Loading...
HomeMy WebLinkAboutRALT-22-0104 City of Arcadia, CA z� Permit NO RALT R22 0104 ; Development Services Department s Permlt Type• R2sldenttaI AdditioniAIteratlon.' i a ��� , 240 West Huntington Drive,Post Office Box 60021 ) "� Arcadia,CA 91066-6021mr ( y ),W ClassificatronRes Addttton/Alteration (626)574-5416 ' PermitStaius Issued ARC DI ,,�r,�,, „, ,„IsueDate 0 % /2022 I Expiration: 01 19 2023 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number 1712 LA RAMADA AVE Arcadia,CA 91006-1628 5766015016 4. Contacts DEAN SIBLEY Owner 's 1712 LA RAMADA AVE (626)482-0234 11 RP'�, kph�s^.1*d.�.�'4... S'fi�kiN& ".`?dYard�R:. .w. �'.. �5. $�A. `Y�SC'• .. .YA'�A. ,.a�.. 4�i:StaST:,""« Description:REMODEL BATHROOM PER APPROVED LAYOUT. Valuation: $ 2,567.52 Tenant WITH EMP i Total Sq Feet: 0.00 Plan Check# Plan# n ., -, Fees • Amount payments Amount Paid Building Issuing Fee $55.00 Total Fees $595.49 Building Permit Fees $135.10 Cash/Receipt#REC-09915-22 $595.49 Building Plan Review Fee $87.82 Cal Green Plan Check $8.79 Amount Due: $0.00 Electrical Permit Issuance Fee $55.00 Energy Plan Review Fee $27.02 Green Building Standard $1.00 Lavatories $15.00 Light Fixtures $12.00 Mechanical Permit Issuance Fee $55.00 Outlets-Receptacles&Switches $8.00 CALLS FOR INSPECTIONS Plumbing Permit Issuance Fee $55.00 Request for inspection by telephone at 626-574-5450. Leave a message Shower $15.00 requesting the address,timeframe and what inspection item is needed. Solid Waste Management Fee $6.25 Solid Waste Management Fee 2 $1.00 Solid Waste Management Fee 2 $1.00 This permit/plan review expires by time limitation and becomes null and Solid Waste Management Fee 2 $1.00 void if the work authorized by the permit is not commenced within 180 days Strong Motion Inst.Program Res $0.50 from the date of issuance or if the permit is not obtained within 180 days Technology Fee(Permit) $16.51 from the date of plan submittal.This permit expires and becomes null and Technology Fee(Permit) $3.58 void if any work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of Technology Fee(Permit) $4.12 Arcadia building inspector for a period of 180 consecutive days. Total: $595.49 d ffr,P ( lia4: F l `, j b.'F SlxSS1 January 19, 2022 Issued By:John Zurick Date January 20,2022 Page 1 of 1