HomeMy WebLinkAboutSOLR-20-0548 " g City of Arcadia, CA " ' ' ' Perm,t No S"OLR20 0548
s .Development Services Department " e` � Tj � PermfType Solar.
240 West Huntington Drive,Post Office Box 60021 t" to +: ' P " : as 4{
• ork Classi canon Solar Commercial, uer 10 KV
� Arcadia CA 91066-6021 '" )� ��f� , 7
(626)574-5416 P e z �` ermit Strfu's Issued
t � ' ;; xN:AW a r.. cA
:ARCADI e issu(e Date 01/25/2021 Expiration: 01/25/2022
Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number
12369 LOWER AZUSA RD Arcadia,CA 91006-5889 8541017049
Contacts
SCANNELL PROPERTIES 255 LLC LSEE Owner EMPOWER ENERGIES INC* Applicant
YELLOW IRON INVESTMENTS LLC LSOR 3 Bethesda Metro Center,Suite 800 BETHESDA METRO CENTER 800,BE
C/O JAMES C CARLINO (443)924-7294 - -
12359 LOWER AZUSA RD
SOUTH COAST COMMERICAL ELECTRIC Contractor
.INC dba FUTURE ENERGY*
16735 SATICOY ST 105,VAN NUYS,CA 91406
(818)683-4724 1024289
Description:ROOF MOUNTED SOLAR SYSTEM FOR FEDEX.4104 Valuation: $0.00 Tenant
MODULES,12 INVERTERS AND 1 SOLAR AC SWITCHBOARD. 9/_
Total Sq Feet: 0.00 Plan Check#20-548 Plan#3
Fees Amount payments Amount Paid
Building Plan Check Fee Commercial $100.00 Total Fees $2,277.30
Distribution Panel $16.48 Cash/Receipt#REC-06565-21 $2,277.30
Double Fee(Building) $285.00
Double Fee(Building) $712.00 Amount Due: $0.00
Electrical Permit Issuance Fee $47.01
Fire Plan Check Fee Commercial $100.00
Inverters $933.36
Panels $82.45
Solid Waste Management Fee 2 $1.00
Total: $2,277.30 CALLS FOR INSPECTIONS
Request for inspection by telephone at 626-574-5450. Leave a message
requesting the address,timeframe and what inspection item is needed.
• This permit/plan review expires by time limitation and becomes null and
void if the work authorized by the permit is not commenced within 180 days
from the date of issuance or if the permit is not obtained within 180 days
from the date of plan submittal.This permit expires and becomes null and
void if any work authorized by this permit is suspended or abandoned for 180
consecutive days or if no progressive work has been verified by a City of
Arcadia building inspector for a perigd of 180 consecutive days.
Er.] compiETED
Sid c,
January 25, 2021
Issued By: 1 Date
January 25,2021 Page 1 of 1
- I