Loading...
HomeMy WebLinkAboutItem 11h - Accept Annual Concrete Repairs Project DATE: November 2, 2021 TO: Honorable Mayor and City Council FROM: Paul Cranmer, Public Works Services Director By: Eddie Chan, P.E., Principal Civil Engineer SUBJECT: ACCEPT ALL WORK PERFORMED BY CT&T CONCRETE PAVING, INC. FOR THE FISCAL YEAR 2020-21 ANNUAL CONCRETE REPAIRS PROJECT AS COMPLETE Recommendation: Approve SUMMARY On May 4, 2021, the City Council approved a contract with CT&T Concrete Paving, Inc. in the amount of $61,145, with a 10% contingency, for the Fiscal Year 2020-21 Annual Concrete Repairs Project. The terms and conditions of this project have been complied with and the work has been performed to the satisfaction of the Project Manager for a total project cost of $65,535. This amount reflects the original contract amount of $61,145 plus quantity changes totaling $4,390, or 7.18% more than the original contract amount. It is recommended that the City Council accept all work performed by CT&T Concrete Paving, Inc. for the Fiscal Year 2020-21 Annual Concrete Repairs Project as complete; and authorize the final payment to be made in accordance with the contract documents, subject to retention of $3,276.75. BACKGROUND The Public Works Services Department (“PWSD”) is responsible for the maintenance and repair of approximately 147 miles of roadway within the City. In 1999, as part of the Pavement Management Program, the condition of all City streets was assessed, and an Annual Asphalt and Concrete Repair Program was established. As part of this program, street surfaces that are cracked are slurry sealed, and concrete curbs, gutters, and pavement areas that have been damaged are repaired. More specifically, the concrete repairs portion of the program includes identifying and prioritizing replacement of sidewalks, curbs, and gutters. Accept Annual Concrete Repairs Project November 2, 2021 Page 2 of 3 DISCUSSION On May 4, 2021, the City Council approved a contract with CT&T Concrete Paving, Inc. for the Fiscal Year 2020-21 Annual Concrete Repairs Project. The work performed included repairing concrete curbs, gutters, cross gutters, and pavement areas that were damaged. The focus of the repairs was to fix safety and drainage issues. During the course of work, there were some additions and reductions in quantities of various bid items. Also, additional work was requested to remove a concrete sidewalk at 820 S. Baldwin Avenue for pedestrian safety. This resulted in an overall addition in the amount of work completed in this contract. Below is a breakdown of contract change orders. CCO Description Amount 1. Additional (45 LF) – Remove and Replace PCC Curb and Gutter $2,385 2. Additional (10 SF) – Remove and Replace PCC Cross Gutter/Spandrel $180 3. Deleted (250 SF) – Remove and Replace 4-inch thick Asphalt ($2,725) 3. CCO #1 820 S. Baldwin Ave. Remove PCC Sidewalk $4,550 Total: $4,390 The terms and conditions of this contract have been complied with and the work has been performed to the satisfaction of the Project Manager. CT&T Concrete Paving, Inc. completed the work as defined in the project plans and specifications in an efficient and timely manner. FISCAL IMPACT The work plan and budget for the Fiscal Year 2020-21 Annual Concrete Repairs Project was included in the Fiscal Year 2020-21 Capital Improvement Program as part of the overall Pavement Rehabilitation Program. Funds in the amount of $1,100,000 were budgeted in that budget. The project’s total cost is $65,535. This amount reflects the original contract amount of $61,145 plus quantity changes totaling $4,390. RECOMMENDATION It is recommended that the City Council accept all work performed by CT&T Concrete Paving, Inc. for the Fiscal Year 2020-21 Annual Concrete Repairs Project as complete; and authorize the final payment to be made in accordance with the contract documents, subject to the retention of $3,276.75. Accept Annual Concrete Repairs Project November 2, 2021 Page 3 of 3