HomeMy WebLinkAboutPOOL-22-0092 � `:
� ,�.� ,� , � �
ga��" City of Arcadia, CA � � �. � Perin�tNo Pool �22-0092,r
Develo mentServicesDe artment �� � r � �.; ����� �
p P ��,�� "�""� '""� � i� .;. PermitType;Pool/Spa;�
240 West Huntin ton Drive,Post Office Box 60021 �; � r� ' ���" � �� � �
Arcadia,CA 91066-6021 ��j �,t , � � j � i �f {w�� �-, work Classi�icqtion:Pool-Residenfial
�W ,„� .� � .
(626)574-5416 � . Permit'Status:IssUed•'
1���f�..D�� Issue-Date:ol/19/2022 Expiration• 01/19/2023
Addr N0. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number
628 ENCINO CT Arcadia,CA 91006-4450 5780013044
Contacts
Maggie Chen Owner JAY-MAR CONSTRUCTION INC dba Contractor
628 encino CT WATER VISUALS*
. 1860 W 9TH ST,UPLAND,CA 91786
(909)985-1071 784994
Description:NEW IN GROUND POOLAND SPA 90 PF Valuation: $ 21,770.10 r Tenant
Total Sq Feet: 0.00 Plan Check# Plan#
Fees Amount payments Amount Paid
Building Issuing Fee $55.00 Total Fees $1,219.11
euilding Permit Fees $491.35 Cash/Receipt#REC-09904-22 $1,219.11
Building Plan Review Fee S31938
Amount Due: $0.00
Electrical Fee(Motors,Fix,Wiring) $83.00
Electrical Permit Issuance Fee $55.00
Plumbing Permit Issuance Fee $55.00
Pool Piping $31.00
Pool P-Trap $50.00
Solid Waste Management Fee $6.25
Solid Waste Management Fee 2 $1.00
swimming Pool,Spa/HotTub Heater 548.0o CALL$ FOR INSPECTIONS
SwMF FEE 2 Si.00 Request for inspection by telephone at 626-574-5450. Leave a message
Technology Fee(Permit) $45.56 requesting the address,timeframe and what inspection item is needed.
Technology Fee(Plan Check) $17.57
Total: $1,219.11
This permit/plan review expires by time limitation and becomes null and
void if the work authorized by the permit is not commenced within 180 days
L �(�'��iZ from the date of issuance or if the permit is not obtained within 180 days
v from the date of plan submittal.This permit expires and becomes null and
� / void if any work authorized by this permit is suspended or abandoned for 180
�� ��L �. consecutive days or if no progressive work has been verified by a City of
Arcadia building inspector for a period of 180 consecutive days.
� � �����
�
January 19, 2022
Issued By:Jeff Wang Date
lanuary 19,2022 Page 1 of 1