HomeMy WebLinkAboutItem 11c - Annual Slurry Seal ProjectAward Annual Slurry Seal Project
February 15, 2022
Page 1 of 3
DATE: February 15, 2022
TO: Honorable Mayor and City Council
FROM: Paul Cranmer, Public Works Services Director
By: Eddie Chan, P.E., Principal Civil Engineer
SUBJECT: CONTRACT WITH MISSION PAVING AND SEALING, INC. FOR THE
FISCAL YEAR 2021-22 ANNUAL SLURRY SEAL PROJECT IN THE
AMOUNT OF $534,922.10
Recommendation: Approve
SUMMARY
As part of the City’s Annual Asphalt and Concrete Program, the Public Works Services
Department (“PWSD”) is preparing to slurry seal various residential streets within the City.
To ensure that the City is receiving the most competitive prices and quality service for this
work, the PWSD conducted a formal bid. Mission Paving and Sealing, Inc. submitted the
lowest responsive bid.
It is recommended that the City Council approve, authorize, and direct the City Manager
to execute a Contract with Mission Paving and Sealing, Inc. for the Fiscal Year 2021-22
Annual Slurry Seal Project in the amount of $534,922.10 and approve a 5% construction
contingency.
BACKGROUND
The PWSD is responsible for the maintenance and repair of approximately 147 miles of
roadway within the City. The 2021 Pavement Management Program Update assessed
the condition of all City streets and assigned a numerical index between 0 and 100, which
is used to indicate the general condition of pavement. The Annual Slurry Seal
Maintenance Program assists in extending the life expectancy, and improves the overall
appearance and safety of City streets. This program provides surface maintenance of all
City streets and divides the City up into eight zones, with one zone being addressed each
year as part of an eight-year cycle. Updates to the plan are conducted regularly to ensure
that the program is effective and to identify street segments with unusual wear and tear.
Award Annual Slurry Seal Project
February 15, 2022
Page 2 of 3
DISCUSSION
The Fiscal Year 2021-22 Annual Slurry Seal Project will address approximately 13.3 miles
of residential and arterial streets as shown on the attached Project Location Map (Exhibit
“A”). The area can generally be described as being from east of Michilinda Avenue to the
west of Baldwin Avenue and south of Colorado Street to the north of Huntington Drive.
The work includes crack sealing, the application of an emulsified asphalt and sand coating
commonly referred to as slurry, and re-striping of street centerlines, stop bars, and other
safety striping. This process protects the asphalt pavement surface from weather,
restores skid resistance, and provides an aesthetic uplift to the street and neighborhood.
The sidewalk, curb, and gutter repair portion of the Program will go out to bid in late
February 2022.
A Notice Inviting Bids was published in the City’s adjudicated newspaper and bid
packages were provided to contractors that perform this type of work. On January 4,
2022, the City Clerk received six sealed bids with the following results:
Rank Firm Location Base Bid
1 Mission Paving and Sealing, Inc. Irwindale $467,722.10
2 Roy Allan Slurry Seal Inc. Santa Fe Springs $469,658.20
3 Doug Martin Contracting Co., Inc. La Habra $471,085.50
4 American Asphalt South, Inc. Fontana $528,873.75
5 All American Asphalt Corona $563,255.00
6 Pavement Coatings Co. Jurupa Valley $585,575.00
Bid documents were reviewed for content and the contractor’s background was also
investigated. Based on this review, it has been determined that Mission Paving and
Sealing, Inc. is the lowest responsive bidder for this work. Mission Paving and Sealing,
Inc. has successfully completed similar work within budget for the Cities of El Monte,
Duarte, Industry, Fontana, Torrance, Chino Hills, and Rancho Palos Verdes.
The bid documents included a request for pricing for bid alternate items, including
application of Type II slurry and installation of traffic striping and pavement markers on
Colorado St from Michillinda Avenue to Baldwin Avenue. The total cost of these bid
alternate items is $67,200. The bid alternate items are highly desirable, and there is
sufficient funding in the Fiscal Year 2021-22 Capital Improvement Program for the Annual
Slurry Seal Program to include them in the project. The total project construction cost is
$534,922.10, which includes the base bid and the bid alternate items. Per the contract
documents, City shall award the contract for the Project to the lowest responsive,
Award Annual Slurry Seal Project
February 15, 2022
Page 3 of 3
responsible Bidder as determined by the City from the base bid alone. Therefore, Mission
Paving and Sealing, Inc. had the lowest base bid at $467,722.10 and an alternate bid of
$67,200 for a total construction cost of $534,922.10.
ENVIRONMENTAL ANALYSIS
This project is considered a Class 1 exemption as defined in Section 15301(c) of the
California Environmental Quality Act since the project consists of the maintenance of
existing public streets and does not involve expansion of the existing use of the streets.
FISCAL IMPACT
Funds in the amount of $700,000 have been budgeted in the Fiscal Year 2021-22 Capital
Improvement Program for the Annual Slurry Seal Program. The total cost for this Project
is $534,922.10. With the request of a 5% construction contingency, the total project cost
would be $561,668.20. The remaining funds from the Slurry Seal project will be used for
sidewalk, curb, and gutter repair in this same area.
RECOMMENDATION
It is recommended that the City Council determines that this project is considered a Class
1 exemption as defined in Section 15301(c) under the California Environmental Quality
Act (“CEQA”); and approve, authorize, and direct the City Manager to execute a Contract
with Mission Paving and Sealing, Inc. for the Fiscal Year 2021-22 Annual Slurry Seal
Project in the amount of $534,922.10, and approve a 5% construction contingency.
Attachments: Exhibit “A” - Project Location Map
Proposed Contract with Mission Paving and Sealing, Inc.
CITY OF ARCADIA
2021/2022 ANNUAL SLURRY SEAL PROJECT
PROJECT NUMBER: 55331022
BETWEEN
CITY OF ARCADIA
AND
MISSION PAVING AND SEALING, INC.
CONTRACT
Contract - 1
CONTRACT FOR THE
CITY OF ARCADIA
This CONTRACT, No. ________ is made and entered into this ____ day of _______, 2022, by
and between City of Arcadia, sometimes hereinafter called “City,” and Mission Paving and
Sealing, Inc., sometimes hereinafter called “Contractor.”
WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these
presents do covenant and agree with each other as follows:
A. SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the
Contract, and shall provide all labor, materials, equipment, tools, utility services, and
transportation to complete all of the Work required in strict compliance with the Contract
Documents as specified in Article 5, below, for the following Project:
2021/2022 Annual Slurry Seal Project / Project No.: 55331022
The Contractor and its surety shall be liable to the City for any damages arising as a result of
the Contractor’s failure to comply with this obligation.
B. TIME FOR COMPLETION. Time is of the essence in the performance of the Work. The Work
shall be commenced on the date stated in the City’s Notice to Proceed. The Contractor shall
complete all Work required by the Contract Documents within sixty (60) calendar days from the
commencement date stated in the Notice to Proceed. By its signature hereunder, Contractor
agrees the time for completion set forth above is adequate and reasonable to complete the Work.
C. CONTRACT PRICE. The City shall pay to the Contractor as full compensation for the
performance of the Contract, subject to any additions or deductions as provided in the Contract
Documents, and including all applicable taxes and costs, the sum of FIVE HUNDRED THIRTY-
FOUR THOUSAND, NINE HUNDRED TWENTY-TWO DOLLARS AND TEN CENTS
($534,922.10). Payment shall be made as set forth in the General Conditions.
D. LIQUIDATED DAMAGES. In accordance with Government Code section 53069.85, it is
agreed that the Contractor will pay the City the sum set forth in Special Conditions, Article 1.11
for each and every calendar day of delay beyond the time prescribed in the Contract Documents
for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this
is not paid, the Contractor agrees the City may deduct that amount from any money due or that
may become due the Contractor under the Contract. This Article does not exclude recovery of
other damages specified in the Contract Documents.
E. COMPONENT PARTS OF THE CONTRACT. The “Contract Documents” include the
following:
Notice Inviting Bids
Instructions to Bidders
Bid Form
Bid Bond
Designation of Subcontractors
Information Required of Bidders
Non-Collusion Declaration Form
Iran Contracting Act Certification
Public Works Contractor Registration Certification
Performance Bond
Contract - 2
Payment (Labor and Materials) Bond
General Conditions
Special Conditions
Technical Specifications
Addenda
Plans and Drawings
Standard Specifications for Public Works Construction “Greenbook”, latest edition, Except
Sections 1-9
Applicable Local Agency Standards and Specifications, as last revised
Approved and fully executed change orders
Any other documents contained in or incorporated into the Contract
The Contractor shall complete the Work in strict accordance with all of the Contract Documents.
All of the Contract Documents are intended to be complementary. Work required by one of the
Contract Documents and not by others shall be done as if required by all. This Contract shall
supersede any prior agreement of the parties.
F. PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE. Each and every
provision of law required to be included in these Contract Documents shall be deemed to be
included in these Contract Documents. The Contractor shall comply with all requirements of
applicable federal, state and local laws, rules and regulations, including, but not limited to, the
provisions of the California Labor Code and California Public Contract Code which are applicable
to this Work.
G. INDEMNIFICATION. Contractor shall provide indemnification and defense as set forth in the
General Conditions.
H. PREVAILING WAGES. Contractor shall be required to pay the prevailing rate of wages in
accordance with the Labor Code which such rates shall be made available at the City’s
Administrative Office or may be obtained online at dir.ca.gov and which must be posted at the job
site.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
Contract - 3
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named parties, on
the day and year above written.
CITY OF ARCADIA
By:
Dominic Lazzaretto
City Manager
MISSION PAVING AND SEALING, INC.
By:
Signature
Print Name and Title
Attest:
By:
City Clerk
By:
Signature
Print Name and Title
Approved as to Form:
Stephen P. Deitsch
City Attorney