Loading...
HomeMy WebLinkAboutMEP-21-1850 ``' _ '$ PerrnitNO MEP 21 1850 City of Arcadia, CA ti' Development Services Department �� Tily v'' rL''r,-1 .t��. _ Permit Type:,MEP .' 240 West Huntington Drive,Post Office Box 60021 1 ' L Work Classification:'MEP Residential. r=a g- `:` Arcadia,CA 91066-6021 if ` )-r.' ' (626)574-5416 ,Permit Status:Issued' ARCADIA. q, , Issue Date:.1O/01/2021, Expiration: 10/03/2022 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number 1418 S FIFTH AVE Arcadia,CA 91006-4340 5780009012 Contacts i KEN KWAN• Owner TRAN CONSTRUCTION INC* Contractor ql 1418 S FIFTH AVE ii (626)716-1099` (626)926-7402 980914 Description:REMODEL KITCHEN AND 3 BATHROOMS ( Valuation: $ 0.00 Tenant EXISTING LAYOUT TO REMAIN) Total Sq Feet: 0.00 t Plan Check# Plan# Fees Amount Payments Amount Paid Bathtubs/or Combo $15.00 Total Fees $480.12 Dishwasher $15.00 Cash/Receipt#REC-09022-21 $480.12 Electrical Permit Issuance Fee $55:00 Garbage Disposal Fee $15.00 Amount Due: $0.00 Hood Serviced by Mechanical Exhaust $16.00 -' Kitchen Sink $15.00 Lavatories $60.00 Mechanical Permit Issuance Fee $55.00 .Outlets-Receptacles&Switches $46.25 ,Plumbing Permit Issuance Fee $55.00 Shower $30.00 CALLS FOR INSPECTIONS Solid Waste Management Fee 2 $1.00 Request for inspection by telephone at 626-574-5450. Leave a message Solid Waste Management Fee 2 $1.00 requesting the address,timeframe and what inspection item is needed. Solid Waste Management Fee 2 $1.00 Technology Fee(Permit) $24.87 Ventilation Fan(Single Duct) $30.00 This permit/plan review expires by time limitation and becomes null and Water Closet $45.00 void if the work authorized by the permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days Total: $480.12 from the date of plan submittal.This,permit expires and becomes null and void if any work authorized by this permit is suspended or abandoned for 180 ( 2—` ".7 iI consecutive days or if no progressive work has been verified by a City of _ .,„,I EJ C, e}_ 17 �p31Fd Arcadia building inspector for a period of 180 consecutive days. Kp[,(>�rtil� Xx�Jl�� Ttlt Ryrvvf D-- e/ /4 - ait CoORi? af ''i/ O7 isziCOF -PLET ED rwAL 6K P October 01, 2021 Issued By:Jeff Wang Date October 01,2021 Page 1 of 1