HomeMy WebLinkAboutUntitled �..�"s �. u �, �o- : � �. ,
��°�������� � T ��'
� � � City of Arcadia, CA �, x�� �� ����� _���� �PermrrNo rS"OLR&22 1x309�
� Development Services Department � ��� ���. °� `" � � ���� � � �
, �„��� Permrt ype Solar�
240 West Huntington Drive,Post Office Box 60021 � � 4 a �, �`�� � � � �
� ° Arcadia,CA 91066-6021 � '��� ;� y" � WOYkCIp551��cation Solar�Resideht►al
' � (626)574-5416 �����'��'a # ��. �� ��s�*��������g� � �� �
� Permrt Stafifls�alssued
� �� .��X., a��y`S�� i'��'$��r�'"?P��,�� a�� m �'�.?;»�' "xg�'"','.i �' ..r.�z.�'»._..�„�.,�+'.'C`,���.:":;�.:
:E�.1Z'CADI�; �, ��Issue'�Date�os/zs/2o22: Expirat�on: 08/23/2023
. ;�����„��4 a��4� � ��3�4
Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number
401 S OLD RANCH RD Arcadia,CA�91007-6229 5777024011
Contacts
WILLIAM KLIPSTEIN Owner ALTADENA ENERGY&SOLAR INC* Contractor
4010LD RANCH 460 E CALAVERAS ST,ALTADENA,CA 91001
(818)201-4206 979146
Description:ROOF MOUNTED SOLAR SYSTEM 32 Valuation: $0.00 Tenant
MODULES/MICROINVERTERS AND COMBINER BOX
Total Sq Feet: 0.00 Plan Check# Plan#
Fees Amount payments Amount Paid
Distribution Panel $23.50 Total Fees $289,84
Electrical Permit Issuance Fee $59.00 Cash/Receipt#REC-12163-22 $289,84
Residential Solar<10 kW $33.00
Residential Solar Plan Check<10 kW $160.00 Amount Due: $0.00
Solid Waste Management Fee 2 $1.00
Technology Fee(Permit) $4.54
� Technology Fee(Plan Check) $8.80
Total: $289.84
. G�.-��Z'Z CALLS FOR INSPECTIONS
Request for inspection by telephone at 626-574-5450. Leave a message
� requesting the address,timeframe and what inspection item is needed.
���� �
This permit/plan review expires by time limitation and becomes null and
void if the work authorized by the permit is not commenced within 180 days
from the date of issuance or if the permit is not obtained within 180 days
from the date of plan submittal.This permit expires and becomes null and
void if any work authorized by this permit is suspended or abandoned for 180
consecutive days or if no progressive work has been verified by a City of
Arcadia building inspector for a period of 180 consecutive days.
� ��a'B �
. p���
. ��
�
��
August 23,2022
Issued By:Steven Roberts Date
August 23,2022 Page 1 of 1