HomeMy WebLinkAboutItem 12d - Huntington Drive Sidewalk Rehabilitation Improvements Project DATE: May 3, 2022 TO: Honorable Mayor and City Council FROM: Jason Kruckeberg, Assistant City Manager/Development Services Director Philip A. Wray, Deputy Director of Development Services/City Engineer By: Ryan Huey, Assistant Engineer SUBJECT: CONTRACT WITH GRIGOLLA & SONS CONSTRUCTION COMPANY TO PROVIDE CONSTRUCTION SERVICES FOR HUNTINGTON DRIVE SIDEWALK REHABILITATION IMPROVEMENTS ALONG WESTBOUND HUNTINGTON DRIVE BETWEEN SUNSET BOULEVARD AND CORTEZ ROAD IN THE AMOUNT OF $86,490 Recommendation: Approve SUMMARY In an ongoing effort to provide accessibility for pedestrians, the Fiscal Year 2021-22 Capital Improvement Program included a project for Sidewalk Accessibility/Americans with Disabilities Act (“ADA”) Ramp Improvements, with a budget of $100,000 provided by Transportation Development Act (“TDA”) Article 3 funds. The project includes construction of a new ADA compliant sidewalk and curb ramp along the north side of Huntington Drive between Sunset Boulevard and Cortez Road. On Monday, March 7, 2022, a Public Notice Inviting Bids was published. Bids were opened on Thursday, March 31, 2022. Seven bids were received, with Grigolla & Sons Construction Company producing the lowest bid. It is recommended that the City Council find the project categorically exempt pursuant to the requirements of the California Environmental Quality Act (“CEQA”) and approve a contract with Grigolla & Sons Construction Company in the amount of $86,490 for the Huntington Drive Sidewalk Rehabilitation Improvements project, with a 10% contingency. BACKGROUND As an ongoing project to improve the City’s pedestrian infrastructure and ensure that ADA requirements are met, the City annually funds projects to address areas that are deemed inaccessible or unsafe for pedestrians. This year’s project proposes to add sidewalk, curb and gutter, cross gutter, a curb ramp, and a new drive approach on the north side of Huntington Drive from 90 feet east of Sunset Boulevard to and around the corner at Award Contract for Huntington Drive Sidewalk Rehabilitation Improvements May 3, 2022 Page 2 of 3 Cortez Road. The proposed location does not currently have sidewalk and is inaccessible to pedestrians due to various obstructions and minimal space for path of travel. The goal of the project is to adhere to ADA requirements to provide a path that allows pedestrians to safely travel through the area. The location along the north side of Huntington Drive will be the last segment to complete the sidewalk corridor along both sides of one of the City’s most traveled streets between Michillinda Avenue and Holly Avenue. The scope of work consists of the removal and disposal of existing palm trees, concrete bumper stops, asphalt pavement, curb and gutter, cross gutter, and sidewalk, and the construction of various concrete improvements including variable height curb, curb and gutter, driveway, curb drain, cross gutter, and ADA compliant sidewalk and curb ramp. The parking stalls for the private property currently extend into the public right-of-way, blocking the pedestrian path of travel. Therefore, changes to the parking lot within the City right-of-way will occur to allow for the improvements. The engineer’s estimate for the project was $82,000. DISCUSSION The project was advertised for bids on March 7, 2022. Bids were received from seven prospective contractors on March 31, 2022, with the following results: Contractor Amount Grigolla & Sons Construction Company $86,490.00 EC Construction $105,008.56 Dash Construction $112,777.00 CT&T Concrete Paving $140,670.00 Onyx Paving Company $142,000.00 Falkon Construction $155,404.15 Gentry General Engineering $178,332.00 Grigolla & Sons Construction Company is a qualified, licensed contractor with both public and private experience. The company specializes in concrete work and public works projects. Grigolla & Sons Construction Company has prior work experience in the City and has performed satisfactory work on numerous Capital Improvement Projects. The most recent project completed in the City was the Huntington Drive Sidewalk & ADA Curb Ramp Improvements project along Eastbound Huntington Drive. Through their previous work, they have proven that they can provide quality work at a competitive price. ENVIRONMENTAL ANALYSIS The City was responsible for evaluating the project under the guidelines of the California Environmental Quality Act (“CEQA”). It was determined that the project is Categorically Award Contract for Huntington Drive Sidewalk Rehabilitation Improvements May 3, 2022 Page 3 of 3 Exempt under Section 15301 – Class 1, Existing Facilities, and Class 2, Replacement or Reconstruction. FISCAL IMPACT The project was budgeted in the FY 2021-22 Capital Improvement Program. The total budget allocated to Sidewalk Accessibility/ADA Ramp Improvements is $100,000 of TDA Article 3 funds. The low bid for the work is $86,490 and, with a 10% contingency, the maximum total cost of the project would be $95,139. There are sufficient funds to cover all elements of the project with existing unspent funds. RECOMMENDATION It is recommended that the City Council find the project categorically exempt pursuant to the requirements of the California Environmental Quality Act (“CEQA”); and authorize the City Manager to enter into a Contract with Grigolla & Sons Construction Company to provide construction services for Huntington Drive sidewalk rehabilitation improvements along westbound Huntington Drive between Sunset Boulevard and Cortez Road in the amount of $86,490, including a 10% contingency. Attachment: Proposed Contract CONTRACT This CONTRACT, No. ________ is made and entered into this ____ day of _______, ______, by and between City of Arcadia, sometimes hereinafter called “City,” and GRIGOLLA & SONS CONSTRUCTION COMPANY, sometimes hereinafter called “Contractor.” WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other as follows: a. SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract, and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5, below, for the following Project: HUNTINGTON DRIVE SIDEWALK REHABILITATION IMPROVEMENTS The Contractor and its surety shall be liable to the City for any damages arising as a result of the Contractor’s failure to comply with this obligation. b. TIME FOR COMPLETION. Time is of the essence in the performance of the Work. The Work shall be commenced on the date stated in the City’s Notice to Proceed. The Contractor shall complete all Work required by the Contract Documents within 30 calendar days from the commencement date stated in the Notice to Proceed. By its signature hereunder, Contractor agrees the time for completion set forth above is adequate and reasonable to complete the Work. c. CONTRACT PRICE. The City shall pay to the Contractor as full compensation for the performance of the Contract, subject to any additions or deductions as provided in the Contract Documents, and including all applicable taxes and costs, the sum of ____________________________________________________________________ Dollars ($_________________________________). Payment shall be made as set forth in the General Conditions. d. LIQUIDATED DAMAGES. In accordance with Government Code section 53069.85, it is agreed that the Contractor will pay the City the sum set forth in Section 00 73 13, Article 1.11 for each and every calendar day of delay beyond the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, the Contractor agrees the City may deduct that amount from any money due or that may become due the Contractor under the Contract. This Article does not exclude recovery of other damages specified in the Contract Documents. e. COMPONENT PARTS OF THE CONTRACT. The “Contract Documents” include the following: Notice Inviting Bids Instructions to Bidders Bid Form Bid Bond Designation of Subcontractors Information Required of Bidders Non-Collusion Declaration Form Iran Contracting Act Certification Public Works Contractor Registration Certification Performance Bond Payment (Labor and Materials) Bond General Conditions Special Conditions Technical Specifications Addenda Plans and Drawings Standard Specifications for Public Works Construction “Greenbook”, latest edition, Except Sections 1-9 Applicable Local Agency Standards and Specifications, as last revised Approved and fully executed change orders Any other documents contained in or incorporated into the Contract The Contractor shall complete the Work in strict accordance with all of the Contract Documents. All of the Contract Documents are intended to be complementary. Work required by one of the Contract Documents and not by others shall be done as if required by all. This Contract shall supersede any prior agreement of the parties. f. PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE. Each and every provision of law required to be included in these Contract Documents shall be deemed to be included in these Contract Documents. The Contractor shall comply with all requirements of applicable federal, state and local laws, rules and regulations, including, but not limited to, the provisions of the California Labor Code and California Public Contract Code which are applicable to this Work. g. INDEMNIFICATION. Contractor shall provide indemnification and defense as set forth in the General Conditions. h. PREVAILING WAGES. Contractor shall be required to pay the prevailing rate of wages in accordance with the Labor Code which such rates shall be made available at the City’s Administrative Office or may be obtained online at http://www.dir.ca.gov and which must be posted at the job site. [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK] IN WITNESS WHEREOF, this Contract has been duly executed by the above-named parties, on the day and year above written. CITY OF ARCADIA GRIGOLLA & SONS CONSTRUCTION COMPANY By: By: Dominic Lazzaretto City Manager Its: Printed Name: ATTEST: By: City Clerk APPROVED AS TO FORM: By: City Attorney (CONTRACTOR’S SIGNATURE MUST BE NOTARIZED AND CORPORATE SEAL AFFIXED, IF APPLICABLE) END OF CONTRACT Notary Acknowledgment A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. STATE OF CALIFORNIA COUNTY OF ______________ On , 20___, before me, _______________________________, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature of Notary Public OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual  Corporate Officer Title(s) Title or Type of Document  Partner(s)  Limited  General Number of Pages  Attorney-In-Fact  Trustee(s)  Guardian/Conservator Date of Document  Other: Signer is representing: Name Of Person(s) Or Entity(ies) Signer(s) Other Than Named Above