Loading...
HomeMy WebLinkAboutRALT-20-0957 • • rr Cityof Arcadia, CA " 0 • Permit NO RALT 20 0957 T Development Services Department D '` r Permt-Type•:Residential Addition/Alteration 240 West Huntington Drive,Post Office Box 60021 '• W Arcadia,CA 91066-6021 • ..,rWork-Classification:Res-Addition/Alteration. � ( (626)574-5416 Permit Status:Issued: ARCADIA Issue"Date b1/o6/2Q21k1 Expiration: 01/06/2022 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number 491 W LONGDEN AVE Arcadia,CA 91007-8132 5785018040 Contacts KOYU ONDA Owner . Xin Miao Applicant 491 W LONGDEN AVE,Arcadia,CA 91007-8132 38 Umbria,Irvine,CA 92618 (626)617-2255 (888)622-6688 steve.miaomiao@gmail.com QUAN CONSTRUCTION* Contractor 3325 JACKSON AVE,ROSEMEAD,CA 91770 (626)313-8899 1059126 •�� � « _ f....,. NMIWEM Description:ADDITION TO INCREASE TWO BEDROOMS.ADD Valuation: $ 58,239.42 Tenant NEW BATHROOM IN BEDROOM AND REMODEL TWO BEDROOMS. , Total Sq Feet: 285.00 Plan Check#20-957 Plan#384 • Fees Amount Payments Amount Paid Building Issuing Fee $47.01 Total Fees $2,844.46 Building Permit Fees $881.65 Cash/Receipt#REC-04957-20 $1,086.72 Building Plan Review Fee $573.08 Cash/Receipt#REC-06456-21 $1,757.74 Cal Green Plan Check $57.31 Energy Plan Review Fee $176.33 Amount Due: $0.00 Green Building Standard $3.00 Parks&Recreation Fee(SFR) $812.25 Single Family Fire Plan Check $280.00 Solid Waste Management Fee $6.25 Strong Motion Inst.Program Res $7.58 CALLS FOR INSPECTIONS Total: $2,844.46 Request for inspection by telephone at 626-574-5450. Leave a message requesting the address,timeframe and what inspection item is needed. This permit/plan review expires by time limitation and becomes null and ,� void if the work authorized by the permit is not commenced within 180 days C l ij D from the date of issuance or if the permit is not obtained within 180 days from the date of plan submittal.This permit expires and becomes null and void if any work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of 6Z—Fs—Z/ %$G Arcadia building inspector fora period of 180 consecutive days. January 06, 2021 Issued By: Date January 06,2021 Page 1 of 1