HomeMy WebLinkAboutCOMM-21-0698 �s Pkfit
�{.Y City of Arcadia,CA s �,� ' x� Permttf,PO Comm 21 0698
W � ia dui«`# �
i Development Services Department 4 � Permit Type Commercial
` + 240 West Huntington Drive,Post Office Box 60021 j £ ¢ fl I i
i Work Classi ication Commercial Add/Alt
Arcadia,CA 91066-6021 s1
4So-0
(626)574-5416
Permit Status ISsu�d
ARCADIA H D e Issuate 04/16/2021�
� Expiration:04/18/20222
Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number
301 W HUNTINGTON DR Arcadia,CA 91007-3462 5775001019
,:Sty
Contacts
WINDROSE SANTA ANITA PROP LLC C/O Owner CASTLE CONSTRUCTION SERVICES INC* Contractor
CPAC 2495 OLIVE AVE,ALTADENA,CA 91001
301 W HUNTINGTON DR (626)233-8132 1046985
Description:INSTALL NEW EQUIPMENT CABINET (WALL tk, Valuation: $ 2,000.00 : Tenant
MOUNTED)COLORECTAL BUILDING -TREATMENT RM#2,MUST
CHECK IN AT 300 W HUNTINGTON (METHODIST)THEN TAKE Total Sq Feet: 0.00 Plan Check# Plan#
BRIDGE OVER I—Eck
Fees Amount Payments Amount Paid
Building Issuing Fee $47.01 Total Fees $302.96
Building Permit Fees $103.65 Cash/Receipt#REC-07354-21 $302.96
Building Plan Review Fee $67.38
Cal Green Plan Check •$6.74 Amount Due: $0.00
Electrical Permit Issuance Fee $47.01
Energy Plan Review Fee $20.73
Green Building Standard $1.00
Outlets-Receptacles&Switches $1.63
Solid Waste Management Fee $6.25
Solid Waste Management Fee 2 $1.00
Strong Motion Inst.Program Corn $0.56 CALLS FOR INSPECTIONS
Request for inspection by telephone at 626-574-5450. Leave a message
Total: $302.96 requesting the address,timeframe and what inspection item is needed.
This permit/plan review expires by time limitation and becomes null and
void if the work authorized by the permit is not commenced within 180 days
from the date of issuance or if the permit is not obtained within 180 days
from the date of plan submittal.This permit expires and becomes null and
void if any work authorized by this permit is suspended or abandoned for 180
r
n I L P=
i IIU= E_ D consecutive days or if no progressive work has been verified by a City of
Arcadia building inspector fora period of 180 consecutive days.
April 16, 2021
Issued By:John Zurick Date
April 16,2021 Page 1 of 1