HomeMy WebLinkAboutSOLR-22-1281 _ � ',�
- ,� �� i . w , .��.�
3 ��
City di�,CA �._� t : �;e Permrtnto SOLR`22 1281�
� � � � r��� � �� � � �. ��.
� . �. � ._ �;� �,
Developrnr� .,..� ce�DeparY�lent � � �� ��-�� � '� � ����;���,�a peC11'lltjy�e S0�8C::
� 240 West Huntington Drive,Post Office Box 60021 �� ��� °� �` ��a � �����g� � ��; ����`� ��;-'E
� � ��` �� ` � Work Class� cation Solar� Re"s�denfial ��
Arcadia,CA 91066-6021 � ������� m . � � ����, �
a. -r
� � - _, ,� .. ".".r . °�.�'�zr ,a•�:- ���i
(626)574-5416 �'� ��� � �, Perm�tStatus tssUetl�
�R�I�D..lt�l " Issue Date os/o5/2oz2 Expiration: 08/07/2023'
� w��,
Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number
2501 WOODRUFF WAY Arcadia,CA 91007-8558 5788012026
Contacts
BOB FANG Owner SOLAR OPTIMUM INC* Contractor
2501 WOODRUFF AVE 501 W Glenoaks BLVD#555,Glendale,CA 91202
(818)804-3122 972228
Description:ROOF MOUNTED SOLAR SYSTEM 29 Valuation: $0.00 Tenant
NODULES/MICROINVERTERS, 125 COMBINER BOX.DERATE TO
175 A Total Sq Feet: 0.00 Plan Check# Plan#
Fees Amount Payments Amount Paid
Distribution Panel $44.00 Total Fees $294.69
Electrical Permit Issuance Fee $55.00 Cash/Receipt#REC-11961-22 $294,69
Residential Solar<10 kW $31.00 qmount Due: $0.00
Residential Solar Plan Check<10 kW $150.00
Solid Waste Management Fee 2 $1.00
Technology Fee(Permit) $5.44
Technology Fee(Plan Check) $8.25
Total: $294.69
��`�N �'L CALLS FOR INSPECTIONS
� Request for inspection by telephone at 626-574-5450. Leave a message
��� �. requesting the address,timeframe and what inspection item is needed.
�.. ,- This permit/plan review expires by time limitation and becomes null and
�"��'��'���=J� ��� " � void if the work authorized by the permit is not commenced within 180 days
from the date of issuance or if the permit is not obtained within 180 days
�^0������D from the date of plan submittal.This permit expires and becomes null and
� lU void if any work authorized by this permit is suspended or abandoned for 180
consecutive days or if no progressive work has been verified by a City of
Arcadia building inspector for a period of 180 consecutive days.
� August 05,2022
Issued By:Henry Kemick Date �
August 05,2022 Page 1 of 1