Loading...
HomeMy WebLinkAboutSIGN-19-1901 a� City of Arcadia, CA i Permit NO.SIGN-19-1901 S ' it i Development Services Department D }fi.: f ,'-�..--) C, '-1 Permit,Type:Sign m 240 West Huntington Drive,Post Office Box 60021 I ; I i Arcadia,CA 91066-6021 ',i •_mil 1,3 , O U Work Classification:Sign Illuminated ix, (626)574-5416 ^ ,,, ,, , , , I e,n,3 a Permit Status Issued.,; ARCADIA Issue Date:09/18/2019 Expiration: Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number 1019 S Baldwin AVE Arcadia, CA 5783011030 Contacts KLINGER,JOHN AND AMALIATRSJ AND Owner ULTIMATE ACRYLICS LLC dba JDH SIGNS Contractor A KLINGER TRUST AND SONNEGA,N CO &PRINTING* TR SONNEGA TRUST 13892 HARBOR BLVD 4A,GARDEN GROVE,CA 92843 869 Contra Costa AVE,Kensington,CA 94707 (714)468-4664 1036840 ...A_,,..a:e wm.e%,,.,�..i.> ve G..C.: X9+.'..._..,.4 .:•*.dk:T,..m..YN.C...✓.::P.'.:.C..t...„.SS& 'M;.F:._ a.. �szc:.�.._..a: «_s.,a.-'>u. ...a: ^,:..:�_., as..s:..�.s�." -M ..K as.�,;,;.:"`n..9w'oe .,...,s.wwz'a. :Y�X.:• 4 Description:2 NEW SIGNS FOR DING TEA Valuation: $ 3,000.00 Tenant DING TEA Total Sq Feet: 0.00 Plan Check# Plan# Fees Amount Payments Amount Paid Building Issuing Fee $47.01 Total Fees $446.48 Building Permit Fees $120.35 Cash/Receipt#REC-02534-19 $446.48 Electrical Permit Issuance Fee $47.01 Amount Due: $0.00 Sign and Branch Circuit $131.72 Sign Connection $32.96 Sign Plan Review $60.18 Solid Waste Management Fee $6.25 Solid Waste Management Fee 2 $1.00 Total: $446.48 CALLS FOR INSPECTIONS Request for inspection by telephone at 626-574-5450. Leave a message requesting the address,timeframe and what inspection item is needed. z LETEDThis permit/plan review expires by time limitation and becomes null and �o�� v ' workauthorized b the ermit is not commenced within 180 da s void ifthe y p y from the date of issuance or if the permit is not obtained within 180 days ` f14 from the date of plan submittal.This permit expires and becomes null and / void if any work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of Arcadia building inspector for a period of 180 consecutive days. fl September 18, 2019 Issued By: Date September 18,2019 Page 1 of 1