HomeMy WebLinkAboutSOLR-21-1472 (2) E. PerimitNO SOLR-21-1472
``' City of Arcadia, CA _
:;.:* Development Services Department
s 1 I p, Permit�Type Solar'
;,� 240 West Huntington Drive,Post Office Box 60021 )
.� Arcadia,CA 91066-6021 ) ` i r I a g <. t work CIosS Catloll'",Solar Residential�.
- %, a• (626)574-5416 '' ' E ' Permit Status:~Complete
ARCADIA issue Date:08/10/2021`I Expiration: 03/16/2022
Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number
914 S FOURTH AVE Arcadia,CA 91006-4216 5780005006
Contacts
Thomas Li Owner TESLA ENERGY* Contractor
914 4th d ( 3055 Clearview Way,San Mateo,CA 94402
A- O ZZ (323)240-3174 888104
Description:Install Roof Mounted PV, 12.24 KW,(36) Valuation: $ 0.00 Tenant
modules,(2)Tesla Powerwall (ESS)1(N)225A Distribution
panel.1(N)200A Load Center, 125 amp load center Total Sq Feet: 0.00 Plan Check# Plan#
sue.s.. - -- _ -. 11 .
Fees Amount Payments Amount Paid
Battery Storage Device $118.00 Total Fees $598.00
Distribution Panel $22.00 Cash/Receipt#REC-08506-21 $454.00
Electrical Permit Issuance Fee $55.00 Cash/Receipt#REC-10382-22 $144.00
Energy Storage System Plan Review $55.00
Plan Check,Per Hour $100.00 Amount Due: $0.00
Residential Services up to 400 amps $44.00
Residential Solar<10 kW $31.00
Residential Solar Plan Check<10 kW $150.00
Solid Waste Management Fee 2 $1.00
Technology Fee(Permit) $10.72
Technology Fee(Plan Check) $11.28 CALLS FOR INSPECTIONS
Request for inspection by telephone at 626-574-5450. Leave a message
Total: $598.00 requesting the address,timeframe and what inspection item is needed.
This permit/plan review expires by time limitation and becomes null and
void if the work authorized by the permit is not commenced within 180 days
from the date of issuance or if the permit is not obtained within 180 days
from the date of plan submittal.This permit expires and becomes null and
void if any work authorized by this permit is suspended or abandoned for 180
consecutive days or if no progressive work•.has been verified by a City of
Arcadia building inspector for a period of 180 consecutive days.
August 10, 2021
Issued By:Jeff Wang Date ,
March 11,2022 Page 1 of 1