Loading...
HomeMy WebLinkAboutSOLR-21-1447 ,.:1; Y f k k I « F R .0^ I t ' ,. Permit NO SOLR �. 1444; iic , City'of Arcadia, CA did ro u N 4x a Y v t is.11,IVI , Development Services Department a( a ''' o k4� r' k=PermitT e Solar Arc West Huntington Drive,Post Office Box 60021 S ; c A k Pr 1 , fi:4 l Work Classification'Solar Resldentiaii �, Arcadia,CA 91066-6021i » r, +fAr� 1 (626)574-5416 1�� r�f t r Vw a, Permlt$tatLlS Issued CI Issue".Date o8/05/2021 j Expiration: 08/05/2,022 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number j 1740 ELEVADO AVE Arcadia,CA 91006-1707 5771006014 Contacts Jean Tsunashima Owner SUNRUN* Contractor 1740 9220 HALL RD,DOWNEY,CA 90241 (562)441-8063 750184 r Description:ROOF MOUNTED SOLAR SYSTEM 16 MODULES, 1 f Valuation: $ 0.00 Tenant INVERTER, ESS,REPLACE EXISTING 200 AMP WITH 150A BREAKER Total Sq Feet: 0.00 Plan Check# Plan# Fees Amount Payments Amount Paid Battery Storage Device $59.00 Total Fees $391.76 Distribution Panel $22.00 Cash/Receipt#REC-08417-21 $391.76 Electrical Permit Issuance Fee $55.00 Amount Due: . $0.00 Energy Storage System Plan Review $55.00 Residential Solar<10 kW $31.00 'e_ Residential Solar Plan Check<10 kW $150.00 Solid Waste Management Fee 2 $1.00 Technology Fee(Permit) $7.48 Technology Fee(Plan Check) $11.28 Total: $391.76 CALLS FOR INSPECTIONS Request for inspection by telephone at 626-574-5450. Leave a message 9' requesting the address,timeframe and what inspection item is needed. 5K 4�a►r�'! Se -CG/, ijC� /mil / e i c 2' This permit/plan review expires by time limitation and becomes null and void if the work authorized by the permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days from the date of plan submittal.This permit expires and becomes null and void if any work authorized by this permit is suspended or abandoned for 180 • consecutive days or if no progressive work has been verified by a City of Arcadia building inspector for a period of 180 consecutive days. i;ei—.ii prilmiti Er, rrIll August 05, 2021 Issued By:Steven Roberts Date August 05,2021 Page 1 of 1