Loading...
HomeMy WebLinkAboutsolr-21-1599 City of Arcadia, CA V`"- l i t!t: "`'. �° �' �a>+ gi 'Permit4JO SOLR 21 1599 g Z;::::4-- Development Services De artment � r � ` , �+ x� r r r P p kt° { 1 ei v b i rr .,-;;A' A v. .s r µ fr,Permlt-Type Solar . $ e , 240 West Huntington Drive,Post Office Box'60021 ,- �,i al ; fi t ' i' r x ,, i ,Work classi cation Solar Residential Overt 10 KW 4114 Arcadia,CA 91066-6021 ' � xN (626)574-5416 r i::� -`A i s , Permit 5tatus:Issued . .RCA Jr1[A Issue Date 09/08/2021'f Expiration: 08/24/2022 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number 248 Oakhurst LN Arcadia,CA 91007 .: 5775012019 . •Ya e`F9Kht`RG.�f"am-'.Saw"`A.Ftp'Ad$ "X :i� .a••( ' Contacts GAI,ERICJ AND TRACY Owner TESLA ENERGY*, Contractor 248 OAKHURST LN 3055 Clearview Way,San Mateo,CA 94402 (323)240-3174 , 888104 ,." Description:Install Roof Mounted PV, 16.32 Kw, (48) Valuation: $ 0.00 Tenant modules and(N)energy storage system Total Sq Feet: 0.00 Plan Cheeky Plan# 4 •.. at�uvse�a. r•.-.. a.tt34P".aa a"'az.aYa`tl+ff 8k='A4`!a.a 6•vd:�;: .-u $. , Fees Amount Payments Amount Paid Battery Storage Device $118.00 Total Fees $506.10 Distribution Panel $22.00 Cash/Receipt#REC-08767-21 $506.10 Electrical Permit Issuance Fee $55.00 Energy Storage System Plan Review $55.00 Amount Due: $0.00 Residential Solar>10 kW $62.00 'mi.. Residential Solar Plan Check>10 kW $170.00 Solid Waste Management Fee 2 $1.00 Technology Fee(Permit) $10.72 Technology Fee(Plan Check) $12.38 Total: $506.10 CALLS FOR INSPECTIONS Request for inspection by telephone at 626-574-5450. Leave a message requesting the address,timeframe and what inspection item is needed. This permit/plan review expires by time limitation and becomes null and void if the work authorized by the permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days from the date of plan submittal.This permit expires and becomes null and void if any work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of Arcadia building inspector for a period of 180 consecutive days. i Itki CO cOFu:PTED September 08, 2021 Issued By:John Zurick Date September 08,2021 Page 1 of 1