Loading...
HomeMy WebLinkAboutUntitled / �_ t t , Permit NO SOLR-20-1923: City of Arcadia, CA �'• Y, , Development Services Department F ✓`<- Permit Type Solar " � i 240 West Huntington Drive,Post Office Box 60021 Arcadia;CA 91066-6021 - ; ; work Classification-Solar Residential., [; (626)574-5416 Permit Status Issued ARCA VIA Issu 'eDate 11/25/2020;'I Expiration: 11/25/2021 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number 34 W NAOMI AVE Arcadia,CA 91007-4030 5782011006 .+a; ':.:e i°cR+. a:S?' '. 3�"i.^:.."....d.„�.:;d.?`".„ v°:YtAr?::w"B`k.wsS.,i.':".4°.".,..�".v.R.'Y. '"dS`@'s?:`;•`T.....«.a Fx."": R'rt'2y..... :..,..n._•:.zVYaa.. °'YY'L":°`�"2"K°P"tiA:N4Y '3F«.:', r.:.kk-"syR Contacts GEOFFREY HUANG'" ' Owner SUNPOWER CORPORATION SYSTEMS* Contractor 34 W NAOMI AVE,ARCADIA,91006 1414 Harbour WAY#1901,Richmond,CA (949)677-0029 (408)218-6811 890895 `°:.ka'... _-.a .-.;«3^5.k�_.3*a �`�°x`C.r . NPY4.ar&4..,...sS.,V4.`A.mx`s. kM^"r,,' _ M.'�.'k.m1^..s ..z;t...,s;.c ., ,'ttC.:.'q..,. , s,.a.i:-ti...._r "e..•-,aaa .. rte. .o-"..;Y a.-.w,_w.....ID's ..._2',-,a_.r�a. Description:6.87 KW ROOF MOUNT PV SYSTEM, 21 i Valuation: $ 0.00 Tenant i. MODULES/MICRO INVERTERS,NEW 100 AMP LOAD CENTER Total Sq Feet: 0.00 1.4, Plan Check# Plan# -. ditEEMI Fees Amount Payments Amount Paid Building Plan Check Fee Residential $100.00 Total Fees $324.72 Distribution Panel $16.48 Cash/Receipt#REC-06142-20 $324.72 Electrical Permit Issuance Fee $47.01 Inverters $77.78 Amount Due: $0.00 Panels $82.45 Solid Waste Management Fee 2 $1.00 Total: $324.72 /Zr/7-20 F/7/,‘? (//'^eKehs CALLS FOR INSPECTIONS Request for inspection by telephone at 626-574-5450. Leave a message requesting the address,timeframe and what inspection item is needed. This permit/plan review expires by time limitation and becomes null and void if the work authorized by the permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days from the date of plan submittal.This permit expires and becomes null and • - .. void if any work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of Arcadia building inspector fora period of 180 consecutive days. EIJ COMPLETED November 25, 2020 Issued By: Date November 25,2020 Page 1 of 1 OF ARC %%�VFO(y�.,99A, a:� ,VVI' PERMIT/PLAN REVIEW APPLICATION Development Services Department,240 West Huntington Drive,Post Office Box 60021 m.„,,y0,N° Arcadia, CA 91066-6021, (626) 574-5416,Fax (626)447-9173 City of Arcadia LICENSED CONTRACTOR'S DECLARATION WORKERS'COMPENSATION DECLARATION ❑ I hereby affirm under penalty of perjury that I am licensed under provisions of I hereby affirm under penalty of perjury one of the following: Chapter 9(commencing with Section 7000,of Division 3 of the Business and Professions Code,and my license is in full force and effect. ❑ I have and will maintain a certificate of consent to self-insure for workers' License Class License No. Exp. Date compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. Signature of Contractor OWNER-BUILDER DECLARATION ElI have and will maintain workers'compensation insurance,as required by Section 1:1I hereby affirm under penalty of perjury that I am exempt from the Contractors 3700 of the Labor Code,for the performance of the work for which this permit License Law for the following reason(Section 7031.5,Business and Professions is issued.My workers'compensation insurance carrier and policy numbers are: Code.Any city or county which requires a permit to construct,alter,improve, Carrier demolish,or repair any structure,prior to its issuance,also required the applicant for such permit to file a signed statement that he or she is licensed pursuant to the Policy Number provisions of the Contractors License Law(Chapter 9(commencing with Section (This section need not be completed if the permit is for one hundred dollars or less) 7000)of Division 3 of the Business and Professions Code)or that he or she is exempt there from and the basis for the alleged exemption. Any violation of ❑ I certify that in the performance of the work for which this permit is issued,I shall Section 7031.5 by any applicant for a permit subjects the applicant to a civil not employ any person in any manner so as to become subject to the workers' penalty of not more than five hundred dollars($500)): compensation Laws of California,and agree that if I should become subject to the workers'compensation provisions of Section 3700 of the Labor Code,I shall ❑I, as owner of the property, or my employees with wages as their sole forthwith comply with those provisions. compensation,will do the work,and the structure is not intended or offered for sale(Section 7044,Business and Professions Code:The Contractors License Date Signature Law does not apply to an owner of property who builds or improves thereon, or who does such work himself or herself or through his or her own employees,provided that such improvements are not intended or offered for WARNING: Failure to secure Workers'Compensation coverage is unlawful, sale.If,however,the building or improvement is sold within one(1)year of and shall subject an employer to criminal penalties and civil fines up to one completion,the owner-builder will have the burden of proving that he or she hundred thousand dollars($100,000),in addition to the cost of compensation, did not build or improve for the purpose of sale). damages as provided for in Section 3706 of the Labor Code, interest, and attorney's fees. ❑I, as owner of the property, am exclusively contracting with licensed contractors to construct the project(Section 7044,Business and Professions Code:The Contractors License Law does not apply to an owner of property CONSTRUCTION LENDING AGENCY who builds or improves thereon,and who contracts for such projects with a I hereby affirm under penalty of perjury that there is a construction lending agency contractor(s)licensed pursuant to the Contractors License Law). for the performance of the work for which this permit is issued (Section 3097, Civil Code). ❑ I am exempt under Section 7044,Business and Professions Code,for this reason: Lender's Name Date Signature Lender's Address IMPORTANT:APPLICATION IS HEREBY MADE TO THE BUILDING OFFICIAL FOR A PERMIT SUBJECT TO THE CONDITIONS AND RESTRICTIONS SET FORTH ON THIS APPLICATION AND THE FOLLOWING: 1. The City's approved plans and permit inspection card must remain on the job site for use by City inspection personnel. 2. Final inspection of the work authorized by this permit is required.A Certificate of Occupancy must be obtained prior to use and occupancy of new buildings and structures. 3. Per South Coast Air Quality Management District(AQMD)regulations,renovation and remodeling work that results in the removal,stripping,or altering of asbestos containing materials requires an asbestos survey and removal prior to disturbing the asbestos.Please contact AQMD at(909)396-2000 for further information. Name Title PRINT NAME I certify that I have read this application and state that the above information is correct and that I am the owner or duly authorized agent of the owner. I agree to comply with all City ordinances and State Laws relating to building construction. I hereby authorize representatives of the City of Arcadia to enter upon the above-mentioned property for inspection purposes. Signature Date LAGUNA ;! CONSULTING ENGINEERS 28202 Cabot Road, Suite 300 - LAGUNA PACIFIC GROUP;INC. Laguna Niguel, CA 92677 949-371-5238 info@LagunaEngineers.com . :vemr 5 Sunpower Corporation 9,y I. 1414 arboiir South HRichmondaCA.94804 y W.a $58- . Z m °. EXP.' .12/21 .* Subject: Certification Letter v�•/ S f Huang Residence l4?e:....9F-C T',OCTV�• t� / 34 W Naomi Ave �� A' / Digitally signed by Paymon Arcadia,CA.91007 Eskandanian.' Date:2020.11.05 • To Whom It May Concern, 16:16:56-08'00' Ajobsite observation of the condition of the existing framing system was performed by an audit team of Sunpower Corporation as a request from Laguna Pacific Group.All review-is based on these observations and the design criteria listed below and only deemed valid if provided information is true and accurate. On the above referenced project,the roof structural framing has been reviewed for additional loading due to the installation of- the solar PV addition to the roof.The structural review only applies to the section of the roof that is directly supporting the solar PV system and its supporting elements.The observed roof framing is described below.If field conditions differ,contractor • to notify engineer prior to starting construction. The roof structures of(Roof 1&2)consist of composition shingle on lx decking that is supported by 2x4 rafters @ 24"o.c.with ceiling joists acting as rafter ties.The rafters have a max projected horizontal span of 5'16",with a slope of 21 degrees.The rafters are connected at the ridge to a ridge board and are supported at the eave by a load bearing wall. The existing roof framing systems of(Roof 1&2)are judged to be adequate to withstand the loading imposed by the installation of the solar panels.No reinforcement is necessary. • The spacing of the solar standoffs should be kept at 72"o.c.for landscape and 72"o.c.for portrait orientation. The scope of this report is strictly limited to an evaluation of the fastener attachment,underlying framing and supporting structure only. All panels,,racking and hardware shall be installed per manufacturer specifications and within specified design • limitations.All waterproofing shall be provided by the manufacturer. Laguna Pacific Group assumes no responsibility for . misuse or improper installation of the solar PV panels or racking. Design Criteria: . �r `�af+.�t\�A5�`l�C • Applicable Codes=2019 CBC,ASCE 7-16 C ' - �C\N\L\ �`��}� 1 \le • Roof Dead Load=8 psf(Roof 1&2) \ll�\>>�\1 C2 `�9� 0\\1`:• >�t A'e<Z\'\C\,S' • • Roof Live Load=20 psf 10C4'L 1 b lCi\\}t;'‘\�\ `�C�" •,1:01, •.Wind Speed=110 mph(Vult),Exposure C \�\5\ C\-•;d11• 0\}l�\' \�4 • Attachments:1-5/16"dia.lag screw with 2.5 inch min • \lc,'0., ��\�A\1" \L\\Cl\\1" .A.0A\\ embedment depth,at spacing Shown above. gCk.Of\,\� il\1\`- , 1\1�` \l',\�\n\l ��1-�'6� `fib\S` VA\� c. �- `�e'LSC ' \,e`\o ,.� VAI Please contact me with any further questions or concerns regarding this projectO\N b• `t\1C\-thQ.,1 -O' `i\.\\A',\)\ \1<<\`l\�\ \1•,ih-" \NA is ll, t\Q\ , \\1`=' Sincerely, Cbt�\\}1\1',11r\1�`1 ll\1 ,ll�i,\.\` �ti l \1 t\L VC 0- •. ..,,,,•;V:"' • :,t\\ ,rte,''" Paymon Eskandanian,S.E. 0 - Principal Engineer ..Huang Residence,Arcadia, CA PE Calcs .xlsm 1 LAGUNA . 28202 Cabot Road, Suite 300 CONSULTING ENGINEERS Laguna Niguel, CA 92677 LAGUNA PACIFIC GROUP;INC. 949-371-5238 info@LagunaEngineers.com Gravity Loading PV Dead Load=3 psf(Per Sunpower Corporation) DL Adjusted to 21 Degree Slope 3.21psf Weight of PV System(Per Sunpower Corporation) 3.0 psf X Standoff Spacing 6:00 ft Y Standoff Spacing= 2.75 ft Standoff.Tributary Area= 16.50.sft Point Loads of Standoffs - 50 lb. f - Roof Live Load=20 psf— Note:Roof live load is removed in area's covered by PV array. • Roof Dead Load(Roof 1&2) Composition Shingle 4.00 1x Decking. 3.00 . . • 2x4 Rafters @ 24"o.c. 0.73 . Vaulted.Ceiling. 0.00: (Ceiling Not Vaulted) Miscellaneous. 0.27 Total Roof DL(Roof 1&2) : •8.0 psf • DL Adjusted to 21 Degree Slope 8.6 psf Huang Residence,Arcadia, CA PE Calcs .xlsm 2 °. -LAGUNA.. CONSULTING ENGINEERS • 28202 Cabot Road,Suite 300 LAGUNA PACIFIC GROUP,INC. .Laguna Niguel,CA 92677 . - - -949-371-5238 . info@LagunaEngineers.com Wind Calculations . Per.ASCE 7-16 Components and Cladding • • Input.Variables ] ' Wind Speed 110 mph ' • . ' . Exposure Category :. ' . • C., Roof Shape Gable Roof Roof Slope • 21,degrees, Mean Roof.Height 20;ft • Effective Wind Area. 19:3 1l - - . . Ground Elevation 10 ft • • Design Wind Pressure Calculations' ! a • .' ':. qh=0.00256'Ki"Kzt'.Kd"Ke'VA2 :(Eq.26.10-1) • - Kz(Exposure Coefficient)=0.90 (Table.30.3-1). . .Kzt(topographic factor)=.1.00.-- ' (Fig:26.8-1)- • Kd(Wind.Directionality Factor)= 0.85 (Table 26.6-1) Ke(Ground Elevation Factor)= 1.00 -V(Design Wind Speed)=110 mph• (Fig.26.5-1A) 1 . Risk Category II (Table:1.5-1). . . - - qh=. 23.75 . I, Standoff,Uplift Calculations=Portrait. ! Zone 1 Zone 2 .• Zone 3 : Positive . ff,= • 0.73 0.73 • -.0.79 - 0.73 GCp= -130 -2.26 2.88. 0.48 (Fig.30.3) . - . . Uplift Pressure= -25.9 psf -39.0 psf, -53.7 psf 8.4 psf. .(Eq.29.4-7) ASO Uplift Pressure= -15.5 psf -23.4 pst` -32:2 psf 9.6 psf •` . X Standoff Spacing:= , • 6.00- • 6.00. • ' 4.00 . Y Standoff Spacing= 2:75 2.75 • 2.75- • • . ' • . . . Tributary Area= . `"16.50. . • .'.16.50 . •11.00 - , . . Dead Load on attachment= 50 lb 50 lb -33 Ib Footing Uplift(0.61)+0.6W)_--- 207lb:'.' • -337 lb -322 Ib : - Standoff Uplift Calculations-Landscape.. ( -. • • Zone 1 .Zone 2 Zone 3 Positive y.---. 0.79 . . 0.79 0.80. 0.79 ' .GCp= =1.50 -2.48 1 •-3.20 0.53 ; (Fig.30.3) • Uplift Pressure= -28.2 psf -46.6 psf -60:8 psf 10.0.psf (Eq.29A-7) ' . • ASDUplift Pressure(0.6W)= -16.9'psf . -28.0 psf -36.5 psf 9.6'psi'. • . ._X Standoff Spacing= • 6:00 ' . ' . .6.00 .. 4.011 " :Y.Standbff Spacing 7 1.75 1.75 : 1;75 • T.ributary.Area.= 10.50 10.50 _' :.7.00 ' ' • Dead Load•onattachment= 31:50 31.50 21.00 • • Footing Uplift(0.6D+0.6W)= ..-146'lb .-262 lb.. . =234 lb. r i� Standoff Uplift Check .T i'I Maximum Design Uplift=-337 lb ' Standoff Uplift Capacity ='450lb 450 lbcepecity>337 lb demand Therefore,OK ' Fastener Capacity Check , ' Fastener=1-.5/16°dia Lag- - '' Number of Fasteners=1. . - ' Embedment Depth=2.5 ,Pullout Capacity Per Inch.=250 lb . Fastener Capacity=625 Ib wfF.S.of1.58DOLof1:6=-667 lb 667.2 lb capacity>337 lb demand Therefore,.OK • Huang Residence,Arcadia,CAPE Calcs.xlsm 3 • • LAGUNA 28202 Cabot Road, Suite 300 "-, CONSULTING ENGINEERS Laguna Niguel, CA 92677 LAGUNA PACIFIC ORQUP,INC. 9497371,5238 info@LaguhaEngineers.cOrn FramingCheck (Roof 1&2) PASS Note:Framing check conservatively assumes full roof live load and PV dead load.Framing checks outs therefore, no further analysis is required. w=64 plf Dead Load psf • PV Load 3.2 psf Live Load 20.0 psf 2x4 Rafters @ 240.c. 0 < : Governing Load Combo=DL LL . Member Span=6, • Total Load .31.8 psf Member Properties Member Size • S(in"3) I(m04)" Lumber Sp/Gr Member Spacing 2x4 3.06 5.38 DF#2 @ 24"15.6. [ -Chick Bending Stress , Fb(psi) fb x • Cd Tx Cf x .Cr (NDS Table 4.3.1) 900 x 1.5 •x 1.15- Allowed Betiding StreSs=1940.6 psi MaximUm Mbment (w1,^2)/8 = 240.3559 ft# = 2884,27 in# Actual Bending Stress=(Maximum Moment)/S =941.9 psi Allowed>Actual 48.6%Stressed Therefore,OK CheckDeflection Allowed Deflection(Total Load) = .U180 (E=1600000 psi Per NDS) = 0.366 in DefleCtion Criteria Based on : = Simple Span Actual Deflection(Total Load) = (5%/1^4)/(384*E*1) = 0.153 in = L1432 > L/180 Therefore OK Allowed Deflection(Live Load) •= • L/240 0.275 in Actual pefiection(Live Load) •= (5*W*LA4)/(384*E*1) 0.097 in L/681 • > U240 Therefore OK • Check Shear Member Area= 5.3 InA2 • • Fv(psi)= 180 psi " (NDS Table 4A) Allowed Shear = Fv*A = 945 lb Max Shear(V)7 w*L/2 = 175 lb Allowed>Actual--18.5%Stressed -- Therefore,OK • Huang Residence;Arcadia, CA PE Cates .xlsm 4 , LAGUNA 28202 Cabot Road,.Suite 300 . a• CONSULTING ENGINEERS ) Laguna Niguel, CA 92677 ° - LAGUNA PACIFIC GROUP;INC. 94.9=371-5238 Lateral Check info@LagunaEngineers.corn Existing Weight of Effected Building Level Area Weight(psf) Weight(Ib) Roof i : 2000:sf . 8.6 psf 17138 lb Ceiling :. . 2000 sf 6.0 psf 12000 lb Wood Siding 100 ft : 5.0 psf :. :. 2000 lb : .(8'-0"Wall Height) Int.Walls 100 ft 6;4 psf 2560 lb .Existing Weight of EffectedBuilding _ 33698 lb Proposed Weight of PV System Weight of PV System(Per Sunpower Corporation) 3.0 psf . Approz:.Area of-Proposed PV System: - - : 462 sf Approximate Total Weight of PV System ; 1386 lb r 10%Comparison 1 I :10%of Existing Building Weight(Allowed) 3370..lb - Approximate Weight of PV.System(Actual) 1386 lb Percent Increase :4.1% 3370 lb_>1386 Ib,Therefore OK Huang Residence;Arcadia, CA PE Calcs .xlsm 5