No preview available
HomeMy WebLinkAboutPOOL-18-2111 �"ec,, ' 11t ' ' Permit NO iPoiilL182.111.• �l City of Arcadia, CA Ni'V. Develo ment Services De artment i , , # " b r i Permit Type Pool/Spa k. r '\it '-' 240 West Huntington Drive,Post Office Box 60021 x Arcadia,CA 91066 6021 f 4, ar- A x. i M , t ,9hWOrk CIOSSIfica on POol RPkic.1 rttlal (626)574-5416 ` % PermltS totus Issued;: ''. , ARCADIAIssue Date11/i3/2 o1s Expiration: 05�12/2019 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number 310 Cambridge DR Arcadia,CA 5775004031 Contacts . 310 CAMBRIDGE LLC C/O DAWEN GAO Owner Wonderful Pools&Spas Pool Contractor(C-53) 310 CAMBRIDGE 475 S Rexford,Rialto,CA 92376 (951)823-6829 . a s=/ _ x mr-..r a.�-r -,:ems--err-,-^z%...g ' `v Description:100 PF INGROUND POOL AND SPA F Valuation: $ 23,037.00 Tenant i . Total Sq Feet: 0.00 Plan Check# Plan# i° • bL".:*.dt '., '&"a 'at'ng-m wg .T, w .,.Lem'^;xa:.a^^vv'sl :.A., ,--4r.-4,r ,.,,:-,f-t----;r ..:13 Fees Amount Payments Amount Paid Building Issuing Fee $44.35 Total Fees $1,064.86 Building Permit Fees $471.05 Cash/Receipt#REC-002863-2018 $1,064.86 Building Plan Review Fee $306.19 Amount Due: $0.00 Electrical Fee(Motors,Fix,Wiring) $67.65 Electrical Permit Issuance Fee $44.35 '' Plumbing Permit Issuance Fee $44.35 Pool Piping $27.07 Pool P-Trap $10.86 � tct ••: • PLETED Solid Waste Management Fee $6.25 Solid Waste Management Fee 2 $1.00 Swimming Pool,Spa/HotTub Heater $40.74 CALLS FOR INSPECTIONS SWMF FEE 2 $1.00 Request for inspection by telephone at 626-574-5450. Leave a message requesting the address,timeframe and what inspection item is needed. Total: $1,064.86 This permit/plan review expires by time limitation and becomes null and void if the work authorized by the permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days from the date of plan submittal.This permit expires and becomes null and void if any work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of Arcadia building inspector for a period of 180 consecutive days. November 13, 2018 Issued By: Date November 13,2018 Page 1 of 1