Loading...
HomeMy WebLinkAboutRALT-21-1677 � ���� � �� � City of Arcadia, CA � Perrrrit No.R/�►Lt-21-1.6��=� Development Services Department ` Perl'i7it Type:R2S�d811'C�a)Aaa�110X1�A�tE:[atlOtl, 240 West Huntington Drive,Post Office Box 60021 Arcadia,CA 91066-6021 'W01'kC�pSSIr7CQtlOI7:Res-R+�model (6z6)s�a-sai6 PermitStacus:Issued �,�(�;��,D�� issue�ate:09/o2/2021 Expiration: 09/02/2022 Addr NO. Dir Prefix Street Name Street Suffix Unit City,State,Zip Parcel Number ! 754 FAIRVIEW��AVE ��� B Arcadia,CA 91007-6659 �� 5783011137 � � Contacts 11AN WEN Owner TEAM YOUNG INC* Contractor 754 FAIRVIEW UNIT B,ARCADIA,CA 91007-6659 13209 GARVEY AVE, BALDWIN PARK,CA 91706 (626)589-4212 965676 Description:REMOVE ILLEGAL WIRING,VENTING, NEW Valuation: $ 20,000.00 Tenant CEILING INSULATION AND MISC DRYWALL PATCH WORK . RETURN HOUSE TO ORIGINAL USE. 100 AMP SERVICE. Total Sq Feet: 0.00 Plan Check�t Plan# Fees Amount payments Amount Paid Building Issuing Fee $55.00 Total Fees $1,091.42 Building Permit Fees S453.85 Cash/Receipt#REC-08729-21 $1,091.42 Building Plan Review Fee 5295.01 Cal Green Plan Check $29.51 Amount Due: $0.00 Electrical Permit Issuance Fee 555.00 Energy Plan Review Fee $90.77 Green BuildingStandard $1.00 Residential Services up to 400 amps $22.00 Solid Waste Management Fee $6.25 Solid Waste Management Fee 2 $1.00 Strong Motion Inst.Program Res Sz.00 CALLS FOR INSPECTIONS Technology Fee(Permit) 527.99 Request for inspection by telephone at 626-574-5450. Leave a message rechnology Fee(Permit) $24.96 requesting the address,timeframe and what inspection item is needed. Technology Fee(Permit) 54•24 Technology Fee(Plan Check) $22.84 This permit/plan review expires by time limitation and becomes null and Total: $1,091.42 void if the work authorized by the permit is not commenced within 180 days from the date of issuance or if the permit is not obtained within 180 days Q� ��+. 22 from the date of plan submittal.This permit expires and becomes null and V void if any work authorized by this permit is suspended or abandoned for 180 consecutive days or if no progressive work has been verified by a City of � Arcadia building inspector for a period of 180 consecutive days. �' September 02, 2021 Issued By: Henry Kemick Date September 03,2021 Page 1 of 1