HomeMy WebLinkAboutUntitled /
City of Arcadia, CA � , Perm�tNo.SOLR-2Q-0327
Development Services Department Petmit Type:5o18Y
240 West Huntington Drive,Post Office Box 60021
Arcadia,CA 91066-6021 Work CIp55lflCafi0r1:SOIdf-Residential Over 10 KV
(6z6)s�a-sai6 PermltStatus;•Issued
1'��o��t���� IssueDatec02/26/2020 Expiration: 08/24/2020
Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number
�.._.�__...._w�_---__._._._._.._.�.__._._�_.._._.____._._.��.._.____w__.....__.._..__._. . _..... .. . ........._......__ ............. ....._....___ _
� 31 WOODLAND LN Arcadia,CA 91006-2337 5770003008
Contacts
�.__.._ ____.._._.__..��.�.__._.._.._�_.. � _.._.__.� _.._.,..__._. .__.__�_ _._.�._�__.._._---.__.,
�� SACRO,JANSSEN CO TR SACRO FAMILY Owner IMPERIAL SOLAR INC dba IMPERIAL Contractor
_TRUST ELECTRICAL
31 WOODLAND LN 13547 VENTURA BLVD 174,SHERMAN OAKS,CA 91423
j (818)650-3500 1019219
' _.._,.__.._ ____.___.__.__.__.__,
._._v___ _ _.�.. � �-
r_._._.__� �.__..�..�_._.._____�_._.____�_. � Te n a nt
1 Description:ROOF MOUNT PV SYSTEM, 18 MODULES/1 j Valuation: $ 0.00
� INVERTER, DERATE MAIN SERVICE 175 AMP,ELECTRICAL LOAD �
CALCS ATTACHED. PERMIT ISSUED FOR RE-ROOF,STEEL WITH � Total S�Feet: 0.00 Plan Check q Plan q
E
COMP UNDER ARRAY.LANSFORD ROOFING
Fees Amount payments Amount Paid
Building Plan Check Fee Residential $50.00 Total Fees $324.�Z
Electrical Permit Issuance Fee 547.01 Cash/Receipt#REC-03970-20 $3Z4•�Z
Fire Plan Check Fee Residential $50.00
Amount Due: $0.00
Inverters 5��78
Panels $8z.45
Residential Services up to 400 amps $16.48
Solid Waste Management Fee 2 51.00
Total: $324.72
�y/� ,� / p/ CALLS FOR INSPECTIONS
� ����� l'^( (��� �� Request for inspection by telephone at 626-574-5450. Leave a message
requesting the address,timeframe and what inspection rtem is needed.
This permit/plan review expires by time limitation and becomes null and
void if the work authorized by the permit is not commenced within 180 days
from the date of issuance or if the permit is not obtained within 180 days
from the date of plan submittai.This permit expires and becomes null and
void if any work authorized by this permit is suspended or abandoned for 180
consecutive days or if no progressive work has been verified by a City of
Arcadia building inspector for a period of 180 consecutive days.
d� � �D
�
P
�F
r�
0
February 26, 2020
Issued By: Date
February 26,2020 Page 1 of 1