Loading...
HomeMy WebLinkAboutPlans44 9 S F PO O L LA N D S C A P E NE W 2 - S T O R Y S F R 38 1 2 S F 1S T F L R : 2 3 5 0 S F 2N D F L R : 1 4 6 2 S F GA R A G E 49 0 S F 1- S T O R Y A D U 10 0 0 S F 246'-6" 65 ' - 0 " 19'-0" 14 ' - 6 " 6' - 6 " 7' - 0 " 10 ' - 6 " 3' - 0 " 30'-0" 15 ' - 6 " 41 ' - 5 " 1- S T O R Y P O O L HO U S E 80 0 S F 9' - 1 " 7'-0" 9' - 1 " 9' - 1 " 13 ' - 7 " 15'-0" 29 ' - 1 0 " 1- C A R G A R A G E 30 0 S F AC AC REQ. 1ST FLR SETBACK - 6'6" REQ. 2ND FLR SETBACK - 13' LO T C O V E R A G E O F R E Q U I R E D R E A R Y A R D : 5 5 7 S F ( 2 4 . 7 % ) 7' - 1 " CO N C R E T E CO V E R E D P A T I O LA N D S C A P E 4'-0" PARKING STALL 10' X 20' PARKING STALL 10' X 20' 1S T F L R S E T B A C K P R O V I D E D 2N D F L R S E T B A C K P R O V I D E D 34'-7" RE A R Y A R D S E T B A C K - 3 4 ' - 7 " 15 ' - 7 " 15 ' - 7 " 15'-5"4'-0"8'-9"1'-6" 3' - 0 " 4" GATESWING GATE SCALE: 3/32" = 1' SITE PLAN (EXISTING AND PROPOSED)1 SCOPE OF WORK VICINITY MAP NAME: ADDRESS: CRYSTAL CHOW 530 CAMINO REAL ARCADIA, CA 91007 OWNER'S INFORMATION PROJECT DATA SITE ADDRESS: ZONING: 530 W CAMINO REAL, ARCADIA, CA 91007 R-1 5785-002-099ASSESSOR'S ID NO: PROPOSED USE:(1)SFR WITH (4) BEDROOM + (5) BATH + (1) DETACHED ADU WITH (2) BEDROOM + (2) BATH + (1) POOL HOUSE W/ (1) BATH - NEW 2-STORY SINGLE FAMILY DWELLING, 3812 SF - NEW DETACHED ADU, 1000 SF - NEW POOL HOUSE, 800 SF SITE PLAN KEY NOTES 1 NEW 2-STORY SINGLE FAMILY DWELLING 2 NEW DETACHED ADU 3 NEW POOL HOUSE 4 2-CAR GARAGE 5 1-CAR GARAGE 6 REAR PATIO 7 REAR BALCONY 8 SWIMMING POOL 9A SLIDING VEHICLE GATE 9B NEW 3'H CMU WALL (INSIDE PL) 9C NEW 6'H CMU WALL (INSIDE PL) SHEET INDEX T1.0 SITE PLAN T2.0 CALGREEN CHECKLIST T3.0 CITY CONDITIONS SU-1 SURVEY A1.0 FLOOR PLAN A1.1 ELECTRICAL PLAN A2.0 ROOF PLAN A3.0 ELEVATIONS A3.1 SECTION ELEVATIONS ADU1.0 ADU PROPOSED FLOOR PLAN ADU2.0 ADU ROOF PLAN ADU3.0 ADU ELEVATIONS ADU3.1 ADU SECTION ELEVATIONS SD0 STRUCTURAL SPECIFICATIONS S1 FOUNDATION PLAN S2 ROOF FRAMING PLAN SD1 STRUCTURAL DETAILS SD2 STRUCTURAL DETAILS T-1 TITLE 24 T-2 TITLE 24 T-3 TITLE 24 T-4 TITLE 24 PLAN CHECK Revisions: Office Project Number: Drawn By: Paper Size: Scale: Date: AS NOTED Date Information: - - - Drawing Title: Project: Address: Consultant: Applicant: PETER SUN ARCH D (24.00 X 36.00 INCHES) 530 CAMINO REAL ARCADIA, CA 91007 NEW SFR AND ADU SITE PLAN & PROJECT DATA T1.0 GENERAL NOTES OCCUPANCY GROUP:R3/U TYPE OF CONSTRUCTION: V-B FIRE SPRINKLERED 1.GOVERNING CODES ON THIS PROJECT ARE: 2019 CALIFORNIA RESIDENTIAL CODE (CRC) 2019 CALIFORNIA ELECTRICAL CODE (CEC) 2019 CALIFORNIA MECHANICAL CODE (CMC) 2019 CALIFORNIA PLUMBING CODE (CPC) 2019 CALIFOFNIA BUILDING ENERGY EFFICIENCY STANDARDS CODE (BEES) 2019 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGREEN) 2019 CITY OF ARCADIA BUILDING REGULATIONS AND LOCAL AMENDMENTS 1.CALIFORNIA BUSINESS & PROFESSIONS CODE SECTIONS 5537 & 6737: THESE SECTIONS PROVIDE THE FOLLOWING EXCEPTIONS FOR BUILDING PLANS THAT HAVE BEEN DESIGNED IN ACCORDANCE WITH THE BUILDING CODE REQUIREMENTS OF DIVISION IV OF CHAPTER 23 FOR CONVENTIONAL LIGHT WOOD-FRAME CONSTRUCTION AND TABLES OF LIMITATION OF WOOD FRAME CONSTRUCTION AS ADOPTED BY THE LOCAL JURISDICTION: AN UNLICENSED PERSON MAY PREPARE PLANS, DRAWINGS, OR SPECIFICATIONS FOR THE FOLLOWING: 1.1.SINGLE FAMILY DWELLING NOT MORE THAN TWO STORIES AND BASEMENT IN HEIGHT. 1.2.MULTIPLE DWELLINGS CONTAINING NO MORE THAN FOUR DWELLING UNITS AND NOT MORE THAN TWO STORIES AND BASEMENT IN HEIGHT. ALSO, MAXIMUM OF FOUR DWELLING UNITS ON ANY LOT. 1.3.GARAGES OR OTHER STRUCTURES APPURTENANT TO SINGLE-FAMILY DWELLING OR MULTIPLE DWELLINGS NOT MORE THAN TWO STORIES AND BASEMENT IN HEIGHT. 2.CALIFORNIA BUSINESS & PROFESSIONS CODE SECTIONS 5538 & 6745: THESE SECTIONS DOES NOT PROHIBIT ANY PERSON FROM FURNISHING PLANS FOR THE FOLLOWING: 2.1.NON-STRUCTURAL STORE FRONTS, INTERIOR ALTERATIONS OR ADDITIONS, FIXTURES, CABINET WORK, FURNITURE, OR OTHER APPLIANCES OR EQUIPMENT. 2.2.ANY NONSTRUCTURAL WORK NECESSARY TO PROVIDE FOR THEIR INSTALLATION. CONSULTANTS STRUCTURAL ENGINEER JKL ENGINEERING 1529 LONGHILL DR. MONTEREY PARK, CA 91754 (626) 524-2210 ENERGY CONSULTANT PERFECT DESIGN 2416 W. VALLEY BLVD. ALHAMBRA, CA 91803 (626) 289-8808 1.CONTRACTOR SHALL STUDY THE DRAWINGS, SPECIFICATIONS AND FIELD CONDITIONS BEFORE COMMENCING WITH THE WORK INVOLVED ANY DISCREPANCIES FOUND SHALL BE REPORTED TO THE OWNER IN WRITING FOR CORRECTIONS OR CLARIFICATION. 2.AT TIME OF PERMIT ISSUANCE, CONTRACTOR SHALL SHOW THEIR VALID WORKERS' COMPENSATION INSURANCE CERTIFICATE. 3.ALL WORK SHALL CONFORM TO ALL REQUIREMENTS OF STATE OF CALIFORNIA TITLE 24 REGARDLESS OF THE INFORMATION INDICATED ON THESE PLANS. IT IS THE RESPONSIBILITY OF THE INDIVIDUAL SUPERVISING THE CONSTRUCTION TO ENSURE THAT THE WORK IS DONE ACCORDANCE WITH CODE REQUIREMENTS PRIOR TO REQUESTING INSPECTION. 4.ALL NONCOMPLIANT PLUMBING FIXTURES SHALL BE REPLACED WITH WATER-CONSERVING PLUMBING FIXTURE PRIOR TO FINAL INSPECTION. 5.SEPARATE PERMIT SHALL FIRST BE OBTAINED FROM THE CITY PUBLIC WORKS DEPARTMENT PRIOR TO PLACEMENT OF ANY CONSTRUCTION MATERIALS OR EQUIPMENT IN THE PUBLIC WAY. 6.EXCESS OR WASTE CONCRETE MAY NOT BE WASHED INTO THE PUBLIC WAY OR ANY OTHER DRAINAGE SYSTEM. PROVISIONS SHALL BE MADE TO RETAIN CONCRETE WASTES ON SITE UNTIL THEY CAN BE DISPOSED OF AS SOLID WASTE. 7.SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD) SHALL BE NOTIFIED IN ACCORDANCE WITH CALIFORNIA STATE LAW PRIOR TO START OF ANY DEMOLITION, ADDITION, AND/OR REMODEL WORK. THE SCQMD OFFICE IS LOCATED AT 21865 COPLEY DRIVE IN DIAMOND BAR, PHONE NO. (909) 396-2000. BE ADVISED, SCAQMD MAY REQUIRE A 10 DAY WAIT PERIOD PRIOR TO START OF WORK. 8.SEDIMENTS AND OTHER MATERIALS MAY NOT BE TRACKED FROM THE SITE BY VEHICLE TRAFFIC. THE CONSTRUCTION ENTRANCE ROADWAYS MUST BE STABILIZED SO AS TO INHIBIT SEDIMENTS FROM BEING DEPOSITED INTO THE PUBLIC WAY. ACCIDENTAL DEPOSITIONS MUST BE SWEPT UP IMMEDIATELY AND MAY NOT BE WASHED DOWN BY RAIN OR OTHER MEANS. STOCKPILES OF EARTH AND OTHER CONSTRUCTION RELATED MATERIALS MUST BE PROTECTED FROM BEING TRANSPORTED FROM THE SITE BY THE FORCES OF WIND OR WATER. TRASH AND CONSTRUCTION RELATED SOLID WASTES MUST BE DEPOSITED INTO A COVERED RECEPTACLE TO PREVENT CONTAMINATION OF RAINWATER AND DISPERSAL BY WIND. FUELS, OILS, SOLVENTS AND OTHER TOXIC MATERIALS MUST BE STORED IN ACCORDANCE WITH THEIR LISTING AND ARE NOT TO CONTAMINATE THE SOIL AND SURFACE WATERS. ALL APPROVED STORAGE CONTAINERS ARE TO BE PROTECTED FROM THE WEATHER. SPILLS MUST BE CLEANED UP IMMEDIATELY AND DISPOSED OF IN A PROPER MANNER. SPILLS MAY NOT BE WASHED INTO THE DRAINAGE SYSTEM. 9.DUE TO THE POSSIBLE PRESENCE OF LEAD-BASED PAINT, LEAD-SAFE WORK PRACTICES ARE REQUIRED FOR ALL REPAIRS THAT DISTURB PAINT IN PRE-1979 BUILDINGS. FAILURE TO DO SO COULD CREATE LEAD HAZARDS THAT VIOLATE CALIFORNIA HEALTH & SAFETY CODE, SECTIONS 17920.10 AND 105256 WITH POTENTIAL FINES FOR VIOLATIONS UP TO $5,000 (SECTION (D) AMENDED) OR IMPRISONMENT FOR NOT MORE THAN 6 MONTHS IN THE COUNTY JAIL OR BOTH. 10.THE ISSUANCE OF A PERMIT SHALL NOT PREVENT THE BUILDING OFFICIAL FROM REQUIRING THE CORRECTION OF ERRORS ON THESE PLANS OR FROM PREVENTING ANY VIOLATION OF THE CODES ADOPTED BY THE CITY, RELEVANT LAWS, ORDINANCES, RULES AND/OR REGULATIONS. 11.PROVIDE SHORING AT ALL TIMES WHEN ALTERING VERTICAL MEMBERS. CONTRACTOR SHALL VERIFY ACTUAL CONDITIONS AND REPORT IN WRITING TO THE ARCHITECT FOR RESOLUTION PRIOR TO PROCEEDING WITH THE WORK. 12.THE AREA OF GLASS IN WINDOWS LIMITED TO 20% OF THE FLOOR ADDITION PLUS THE AREA OF ANY GLASS THAT WAS ELIMINATED IN THE ORIGINAL RESIDENCE WALL AREA WHERE THE NEW ADDITION IS ATTACHED. ALL NEW WINDOWS SHALL BE DUAL-GLAZED. 13.ALL WINDOWS ARE TO BE WEATHER STRIPPED. 14.SMOKE DETECTORS SHALL BE INSTALLED IN AREAS GIVING ACCESS TO SLEEPING ROOMS ON OR NEAR THE CEILING, IN EACH SLEEPING ROOM (CBC 310.9.1-4). 15.ATTIC VENTILATION, EQUAL TO 1/150 OF SPACE VENTILATED, SHALL BE PROVIDED OR AS REQUIRED FOR FORCED AIR UNIT. 16.UTILITY LINES AND ACCESSORIES FOUND AT THE SITE THAT INTERFERE WITH THE NEW CONSTRUCTION SHALL BE RELOCATED AS NECESSARY. THE CONTRACTOR SHALL OBTAIN ANY BUILDING PERMIT REQUIRED. 17.ALL WOOD IN CONTACT WITH CONCRETE AND FOUNDATION SILLS SHALL BE PRESSURE TREATED. 18.PROVIDE CORROSION RESISTED WEEP SCREED AT FOUNDATION PLATE LINE WHICH WILL ALLOW TRAPPED WATER TO DRAIN TO THE EXTERIOR OF THE BUILDING. 4” MINIMUM HEIGHT ABOVE GRADE. 19.WALLS CONTAINING 3” OR 4" DIAMETER DRAIN/WASTE/VENT PIPING SHALL BE SIZED TO ALLOW CUTTING/NOTCHING/BORING (2 X 6 MIN.). 20.CAULK/SEAL ALL PENETRATIONS TO TOP AND BOTTOM PLATES. 21.CAULK/SEAL ALL EXTERIOR BOTTOM PLATES. 22.ALL EXTERIOR FINISH MATERIAL TO MATCH EXISTING IN TYPE AND COLOR. 23.ALL NEW ELECTRICAL WIRING SHALL BE COPPER. 24.PROVIDE SEPARATE INSPECTION FOR EACH PHASE OF EXTERIOR PLASTER AS FOLLOWS : SCRATCH COAT, BROWN COAT , COLOR COAT [ STAPLES ARE NOT PERMITTED FOR ATTACHING WIRE ]. 25.BUILDING PAPER TO BE USED # 60 FOR STUCCO THAT DOES NOT HAVE PLYWOOD BACKING. 26.DUCTS SHALL BE SIZED PER CHAPTER 6 OF THE MECHANICAL CODE. 27.DISTANCE FROM FACE OF THE FOUNDATION TO PROPERTY LINE TO BE ZONING SETBACK PLUS WALL FINISH THICKNESS (MINIMUM). 28.THE DISCHARGE OF POLLUTANTS TO ANY STORM DRAINAGE SYSTEM IS PROHIBITED. NO SOLID WASTE MATERIALS, OR WASTEWATER GENERATED ON CONSTRUCTION SITES OR BY CONSTRUCTION ACTIVITIES SHALL BE PLACED, CONVEYED OR DISCHARGED INTO THE STREET, GUTTER OR STORM DRAIN SYSTEM. 29.THE INSULATION INSTALLER AND THE CONTRACTOR SHALL POST A SIGNED CERTIFICATE OF COMPLIANCE IN A CONSPICUOUS LOCATION IN THE BUILDING. THIS CERTIFICATE SHALL STATE THAT THE INSTALLATIONS AND MATERIALS CONFORM TO THE APPROPRIATE SECTIONS OF THE CALIFORNIA ADMINISTRATIVE CODE, TITLES 20 AND 24 AND SHALL SPECIFY THE MANUFACTURE' S NAME AND MATERIAL IDENTIFICATION, THE INSTALLED R-VALUE, AND WHEN LOOSE FILL IS INSTALLED, SHALL STATE THE MINIMUM INSTALLED WEIGHT PER SQUARE FOOT CONSISTENT WITH THE MANUFACTURE'S LABELED DENSITY FOR THE DESIRED R-VALUE. DESIGN STUDIO ELEVATE PETER SUN 5328 CLOVERLY AVE TEMPLE CITY, CA 91780 (626) 203-5971 PARCEL AREA:65 X 246.48 = 16,021 SF PROJECT DATA: SFR:3,670 SF LIVING AREA 1ST FLR:2350 2ND FLR:1462 - 142 = 1320 VAULTED FOYER (19'-5"CLG):142 REAR PATIO:289 SF ATTACHED GARAGE:490 SF DETACHED ADU:1000 SF DETACHED GARAGE:300 SF POOL HOUSE:800 SF MAX LOT COV:5607 SF (35%) MAX FLOOR AREA:6806 SF PROPOSED FLOOR AREA:3812+(490-450)+300+800+1000 = 5952 PROPOSED LOT COV:2350+289+490+1000+300+800 = 5229 GENERAL NOTES FRONT YARD SETBACK ADDRESS FRONT YARD SETBACK 518 CAMINO REAL 30' 534 CAMINO REAL 30' (E) 530 W CAMINO REAL 30' (N) 530 W CAMINO REAL 30' 1 2 3 5 4 8 6 7 9A 9B 9B 9C 9C 9C FRONT YARD CALCULATION TOTAL FRONT YARD: 1950 SF LANDSCAPE = 1173 SF HARDSCAPE = 777 SF (39.8%) 3:12 3:12 3:12 3:12 3: 1 2 3: 1 2 3:12 3:12 3:12 3:12 3:12 3: 1 2 3: 1 2 3: 1 2 3: 1 2 3: 1 2 3:12 3:12 2' - 0 " 2'-0" 2'-0" 3'-0" SCALE: 1/4" = 1' ROOF PLAN1 PLAN CHECK Revisions: Office Project Number: Drawn By: Paper Size: Scale: Date: AS NOTED Date Information: - - - Drawing Title: Project: Address: Consultant: Applicant: PETER SUN ARCH D (24.00 X 36.00 INCHES) 530 CAMINO REAL ARCADIA, CA 91007 NEW SFR AND ADU MAIN HOUSE ROOF PLAN A2.0 8" 10 ' - 0 " 1' - 1 " 8' - 4 " 8" 3' - 9 " 24 ' - 6 " CLG CLG 2ND FLR 1ST FLR FG MAX HT 25' ATTIC FLR RIDGE 3 12 3 12 2' - 1 0 " + 10'-8" + 20'-1" + 24'-6" + 25' PLPL 534 CAMINO REAL EXISTING 1-STORY SFR APPROX. 20 HORIZONTAL LINEAR FEET FROM PROPOSED 2ND STORY EXISTING HEDGES PROPOSED HEDGES PER LANDSCAPE 3 0 D E G P L A N E F O R R E F E R E N C E 8" 10 ' - 0 " 1' - 1 " 8' - 4 " 8" 3' - 9 " 24 ' - 6 " CLG CLG 2ND FLR 1ST FLR FG MAX HT 25' ATTIC FLR RIDGE + 10'-8" + 20'-1" + 24'-6" + 25' PLAN CHECK Revisions: Office Project Number: Drawn By: Paper Size: Scale: Date: AS NOTED Date Information: - - - Drawing Title: Project: Address: Consultant: Applicant: PETER SUN ARCH D (24.00 X 36.00 INCHES) 530 CAMINO REAL ARCADIA, CA 91007 NEW SFR AND ADU JADU ELEVATIONS A3.0 2 SCALE: 1/4" = 1' NORTH ELEVATION1 SCALE: 1/4" = 1' SOUTH ELEVATION2 ELEVATION KEY NOTES NUM.COLOR MANUF.NOTE 1 CHARCOAL/SLATE EAGLE ROOFING BEL AIR LIGHTWEIGHT SLATE TILE; CRRC 0918-0046 2 BLACK N/A VINYL WINDOW 3 BLACK N/A FASCIA BOARD 4 BLACK N/A RAIN GUTTER -CONTEMPORARY SEAMLESS-FLAT 5 WOOD N/A WOOD SIDING 6 WOOD N/A EXTERIOR DOOR TO MATCH WOOD SIDING COLOR 7 WHITE N/A STUCCO SMOOTH FINISH 8 BLACK N/A METAL RAILING 9 BLACK N/A METAL SLEEVE OVER WOOD POST 10 WHITE CORONADO 3" SPLIT LIMESTONE 1 4 3 5 6 8 9 9 7 ALL WINDOWS TO BE RECESSED A MINIMUM OF 2" FROM EXTERIOR FINISH. 10 8" 10 ' - 0 " 1' - 1 " 8' - 4 " 8" 3' - 9 " 24 ' - 6 " CLG CLG 2ND FLR 1ST FLR FG MAX HT 25' ATTIC FLR RIDGE + 10'-8" + 20'-1" + 24'-6" + 25' 2'-0" 2'-0" 30 ° 8" 10 ' - 0 " 1' - 1 " 8' - 4 " 8" 3' - 9 " 24 ' - 6 " CLG CLG 2ND FLR 1ST FLR FG MAX HT 25' ATTIC FLR RIDGE + 10'-8" + 20'-1" + 24'-6" + 25' PLAN CHECK Revisions: Office Project Number: Drawn By: Paper Size: Scale: Date: AS NOTED Date Information: - - - Drawing Title: Project: Address: Consultant: Applicant: PETER SUN ARCH D (24.00 X 36.00 INCHES) 530 CAMINO REAL ARCADIA, CA 91007 NEW SFR AND ADU JADU ELEVATIONS A3.0 SCALE: 1/4" = 1' EAST ELEVATION1 SCALE: 1/4" = 1' WEST ELEVATION2 3: 1 2 3:12 3:12 3: 1 2 3: 1 2 3:12 3:12 PARKING STALL 10' X 20' SCALE: 1/4" = 1' ROOF PLAN1 PLAN CHECK Revisions: Office Project Number: Drawn By: Paper Size: Scale: Date: AS NOTED Date Information: - - - Drawing Title: Project: Address: Consultant: Applicant: PETER SUN ARCH D (24.00 X 36.00 INCHES) 530 CAMINO REAL ARCADIA, CA 91007 NEW SFR AND ADU ADU ROOF PLAN ADU2.0 8" 10 ' - 0 " 14 ' - 1 1 " CLG 1ST FLR FG RIDGE HT. 16 ' - 0 " MAX HT. 16' 3 12 14 ' - 1 1 " 8" 10 ' - 0 " MAX HT. 16' CLG HT. 10' F.F. PLAN CHECK Revisions: Office Project Number: Drawn By: Paper Size: Scale: Date: AS NOTED Date Information: - - - Drawing Title: Project: Address: Consultant: Applicant: PETER SUN ARCH D (24.00 X 36.00 INCHES) 530 CAMINO REAL ARCADIA, CA 91007 NEW SFR AND ADU ADU ELEVATIONS ADU3.0 SCALE: 1/4" = 1' NORTH ELEVATION1 SCALE: 1/4" = 1' SOUTH ELEVATION2 SCALE: 1/4" = 1' EAST ELEVATION3 SCALE: 1/4" = 1' WEST ELEVATION4 ELEVATION KEY NOTES NUM.COLOR MANUF.NOTE 1 CHARCOAL/SLATE EAGLE ROOFING BEL AIR LIGHTWEIGHT SLATE TILE; CRRC 0918-0046 2 BLACK N/A FIBERGLASS WINDOW/DOOR 3 BLACK N/A FASCIA BOARD 4 BLACK N/A RAIN GUTTER 5 WHITE N/A STUCCO SMOOTH FINISH 1 2 4 3 5 2 1-STORY POOL HOUSE 800 SF 3: 1 2 3:12 3: 1 2 3:12 SCALE: 1/4" = 1' ROOF PLAN1 PLAN CHECK Revisions: Office Project Number: Drawn By: Paper Size: Scale: Date: AS NOTED Date Information: - - - Drawing Title: Project: Address: Consultant: Applicant: PETER SUN ARCH D (24.00 X 36.00 INCHES) 530 CAMINO REAL ARCADIA, CA 91007 NEW SFR AND ADU REC ROOM ROOF PLAN RR2.0 8" 10 ' - 0 " 13 ' - 1 1 " CLG 1ST FLR FG RIDGE HT. 16 ' - 0 " MAX HT. 16' 3 12 PLAN CHECK Revisions: Office Project Number: Drawn By: Paper Size: Scale: Date: AS NOTED Date Information: - - - Drawing Title: Project: Address: Consultant: Applicant: PETER SUN ARCH D (24.00 X 36.00 INCHES) 530 CAMINO REAL ARCADIA, CA 91007 NEW SFR AND ADU REC ROOM ELEVATIONS RR3.0 SCALE: 1/4" = 1' NORTH ELEVATION1 SCALE: 1/4" = 1' SOUTH ELEVATION2 SCALE: 1/4" = 1' EAST ELEVATION3 SCALE: 1/4" = 1' WEST ELEVATION4 ELEVATION KEY NOTES NUM.COLOR MANUF.NOTE 1 CHARCOAL/SLATE EAGLE ROOFING BEL AIR LIGHTWEIGHT SLATE TILE; CRRC 0918-0046 2 BLACK N/A FIBERGLASS WINDOW/DOOR 3 BLACK N/A FASCIA BOARD 4 BLACK N/A RAIN GUTTER 5 WHITE N/A STUCCO SMOOTH FINISH 1 2 2 2 5 4 3