a. SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in
the Contract, and shall provide all labor, materials, equipment, tools, utility services, and
transportation to complete all of the Work required in strict compliance with the Contract
Documents as specified in Article 5, below, for the following Project:
TRAFFIC SIGNAL FIBER OPTICS NETWORK EXTENSIONS
The Contractor and its surety shall be liable to the City for any damages arising as a result of
the Contractor's failure to comply with this obligation.
b. TIME FOR COMPLETION. Time is of the essence in the performance of the Work. The
Work shall be commenced on the date stated in the City's Notice to Proceed. The Contractor shall
complete all Work required by the Contract Documents within 30 calendar days from the
commencement date stated in the Notice to Proceed. By its signature hereunder, Contractor
agrees the time for completion set forth above is adequate and reasonable to complete the Work.
c. CONTRACT PRICE. The City shall pay to the Contractor as full compensation for the
performance of the Contract, subject to any additions or deductions as provided in the Contract
Documents, and including all applicable taxes and costs, the sum of SIXTY THOUSAND NINE
HUNDRED FIVE DOLLARS AND SEVEN CENTS Dollars ($60,905.07). Payment shall be made
as set forth in the General Conditions.
d. LIQUIDATED DAMAGES. In accordance with Government Code section 53069.85, it is
agreed that the Contractor will pay the City the sum set forth in Section 00 73 13, Article 1.11 for
each and every calendar day of delay beyond the time prescribed in the Contract Documents for E
finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is
not paid, the Contractor agrees the City may deduct that amount from any money due or that may
become due the Contractor under the Contract. This Article does not exclude recovery of other
damages specified in the Contract Documents.
e. COMPONENT PARTS OF THE CONTRACT. The "Contract Documents" include the
following:
t
Notice Inviting Bids
Instructions to Bidders
Bid Form f. I
Bid Bond
Designation of Subcontractors
11
Information Required of Bidders ;
ilNon-Collusion Declaration Form
Iran Contracting Act Certification a
Public Works Contractor Registration Certification t i
li'
Performance Bond
Payment (Labor and Materials) Bond
General Conditions
Special Conditions
Technical Specifications
Addenda
101 Plans and Drawings
Standard Specifications for Public Works Construction "Greenbook", latest edition, Except
Sections 1-9
Applicable Local Agency Standards and Specifications, as last revised
Approved and fully executed change orders
Any other documents contained in or incorporated into the Contract
The Contractor shall complete the Work in strict accordance with all of the Contract Documents.
All of the Contract Documents are intended to be complementary. Work required by one of the
Contract Documents and not by others shall be done as if required by all. This Contract shall
supersede any prior agreement of the parties.
f. PROVISIONS REQUIRED BY LAW AND CONTRACTOR
every provision of law required to be included in these Contract Documents shall be deemed to
be included in these Contract Documents. The Contractor shall comply with all requirements of
applicable federal, state and local laws, rules and regulations, including, but not limited to, the
provisions of the California Labor Code and California Public Contract Code which are applicable
to this Work.
9 INDEMNIFICATION. Contractor shall provide indemnification and defense as set forth in
the General Conditions.
h. PREVAILING WAGES. Contractor shall be required to pay the prevailing rate of wages
in accordance with the Labor Code which such rates shall be made available at the City's
Administrative Office or may be obtained online at http://www.dir.ca.gov and which must be
posted at the job site.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
I
IIN WITNESS WHEREOF, this Contract has been duly executed bythe above-named
the day and year above written. ve named parties, on
II CITY OF ARCADIA ECONOLITE SYSTEMS
:7 .--'
By: _� By: ,,- e--k_---
Dominic Lazzar
City Manager Its: ,Pfr�.1¢f` Cent,
Printed Name: itAilArx /' 4'�s
IATTEST: /7By:
By: /1/16849--- ` Its: �-� M4G,�4�N``� avt'
Printed Name: Nlo µro LL •7742AUtAl
IAPPROVED AS TO FORM:
I By: , t.d'p-4c.` " ` byi--- et
1 City Attorney
(CONTRACTOR'S SIGNATURE MUST BE
NOTARIZED AND CORPORATE
r
SEAL AFFIXED, IF APPLICABLE)
END OF CONTRACT
i
Notary Acknowledgment
A notary public or other officer completing this certificate
verifies only the identity of the individual who signed the
document to which this certificate is attached, and not the
truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF (fir
Jennifer J.DeWitt.Notary runic
On a-V\ ! ° , 20_Iz? before me, , Notary Public, personally
appeared ANrp ct5 M43►RdC`GS 4- w. l.faCeywho proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and corre t.
,,"`''•� JENNIFER J. DEWITT
`k COMM. #2298483 Z WITNESS my hand and official seal.
ccrr.k.,
2.0 Notary Public • California ,2
Z Orange County o
. Comm.Ex.ires Au.,20,2023
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
❑ Individual
❑ Corporate Officer
s Title -
� ) Title or Type of Document
❑ Partner(s) ❑ Limited
❑ General Number of Pages -
❑ Attorney-In-Fact
❑ Trustee(s)
❑ Guardian/Conservator Date of Document
❑ Other:
Signer is representing:
Name Of Person(s)Or Entity(ies)
Signer(s)Other Than Named Above