HomeMy WebLinkAboutTI-20-0558 � City of Arcadia, CA Kati; '' n Permit NO TI-20 0558'
'., c
I �`` Development Services Department �) a "" ( -z 1 Permit Type Tenant Initprovemerlt
. ;, 240 West Huntington Drive,Post Office Box 60021 ( 1
r f.lNorkClassificahan Tenant improvement =
y�;".; Arcadia,CA 91066-6021 .`��u : r ;z
(626)574-5416 ; �+ �a PermitStatt1055ueds�
. CAD , issue Date 10/22/2020 I Expiration: 10/22/2021 .
Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number
165 E Foothill BLVD Arcadia,CA 91006-2506 5771021029
Contacts
HIGHLANDER CENTER LLC C/O GLOBE Owner Jan Bustalino Applicant
PROPERTIES
9320 WILSHIRE BLVD 208,BEVERLY HILLS,CA 90212 (818)447-7402 Jan@permitadvisors.com
A R MAYS CONSTRUCTION INC* Contractor
6900 INDIAN SCHOOL RD 200,SCOTTSDALE,AZ 85251
(408)850-6900 582869
Description:INTERIOR TI FOR NEW GROCERY STORE,MEP 4 Valuation: $ 650,000.00 Tenant
INCLUDED,NEW PROPOSED REFRIDGERATION AND WALK-IN
COOLERS.MINOR EXTERIOR WORK TO INCLUDE NEW DOOR Total Sq Feet: 0.00 Plan Check#20 558 Plan#
SYSTEM.INCLUDES RACKING
Fees Amount payments Amount Paid
Accessibility Plan Check $489.36 Total Fees $12,328.27
Accessiblity Building Permit $501.90 Cash/Receipt#REC-05848-20 $6,966.52
Add/Alter Ducts $258.44 Cash/Receipt#REC-04257-20 $5,361.75
Air Handling Units<=10,000 cu ft per min. $59.84
Building Issuing Fee $47.01
Amount Due: $0.00
-
Building Permit Fees $5,019.00 �'lding Plan Review Fee $3,262.35
Bui
Cal Green Plan Check q$326.24 F..)"— .s-v svfCOMPLETED
Commercial T.I.Fire Plan Chk. $280.00
Commercial service 200 to 1000amps $65.86
Compressor 3-5 Ton(3 to 15 hp) $72.70 CALLS FOR INSPECTIONS
Distribution Panel $65.92 Request for inspection by telephone at 626-574-5450. Leave a message
Electrical Permit Issuance Fee $47.01 requesting the address,timeframe and what inspection item is needed.
Energy Plan Review Fee $1,003.80
Fire Final Occupancy Fee $200.00
Floor Sink $13.21 This permit/plan review expires by time limitation and becomes null and
Furnace or Burner<=100,000 BTU $59.58 void if the work authorized by the permit is not commenced within 180 days
Furnace or Burner>100,000 BTU $24.90 from the date of issuance or if the permit is not obtained within 180 days
Gas System(Outlets) $15.55 from the date of plan submittal.This permit expires and becomes null and
Green Building Standard $26.00 void if any work authorized by this permit is suspended or abandoned for 180
consecutive days or if no progressive work has been verified by a City of -
Kitchen Sink $13.21 Arcadia building inspector for a period of 180 consecutive days.
Tota l: $12,328.27
•
October 22, 2020
Issued By: Date
Page October 22,2020 Pa g