HomeMy WebLinkAboutSOLR-22-0311 �' City of Arcadia, CA Permit NO S®LR 22 0311 ,
# 3# Development Services Department1-';'-14");;JS*-:.""'t `Permit Type Solar
P P �.�' �
` 240 West Huntington Drive,Post Office Box 60021 t �} 1
s � 9 Worli•Classifrcation Solar Residential Over 10 KW
Arcadia,CA 91066 6021 I a
(626)574-5416 PermrtStatus Issued
ARCADIA Issue Date 02 23 2022. ir..; o 3 3.
/ / Expiration: 02�23�2023
Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number
1030 EL SUR AVE Arcadia,CA 91006-4529 8510001042
)'..M.v. x0.�. .n,.._...M .A�.u`_ @b xa aA51'�_3J<`.h Lfl\tea..NY,ae 1„ .mvE':nlw'9"3.Y Y'>`.s'�..'=sd� bK:d"_` ,." ,' sb 2hP..^aC'._. a `.s.:.'_?A.. ...A':.RY....'S,a+-..Xrs:...a t'ddYo+iS`8 X. mr° 'AF.r. ✓Swr, »x'_•F` .`�,^i
Contacts
PAUL MIN LIU Owner NEXUS ENERGY SYSTEMS INC* Contractor
1030 EL SUR AVE 2810 HARBOR BLVD 201,OXNARD,CA
(805)748-5950 359060
Description:ROOF MOUNTED SOLAR SYSTEM 25 Valuation: $ 0.00 Tenant
MODULES/MICROINVERTERS AND COMBINER PANEL
Total Sq Feet: 0.00 Plan Check# Plan#
Fees Amount Payments Amount Paid
Electrical Permit Issuance Fee $55.00 Total Fees $300.37
Residential Solar>10 kW $62.00 Cash/Receipt#REC-10224-22 $300.37
Residential Solar Plan Check>10 kW $170.00
Solid Waste Management Fee 2 $1.00 Amount Due: $0.00
Technology Fee(Permit) $3.02
Technology Fee(Plan Check) $9.35
Total: $300.37
CALLS FOR INSPECTIONS
Kit6X L (514— I \ Request for inspection by telephone at 626-574-5450. Leave a message
,v1-'1v1 requesting the address,timeframe and what inspection item is needed.
This permit/plan review expires by time limitation and becomes null and
void if the work authorized by the permit is not commenced within 180 days
from the date of issuance or if the permit is not obtained within 180 days
from the date of plan submittal.This permit expires and becomes null and
void if any work authorized by this permit is suspended or abandoned for 180
consecutive days or if no progressive work has been verified by a City of
Arcadia building inspector fora period of 180 consecutive days.
SI n TLETED
February 23, 2022 Issued By:Jeff Wang Date
February 23,2022 - Page 1 of 1