HomeMy WebLinkAboutSolr-21-1278 Permit NO SOLR 21 127.8
'� City of Arcadia, CA f y„
Development Services Department i L s � �- � i �~ ) -• IV- L.) � �, ,Permit Type SOlar'
240 West Huntington Drive,Post Office Box 60021 1 5. ' i i 1.1 C
g F � . L, III I f , i • Work Classification:Solar Residential
V,
Arcadia,CA 91066-6021 1 j
` # (626)574-5416 " aw Permit Status Issued .
ARCADIA Issue Date 07/15/2031
Expiration: 07/15/202 2
Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number
s
148 FANO ST Arcadia,CA 91006-3857 5779009075
Contacts
TESLA ENERGY* Owner BO HUANG 'Owner
3055 Clearview Way,San Mateo,CA 94402 148 FANO ST,ARCADIA,CA 91006
(323)240-3174
Description:ROOF MOUNTED SOLAR SYSTEM 13 MODULES, Valuation: $ 0.00 Tenant
INVERTER,200A INTERNAL 2 TESLA ESS
Total Sq Feet: 0.00 Plan Check#21-1278 Plan#
Fees Amount Payments Amount Paid
Battery Storage Device $118.00 Total Fees $454.00
Distribution Panel $22.00 Cash/Receipt#REC-08212-21 $454.00
Electrical Permit Issuance Fee • $55.00 - -
Energy Storage System Plan Review $55.00 Amount Due: $0.00
Residential Solar<10 kW $31.00
Residential Solar Plan Check<10 kW $150.00
Solid Waste Management Fee 2 $1.00
Technology Fee(Permit) $10.72
Technology Fee(Plan Check) $11.28
Total: $454.00 CALLS FOR INSPECTIONS
9 Request for inspection by telephone at 626-574-5450. Leave a message
Z�-.2.--'1
requesting the address,timeframe and what inspection item is needed.
fcLr 61
4 V #\
This permit/plan review expires by time limitation and becomes null and
void if the work authorized by the permit is not commenced within 180 days
from the date of issuance or if the permit is not obtained within 180 days
from the date of plan submittal.This permit expires and becomes null and
void if any work authorized by this permit is suspended or abandoned for 180
consecutive days or if no progressive work has been verified by a City of
Arcadia building inspector fora period of 180 consecutive days.
,O Is CO1PLETEDou �
see 't5 t
e-s
eo kV t,
July 15, 2021
Issued By:Jeff Wang Date
July 15,2021 Page 1 of 1
4 oFF Rv,C9dr
PERMIT/PLAN REVIEW APPLICATION
o Development Services Department,240 West Huntington Drive,Post Office Box 60021
°{N° Arcadia, CA 91066-6021, (626) 574-5416,Fax (626) 447-9173
City of
Arcadia
LICENSED CONTRACTOR'S DECLARATION WORKERS'COMPENSATION DECLARATION
❑ I hereby affirm under penalty of perjury that I am licensed under provisions of I hereby affirm under penalty of perjury one of the following:
Chapter 9(commencing with Section 7000,of Division 3 of the Business and
Professions Code,and my license is in full force and effect. ❑ I have and will maintain a certificate of consent to self-insure for workers'
License Class License No. Exp. Date compensation, as provided for by Section 3700 of the Labor Code, for the
Signature of Contractor performance of the work for which this permit is issued.
OWNER-BUILDER DECLARATION ❑ I have and will maintain workers'compensation insurance,as required by Section
El hereby affirm under penalty of perjury that I am exempt from the Contractors 3700 of the Labor Code,for the performance of the work for which this permit
License Law for the following reason(Section 7031.5,Business and Professions is issued.My workers'compensation insurance carrier and policy numbers are:
Code.Any city or county which requires a permit to construct,alter,improve, Carrier
demolish,or repair any structure,prior to its issuance,also required the applicant
for such permit to file a signed statement that he or she is licensed pursuant to the Policy Number
provisions of the Contractors License Law(Chapter 9(commencing with Section (This section need not be completed if the permit is for one hundred dollars or less)
7000) of Division 3 of the Business and Professions Code)or that he or she is
exempt there from and the basis for the alleged exemption. Any violation of ❑ I certify that in the performance of the work for which this permit is issued,I shall
Section 7031.5 by any applicant for a permit subjects the applicant to a civil not employ any person in any manner so as to become subject to the workers'
penalty of not more than five hundred dollars($500)): compensation Laws of California,and agree that if I should become subject to the
workers'compensation provisions of Section 3700 of the Labor Code,I shall
❑I, as owner of the property, or my employees with wages as their sole forthwith comply with those provisions.
compensation,will do the work,and the structure is not intended or offered for
sale(Section 7044,Business and Professions Code:The Contractors License Date Signature
Law does not apply to an owner of property who builds or improves thereon,
or who does such work himself or herself or through his or her own
employees,provided that such improvements are not intended or offered for WARNING: Failure to secure Workers'Compensation coverage is unlawful,
sale.If,however,the building or improvement is sold within one(1)year of and shall subject an employer to criminal penalties and civil fines up to one
completion,the owner-builder will have the burden of proving that he or she hundred thousand dollars($100,000),in addition to the cost of compensation,
did not build or improve for the purpose of sale). damages as provided for in Section 3706 of the Labor Code, interest, and
attorney's fees.
❑I, as owner of the property, am exclusively contracting with licensed
contractors to construct the project(Section 7044,Business and Professions
Code:The Contractors License Law does not apply to an owner of property CONSTRUCTION LENDING AGENCY
who builds or improves thereon,and who contracts for such projects with a I hereby affirm under penalty of perjury that there is a construction lending agency
contractor(s)licensed pursuant to the Contractors License Law). for the performance of the work for which this permit is issued (Section 3097,
Civil Code).
❑ I am exempt under Section 7044,Business and Professions Code,for this reason:
Lender's Name
Date Signature Lender's Address
IMPORTANT: APPLICATION IS HEREBY MADE TO THE BUILDING OFFICIAL FOR A PERMIT SUBJECT TO THE CONDITIONS AND
RESTRICTIONS SET FORTH ON THIS APPLICATION AND THE FOLLOWING:
1. The City's approved plans and permit inspection card must remain on the job site for use by City inspection personnel.
2. Final inspection of the work authorized by this permit is required.A Certificate of Occupancy must be obtained prior to use and occupancy of new buildings
and structures.
3. Per South Coast Air Quality Management District(AQMD)regulations,renovation and remodeling work that results in the removal,stripping,or altering
of asbestos containing materials requires an asbestos survey and removal prior to disturbing the asbestos.Please contact AQMD at(909)396-2000 for
further information.
Name Title
PRINT NAME
I certify that I have read this application and state that the above information is correct and that I am the owner or duly authorized agent of the owner.
I agree to comply with all City ordinances and State Laws relating to building construction. I hereby authorize representatives of the City of
Arcadia to enter upon the above-mentioned property for inspection purposes.
Signature Date
PITCH:32 ARRAY PITCH:32'
ALL ELECTRICAL EQUIPMENT TO BE 148 Fano St MP1 AZIMUTH:179 ARRAY AZIMUTH:179
MOUNTED ON WALL MATERIAL:Flat Cement Tile STORY:2 Stories
Front Of House PITCH:31 ARRAY PITCH:31
MP2 AZIMUTH:269 ARRAY AZIMUTH:269
MATERIAL:Flat Cement Tile STORY:2 Stories
rFm rrm
isI .. Devi 1 pntcnt Snr1 iccs i?:•part:nt•nt
TN.:set ni pl:to,and yucilic atinnti nlna he hunt
O
—
on the;tilt at all!B:ret and no cl:an;Cc:or aituratinns
O ral o , sisalt In:wadi.a c•.;'cpi h.the:it:itciog:Pin Mon.
— hhcSiar•ipin;.:,:'In phm and••iirciiu•aiinn'.hail net
o , Le held to pt-mil ne no n an:Ipprr.rd n!ihu 1 tnitl;inn
® of any prm raont c'
° I :.tatc Iau
® LEG` N1:..::
o°® I < I n (E)UTILITY METER &WARNING LABEL
® (—I INVER W/ RATED DC DISCO
o I I &WARNING
TER LABELSINTEG
o
® AUTOMATIC RELAY
...),
® I ri DC DISCONNECT&WARNING LABELS
AC DISCONNECT&WARNING LABELS
o I n DC JUNCTION/COMBINER BOX&LABELS
I \,.� O ENERGY STORAGE SYSTEM FOR STAND
^ ALONE OPERATION
U — I DISTRIBUTION PANEL&LABELS
1
1 n LOAD CENTER&WARNING LABELS
1 I / O DEDICATED PV SYSTEM METER
®I I y; n RAPID SHUTDOWN
811\t (p/I I STANDOFF LOCATIONS
I S/ �v CONDUIT RUN ON EXTERIOR
/ ®�°\' / J/ CONDUIT RUN ON INTERIOR
QpOFESS/p — — '� u GATE/FENCE
e4o�61AUNy4y!i ^ I 0 �'. O, HEAT PRODUCING VENTS ARE RED
y Ate' '%, Digitally signed by ®177 ®� �_� INTERIOR EQUIPMENT IS DASHED
�'" C 88783 P.El Eugene Munyanziza ■t� ! �'° I
`f7�, �* Date20:03: G-04'00' rm7` SITE PLAN
\te OF C AO
�� 20:03:40 04'00' w` (E)DRNEWAY SEale:l/i6"=1' wtN
E
Alley a Or 16' 32'
JB-9104141 00 °` "°` °°°`
e "1w-'O �' 'e N°� Bo Huang 4.42 KW PV ARRAY Lance Sedgwlck T � 5 L In
caEFIT O OWL NOT U T D FOR M.
BENEFIT v MORE D1V T DMA etc,NOR Youxltq MDR
WU'1r EE"RUM N WM aR N UP Mighty Hook 148 Fano St 27 KWH ENERGY STORAGE SYSTEM —
IMT TO OT Al 0U1m!DE IE0'un1
maulZA1 t I 1q,1 MI Dattin Arcadia, CA 91006
DE SW AND USE v ne RFSECTNE (13)Hanwha 0-CELLS/Q.Peak DUO BLK-G6+ 340
1EMA EID P14)IL MOH DE TRITER eNalaR IACL RAM MID RR &L•
�O IMI""''PC Powerwalt+ Tesla Inc 1240V1/1850000-00-B 7.6 kW/13.5 kV'h6262037785 SITE PLAN 3 a 6/22/2021
Version#91.8-1
NAS
June 22,2021
RE: CERTIFICATION LETTER (p'a� .
Di' ei( 1u 1Sl i(`�1 T.''ti i��aycat
Project/Job#9104141 _- e �?•t`r� G a�'j.'f; ,
Project Address: Huang Residence
148 Fano St �tl�S 5E l(:f k)t Patti a'S"!t `i
tii tl( ti�rl
Arcadia,CA 91006i;tt(11?5
3C :;k)211 flk;1. 116C';iiD' i
4El t ,iiktk:ll'f ..y'�isk(;i:.
AHJ Arcadia , (Iti,l`•;��a}�-})ti 113C 13
SC Office Atwater Village St:%ikk ?('ti•11 t ° ' i], ic:iiioll`'k`'it]13Ot
tit liii"')!�lr t.tli` k3ir:il ili a 1 i(i1
Design Criteria: )
q {( 1'i'ati?df)
tii �i1 k1 1e k): Eiti (`.i
-Applicable Codes=Structure:2019 CEBC;PV:2019 CBC/CRC,ASCE 7-16 nd}2018.NL1S(,'. 2i't 1,(
-Risk Category=II
-Wind Speed=100 mph(3-s Gust-Vult),Exposure Category C, Partially/Fully Enclosed Method
-Ground/Roof Snow Load=0 psf
-MP1:Roof DL=15.5 psf,Roof LL=16.5 psf
-MP2:Roof DL=15.5 psf,Roof LL=17 psf
Per Section 1613.1,W-(PV)/W-(exist roof)=1.3%,Increase Seismic Shear Load<10%,->[OK]
To Whom It May Concern,
A structural evaluation of loading was conducted for the above address based on the design criteria listed above.
Based on this evaluation,I certify that the alteration to the existing structure by installation of the PV system meets the prescriptive
compliance requirements of the applicable existing building and/or new building provisions adopted/referenced above.
Additionally,I certify that the PV module assembly including all standoffs supporting it have been reviewed to be in accordance with the
manufacturer's specifications and to meet and/or exceed all requirements set forth by the referenced codes for loading.
The PV assembly hardware specifications are contained in the plans/docs submitted for approval.
Installer shall verify existing roof framing is in suitable condition and does not exhibit any signs of structural damage which may diminish
the capacity of its members or connections prior to commencement of PV installation.Installer verification of the mounting planes noted
above is required because some or all of the framing was not observed prior to the structural evaluation performed for this report.
p>i ESS/p
okc �UNy Nql
y �� y1 DDigitally signed by
W'W G 88783 '' m Eugene Munyanziza
F4 Date:2021 06:22
20:04:08-04'00'
eop CAk-\ •
•
Tesla,Inc.
Version#91.8-1
NAS
,HARDWARE DE$IGN AND STRUCTURAL EVALUATION RESULTS SUMMARY TABLES'
•,., Landscape ' '-`„,- -`,-,-4, -`, . . .' Hardware-Landscape Modules'Standoff Specifications
Hardware..-- X-X Spacing - X-X Cantilever Y-Y Spacing. Y-Y Cantilever c `,, Configuration ' ''Uplift DCR
MP1 72" 24" 52" 24" Not-Staggered 40.1
MP2 72" 24" 52" 24" Not-Staggered 40.0%
Portrait ,,,,,. , . - .-..- Hardware-Portrait Modules'Standoff Specifications
Hardware,..--, X-X Spacing ' -X-X Cantilever ,Y-Y Spacing - Y-Y Cantilever- Configuration ' Uplift DCR
MP1 64" 20" 52" 24" Not-Staggered 35.6%
MP2 64" 20" 52" - 24" Not-Staggered 35.5%
viitiriiiii ,,i,644ii, , , 4. Root Pitch,'',...',,,,., ';-'',',r-,... , ' , ' -. ,.... -,- :,'Qualification Reaults.
' -- ' ‘ (Degrees) - . . , , .. ., •- ' Member Evaluation Results
MP1 32° Member Impact Check OK
MP2 31° Member Impact Check OK
Tesla,Inc.
- -
(7-1 335 Cko-,'z'l;,,V:v ::';a 1;,;,''V.. :. CA::14,,,(32
;/0,,C,,:;%; 1 C:”..1 f Ci:C,%;;;-3