HomeMy WebLinkAboutROOF-22-1590 • _ .
�`" r 7 }�` � �� � °aa t �''��aw*� �k � `� � "^�a+�vt?� �k�^�`� �„����^��`�`�'�;
„ City of Arcadia CA � � ������ ����� � ������ ��
� ����`� ;��� �> -_ �� ���� �� �� � xPerm�t��vo ROOF 22 1590 a
' ''� F�' �� �T� �` `' � 4�� � �����c�a��� �Z��m,*a���o��a
DevelopmentServices Department 2 �j 4�"`� ,� ���k������P�eCIT11t,Type Roof;
240 West Huntington Drive Post Office Box 60021 f �� �, � � ��'°����� ��� �`�� `� �`�*°"��
�.
' k '� P� ork Class��ica�ron�Reroof�Gommercial��
Arcadia,CA 91066-6021 , a � f = � ������������� �,�� ��
' � (626)574-5416 � � � '" �'
i� n�. m,e�#w,� � a� ��rn,,n�t r a`^.� ''�°�'¢�,r� �PefflTft$CptUS �SSU@G)�
� _"�" `,
r �. ; . . � ''w d p�u w a..�,fl.�3b�'.F .. A; � `� •
A�Cf��l� „��� � ��issue Date��08�16'�2b 2�a
,R,.
_. . .,./ / Expirat�on: 08/16/2023
:E ,,,.�.,;.
Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number
150 LAS TUNAS DR Arcadia,CA 91007-8512 5788022014
Contects
Tippy Lambert Owner BE KING INC dba KING ROOFING* Contractor
150 Las Tunas 2269 RITCHEY ST,SANTA ANA,CA 92705
(714)542-0101 759061
Description:REROOF OVER EXISTING LAYER WITH GAF WHITE Valuation: $ 58,500.00 Tenant
COOL ROOF TPO CLASS A 98 SQ(AM) **FIELD VERIFY
EXISTING LAYER"`* Total Sq Feet: 0.00 Plan Check# Plan#
Fees Amount Payments Amount Paid
Building Issuing Fee $59.00 Total Fees $1,113.06
Building Permit Fees $989.68 Cash/Receipt#REC-12081-22 $1,113.06
Solid Waste Management Fee $6.70
Technology Fee(Permit) $57.68 Amount Due: $0.00
Total: $1,113.06
8-� 2�{ --22
PR� oNS�f Ruc i�o�J ��+SS
CALLS FOR INSPECTIONS
Request for inspection by telephone at 626-574-5450. Leave a message
requesting the address,timeframe and what inspection item is needed.
q _� �-zz
' 1 This permit/plan review expires by time limitation and becomes null and
�i���� �-�, ;.� void if the wo�k authorized by the permit is not commenced within 180 days
� � from the date'of issuance or if the permit is not obtained within 180 days
from the date of plan submittal.This permit expires and becomes null and
void if any work authorized by this permit is suspended or abandoned for 180
consecutive days or if no progressive work has been verified by a City of
Arcadia building inspector for a period of 180 cgrtsecutive days.
�
L:.�.J � • ;T.� .
�����
���
August 16, 2022
Issued By: Henry Kemick Date
August 16,2022 Page 1 of 1