Loading...
HomeMy WebLinkAboutRALT-21-2285 City of Arcadia, CA Permit NO RALT 21 2285' Development Services Department I D }l :s- ) Permit Type Residential Addition/Alteration 1 240 West Huntington Drive,Post Office Box60021 Arcadia,CA 91066-6021 c? } E WdrkClassificahon Res Addition/Alteration E „ �, � u� ��� e +. ' 626)574-5416 °w --' ` _"., ' °" Permit Status Issued ARCA.DI.A Issue Date:12/01/2021 Expiration: 07/25/2022 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number 502 W LEMON AVE Arcadia, CA 91007-7946 5785013026 Contacts MING DONG WU Owner PROVENANCE DEVELOPMENT, LLC Contractor 502 W LEMON AVE (626)620-9751 (626)215-5528 950477 Description:UPGRADE ELECTRICAL SERVICE, REPAIR DRYWALL, Valuation: $ 10,000.00 Tenant ELECTRICAL AND PLUMBING REPAIR (FLOOD DAMAGED) Total Sq Feet: 0.00 Plan Check# Plan# Fees Amount Payments Amount Paid Building Issuing Fee $55.00 Total Fees $581.14 Building Permit Fees $266.35 Cash/Receipt#REC-09563-21 $581.14 Electrical Permit Issuance Fee $55.00 Amount Due: $0.00 Energy Plan Review Fee $53.27 Fixture with Trap/Misc. $15.00 Green Building Standard $1.00 Outlets-Receptacles&Switches $20.00 Plumbing Permit Issuance Fee $55.00 Residential Services up to 400 amps $22.00 Solid Waste Management Fee $6.25 Solid Waste Management Fee 2 $1.00 CALLS FOR INSPECTIONS Solid Waste Management Fee 2 $1.00 Request for inspection by telephone at 626-574-5450. Leave a message Strong Motion Inst.Program Res $1.30 requesting the address,timeframe and what inspection item is needed. Technology Fee(Permit) $20.70 Technology Fee(Permit) $5.34 Technology Fee(Plan Check) $2.93 This permit/plan review expires by time limitation and becomes null and void if the work authorized by the permit is not commenced within 180 days Total: $581.14 from the date of issuance or if the permit is not obtained within 180 days from the date of plan submittal.This permit expires and becomes null and void if any work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of Arcadia building inspector fora period of 180 consecutive days. OC011(Pr E'D • December 01, 2021 Issued By: Henry Kemick Date January 25,2022 Page 1 of 1