HomeMy WebLinkAboutItem 09i - Purchase of Roofing MaterialsPurchase Order with The Garland Company, Inc.
for Roofing Materials
November 7, 2023
Page 1 of 3
DATE: November 7, 2023
TO: Honorable Mayor and City Council
FROM: Paul Cranmer, Public Works Services Director
By: Carlos Aguilar, General Services Superintendent
SUBJECT: PURCHASE ORDER WITH THE GARLAND COMPANY, INC. FOR THE
PURCHASE OF ROOFING MATERIALS FOR THE REROOF OF
VARIOUS CITY FACILITIES PROJECT IN THE AMOUNT OF $142,709.94
CEQA: Not a Project
Recommendation: Approve
SUMMARY
The Fiscal Year 2023-24 Capital Improvement Program (“CIP”) provides for roof
restoration at the Police Department and roof replacements at the Chamber of
Commerce, City Council Chambers, and Community Center. Utilizing the State of
California Multiple Award Schedules (“CMAS”) purchasing program will enable the City
to streamline the process of procuring roofing materials and receive the best price
possible for these items. It is recommended that the City Council approve a Purchase
Order with The Garland Company, Inc. for the purchase of roofing materials for the Reroof
of Various City Facilities Project in the amount of $142,709.94.
BACKGROUND
The Fiscal Year 2023-24 CIP provides for the reroofing of the Chamber of Commerce,
City Council Chambers, and Community Center buildings as well as a roof restoration at
the Police Department. This work was budgeted in prior fiscal years, but was ultimately
put on hold due to substantial industry price increases in materials and labor. These
projects were re-programmed as part of the Fiscal Year 2023-24 Capital Improvement
Program.
Chamber of Commerce
The current roof system at the Chamber of Commerce is 54 years old and has never been
replaced; it requires a full roof replacement. The existing wood shingles on the roof are
brittle and starting to deteriorate, and create a higher fire risk for the building. The existing
wood shingles will be replaced with an approved metal wood shingle style covering.
Purchase Order with The Garland Company, Inc.
for Roofing Materials
November 7, 2023
Page 2 of 3
City Council Chambers
The monolithic roofing system at the City Council Chambers has started to break down
and deteriorate due to years of sun exposure and environmental conditions. The existing
roofing material is becoming brittle and is currently experiencing blisters, mole runs, splits,
and tears, which will lead to cracks and leaks. A reroof of the City Council Chambers is
required to address the poor condition of the existing roof. The roof replacement will
include an asphalt primer coating with a topcoat that will offer more protection and help
lower interior temperatures by reducing heat absorption.
Community Center
The Community Center is over 25 years old, and the roof has begun to deteriorate and
fail. The existing top layer roof cap sheet has begun to bubble and develop mole runs,
which has resulted in cracking, seam separation, and leaks. Additionally, the base
flashings and cap sheets are starting to pull away from the parapet walls, creating open
gaps for water to infiltrate the building. The entire flat roof will be replaced and tile areas
will be repaired, as needed, to provide a leak-free roof system.
Police Department
The main roof at the Police Department has numerous leaks and is in poor condition.
There are cracks around the pipes and vent protrusions, which have allowed water to
seep into the building during the rainy season. The existing roof has also lost much of its
protective granules in certain areas. A roof restoration is needed to prevent these issues
from worsening and leading to more building damage.
DISCUSSION
The roof replacement and restoration project will be performed by a licensed roofing
contractor using materials that are purchased and supplied by the City. This construction
method will reduce the total project cost by eliminating a material price markup from the
contractor. The Public Works Services Department (“PWSD”) is currently out to bid for
the construction labor services portion of this project. A contract for construction services
will be presented to the City Council for approval as a separate agenda item.
The State Department of General Services’ Procurement Division has issued a
purchasing contract to The Garland Company, Inc. for roofing materials, through the
California Multiple Award Schedule program. The California Government Code
authorizes public agencies to participate in purchasing agreements, like those established
by the CMAS, while still adhering to the City’s adopted rules and procedures for
procurement. CMAS contracts offer a wide variety of commodities and products at prices
that have been assessed to be fair, reasonable, and competitive. By utilizing the CMAS
purchasing program, the City can streamline the process of procuring roofing materials
with the best possible prices. The PWSD has reviewed the specifications and CMAS bid
Purchase Order with The Garland Company, Inc.
for Roofing Materials
November 7, 2023
Page 3 of 3
documents provided by The Garland Company, Inc. and has verified that they are
compatible with the City’s scope of services.
ENVIRONMENTAL ANALYSIS
The proposed action does not constitute a project under the California Environmental
Quality Act (“CEQA”) per Section 15061(b)(3) of the CEQA Guidelines, as it can be seen
with certainty that it will have no impact on the environment. Thus, this project is exempt
under CEQA.
FISCAL IMPACT
The total purchase price for the roofing materials is $142,709.94. Funds in the amount
of $1,500,000 for both materials and labor have been budgeted in the Fiscal Year 2023-
24 Capital Improvement Program for the Reroof of Various City Facilities Project.
Sufficient budget exists to purchase the roofing materials needed for the Chamber of
Commerce, City Council Chambers, Community Center, and Police Department.
RECOMMENDATION
It is recommended that the City Council determine that this action does not constitute a
project and is, therefore, exempt under the California Environmental Quality Act
(“CEQA”); and approve a Purchase Order with The Garland Company, Inc. for the
purchase of roofing materials for the Reroof of Various City Facilities Project in the amount
of $142,709.94.
Attachments: CMAS Garland Company, Inc. Roofing Material Proposal Contract
CMAS Material Purchase Order Request
Terms: 1 1/2% DISCOUNT 10 DAYS - A FINANCE CHARGE OF 2% PER MONTH, 20% PER ANNUM WILL BE ADDED TO THE UNPAID
BALANCE 60 DAYS AFTER INVOICE DATE.
Printed 09/18/2023 - pricing is valid 30 days from this date.
*** Quote developed in accordance with and subject to CMAS Contract #4-20-56-0006B ***
*** Quote developed in accordance with and subject to CMAS Contract #4-20-56-0006B ***
Product Item # Quantity CMS Line # Price Total Extended
4133 14 $346.00 $4,795.56
Description: R-Mer Seal SA, high-temp, metal roof underlayment with non-slip cross laminated surface
Total Material $4,795.56
Tax (10.25) $491.54
Freight Est. $808.16
Grand Total 6,095.26
High Performance Roofing And Flooring Systems
The Garland Company, Inc. 3800 East 91st Street • Cleveland, Ohio 44105-2197
Phone: (216) 641-7500 • Fax: (216) 641-0633
Nationwide: 1-800-321-9336
From: Austin Hansen
Date: September 2023
Re: Chamber of Commerce
Email: ahansen@garlandind.com
Austin Hansen
ahansen@garlandind.com
Terms: 1 1/2% DISCOUNT 10 DAYS - A FINANCE CHARGE OF 2% PER MONTH, 20% PER ANNUM WILL BE ADDED TO THE UNPAID
BALANCE 60 DAYS AFTER INVOICE DATE.
Printed 09/18/2023 - pricing is valid 30 days from this date.
*** Quote developed in accordance with and subject to CMAS Contract #4-20-56-0006B ***
*** Quote developed in accordance with and subject to CMAS Contract #4-20-56-0006B ***
Product Item # Quantity CMS Line # Price Total Extended
4112 30 $174.00 $5,167.80
Description: HPR Glasbase Heavy duty double coated ASTM D 4601, TYPE II fiberglass, TYPE II
4411-80-PRM 60 $296.00 $17,582.40
Description: StressBase 80 Plus Fbgl.-reinforced SBS Mod underlayment used w/VersiPly and StressPly Cap Sheets
4377 119 $287.00 $33,811.47
Description: StressPly Plus FR Mineral Poly/fbgl.-reinforced SBS-mod. FR membrane w/recycled rubber & min
7303-3 9 $416.00 $3,706.56
Description: KEE-Lock Mastic White 100% solids polyether termination mastic for use w/ KEE-Stone FB 60 Flashing
Total Material $60,268.23
Tax (10.25) $6,177.49
Freight Est. $6,682.52
Grand Total 73,128.24
High Performance Roofing And Flooring Systems
The Garland Company, Inc.
3800 East 91st Street • Cleveland, Ohio 44105-2197
Phone: (216) 641-7500 • Fax: (216) 641-0633
Nationwide: 1-800-321-9336
From: Austin Hansen
Date: September 2023
Re: Community Center
Email: ahansen@garlandind.com
Austin Hansen
ahansen@garlandind.com
Terms: 1 1/2% DISCOUNT 10 DAYS - A FINANCE CHARGE OF 2% PER MONTH, 20% PER ANNUM WILL BE ADDED TO THE UNPAID
BALANCE 60 DAYS AFTER INVOICE DATE.
Printed 09/18/2023 - pricing is valid 30 days from this date.
*** Quote developed in accordance with and subject to CMAS Contract #4-20-56-0006B ***
*** Quote developed in accordance with and subject to CMAS Contract #4-20-56-0006B ***
Product Item # Quantity CMS Line # Price Total Extended
4411-80-PRM 54 $296.00 $15,824.16
Description: StressBase 80 Plus Fbgl.-reinforced SBS Mod underlayment used w/VersiPly and StressPly Cap Sheets
4377 108 $287.00 $30,686.04
Description: StressPly Plus FR Mineral Poly/fbgl.-reinforced SBS-mod. FR membrane w/recycled rubber & min
7303-3 9 $416.00 $3,706.56
Description: KEE-Lock Mastic White 100% solids polyether termination mastic for use w/ KEE-Stone FB 60 Flashing
Total Material $50,216.76
Tax (10.25) $5,147.22
Freight Est. $4,560.24
Grand Total 59,924.22
High Performance Roofing And Flooring Systems
The Garland Company, Inc.
3800 East 91st Street • Cleveland, Ohio 44105-2197
Phone: (216) 641-7500 • Fax: (216) 641-0633
Nationwide: 1-800-321-9336
From Austin Hansen
Date: September 2023
Re: Council Chambers
Email: ahansen@garlandind.com
Austin Hansen
ahansen@garlandind.com
Terms: 1 1/2% DISCOUNT 10 DAYS - A FINANCE CHARGE OF 2% PER MONTH, 20% PER ANNUM WILL BE ADDED TO THE UNPAID
BALANCE 60 DAYS AFTER INVOICE DATE.
Printed 10/17/2023 - pricing is valid 30 days from this date.
*** Quote developed in accordance with and subject to CMAS Contract #4-20-56-0006B ***
*** Quote developed in accordance with and subject to CMAS Contract #4-20-56-0006B ***
Product Item # Quantity CMS Line # Price Total Extended
2130-TRUWHITE 72 $21.00 $1,496.88
Description: Tuff-Stuff MS True White Mositure curing, single component modified silane sealant
4840-6 2 $82.00 $162.36
Description: GarMesh 6" SBR-coated, woven fiberglass reinforced scrim for roof blisters, fractures & other defects
7303-3 3 $416.00 $1,235.52
Description: KEE-Lock Mastic White 100% solids polyether termination mastic for use w/ KEE-Stone FB 60 Flashing
Total Material $2,894.76
Tax (10.25) $296.71
Freight Est. $370.75
Grand Total 3,562.22
High Performance Roofing And Flooring Systems
The Garland Company, Inc.
3800 East 91st Street • Cleveland, Ohio 44105-2197
Phone: (216) 641-7500 • Fax: (216) 641-0633
Nationwide: 1-800-321-9336
From: Austin Hansen
Date: September 2023
Re: City of Aguilar - Police Department
Email: ahansen@garlandind.com
Austin Hansen
ahansen@garlandind.com