Loading...
HomeMy WebLinkAboutMEP-21-0209 ', ' City of Arcadia, CA a -� ` Permit NO'MEP 21 0209z ," • eM {" Development Services Department D ----- -v-3 i. '-1• Permit Type MEP 240 West Huntington = ,' Arcadia,CA 91066-6021Drive,Post Office Box 60021 f •1 Work "Classification:MEP Residential_ 'µ r' (626)574-5416 s. i i`,• , :, 1 Permit Status::Is sued ARC IA Issue Date'02/09/2021,I Expiration: 02/09/2022 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number 176 WHITE OAK DR Arcadia,CA 91006-1725 5765017006 11 ' Contacts Charlotte Streng Owner AIR TRO INC* Contractor s 176 White Oak 1630 S Myrtle AVE,Monrovia,CA 91016 (626)357-5317 258228 ' I. Description:REPLACE HVAC SYSTEM IN SAME LOCATION AND Valuation: $ 0.00 g Tenant ,, .11.DUCTS.HERS REQUIRED.FOR FINAL Total Sq Feet: 0.00 Plan Check# Plan# fi .`PtW.a•.:.:ei. ,.^z' q .. .m.. v.R.ab."-%... v«. .Y s..,..�. _;.=..tc�Ys a___.mow... S-$&' ..e ..._x .� L ;;b8S�8°..w.Na"`.'. zvg '. Fees Amount Payments Amount Paid Add/Alter Ducts $9.94 Total Fees $229.87 Compressor 3-5 Ton(3 to 15 hp) $36.35 Cash/Receipt#REC-06711-21 $229.87 Electrical Permit Issuance Fee $47.01 Furnace or Burner<=100,000 BTU $19.86 Amount Due: $0.00 Gas System(Outlets) $16.43 Light Fixtures $1.63 Mechanical Permit Issuance Fee $47.01 —( ET�� Outlets-Receptacles&Switches $1.63 {;' COMPI.• Plumbing Permit Issuance Fee $47.01 Solid Waste Management Fee 2 $1.00 Solid Waste Management Fee 2 $1.00 CALLS FOR INSPECTIONS Solid Waste Management Fee 2 $1.00 Request for inspection by telephone at 626-574-5450. Leave a message requesting the address,timeframe and what inspection item is needed. Total: $229.87 T +Nel, 3,Z3 .Z/ ‘ ----- This permit/plan review expires by time limitation and becomes null and void if the work authorized by the permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days from the date of plan submittal.This permit expires and becomes null and void if any work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of Arcadia building inspector for a period of 180 consecutive days. 0'. February 09, 2021 Issued By:Steven Roberts Date February 09,2021 Page 1 of 1