HomeMy WebLinkAboutMECH-21-2446 '. Permit NO .Mech 21 2446,
44 4` City of Arcadia, CA
! i. Development Services Department ' i) �� v 1 i'L I. �Permit Type Mechanical
,. 240 West Huntington Drive,Post Office Box 60021 , ` S ` fi t '
kff g .. WorkcCla,ssificatipm HVAD,New System,Residential
Arcadia,CA 91066-6021 ti r�r 1 3-
• ) (626)574-5416 Permit Status:Issued
ARCADIA Issue Date:12/23/2021 1 Expiration: 12/23/2022
Addr NO. ' Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number
230 SAN ANTONIO RD Arcadia, CA 91007-3002 5775019009
Contacts
WANG,XIAOCHUN AND ZHOU,LIPING Owner SEMPER SOLARIS CONSTRUCTION INC* Contractor
230 San Anotnio Rd,Arcadia,CA 91007 1805 JOHN TOWERS AVE, EL CAJON,CA
(619)715-4054 978152
Description:NEW HVAC SYSTEM PER APPROVED PLANS.HERS Valuation: $ 0.00 t Tenant
REQUIRED FOR FINAL (c..5)
Total Sq Feet: 0.00 I Plan Check# Plan#
Fees Amount Payments Amount Paid
Compressor 3-5 Ton(3 to 15 hp) $40.00 Total Fees $275.19
Electrical Permit Issuance Fee $55.00 Cash/Receipt#REC-09760-21 $275.19
Furnace or Burner<=100,000 BTU $22.00
Gas System(Outlets) $18.00 Amount Due: $0.00
Light Fixtures $2.00
Mechanical Permit Issuance Fee $55.00
Motors,Generators<1 hp $9.00
Outlets-Receptacles&Switches $2.00
Plumbing Permit Issuance Fee $55.00
Solid Waste Management Fee 2 $1.00
Solid Waste Management Fee 2 $1.00 CALLS FOR INSPECTIONS
Solid Waste Management Fee 2 $1.00 Request for inspection by telephone at 626-574-5450. Leave a message
Technology Fee(Permit) $14.19 requesting the address,timeframe and what inspection item is needed.
Total: $275.19
This permit/plan review expires by time limitation and becomes null and
void if the work authorized by the permit is not commenced within 180 days
from the date of issuance or if the permit is not obtained within 180 days
from the date of plan submittal.This permit expires and becomes null and
Ld
void if any work authorized by this permit is suspended or abandoned for 180
consecutive days or if no progressive work has been verified by a City of _
Arcadia building inspector for a period of 180 consecutive days.
Eve p ��Ai rii 1 ,
December 23, 2021
Issued By:John Zurick Date
December 23,2021 Page 1 of 1