Loading...
HomeMy WebLinkAboutC-4459 \\co-90 CONTRACT This CONTRACT, No. �y�Q( is made and entered into this day of ,Jc f Z22, by and between City of Arcadia, sometimes hereinafter called "City," and Econole Systems, sometimes hereinafter called "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other as follows: a. SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract, and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5, below, for the following Project: TRAFFIC SIGNAL FIBER OPTICS NETWORK EXTENSIONS The Contractor and its surety shall be liable to the City for any damages arising as a result of the Contractor's failure to comply with this obligation. b. TIME FOR COMPLETION. Time is of the essence in the performance of the Work. The Work shall be commenced on the date stated in the City's Notice to Proceed. The Contractor shall complete all Work required by the Contract Documents within 30 calendar days from the commencement date stated in the Notice to Proceed. By its signature hereunder, Contractor agrees the time for completion set forth above is adequate and reasonable to complete the Work. c. CONTRACT PRICE. The City shall pay to the Contractor as full compensation for the performance of the Contract, subject to any additions or deductions as provided in the Contract Documents, and including all applicable taxes and costs, the sum of SIXTY THOUSAND NINE HUNDRED FIVE DOLLARS AND SEVEN CENTS Dollars ($60,905.07). Payment shall be made as set forth in the General Conditions. d. LIQUIDATED DAMAGES. In accordance with Government Code section 53069.85, it is agreed that the Contractor will pay the City the sum set forth in Section 00 73 13, Article 1.11 for each and every calendar day of delay beyond the time prescribed in the Contract Documents for E finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, the Contractor agrees the City may deduct that amount from any money due or that may become due the Contractor under the Contract. This Article does not exclude recovery of other damages specified in the Contract Documents. e. COMPONENT PARTS OF THE CONTRACT. The "Contract Documents" include the following: t Notice Inviting Bids Instructions to Bidders Bid Form f. I Bid Bond Designation of Subcontractors 11 Information Required of Bidders ; ilNon-Collusion Declaration Form Iran Contracting Act Certification a Public Works Contractor Registration Certification t i li' Performance Bond Payment (Labor and Materials) Bond General Conditions Special Conditions Technical Specifications Addenda 101 Plans and Drawings Standard Specifications for Public Works Construction "Greenbook", latest edition, Except Sections 1-9 Applicable Local Agency Standards and Specifications, as last revised Approved and fully executed change orders Any other documents contained in or incorporated into the Contract The Contractor shall complete the Work in strict accordance with all of the Contract Documents. All of the Contract Documents are intended to be complementary. Work required by one of the Contract Documents and not by others shall be done as if required by all. This Contract shall supersede any prior agreement of the parties. f. PROVISIONS REQUIRED BY LAW AND CONTRACTOR every provision of law required to be included in these Contract Documents shall be deemed to be included in these Contract Documents. The Contractor shall comply with all requirements of applicable federal, state and local laws, rules and regulations, including, but not limited to, the provisions of the California Labor Code and California Public Contract Code which are applicable to this Work. 9 INDEMNIFICATION. Contractor shall provide indemnification and defense as set forth in the General Conditions. h. PREVAILING WAGES. Contractor shall be required to pay the prevailing rate of wages in accordance with the Labor Code which such rates shall be made available at the City's Administrative Office or may be obtained online at http://www.dir.ca.gov and which must be posted at the job site. [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK] I IIN WITNESS WHEREOF, this Contract has been duly executed bythe above-named the day and year above written. ve named parties, on II CITY OF ARCADIA ECONOLITE SYSTEMS :7 .--' By: _� By: ,,- e--k_--- Dominic Lazzar City Manager Its: ,Pfr�.1¢f` Cent, Printed Name: itAilArx /' 4'�s IATTEST: /7By: By: /1/16849--- ` Its: �-� M4G,�4�N``� avt' Printed Name: Nlo µro LL •7742AUtAl IAPPROVED AS TO FORM: I By: , t.d'p-4c.` " ` byi--- et 1 City Attorney (CONTRACTOR'S SIGNATURE MUST BE NOTARIZED AND CORPORATE r SEAL AFFIXED, IF APPLICABLE) END OF CONTRACT i Notary Acknowledgment A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. STATE OF CALIFORNIA COUNTY OF (fir Jennifer J.DeWitt.Notary runic On a-V\ ! ° , 20_Iz? before me, , Notary Public, personally appeared ANrp ct5 M43►RdC`GS 4- w. l.faCeywho proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and corre t. ,,"`''•� JENNIFER J. DEWITT `k COMM. #2298483 Z WITNESS my hand and official seal. ccrr.k., 2.0 Notary Public • California ,2 Z Orange County o . Comm.Ex.ires Au.,20,2023 Signature of Notary Public OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT ❑ Individual ❑ Corporate Officer s Title - � ) Title or Type of Document ❑ Partner(s) ❑ Limited ❑ General Number of Pages - ❑ Attorney-In-Fact ❑ Trustee(s) ❑ Guardian/Conservator Date of Document ❑ Other: Signer is representing: Name Of Person(s)Or Entity(ies) Signer(s)Other Than Named Above