Loading...
HomeMy WebLinkAboutRALT-21-1970 City of Arcadia, CA "mil "`° Permit NO. RALT-21-1970.` `' Development Services Department n D ;: v --,,per t Type:Residential Addition/Alteration 240 West Huntington Drive,Post Office Box 60021 Arcadia,CA 91066-6021 � IiVorl-Classification: / cation:'Res-Addition Alterration � +��'w. ���,.._...r � (626)574-5416 Permit Status:Issued A CAD IA issue bate 10/19/2021 Expiration: 10/19/2022 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number 2323 LOUISE AVE Arcadia,CA 91006-5122 5789025017 k . .. _ ��a .� _.�� b _.. � .�y,; . .�.._u� ,_� •w Contacts WUNG,CHIENFEN CHENG AND Owner HAN,CHIH YANG 2323 LOUISE AVE,ARCADIA,CA 91006-5122 (626)679-1766 Description:ADD WALL TO DIVIDE FAMILY RM TO CREATE Valuation: $ 500.00 i, Tenant SMALLER PLAY ROOM AND STORAGE CLOSET. NO DOOR ON PLAYROOM PER PLANNING Total Sq Feet: 0.00 . Plan Check# Plan# _ Fees Amount Payments Amount Paid Building Issuing Fee $55.00 Total Fees $219.11 Building Permit Fees $45.63 Cash/Receipt#REC-09171-21 $219.11 Building Plan Review Fee $29.66 Cal Green Plan Check $2.97 Amount Due: $0.00 Electrical Permit Issuance Fee $55.00 Energy Plan Review Fee $9.13 Green Building Standard $1.00 Outlets-Receptacles&Switches $2.00 1 Solid Waste Management Fee $6.25 Solid Waste Management Fee 2 $1.00 Strong Motion Inst.Program Res $0.50 CALLS FOR INSPECTIONS Technology Fee(Permit) $5.53 Request for inspection by telephone at 626-574-5450. Leave a message Technology Fee(Permit) $3.14 requesting the address,timeframe and what inspection item is needed. Technology Fee(Plan Check) $2.30 Total: $219.11 This permit/plan review expires by time limitation and becomes null and d I^ 16—z I void if the work authorized by the permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days T - 0 l- from the date of plan submittal.This permit expires and becomes null and void if any work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of ' 1-3 0,f2A Arcadia building inspector fora period of 180 consecutive days. FINAL Og a J aO1PLTD October 19, 2021 Issued By:Jeff Wang Date October 19,2021 Page 1 of 1