No preview available
HomeMy WebLinkAboutMEP-22-0425 r� > ,�lie�r' City of Arcadia, CA ',_ - Perm! NO.-MEP 22 0425 , ' `„ Development Services Department — . i ) (� Permit Type MEP' ::: 't 240 West Huntington Drive,Post Office Box 60021 ' m • E s Arcadia,CA 91066-6021 f Z.71� `, � 1�, ( ' Work Classification•MEP Residential (626)574-5416 �. e e �� Permit Status.Issued• ARCADIAIssue Date:03/04/2022 Expiration: 03/06/2023 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number 112 E MAGNA VISTA AVE Arcadia,CA 91006-4165 . -.- 5781009006, . Contacts HOUSEPRO USA'LLC Owner JAWELL CONSTRUCTION CONSULTING Contractor 112 Magna vista,Arcadia,CA 91006-4165 INC* 15902A HALLIBURTON RD RD,HACIENDA HEIGHTS,CA 91745 (323)327-2734 1031325 Description:REMODEL KITCHEN,FIXTURES SAME LOCATION Valuation: $ 0.00 Tenant Total Sq Feet: 0.00 Plan Check# Plan# Fees Amount Payments Amount Paid Dishwasher $15.00 Total Fees •-$264.64 Electrical Permit Issuance Fee $55.00 Cash/Receipt#REC-10319-22 . $264.64 Garbage Disposal Fee $15.00 Install,Relocate Appliance Vent/Hood $10.00 Amount Due: $0.00 Kitchen Sink $15.00 Light Fixtures $4.00 Mechanical Permit Issuance Fee $55.00 Outlets-Receptacles&Switches $24.00 Plumbing Permit Issuance Fee $55.00 Solid Waste Management Fee 2 $1.00 Solid Waste Management Fee 2 $1.00 CALLS FOR INSPECTIONS Solid Waste Management Fee 2 $1.00 Request for inspection by telephone at 626-574-5450. Leave a message Technology Fee(Permit) $13.64 requesting the address,timeframe and what inspection item is needed. Total: $264.64 This permit/plan review expires by time limitation and becomes null and 4.4-7-2-- void if the work authorized by the permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days - fWA - - cthi0 from the date of plan submittal.This permit expires and becomes null•and--- -—-• -_. void if any work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of Arcadia building inspector fora period of 180 consecutive days. Is COI1PLETED March 04, 2022 Issued By:Jeff Wang Date March 04,2022 - Page 1 of 1