.2 D D D Seismic Design Category= E 3 ASCE 7-16 Seismic Use Group = I Seismic Design Category = E I = 1 SS = 2.568 S1 = 0.979 SMS = 3.082 SM1 = 1.664 R = 6.5 Height = 11.375 T= 0.035*hn^.75 = 0.21679 r(Reliability/Redundancy Factor) = 1 SDS = 2.054 3131 = 1.110 (ASCE 7-16 12.8-2) CS= SDS/(R/I) = 0.3160 W (ASCE 7-16 12.8-3) CS<= SD1/[(R/I)T] = 0.787 W (ASCE 7-16 12.8-5) CS>_ .01 = 0.01 W If S1>0.6g (ASCE 7-16 12.8-5) CS>= 0.5*S1/[R/I] = 0.075 W V(controls) = 0.3160 W Determine Fp for seismic loading on attachments Seismic Load on Nonstructural Components Spacing of attachments 5.33 ft Tributary width of attachments= 1/2 Panel length= 33.5 in AP= 14.9 ft` PV unit weight including racking = 3 psf Wp= 44.63875 lb Other mechanical/electrical components ap= 1 Fp= 0.4apSDS*Wp/(Rp/Ip)(1+2z/h) 73.35 lb 13.3-1 Rp= 1.5 1p= 1 Fp<= 1.6SDS*IpWp 146.70 lb 13.3-2 SDS = 2.054 Wp= 44.63875 lb Fp>= 0.3SDS*IpWp 27.51 lb 13.3-3 z= 22 ft h= 22 ft 4 PROJECT: PV Panels for John Marshall SHEET: 5 OF 7 CLIENT: Solar Max Renewable Energy Provider, li DATE: 5/20/2021 BY: Doug Engineering DE JOB NO.: SMX-7839 DESIGN LOADS Dead Loads Uplift Roof 0.6WL CONC. FLAT TILE 9.0 psf 0.6WL Zone 1 and 2e -15.1 psf, MIN 10 PSF 5/8"Ply shtg 1.9 Overhang -20.2 psf Rf Frm'g 2.8 PWLdown= 8.6 psf 10 psf, MIN 10 PSF Misc. 1.5 Uplift 0.6DL+0.6WL (N) PV System 3.0 Zone 1 0.6*3-15.1 -13.3 psf Zone 2 0.6*3-20.2 -18.4 psf Total DL 18.2 psf Downward DL+0.6WL LL 20.0 psf PDL+wL= 13.0 psf SNOW 0.0 psf Rafter Check Existing 2x8 RAFTERS @ 16"o.c Spacing 1.33 ft Trib panel width = 5.33 ft E 1500000 psi Fb= 900*1.2*1.15 1242 psi 47.6 inA4 Mallowwind= 2176 ft-lb Span1 12.25 ft MaIIowLL= 1700 ft-lb Span2 0.00 ft See below for Wind Uplift loads Span3 0.00 ft due to concentated loads at attachments Span4 0.00 ft (Distance Wind Mmax Wind P= to Att. Load Trib W Uplift wind(ft- Down PVDL P=DL+WL Pts) a b R1 (Ib) R2(lb (psf) (ft) (Ib) lb) (Ib) (Ib) (Ib) -1.00 1 0.00 0.00 12.25 224.4 0.0 15.1 5.3 224.4 0 148.6 44.6 193.2 2 3.58 3.58 8.67 158.9 65.5 15.1 5.3 224.4 568 148.6 44.6 193.2 3 5.58 5.58 6.67 122.3 102.2 15.1 5.3 224.4 682 148.6 44.6 193.2 4 9.16 9.16 3.10 56.7 167.7 15.1 5.3 224.4 519 148.6 44.6 193.2 10.16 Span 1 Uniform DL 12.25 74.5 74.5 9.1 psf 1.3 12.2 plf 228.1 Reactions at Span1 636.8 410.0 Negative values are uplift reactions Mmaxwindup= 922 ft-lb<2176 ft-lb OK Mmaxwinddown= 1611 ft-lb<2176 ft-lb OK For DL+LL including the PV system weight point loads w= 46.9 plf P= 44.6 lb Mmax= 1159 ft-lb< 1700 ft-lb OK Deflection Check DDL= 5wL4/(384EI) (5*18.2*12.25A4)*1728 = 0.172 in = L/ 854.2 OK 384*1.5E6*47.6 PROJECT: PV Panels for John Marshall SHEET: 6 OF 7 CLIENT: Solar Max Renewable Energy Provider, Inc. DATE: 5/20/2021 BY: Doug Engineering DE JOB NO.: SMX-7839 CHECK SCREW ATTACHMENTS FOR WIND UPLIFT PW„Pi;n= 224.4 lb 5/16" Lag with min 2.5"penetration for each attachment Table 12.2A-NDS-Lag Screw Withdrawal Values For 5/16" Lag into .5G wood 266 lb Allowable wind load= 1.6*2.5*266 1064 lb > 224.4 lb OK CHECK SCREW ATTACHMENTS FOR SHEAR DUE TO SEISMIC Fp Fp= 73.35 lb Roof slope/module tilt 26 deg Shear= Fp*cos( 26 )= 65.9 lb \ Fp sin(ang) Tension= Fp*sin( 26 )= 32.2 lb Fp cos(ang) Table 11K-NDS Z= 190 lb Co= 1.6 Z'= Z*Co= 304 lb> 65.93 lb OK Withdrawal capacity W= 1064 lb Interaction Equation f,/F,+f,/F„ 0.241 + 0.217 = 0.458 < 1 OK RAIL SPAN CHECK Everest Railing Check Load for half a panel=2.7' w= 57.78 plf Per the Everest Engineering for 110 mph, 0 psf snow,and 26 deg roof slope,the max span for Crossrail44-X is 80"for Array Interior Panels and 57"for Array Array Edge panels Use Crossrail44-X PV Rails with a spacing of 64"o.c. max for attachment points,typ. Everest Solar 44-X Dual Rail, Enclosed Hip/Gable Roof 0-30ft,60-Cell and 96-Cell(P)Rail Only Ground Exposure Wind speed->,_ 110 mph snow Wad Category Panel Angie qddf Zone-> 1' 1 2e 2r 2n 3e 3r Oto 7 Array Interior 84 77 69 69 69 61 61 Array Edge 84 66 59 59 59 50 50 7 Array Interior 72 72 72 62 62 62 58 to 20 er.iy Fra 62 67 62 52 52 52 47 O psf C I 20b,27 Array Interior 80 80 80 66 66 66 65 NOY 0.7k 69 69 69 57 57 57 55 27 to 45 Array Interior 74 74 74 74 71 66 71 Array Edge 64 64 64 64 62 57 62 45 Array Interior 85 85 81 81 81 81 81 Array Edge 75 75 70 70 70 70 70 PROJECT: PV Panels for John Marshall SHEET: 7 OF 7 CLIENT: Solar Max Renewable Energy Provider, Inc. DATE: 5/20/2021 BY: Doug Engineering DE JOB NO.: SMX-7839 LATERAL ANALYSIS DETERMINE ADDITIONAL LOAD COMPARED TO EXISTING FOR LATERAL LOADING Aroofexisting = 1444 sf Wpanel= 39.7 lb Wrootexisting= 15.2*1444 = 21949 lb 16 *Wpanel = 634.88 lb Wwattexisting= 15*80*4 = 4800 lb Wrestofarray= 257.92 lb Wexisting= 26749 lb Warray= 892.8 lb V= 0.316 W Vrootexisting= 8453 lb Existing Total Lateral Force Vroofwpaneis= 8735 lb New Total Later Force % increase= 8735 *100%-100%= 3% increase which results in less than a 10% increase in the 8453 stress of existing lateral resisting elements OK