HomeMy WebLinkAboutItem 13d - Fiscal Year 2022-23 Annual Slurry Seal ProjectAward Annual Slurry Seal Project
February 7, 2023
Page 1 of 3
DATE: February 7, 2023
TO: Honorable Mayor and City Council
FROM: Paul Cranmer, Public Works Services Director
By: Jan Balanay, Senior Engineering Assistant
SUBJECT: CONTRACT WITH MISSION PAVING AND SEALING, INC. FOR THE
FISCAL YEAR 2022-23 ANNUAL SLURRY SEAL PROJECT IN THE
AMOUNT OF $741,340
CEQA: Exempt
Recommendation: Approve
SUMMARY
As part of the City’s Annual Asphalt and Concrete Program, the Public Works Services
Department (“PWSD”) is preparing to slurry seal various residential streets within the City.
To ensure that the City is receiving the most competitive prices and quality service for this
work, the PWSD conducted a formal bid, and Mission Paving and Sealing, Inc. submitted
the lowest responsive bid.
It is recommended that the City Council approve, authorize, and direct the City Manager
to execute a Contract with Mission Paving and Sealing, Inc. for the Fiscal Year 2022-23
Annual Slurry Seal Project, in the amount of $741,340 and approve a 5% construction
contingency.
BACKGROUND
The PWSD is responsible for the maintenance and repair of approximately 147 miles of
roadway within the City. The 2021 Pavement Management Program Update assessed
the condition of all City streets and assigned a numerical index between 0 and 100, which
is used to indicate the general condition of pavement. The Annual Slurry Seal
Maintenance Program assists in extending the useful life of the pavement and improves
the overall appearance and safety of City streets. This program provides surface
maintenance for all City streets and divides the City into eight zones, with one zone being
addressed each year as part of an eight-year cycle. Updates to the plan are conducted
regularly to ensure that the program is effective and to identify street segments with
unusual wear and tear.
Award Annual Slurry Seal Project
February 7, 2023
Page 2 of 3
DISCUSSION
The Fiscal Year 2022-23 Annual Slurry Seal Project will address approximately 17.9 miles
of residential and arterial streets as shown on the attached Project Location Map (Exhibit
A). The project area generally includes streets east of Santa Anita Avenue to the eastern
City limits, and north of Huntington Drive to the northern City limits. The work includes
crack sealing, the application of an emulsified asphalt and sand coating commonly
referred to as slurry, and re-striping of street centerlines, stop bars, and other safety
striping. This process protects the asphalt pavement surface from weather, restores skid
resistance, and provides an aesthetic improvement to the roadway. The sidewalk, curb,
and gutter repair portion of the Program will go out to bid in late February 2023.
A Notice Inviting Bids was published in the City’s adjudicated newspaper and bid
packages were provided to contractors that perform this type of work. On January 17,
2023, the City Clerk received seven sealed bids with the following results:
Rank Firm Location Base Bid
1. Mission Paving and Sealing, Inc. Irwindale $741,340.00
2. Doug Martin Contracting Co., Inc. La Habra $893,615.80
3. American Asphalt South, Inc. Fontana $896,790.00
4. Pavement Coatings Co. Jurupa Valley $911,880.00
5. All American Asphalt Corona $940,600.00
6. VSS International, Inc. West Sacramento $970,120.00
7. Roy Allan Slurry Seal Inc. Santa Fe Springs $983,664.20
Bid documents were reviewed for content and the contractors’ background and recent
projects were investigated for competency. Based on this review, it has been determined
that Mission Paving and Sealing, Inc. is the lowest responsive bidder for this work.
Mission Paving and Sealing, Inc. has successfully completed similar work within budget
for the Cities of Arcadia, El Monte, Duarte, Industry, Fontana, Torrance, Chino Hills, and
Rancho Palos Verdes.
ENVIRONMENTAL ANALYSIS
This project is considered a Class 1 exemption as defined in Section 15301(c) of the
California Environmental Quality Act, since the project consists of the maintenance of
existing public streets and does not involve expansion of the existing use of the streets.
Award Annual Slurry Seal Project
February 7, 2023
Page 3 of 3
FISCAL IMPACT
Funds in the amount of $800,000 have been budgeted in the Fiscal Year 2022-23 Capital
Improvement Program for the Annual Slurry Seal Program. The total cost for this Project
is $741,340 and a 5% construction contingency would bring the total cost to $778,407,
which is within the adopted budget. Any remaining funds from the Slurry Seal project will
be used for sidewalk, curb, and gutter repair in the same project area.
RECOMMENDATION
It is recommended that the City Council determine this project is considered a Class 1
exemption as defined in Section 15301(c) under the California Environmental Quality Act
(“CEQA”); and approve, authorize, and direct the City Manager to execute a Contract with
Mission Paving and Sealing, Inc. for the Fiscal Year 2022-23 Annual Slurry Seal Project
in the amount of $741,340, and approve a 5% construction contingency.
Attachments: Exhibit “A” - Project Location Map
Proposed Contract with Mission Paving and Sealing, Inc.
AL
L
E
Y
ALL
E
Y
ALL
E
Y
(
V
A
C
A
T
E
D
B
Y
C
I
T
Y
)
SEWER EASEMENT ALLEY
ED
I
S
O
N
E
A
S
E
M
E
N
T
NORTH
2022/23 ANNUAL SLURRY SEAL PROJECT
PROJECT NO.: 55331023
PROJECT LOCATION MAP - EXHIBIT "A"
FOOTHILL BL
COLORADO BL
HUNTINGTON DR
SA
N
T
A
A
N
I
T
A
A
V
E
ORANGE GROVE AVE
SIERRA MADRE BL
SE
C
O
N
D
A
V
E
HIG
H
L
A
N
D
O
A
K
S
D
R
SANTA CLARA ST
FI
F
T
H
A
V
E
GRAND VIEW AVE
SA
N
T
A
A
N
I
T
A
A
V
E
ELKINS AVE
SYCAMORE AVE
CITY OF ARCADIA
2022/2023 ANNUAL SLURRY SEAL PROJECT
PROJECT NO.: 55331023
BETWEEN
CITY OF ARCADIA
AND
MISSION PAVING AND SEALING, INC.
CONTRACT
Contract - 1
CONTRACT FOR THE
CITY OF ARCADIA
This CONTRACT, No. ________ is made and entered into this ____ day of ___________, 2023,
by and between City of Arcadia, sometimes hereinafter called “City,” and Mission Paving and
Sealing, Inc., sometimes hereinafter called “Contractor.”
WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these
presents do covenant and agree with each other as follows:
A. SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the
Contract, and shall provide all labor, materials, equipment, tools, utility services, and
transportation to complete all of the Work required in strict compliance with the Contract
Documents as specified in Article 5, below, for the following Project:
2022/2023 Annual Slurry Seal Project / Project No.: 55331023
The Contractor and its surety shall be liable to the City for any damages arising as a result of
the Contractor’s failure to comply with this obligation.
B. TIME FOR COMPLETION. Time is of the essence in the performance of the Work. The Work
shall be commenced on the date stated in the City’s Notice to Proceed. The Contractor shall
complete all Work required by the Contract Documents within Sixty (60) calendar days from the
commencement date stated in the Notice to Proceed. By its signature hereunder, Contractor
agrees the time for completion set forth above is adequate and reasonable to complete the Work.
C. CONTRACT PRICE. The City shall pay to the Contractor as full compensation for the
performance of the Contract, subject to any additions or deductions as provided in the Contract
Documents, and including all applicable taxes and costs, the sum of SEVEN HUNDRED FORTY-
ONE THOUSAND, THREE HUNDRED FORTY DOLLARS AND NO CENTS ($741,340.00).
Payment shall be made as set forth in the General Conditions.
D. LIQUIDATED DAMAGES. In accordance with Government Code section 53069.85, it is
agreed that the Contractor will pay the City the sum set forth in Special Conditions, Article 1.11
for each and every calendar day of delay beyond the time prescribed in the Contract Documents
for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this
is not paid, the Contractor agrees the City may deduct that amount from any money due or that
may become due the Contractor under the Contract. This Article does not exclude recovery of
other damages specified in the Contract Documents.
E. COMPONENT PARTS OF THE CONTRACT. The “Contract Documents” include the
following:
Notice Inviting Bids
Instructions to Bidders
Bid Form
Bid Bond
Designation of Subcontractors
Information Required of Bidders
Non-Collusion Declaration Form
Iran Contracting Act Certification
Public Works Contractor Registration Certification
Performance Bond
Contract - 2
Payment (Labor and Materials) Bond
General Conditions
Special Conditions
Technical Specifications
Addenda
Plans and Drawings
Standard Specifications for Public Works Construction “Greenbook”, latest edition, Except
Sections 1-9
Applicable Local Agency Standards and Specifications, as last revised
Approved and fully executed change orders
Any other documents contained in or incorporated into the Contract
The Contractor shall complete the Work in strict accordance with all of the Contract Documents.
All of the Contract Documents are intended to be complementary. Work required by one of the
Contract Documents and not by others shall be done as if required by all. This Contract shall
supersede any prior agreement of the parties.
F. PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE. Each and every
provision of law required to be included in these Contract Documents shall be deemed to be
included in these Contract Documents. The Contractor shall comply with all requirements of
applicable federal, state and local laws, rules and regulations, including, but not limited to, the
provisions of the California Labor Code and California Public Contract Code which are applicable
to this Work.
G. INDEMNIFICATION. Contractor shall provide indemnification and defense as set forth in the
General Conditions.
H. PREVAILING WAGES. Contractor shall be required to pay the prevailing rate of wages in
accordance with the Labor Code which such rates shall be made available at the City’s
Administrative Office or may be obtained online at dir.ca.gov and which must be posted at the job
site.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
Contract - 3
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named parties, on
the day and year above written.
CITY OF ARCADIA
By:
Dominic Lazzaretto
City Manager
Attest:
By:
City Clerk
Approved as to Form:
_________________________
Michael J. Maurer
City Attorney