HomeMy WebLinkAboutItem 12d - Baseball Field Bleacher ProjectBaseball Field Bleacher Project
January 17, 2023
Page 1 of 3
DATE: January 17, 2023
TO: Honorable Mayor and City Council
FROM: Paul Cranmer, Public Works Services Director
By: Michael Kwok, Associate Civil Engineer
SUBJECT: CONTRACT WITH ACE CONSTRUCTION, INC. FOR THE BASEBALL
FIELD BLEACHER PROJECT IN THE AMOUNT OF $866,000.19
CEQA: Exempt
Recommendation: Approve
SUMMARY
The City of Arcadia’s 2017 Parks Master Plan identified and prioritized various
improvements for the growth and development of the City’s parks. The Fiscal Year 2022-
23 Capital Improvement Program allocated funding for the construction of new bleachers
and shade canopies at Hugo Reid Park, Longden Avenue Park, and Bonita Park. To
ensure that the City is receiving the most competitive prices and quality service for this
work, a formal bid was conducted. Ace Construction, Inc. submitted the lowest responsive
bid.
It is recommended that the City Council approve, authorize, and direct the City Manager
to execute a contract with Ace Construction, Inc. for the Baseball Field Bleacher Project
in the amount of $866,000.19, and approve a 9% contingency.
BACKGROUND
On August 1, 2017, the City Council adopted the Parks Master Plan, which is a guiding
policy document that provides recommendations for prioritizing future recommendations
for growth, development, and implementation strategies related to parks and recreation
facilities. The recommendations proposed were based on a detailed assessment of
community demographics, community needs, existing conditions of recreation and parks
facilities, and effectiveness of the various recreation and community services programs.
These recommendations were prioritized on a four-tier basis, depending on their degree
of need, with Tier 1 being of highest priority and Tier 4 the lowest priority. Tier 1
recommendations are critical projects necessary for maintaining and improving existing
program operations, replacing aged infrastructure, and providing additional park
enhancements for continued enjoyment and safety.
Baseball Field Bleacher Project
January 17, 2023
Page 2 of 3
The Master Plan identified approximately $10 million in Tier 1 improvements and
recommended that the City implement them as soon as possible. The installation of new
bleachers and shade canopies at Hugo Reid Park, Longden Avenue Park, and Bonita
Park are listed as Tier 1 improvements in the Parks Master Plan. A copy of the Project
Location Map is shown on Exhibit “A”. The bleachers and canopies would generally look
similar to those installed at the City Hall Soccer Field several years ago.
In August 2022, the City published a Notice Inviting Bids for the Baseball Field Bleacher
Project. On August 23, 2022, the City Clerk received four bids. On the day of the bid
opening, the Public Works Services Department (“PWSD”) received a letter from the
lowest bidder, Premier Construction Consultants, requesting their bid to be withdrawn due
to a clerical error; all other bids were reviewed. During the evaluation process, the City
received a bid protest from the fourth lowest bidder, Armond Baghramian Inc. stating that
Golden Sun Enterprise, Inc. and ACE Construction, Inc. did not meet the project’s self-
performance requirement. The project specifications stated that the awarded contractor
must self-perform 50% or more of the project work. The bid protest indicated that the
second and third lowest bidder’s subcontractors were performing more than 50% of the
project. The fourth lowest bidder, Armond Baghramian, Inc. exceeded the project budget.
After discussing with the City Attorney, the PWSD recommended that all bids be rejected
to allow for the bid documents to be revised to omit the self-performance requirement. On
October 18, 2022, the City Council rejected bids for this project and directed staff to re-
bid the project.
DISCUSSION
A Notice Inviting Bids for the Baseball Field Bleacher Project was published in the City’s
adjudicated newspaper and bid packages were provided to contractors that perform this
type of work. On November 29, 2022, the City Clerk received seven bids with the following
results:
Bidder Location Bid Amount____
ACE Construction, Inc. North Hollywood, CA $ 866,000.19
Hart Design Build Inc. Glendale, CA $ 872,000.00
Golden Sun Enterprise, Inc. Van Nuys, CA $ 902,777.00
Armond Baghramian, Inc. Glendale, CA $ 950,584.00
Access Pacific, Inc. Pasadena, CA $ 965,002.04
MCM Construction, Inc. Los Angeles, CA $ 982,522.44
NoHo Constructors Studio City, CA $ 997,360.00
Bid documents were reviewed for content and the contractor’s background was
investigated. Based on the review, it has been determined that ACE Construction, Inc. is
the lowest responsive bidder for this work. ACE Construction, Inc. has successfully
completed other projects for the Cities of West Covina and Alhambra, along with the Los
Angeles Unified School District.
Baseball Field Bleacher Project
January 17, 2023
Page 3 of 3
ENVIRONMENTAL ANALYSIS
This Project is considered a Class 1 exemption as defined in Section 15301 “Existing
Facilities” projects of the California Environmental Quality Act (“CEQA”), which exempts
projects consisting of the minor alteration of existing public structures.
FISCAL IMPACT
Funds in the amount of $950,000 have been budgeted in the FY 2022-23 Capital
Improvement Program for this project. The total cost for this Project is $866,000.19. A 9%
construction contingency would bring the total cost to $943,940.21, which is within the
adopted budget.
RECOMMENDATION
It is recommended that the City Council determine that this project qualifies as a Class 1
exemption per Section 15301 of the California Environmental Quality Act (“CEQA”); and
approve, authorize, and direct the City Manager to execute a contract with ACE
Construction, Inc. for the Baseball Field Bleacher Project in the amount of $866,000.19,
and approve a 9% contingency.
Attachments: Exhibit “A” – Project Location Map
Proposed Contract
CITY OF ARCADIA
BASEBALL FIELD BLEACHER PROJECT
PROJECT NO.: 55851423
BETWEEN
CITY OF ARCADIA
AND
ACE CONSTRUCTION, INC.
CONTRACT
Contract - 1
CONTRACT FOR THE
CITY OF ARCADIA
This CONTRACT, No. ________ is made and entered into this ____ day of _______, ______, by
and between City of Arcadia, sometimes hereinafter called “City,” and Ace Construction, Inc.,
sometimes hereinafter called “Contractor.”
WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these
presents do covenant and agree with each other as follows:
A. SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the
Contract, and shall provide all labor, materials, equipment, tools, utility services, and
transportation to complete all of the Work required in strict compliance with the Contract
Documents as specified in Article 5, below, for the following Project:
Baseball Field Bleacher Project
Project No.: 55851423
The Contractor and its surety shall be liable to the City for any damages arising as a result of
the Contractor’s failure to comply with this obligation.
B. TIME FOR COMPLETION. Time is of the essence in the performance of the Work. The Work
shall be commenced on the date stated in the City’s Notice to Proceed. The Contractor shall
complete all Work required by the Contract Documents within 70 calendar days from the
commencement date stated in the Notice to Proceed. By its signature hereunder, Contractor
agrees the time for completion set forth above is adequate and reasonable to complete the Work.
C. CONTRACT PRICE. The City shall pay to the Contractor as full compensation for the
performance of the Contract, subject to any additions or deductions as provided in the Contract
Documents, and including all applicable taxes and costs, the sum of EIGHT HUNDRED SIXTY-
SIX THOUSAND DOLLARS AND NINETEEN CENTS ($866,000.19). Payment shall be made as
set forth in the General Conditions.
D. LIQUIDATED DAMAGES. In accordance with Government Code section 53069.85, it is
agreed that the Contractor will pay the City the sum set forth in Special Conditions, Article 1.11
for each and every calendar day of delay beyond the time prescribed in the Contract Documents
for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this
is not paid, the Contractor agrees the City may deduct that amount from any money due or that
may become due the Contractor under the Contract. This Article does not exclude recovery of
other damages specified in the Contract Documents.
E. COMPONENT PARTS OF THE CONTRACT. The “Contract Documents” include the
following:
Notice Inviting Bids
Instructions to Bidders
Bid Form
Bid Bond
Designation of Subcontractors
Information Required of Bidders
Non-Collusion Declaration Form
Iran Contracting Act Certification
Public Works Contractor Registration Certification
Contract - 2
Performance Bond
Payment (Labor and Materials) Bond
General Conditions
Special Conditions
Technical Specifications
Addenda
Plans and Drawings
Standard Specifications for Public Works Construction “Greenbook”, latest edition, Except
Sections 1-9
Applicable Local Agency Standards and Specifications, as last revised
Approved and fully executed change orders
Any other documents contained in or incorporated into the Contract
The Contractor shall complete the Work in strict accordance with all of the Contract Documents.
All of the Contract Documents are intended to be complementary. Work required by one of the
Contract Documents and not by others shall be done as if required by all. This Contract shall
supersede any prior agreement of the parties.
F. PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE. Each and every
provision of law required to be included in these Contract Documents shall be deemed to be
included in these Contract Documents. The Contractor shall comply with all requirements of
applicable federal, state and local laws, rules and regulations, including, but not limited to, the
provisions of the California Labor Code and California Public Contract Code which are applicable
to this Work.
G. INDEMNIFICATION. Contractor shall provide indemnification and defense as set forth in the
General Conditions.
H. PREVAILING WAGES. Contractor shall be required to pay the prevailing rate of wages in
accordance with the Labor Code which such rates shall be made available at the City’s
Administrative Office or may be obtained online at dir.ca.gov and which must be posted at the job
site.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
Contract - 3
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named parties, on
the day and year above written.
CITY OF ARCADIA
By:
Dominic Lazzaretto
City Manager
ACE CONSTRUCTION, INC.
By:
Signature
Print Name and Title
Attest:
By:
City Clerk
By:
Signature
Print Name and Title
Approved as to Form:
Michael J. Maurer
City Attorney