HomeMy WebLinkAboutSNEW-19-1565 ' - City of Arcadia, CA Permit NO SNew 19 1565 "
"SO,'
Development Services Department t Permit Type Single Far ily New.
a 240 West Huntington Drive,Post Office Box 60021 Work C(CISsIfICOn $FR Ne Dwelling
Arcadia,CA 91066-6021 u c-tIO W x
A . * (626)574-5416 [ ,,a i Permlt$tatu5 ISSU,ed
.ARCADIA ^' issuebate 01/23/2S20 Expiration:
Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number
811 Monte Verde DR Arcadia, CA 5776014014
lECEZMEMIT
Contacts
MAYFIELD PEAK LLC Owner PDS STUDIO* Applicant
711 S 1st AVE,Arcadia,CA 91006 711 S FIRST AVE,ARCADIA,91006
(626)574-8083 (626)294-9402 pchan@pds-studio.com
SUNNY CONSTRUCTION* Contractor
711 S First AVE,Arcadia,CA 91006
(626)574-8083 737977
Description:4 BED,4.5 BATH,LIVING,FAMILY,DINING, 1 Valuation: $ 606,662.90 Tenant
LIBRARY,KITCHEN,WOK RM,LAUNDY,GAME ROOM. 2 CAR
ATTACHED GARAGE.WITH TPP t Total Sq Feet: 4.100.00 Plan Check#19-1565 Plan#215
Fees Amount payments Amount Paid
Building Issuing Fee $47.01 Total Fees $21,710.08
Building Permit Fees $4,722.30 Cash/Receipt#REC-02085-19 $7,150.91
Building Plan Review Fee $3,069.50 Cash/Receipt#REC-03658-20 $14,559.17
Cal Green Plan Check $306.95
Electrical Permit Issuance Fee $47.01 Amount Due: $0.00
Energy Plan Review Fee $944.46
Grading Issuance Fee $47.01
Grading Permit Fee(1-1000 CY) $450.00
Grading Plan Review Fee $850.00
Green Building Standard $25.00
LID Plan Check Fee $100.00 CALLS FOR INSPECTIONS
Off Site Plan Check(Per Site) $240.00 Request for inspection by telephone at 626-574-5450. Leave a message
Parks&Recreation Fee(SFR) $6,104.70 requesting the address,timeframe and what inspection item is needed.
Single Family Fire Plan Check $280.00
Single Family/Condo/Townhome Impact $1,983.00
Fee This permit/plan review expires by time limitation and becomes null and
Solid Waste Management Fee $6.25 void if the work authorized by the permit is not commenced within 180 days
Solid Waste Management Fee 2 $1.00 from the date of issuance or if the permit is not obtained within 180 days
Strong Motion Inst.Program Res $78.87 from the date of plan submittal.This permit expires and becomes null and
SWMF FEE 2 $1.00 void if any work authorized by this permit is suspended or abandoned for 180
SWMF FEE 2 $1.00 consecutive days or if no progressive work has been verified by a City of
Temporary Power Pole $33.01 Arcadia building inspector for a period of 180 consecutive days.
Total: $21,710.08
January 23, 2020
Issued By: Date
January 23,2020 Page 1-of 1