No preview available
HomeMy WebLinkAboutItem 08a - Adjusting Various City FeesDATE: April 16, 2024 TO: Honorable Mayor and City Council FROM: Henry Chen, Interim Administrative Services Director SUBJECT: RESOLUTION NO. 7558 ESTABLISHING AND ADJUSTING VARIOUS FEES FOR CITY SERVICES CEQA: Not a Project Recommendation: Adopt SUMMARY On July 21, 2020, the City Council approved a User Fee Cost Recovery Level Policy (User Fee Policy), which provides recommended guidance on cost recovery levels and update frequency. The policy states that the User Fee Schedule will be adjusted annually by the higher of: general increases to total labor costs, or the Consumer Price Index for the Los Angeles Urban Wage Earners and Clerical Workers (“CPI-W”), in order to ensure that fee rates and cost recovery levels are maintained over time. Staff performed the calculation based on the CPI-W index for January 2024 and reviewed the new fees with each department. Some adjustments were made by the department to reflect their discretion, market conditions, and other factors for the calculated new fees. Some fees that the City charges are based on fees charged by outside agencies. Several of those ‘outside agency’ fees for next fiscal year have not been finalized by the appropriate agencies yet. Once those fees are finalized, this item will return to the City Council to update the relevant fees. The proposed resolution would add 9 new fees, increase 475 fees, reduce 8 fees, and leave 217 fees unchanged. Upon implementation, the fees would increase revenues Citywide by approximately $80,000 annually. It is recommended that the City Council conduct a public hearing and adopt Resolution No. 7558 adjusting user fees for the City of Arcadia. BACKGROUND The City’s Citizens Financial Advisory Committee (“CFAC”) recommended that the City retain consultant services to assist in preparing a detailed cost analysis of the City’s productive hourly rates and user fees; and to adopt a User Fee Policy to provide guidance on the appropriate levels of cost recovery for fee-based activities. The Resolution No. 7558 Adjusting Various City Fees April 16, 2024 Page 2 of 5 objective was to ensure that the City is fully accounting for the costs and recovering adequate fees for providing those services. The City hired Willdan Financial Services (“Willdan”) to prepare an updated user fee schedule. Willdan’s focus was to ensure that the City is utilizing comprehensive overhead rates and accurately accounting for the true cost of providing various programs and services within City operations. Their report identified the recommended charges for City services and the recommended level of cost recovery as determined through discussion with City staff and the City’s User Fee Policy, adopted on July 21, 2020. The User Fee Policy provides guidance on the appropriate levels of cost recovery for fee-based activities. This policy served as a general framework for developing specific user fee recommendations. The philosophy behind the policy and recommended cost recovery level policies is provided below: 1. Communitywide vs. Private Benefit: The use of taxpayer dollars is appropriate for services that benefit the community such as Police Patrol services. When the service or program provides a benefit to specific individuals or groups such as the issuance of building permits, it is common for the individual(s) receiving that benefit to pay for the full cost of that service. 2. Service Recipient vs. Service Driver: The concept of the service recipient vs. service driver is particularly important for regulated activities such as development review and public issued permits. Although the community primarily benefits, 100% cost recovery from the “driver” of the need for service is appropriate such as a building permit or Fire Code occupancy permit. 3. Consistency with City Goals and Policies: City policies and Council goals related to the community’s quality of life may also be factors in setting cost recovery levels. For example, fee levels can be set to promote healthy habits, facilitate environmental stewardship (e.g., encouraging solar panel installations), or discourage certain actions (e.g., false alarms). 4. Elasticity of Demand for Services: The level of cost recovery can affect the demand for services. A higher level of cost recovery could ensure the City provides services such as recreational classes or summer camps for children and youth, without over-stimulating the market with artificially low prices. Such low prices, which reflect a high General Fund subsidy, may attract participants from other cities or crowd out private options for the same service. However, high-cost recovery levels could negatively impact the demand for such services to low-income individuals, children, or seniors. 5. Availability of Services from the Private Sector: High-cost recovery levels are generally sought in situations where the service is available from other sources to preserve taxpayer funds for core City services. Conversely, services that are not Resolution No. 7558 Adjusting Various City Fees April 16, 2024 Page 3 of 5 available from other sources and are typically unavoidable and primary governmental services typically have low or zero cost recovery levels. The table below overlays certain cost recovery levels grouped in High (70.1% to 100%), Medium (30.1% to 70%), and Low (0% to 30%) cost recovery percentage ranges. It is important to note that these groupings provide policy guidance and are not absolute. Overall, the proposed fees in this study generally follow these patterns. COST RECOVERY LEVELS COST RECOVERY PERCENTAGE RANGE POLICY CONSIDERATIONS FEE EXAMPLES HIGH 70.1% - 100% • Individual users or participants receive most or all the benefit of the service. • Other private or public sector alternatives provide the service. • The use of the service is specifically discouraged. • The service is regulatory in nature Business Licenses & Permits Building & Planning Fees Attorney Fees Fire Code Fees Street Fees MEDIUM 30.1% - 70% • Services having factors associated with the Low and High-cost recovery levels Parking Fees Paramedic Membership Weed Abatement LOW 0% - 30% • No intended relationship between the amount paid and the benefit received. • Fee collection would not be cost effective and/or would discourage compliance with regulatory requirements. • No intent to limit the use of the service. • Public at large benefits even if they are not the direct users of the service. • Affordability of service to low- income residents/seniors Recreation Fees (Classes) Library Fees (Programs) Facility Rentals Resolution No. 7558 Adjusting Various City Fees April 16, 2024 Page 4 of 5 DISCUSSION For Fiscal Year 2024-25, staff has taken the fees from the prior fiscal year and, per the User Fee Policy, adjusted them based on the CPI-W index for January 2024. The Bureau of Labor Statistic calculated the annual inflation factor for January to be 2.0%. The calculated fees were then provided to each department for their review. Based on each individual department’s analysis, some fees were further adjusted to reflect market conditions or other policy considerations. Nine new fees are proposed to be added to the fee schedule, which can be found in the Development Services, Library & Museum Services, and Public Works Services Departments. The new Development Services fees are for zoning clearance for Accessory Dwelling Units (“ADU”) that are over 800 square feet and an additional fee for amendments to an application that are not listed in the schedule. The Library & Museum Services fees are related to lost chargers and books that are returned with missing labels. The new Public Works Services fees are related to water turn on after repairs and a refundable deposit fee for infrastructure restoration. The proposed resolution would add 9 new fees, increase 475 fees, reduce 8 fees, and leave 217 fees unchanged. Upon implementation, the increased fees are projected to increase revenues by approximately $80,000 annually. It is recommended that the City Council conduct a public hearing and adopt Resolution No. 7558 establishing and adjusting various fees for the City of Arcadia. PUBLIC COMMENTS/NOTICE Consideration of Resolution No. 7558 requires a public hearing, which, per Resolution No. 7483, was noticed to the public by posting at the City Council Chambers, City Clerk’s Office, the Public Library, and the City’s website, beginning on April 4, 2024. As of the time this report was written, no comments have been received. ENVIRONMENTAL ANALYSIS The proposed action does not constitute a project under the California Environmental Quality Act (“CEQA”), and it can be seen with certainty that it will have no impact on the environment. FISCAL IMPACT Projecting the fiscal impact of new fees is highly difficult due to the demand-based nature of fees, which fluctuates widely. Nonetheless, a calculation has been created based on percentage increases/decreases proposed in key fee categories. The fiscal impact from the fee adjustments is estimated to generate an additional $80,000 of revenues annually. The new fees will be reflected in the proposed Fiscal Year 2024-25 budget and would go into effect on July 1, 2024. Resolution No. 7558 Adjusting Various City Fees April 16, 2024 Page 5 of 5 RECOMMENDATION It is recommended that the City Council find that the proposed action does not constitute a project under the California Environmental Quality Act (“CEQA”); and adopt Resolution No. 7558 establishing and adjusting various fees for City services. Attachment: Resolution 7558 (includes updated User Fee Schedule as Exhibit “A” to the Resolution) 1 RESOLUTION NO. 7558 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ARCADIA, CALIFORNIA, ESTABLISHING AND ADJUSTING VARIOUS FEES FOR CITY SERVICES WHEREAS, California State law authorizes the City of Arcadia to collect fees and charges for services, provided such fees and charges do not exceed the reasonable cost of providing the service; and WHEREAS, the City Council of the City of Arcadia has established certain fees and charges for services provided by the City of Arcadia; and WHEREAS, the City Council desires to adjust certain fees and charges based upon review of said fees and charges; and WHEREAS, the City Council has determined that such fees and charges shall be based on reasonable costs to the City for providing said services and updated annually by a CPI factor; and WHEREAS, the City of Arcadia held a duly noticed Public Hearing to provide public input and review concerning adjustments in rates for said services. NOW, THEREFORE, the City Council of the City of Arcadia does hereby resolve as follows: SECTION 1. The establishment and adjustment of fees is statutorily exempt from the California Environmental Quality Act (“CEQA”), pursuant to Section 15273 of the CEQA Guidelines (Sections 21080(b)(8) and 21082, Public Resources Code). SECTION 2. Based on a cost allocation study performed by each City department, the fees set forth in this Resolution are necessary for the purposes set forth in this Resolution. Said fees do not exceed the estimated costs for providing the 2 applicable service or programs; and the fees are not being imposed for general revenue purposes, but instead for full or partial recovery of the costs of providing said services and programs. Said fees are to cover the costs of various services and programs set forth in the Fee Schedule, attached hereto as Exhibit “A”. SECTION 3. The City Council hereby adopts the Fee Schedule, attached hereto as Exhibit “A”. SECTION 4. Any fees adopted prior to the adoption of this Resolution which are inconsistent herewith are hereby repealed, effective upon the date the fees set forth in Exhibit “A” take effect. SECTION 5. This Resolution shall become effective April 16, 2024. SECTION 6. All User Fees, including without limitation development fees, shall be imposed and collected commencing July 1, 2024. SECTION 7. The City Clerk shall certify the adoption of this Resolution. [SIGNATURES ON THE NEXT PAGE] MISCELLANEOUSFEESͲCITYWIDE DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 ARCADIATRANSITDIALͲAͲRIDE(RESIDENTSONLY) 1 Seniors/DisabledsingleoneͲwaytrip 0.50$Low$0.50 2 Seniors/DisabledReducedfaremonthlypass $5.00Low$5.00 ARCADIATRANSITFIXEDROUTE(GENERALPUBLIC) 3 GeneralPublicsingleoneͲwaytrip 0.50$Low$0.50 4 Seniors/DisabledsingleoneͲwaytrip $ͲLowFreefareforseniorsanddisabledpersonson thefixedroute.$Ͳ PHOTOCOPYINGFEES(MATERIALSREPRODUCEDBYTHECITY) 5 First25pages Free perpage LowForanysingledocumentFree 6 Everypageafter25page $0.11perpage HighForanysingledocument$0.11 RETURNEDCHECKS/INSUFFICIENTFUNDS 7NonͲSufficientCheckͲ1stcheckpassed25.00$ perreturneditemHigh$25.00 8NonͲSufficientCheckͲsubsequentchecktothatpayeepassedininsufficientfunds$35.00perreturneditemHigh$35.00 Exhibit "A" CITYMANAGER DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 CITYCLERKDUPLICATIONSERVICES 1 MunicipalCode Availableforpurchase onCity'swebsite throughMunicipalCode Corporation High Availableforpurchase onCity'swebsitethrough MunicipalCode Corporation 2CopiesofCityDocumentsͲFirst25pages Free HighFree 3CopiesofCityDocumentsͲEverypagethereafter 0.11$perpage High$0.11 4DVDDuplicationofCityCouncilMeetingsActualcost HighActualcost CITYATTORNEYFEES 5 SubpoenaforRecords15.00$ HighSetbyCAEVIDENCECODE1563.6$15.00 6 EmployeeWitnessFees(Subpoena) 275.00$ HighSetbyCAGOVCODE68097.2$275.00 7 RecoveryofAttorneyFeesinanyaction,administrativeproceedingorspecial proceedingtoabateapublicnuisanceActualCost HighActualCost 8CityAttorneyPassThroughFees CityAttorneyPrivate Lawrateminusa10%HighCityAttorneyPrivate Lawrateminusa10% 9 Flashdrive $5.50High$5.75 10 NotaryFee $15.00HighSetbyCAGOVCODE8211$15.00 11 SpecialEventApplication $649.00High$662.00 CODESERVICES DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 ADMINISTRATIVECITATIONS 1 FirstViolation(AMCViolationOnly) 100.00$ HighSetbyAMCSection1200(b)$100.00 2 SecondViolation(within24months)$200.00HighSetbyAMCSection1200(b)$200.00 3ThirdandsubsequentViolations(within24months) 500.00$ HighSetbyAMCSection1200(b)$500.00 4 DelinquentFines 10%surchargeHigh10%surcharge 5 InterestonDelinquentFines 1/2of1%permonth, prorataHigh1/2of1%permonth,pro rata 6NonͲOperatingPropertyAnnualRegistryFee 1,492.00$ High$1,522.00 BUILDING&SAFETY DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTESNEWFEESEFFECTIVE JULY1,2024 APPEALS 1 BuildingCodeAppeal 790.00$ High$806.00 BUILDINGPERMITFEES 2 IssuingFee $62.00High$63.00 3 AccessibilityReview(ADA)FeesforBuildingPermitissuance 10%increasetobase BuildingPermitCostHigh10%increasetobase BuildingPermitCost 4 AccessibilityReview(ADA)FeesforBuildingPermitissuance 15%increasetobase PlanCheckCostHigh15%increasetobasePlan CheckCost OtherInspections 5 Foranextrainspectionmadenecessaryduetoworknotbeingreadyatthetime specifiedorduetoworknotcorrectedafterpriorwrittennotice 141.00$ High$144.00 6 Foraninspectionforwhichnofeesarehereinprescribed,perhour(time consumedperhourwithaminimumchargeof1hour)141.00$ High$144.00 7 Forinspectionsoutsidenormalbusinesshours,perhour(timeconsumedper hourwithaminimumchargeof2hours)141.00$ High$144.00 PLANREVIEWFEES 8 WhenplansarerequiredtobesubmittedbytheBuildingCode,aplanreview feeequalto65percentofthebuildingpermitfeeshallbepaidatthetimeof submittingplansandspecificationsforreview. 65%ofBuildingPermit FeeHigh65%ofBuildingPermitFee 9 Whenapprovedplansarerevised,asupplementalplanreviewfeeshallbepaid totheCityinanamountequalto$60.95perhour(timeconsumedperhour withaminimumchargeofone[1]hour)ortheactualcosttoreviewtheplans whentheplansarereviewedbyanoutsideCityplancheckconsultant. 148.00$ perhourHigh$151.00 10 WhenplansarerequiredtobesubmittedforcompliancewiththeStateEnergy ConservationRegulations,anenergyplanreviewfeeequalto20percentofthe buildingpermitfeeshallbepaidatthetimeofsubmittingtheplansand specificationsforreview. 20%ofBuildingPermit FeeHigh20%ofBuildingPermitFee 11 Whenplansarerequiredtobesubmittedfornewcommercial,industrialand multiplefamilybuildings,afiredepartmentplanreviewfeeequalto9.75 percentofthebuildingpermitfeeshallbepaidatthetimeofsubmittingthe plansandspecificationsforreview. 9.75%ofBuilding PermitFeeHigh9.75%ofBuildingPermit Fee BUILDING&SAFETY DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTESNEWFEESEFFECTIVE JULY1,2024 12 WhenplansarerequiredtobesubmittedforcompliancewiththeCalifornia GreenBuildingCodeRegulations,aCalGreenplanreviewfeeequalto10 percentofthetotalplancheckfeeshallbepaidatthetimeofsubmittingthe plansandspecificationsofreview 10%ofthetotalPlan CheckFeeHigh10%ofthetotalPlanCheck Fee 13 WELO(WaterEfficiencyLandscapeOrdinance),plancheckfeebyoutside consultants ActualCost HighActualcostofreviewbyoutsideplancheck consultant.ActualCost 14 WELOPlanCheckFee ActualCostHighActualcostofinspectionbyoutsideplancheck consultant.ActualCost 15 WELOIssuancefee 62.00$ High$63.00 GRADINGPLANREVIEWANDPERMITFEES 16 IssuingFee 62.00$ High$63.00 PLUMBINGPERMITFEES 17 Issuancefee,perpermit 62.00$ High$63.00 UnitFeeSchedule 18 Foreachplumbingfixtureortraporsetoffixturesononetrap(includingwater, drainagepiping,andbackflowprotectiontherefore)17.00$ High$17.00 19 Foreachbuildingsewerconnectiononproperty,includingforeachdwellingunit inamultipleͲfamilydevelopment 40.00$ High$41.00 20 Rainwatersystems,perdrain(insidebuilding) 17.00$ High$17.00 21 Foreachprivatesewagedisposalsystem(wherepermitted) 122.00$ High$124.00 22 Foreachwaterheaterand/orvent 20.00$ High$20.00 23 Foreachgaspipingsystemofonetofiveoutlets20.00$ High$20.00 24 Foreachgaspipingsystemoverfiveoutlets,peroutlet 4.50$ High$4.75 25 Foreachinterceptorincludingitstrapandvent,exceptingkitchenͲtypegrease interceptorsfunctioningasfixturetraps 33.00$ High$34.00 26 Forinstallation,alteration,orrepairofwaterservice.Pipingandorwaterpiping toone(1)fixture 17.00$ High$17.00 27 Forrepipinganexistingdomesticwatersupplyanddistributionsystem BybuildingpermitvalueHighBybuildingpermitvalue 28 Forrepairoralterationofdrainageorventpiping,eachfixture 17.00$ High$17.00 29 Foreachlawnsprinklersystemonanyonemeterincludingbackflowprotection devicestherefore 24.00$ High$24.00 30 ForatmosphericͲtypevacuumbreakersnotincludedinitems1:1to5 11.00$ High$11.00 BUILDING&SAFETY DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTESNEWFEESEFFECTIVE JULY1,2024 31 ForatmosphericͲtypevacuumbreakersnotincludedinitems1:over5,each 2.25$ High$2.30 32 ForeachbackflowprotectivedeviceotherthanatmosphericͲtypevacuum breakers:2inchesorsmaller 20.00$ High$20.00 33 ForeachbackflowprotectivedeviceotherthanatmosphericͲtypevacuum breakers:over2inches 40.00$ High$41.00 34 Foreachswimmingpoolpiping(includingspasandhottubs)35.00$ High$36.00 35 Foreachswimmingpool“P”trap11.00$ High$11.00 36 Foreachswimmingpool,spaandhottubwaterheater(includinggaspiping) 50.00$ High$51.00 37 Foreachsewercapand/orcesspoolfill20.00$ High$20.00 OtherInspections 38 Foranextrainspectionmadenecessaryduetoworknotbeingreadyatthetime specifiedorduetoworknotcorrectedafterpriorwrittennotice 141.00$ High$144.00 39 Foraninspectionforwhichnofeesarehereinprescribed,perhour(time consumedperhourwithaminimumchargeof1hour)141.00$ High$144.00 40 Forinspectionsoutsidenormalbusinesshours,perhour(timeconsumedper hourwithaminimumchargeof2hours)141.00$ High2HourMinimum$144.00 PLUMBINGPLANREVIEWFEES 41 Forplumbingplanswhichrequireplanreview,aplanreviewfeeequalto65 percentoftheplumbingpermitfeeshallbepaidtotheBuildingOfficialatthe timeplansaresubmittedforreview. 65%ofPlumbingPermit FeeHigh65%ofPlumbingPermitFee ELECTRICALPERMITFEES 42 Issuancefee,perpermit 62.00$ High$63.00 Services 43 Forresidentialserviceof600voltsorlessandnotover400ampsinrating, includingonmetereachforresidentialserviceof600voltsorlessandover400 ampsinrating,includingone(1)meter 24.00$ High$24.00 44 Forresidentialserviceof600voltsorless,andover400ampsinrating,including one(1)meter 66.00$ High$67.00 45 Foronecommercialservice200ampsorless,includingonemetereach 41.00$ High$42.00 46 Foreachcommercialservice200ampsto1,000amps,includingonemetereach 71.00$ High$72.00 47 Forcommercialservicesover600voltsorover1,000ampsinrating,including onemetereach 141.00$ High$144.00 BUILDING&SAFETY DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTESNEWFEESEFFECTIVE JULY1,2024 48 Foreachadditionalmeter 20.00$ High$20.00 49 Foreachdistributionpanel 24.50$ High$25.00 NewResidentialConstruction 50 Foreachnewsingle,duplexandmultipleͲfamilydwellingforeachsquarefootof grossfloorarea0.08$ High$0.09 51 Forbuildingsaccessorytonewresidentialbuildingsconstructedinconjunction withthoseresidentialbuildingsforeachsquarefootofgrossfloorarea.0.07$ High$0.08 OtherConstruction 52 Forreceptacle,switch,lightingoutlets:First20,each 2.20$ High$2.25 53 Forreceptacle,switch,lightingoutlets:Additional,each 1.40$ High$1.45 54 Forlightingfixtures,socketsorotherlampdevices:First20,each 2.20$ High$2.25 55 Forlightingfixtures,socketsorotherlampdevices:Additional,each 1.40$ High$1.45 56 Forpoleorplatformmountedlightingfixturessuchastenniscourts,parkinglot standardsandwalkwaylightingfixtures,includinganyfoundation:First6 34.00$ High$35.00 57 Forpoleorplatformmountedlightingfixturessuchastenniscourts,parkinglot standardsandwalkwaylightingfixtures,includinganyfoundation:Additional, each 9.00$ High$9.00 58 Forfixedresidentialappliancesorreceptacleoutletsforsame,notexceeding1 hpinrating,each 9.00$ High$9.00 59 FornonresidentialappliancesandselfͲcontainedfactorywiredappliancesnot exceeding1hp,kw,orkva,each 9.00$ High$9.00 60 Forelectricalapparatus,conduitsandconductorforwhichapermitisrequired, butforwhichnofeeisspecified,each 20.00$ High$20.40 POWERSCHEDULE Formotors,generators,transformers,rectifiers,converters,capacitors, industrialheating,airconditioningandheatpumps,cookingorbaking equipmentandotherapparatus,asfollows: Ratinginhp,kw,kvaorkvar: Forequipmenthavingmorethanonemotor, transformer,heater,etc.,thesumofthe combinedratingsmaybeused.Thesefees includeallswitches,circuitbreakers, contractors,thermostats,relaysandother directlyrelatedcontrolequipment BUILDING&SAFETY DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTESNEWFEESEFFECTIVE JULY1,2024 61 Uptoandincluding1,each 10.00$ High$10.00 62 Over1andnotover10,each20.00$ High$20.00 63 Over10andnotover50,each 33.00$ High$34.00 64 Over50andnotover100,each 55.00$ High$56.00 65 Over100,each 87.00$ High$89.00 BUSWAYS 66 FortrolleyandplugͲinbusways,each100feetorfractionthereof 12.00$ High$12.00 SIGNS Thefeeforfilinganapplicationforasign permitshallbethesameasrequiredfora buildingofequivalentvaluationandshallalso includeaplancheckfeewhichshallbe50%of thepermitfee. 67 Foronesign,outlinelightingandmarqueesuppliedfromonebranchcircuit, each 82.00$ High$84.00 68 Foradditionalbranchcircuits,each 8.00$ High$8.00 Carnivals,ChristmasTreeLots,SalesLots,Etc. 69 Forelectricgeneratorsandelectricallydrivenrides,each 20.00$ High$20.00 70 Formechanicallydrivenridesandwalkthroughattractionswithlighting,each 10.00$ High$10.00 71 Forasystemsupplyingboothlighting,each 10.00$ High$10.00 72 ForChristmastreelots,saleslots,etc.,each 40.00$ High$41.00 TEMPORARYPOWER 73 Fortemporaryservicepoleorpedestalinstalledinconjunctionwithtemporary buildings,each70.00$ High$71.00 74 Fortemporaryservicepoleandonedistributionsystemforconstructionsites, each 40.00$ High$41.00 75 Foradditionaldistributionpanelsinstalledinconjunctionwithtemporarypower poles,each 20.00$ High$20.00 BUILDING&SAFETY DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTESNEWFEESEFFECTIVE JULY1,2024 SWIMMINGPOOLS,HOTTUBS,ETC. 76 FornotmorethanonesubͲpanel,threemotors,integrallightingfixturesandall wiringandlightingforoperationofsame94.00$ High$96.00 ELECTRICALPLANREVIEWFEES 77 Forelectricalplansthatrequireplanreview,aplanreviewfeeequalto65 percentoftheelectricalpermitfeeshallbepaidtotheBuildingOfficialatthe timeplansaresubmittedforplanreview. 65%ofElectricalPermit FeeHigh65%ofElectricalPermitFee MECHANICALPERMITFEES 78 Fortheissuanceofeachpermit62.00$ High$63.00 UnitFeeSchedule 79 FortheinstallationorrelocationofeachforcedͲairorgravityͲtypefurnaceor burner,includingductsandventsattachedtosuchappliance,uptoand including100,000Btu/h 24.00$ High$24.00 80 FortheinstallationorrelocationofeachforcedͲairorgravityͲtypefurnaceor burner,includingductsandventsattachedtosuchappliance,over100,000 Btu/h 34.00$ High$35.00 81 Fortheinstallationorrelocationofeachfloorfurnace,includingvents24.00$ High$24.00 82 Fortheinstallationorrelocationofeachsuspendedheater,recessedwall heaterorfloormountedunitheater22.00$ High$22.00 83 Fortheinstallation,relocationorreplacementofeachapplianceventinstalled andnotincludedinanyappliancepermit11.00$ High$11.00 84 Fortheregularrepairof,alterationof,oradditiontoeachheatingappliance refrigerationunit,coolingunit,absorptionunit,oreachheating,cooling, absorptionorevaporativecoolingsystem,includinginstallationofcontrols regulatedbythiscode 24.00$ High$24.00 85 Fortheinstallationorrelocationofeachboilerorcompressortoandincluding3 horsepower,oreachabsorptionsystemtoandincluding10,000Btu/h24.00$ High$24.00 86 Fortheinstallationorrelocationofeachboilerorcompressorover3 horsepowertoandincluding15horsepoweroreachabsorptionsystemover 100,000Btu/handincluding500,000Btu/h 44.00$ High$45.00 BUILDING&SAFETY DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTESNEWFEESEFFECTIVE JULY1,2024 87 Fortheinstallationorrelocationofeachboilerorcompressorover15 horsepowertoandincluding30horsepoweroreachabsorptionsystemover 500,000Btu/handincluding1,000,000Btu/h 62.00$ High$63.00 88 Fortheinstallationorrelocationofeachboilerorcompressorover30 horsepowertoandincluding50horsepoweroreachabsorptionsystemover 1,000,000Btu/handincluding1,750,000Btu/h 92.00$ High$94.00 89 Fortheinstallationorrelocationofeachboilerorcompressorover50 horsepoweroreachabsorptionsystemover1,750,000Btu/h 153.00$ High$156.00 90 ForeachairͲhandlingunittoandincluding10,000cubicfeetperminute, includingductsattachedthereto 18.00$ High ThisfeeshallnotapplytoanairͲhandlingunit whichisaportionofafactoryassembled appliance,coolingunit,evaporativecooleror absorptionunitforwhichapermitisrequired elsewhereinthisCode $18.00 91 ForeachairͲhandlingunitover10,000cubicfeetperminute,includingducts attachedthereto 30.00$ High$31.00 92 Foreachevaporativecoolerotherthanportabletype 18.00$ High$18.00 93 Foreachventilationfanconnectedtoasingleduct 11.00$ High$11.00 94 Foreachventilationsystemwhichisnotaportionofanyheatingorair conditioningsystemauthorizedbyapermit 18.00$ High$18.00 95 Fortheinstallationofeachkitchenhood,whichisservedbymechanical exhaust,includingductsforsuchhood 18.00$ High$18.00 96 FortheinstallationorrelocationofeachdomesticͲtypeincinerator 30.00$ High$31.00 97 FortheinstallationorrelocationofeachcommercialorindustrialͲtype incinerator 122.00$ High$124.00 98 Foreachapplianceorpieceofequipmentregulatedbythiscodebutnotclassed inotherappliancecategories,orforwhichnootherfeeislistedinthisCode 18.00$ High$18.00 99 Fortheinstallationofductstoanexistingcomfortheating/coolingsystem,per system 12.25$ High$12.00 100 Fortheinstallationofafactorybuiltfireplace,includingductsattachedthereto 18.00$ High$18.00 OtherInspections 101 Foranextrainspectionmadenecessaryduetoworknotbeingreadyatthetime specifiedorduetoworknotcorrectedafterpriorwrittennotice 141.00$ High$144.00 102 Foraninspectionforwhichnofeesarehereinprescribed,perhour(time consumedperhourwithaminimumchargeof1hour)141.00$ High$144.00 103 Forinspectionsoutsidenormalbusinesshours,perhour(timeconsumedper hourwithaminimumchargeof2hours)141.00$ High$144.00 BUILDING&SAFETY DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTESNEWFEESEFFECTIVE JULY1,2024 MECHANICALPLANREVIEWFEES 104 Formechanicalplansthatrequireplanreview,aplanreviewequalto65percent ofthemechanicalpermitfeeshallbepaidtotheBuildingOfficialatthetime plansaresubmittedforplanreview 65%oftheMechanical PermitFeeHigh65%oftheMechanical PermitFee RELOCATIONANDREMOVALFEES 105 Arelocationexaminationfeeisestablishedintheamountof$14.10foreach onehundred(100)squarefeetorfractionthereofoffloorspace,whether usableornot,containedwithinthebuildingproposedtoberelocated. 18.00$ eachonehundredsqftHigh$18.00 RelocationPermitFee 106 Relocationpermitfeeshallbe$22.65peronethousanddollars($1000.00) valuation,orfractionthereofofthebuildingtoberelocated.Forthepurposeof computingsuchfee,valuationshallincludethereasonablecostofmovingsuch structureandthereasonablevalueofallnewconstruction,alterations, additions,repairs,replacementsandfoundationsinconnectiontherewith. 28.00$peronethousand dollarsvaluationHigh$29.00 107 Fortheissuanceofeachpermit62.00$ High$63.00 RemovalPermitFee(Export) 108 Thefeeforfilinganapplicationforaremovalpermitshallbe$296.65(route inspectionfeeandownerandmoverbondsshallalsobecollected).390.00$ High$398.00 109 Fortheissuanceofeachpermit62.00$ High$63.00 DEMOLITIONPERMITFEES 110 500squarefeetorless 33.00$ High$34.00 111 501to1,000cubicyards62.00$ High$63.00 112 1,001to3,000cubicyards102.00$ High$104.00 113 3,001to10,000cubicyards174.00$ High$177.00 114 10,001squarefeetormore 345.00$ High$352.00 BUILDING&SAFETY DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTESNEWFEESEFFECTIVE JULY1,2024 SWIMMINGPOOLPERMITANDPLANREVIEWFEES 115 Thefeeforfilinganapplicationforaswimmingpoolpermitandplanreview shallbethesameasrequiredforabuildingofequivalentvaluation.The valuationshallbecalculatedattherateof$208.95perperimeterfootofthe swimmingpooland/orspa. ValuationBased perperimeterfootHighValuationBased 116 Fortheissuanceofeachpermit62.00$ High$63.00 SOLIDWASTEMANAGEMENTFEE 117 Fortheissuanceofeachbuilding,demolitionandreroofingpermit 7.00$ High$7.00 118 Fortheissuanceofeachelectrical,plumbing,mechanical,sign,fire extinguishing,swimmingpoolandspa,firealarm,gradingandmasonrywall permit 1.00$ High$1.00 OTHERINSPECTIONS 119 Foranextrainspectionmadenecessaryduetoworknotbeingreadyatthetime specifiedorduetoworknotcorrectedafterpriorwrittennotice 141.00$ High$144.00 120 Foraninspectionforwhichnofeesarehereinprescribed,perhour(time consumedperhourwithaminimumchargeof1hour)141.00$ High$144.00 121 Forinspectionsoutsidenormalbusinesshours,perhour(timeconsumedper hourwithaminimumchargeof2hours)141.00$ High$144.00 PARKFACILITIESIMPACTFEES(ResolutionNo.6602,01Ͳ15Ͳ08) 122 SingleFamilyProjects 2.85$ persqftHighSetPerResolution,notsubjecttoCPI Adjustment$2.85 123 MultiͲfamilyProjects 3.73$ persqftHighSetPerResolution,notsubjecttoCPI Adjustment$3.73 FIREEXTINGUISHING,ALARMPERMITPERMITANDPLANREVIEWFEES 124 Fortheissuanceofeachpermit62.00$ High$63.00 125 ChangeofAddressFee 817.00$ High$833.00 126 ReplacementJobCard $27.00eachHigh$28.00 127 TemporaryCertificateofOccupancy $250.00eachHigh$255.00 128 ResidentialSolar<10kW $35.00eachHigh$36.00 129 ResidentialSolar>10kW $71.00eachHigh$72.00 BUILDING&SAFETY DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTESNEWFEESEFFECTIVE JULY1,2024 130 CommercialSolar<50kW $53.00eachHigh$54.00 131 CommercialSolar50Ͳ250kW $141.00eachHigh$144.00 132 CommercialSolar>250kW $284.00eachHigh$290.00 133 EnergyStorageSystem $66.00eachHigh$67.00 134 PlanCheckofanElectricVehicleChargingStationatanamountequalto$82.42 perhalfhour(timeconsumedperhalfhourwithaminimumchargeofone[1] halfhour)ortheactualcosttoreviewtheplanswhentheplansarereviewedby anoutsideCityplancheckconsultant. $105.00hourlyHigh$107.00 135 ElectricVehicleChargingStation $62.00eachHigh$63.00 136 ResidentialElevator $35.00eachHigh$36.00 137 PermitExtension $137.00eachHigh$140.00 138 CommercialType1&2Hood&Duct $141.00eachHigh$144.00 139 ResidentialSolarPlanCheck<10kW $169.00eachHigh$172.00 140 ResidentialSolarPlanCheck>10kW $192.00eachHigh$196.00 141 CommercialSolarPlanCheck<50kW $282.00eachHigh$288.00 142 CommercialSolarPlanCheck50Ͳ250kW $593.00eachHigh$605.00 143 CommercialSolarPlanCheck>250kW $1,739.00eachHigh$1,774.00 144 EnergyStorageSystemPlanReview $62.00eachHigh$63.00 145 TechnologyFee 5.5%ofPermit&Plan CheckFees ofPermit&PlanCheck FeesHigh PlanCheck,BuildingPermits,Mech/Elec/Plum Permits,MiscPermits,FirePlanCheck,Fire PermitFees,EngineeringPermitFees,Storm WaterPlan&Inspection,OffsitePlanCheck, LandscapePlanCheck&Inspection 5.5%ofPermit&Plan CheckFees 146 FailuretoObtainPermit DoublethepermitfeeHighDoublethepermitfee Minimum Value Maximum Value Current Base Rate Suggested Base Rate Current Plus $$ Suggested Plus $$ For every 0 500 46.04 46.64 0.00 0.00 0.00 501 2,000 46.04 46.64 4.76 4.82 100.00 2,001 25,000 117.38 118.91 18.91 19.16 1,000.00 25,001 50,000 552.37 559.57 14.44 14.63 1,000.00 50,001 100,000 913.35 925.26 9.46 9.58 1,000.00 100,001 and up 1,386.16 1,404.24 7.81 7.91 1,000.00 Percent Change =1.3% Cost Recovery Level = 80% Please Note: Valuation fee structure is derived from the Uniform Building Code. BBuilding Valuation Table CCurrent (All New Construction) Valuation for Tenant Improvements Bakery $33.57 Bank $48.35 General Office $33.10 Hair Salon $23.23 Medical Office $40.25 Minor Tenant Improvement $16.54 Restaurant $40.25 Retail Store $23.23 Take-out Restaurant $33.04 Tenant Improvement at the mall $56.78 Residential Room Additions and Remodeling Addition without plumbing $115.68 Addition with plumbing $154.24 Remodel withou plumbing $46.27 Remodel with plumbing $61.71 Conversion without plumbing $77.11 Conversion with plumbing $92.55 Patio, Carports and Garages Opens sides, trellis type roof $26.88 Open sides, roofted patio $26.88 Enclosed patio $39.26 Carport $26.88 Garage $41.22 Window Change Out Smaller than 6' x 4' $667.70 each 6' x 4' or larger $801.25 each Door Installation Single $667.70 each Double $1,201.86 each Masonry Garden and Retaining Walls Masonry garden walls $11.36 Retaining walls $26.70 City of Arcadia Building and Safety Division Building Valuation Data for Miscellaneous Work Updated July 1, 2024 $ Per Sq. Ft. APARTMENTS/CONDOS: HOTELS AND MOTELS: SCHOOLS: IA or IIB…...................... $185.27 IA OR IIA….................... $155.76 IA or IIA…...................... $171.50 IIIB…...............................$157.30 IIIA….............................. $134.96 IIIA….............................. $125.24 VA…............................... $157.31 IIIB…...............................$128.63 IIIB…...............................$120.45 VB…................................$145.45 VA…...............................$117.52 VA…............................... $117.37 Basement Garage…......... $57.68 VB…................................$115.20 VB…................................$111.97 BANKS: INDUSTRIAL PLANTS: SERVICE STATIONS: IA or IIA…...................... $228.41 IA or IIA…...................... $87.76 IIB…................................$103.64 IIB…................................$168.27 IIB…................................$56.14 IIIA….............................. $108.12 IIIA….............................. $185.70 IIIA….............................. $67.24 VA…............................... $91.15 IIIB…...............................$185.70 IIIB…...............................$63.38 VB…................................$103.64 VA…............................... $167.95 Tilt-up….......................... $46.27 Canopies…...................... $43.19 VB…................................$161.17 VA…............................... $63.38 VB…................................$57.98 STORES: CHURCHES:IA or IIA…...................... $127.09 IA or IIA…...................... $152.99 MEDICAL OFFICES:IIB…................................$79.84 IIB…................................$114.89 IA or IIA…......................$184.31 IIIA….............................. $99.28 IIIA….............................. $124.92 IIB…................................$135.11 IIIB…...............................$93.13 IIIB…...............................$119.37 IIIA….............................. $154.24 VA…............................... $83.57 VA…............................... $116.75 IIIB…...............................$143.60 VB…................................$77.23 VB…................................$109.81 VA…............................... $139.13 VB…................................$134.17 THEATERS: DWELLINGS:IA or IIA…...................... $169.34 VA…............................... $164.40 OFFICES:IIIA….............................. $123.39 VB…................................$154.24 IA or IIA…...................... $164.72 IIIB…...............................$117.52 Basements:IIB…................................$115.79 VA…............................... $116.14 Semi-Finished…......... $39.36 IIIA….............................. $125.02 VB…................................$109.81 Unfinished….............. $30.02 IIIB…...............................$119.52 Remodel….......................$46.27 VA…............................... $118.51 WAREHOUSES: Remodel w/plumbing…...$61.70 VB…................................$110.28 IA or IIA…...................... $79.96 Conversion…...................$77.11 IIB…................................$44.53 Conversion w/plumbing…$92.54 PARKING STRUCTURES IIIA….............................. $53.74 IA or IIA…...................... $75.41 IIIB…...............................$51.17 FIRE STATIONS:Type I or II, Open…........ $56.59 VA…............................... $47.45 IA or IIA…...................... $176.45 IIB…................................$43.19 VB…................................$44.53 IIB…................................$116.14 IIIA….............................. $57.07 IIIA….............................. $127.09 IIIB…...............................$50.73 IIIB…...............................$122.06 VA…............................... $119.22 PUBLIC BUILDINGS: EQUIPMENT: VB…................................$113.06 IA or IIA…...................... $190.32 Air Conditioning: IIB…................................$154.24 Commercial….............$6.48 GARAGES, PRIVATE:IIIA….............................. $163.80 Residential….............. $5.40 (Utility, Miscellaneous)IIIB…...............................$154.55 Fire Sprinkler System…...$4.01 VB…................................$41.22 VA…............................... $146.52 VA…............................... $46.47 VB…................................$141.86 Open Carport…............... $26.88 Patio (All)….................... $26.88 RESTAURANTS: Patio Enclosed…............. $38.05 IIIA….............................. $150.21 IIIB…...............................$145.13 VA…............................... $137.57 VB…................................$132.18 City of Arcadia Building and Safety Division Valuation for New Buildings and Structures Updated July 1, 2024 Reroofing Permit Fees Updated July 1, 2024 Type of Reroofing Evaluation ( cost per square ) 1 Fiberglass Shingles ( 20 year warranty ) $175.26 2 Laminated Fiberglass Shingles (25 to 30 year warranty) $202.23 3 Laminated Fiberglass Shingles (40 & 50 year warranty) $229.18 4 Heavy Weight Concrete Tile $438.14 5 Lite Weight Concrete Tile $505.54 6 Lite Weight Perlite Shakes $438.14 7 Fiber Cement Shakes $438.14 8 Pressure Treated Wood Shakes $438.14 9 Pressure Treated Wood Shingles $438.14 10 Steel Roofing Systems (Class "B")$471.84 (Class "A") $495.42 The fee for filing an application for a reroofing permit shall be determined by the valuation provided. If no valuation is provided. It shall be the same as required for a building of equivalent valuation as determined by the following: For plywood installation, add $57.68 per square to the above figures. ENGINEERING DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 1PlansandSpecifications 40.00$High $41.00 MiscellaneousCopies 28½x11”and8½x17”1.10$persheet High $1.10 3 15”x20”2.25$persheet High $2.30 4 18”x24”2.85$persheet High $2.90 5 24”x36”3.35$persheet High $3.40 6 30”x36”3.95$persheet High $4.00 7 24”x36”MylarOriginal5.65$persheet High $5.75 PlanReview 8 PublicImprovementPlanReviewBaseFee $384.00High TheapplicantshallreimbursetheCityfor100%of actualcostsandexpendituresincurredbytheCity relativetosaidproject.Thiscostis3hoursofthe hourlyrate. $393.00 9 PublicImprovementPlanReviewBaseFeePlusAdditionalStaffReview $128.00perhourHigh TheapplicantshallreimbursetheCityfor100%of basefeeplusadditionalstafftimededicatedto project.Additionalstafftimeisbasedonhourly rateofpositionperformingreview. $131.00 10 FinalMapandParcelMapReviewBaseFee $186.00High $190.00 11 FinalMapandParcelMapReviewBaseFeePlusAdditionalStaffReview $63.00perlotHigh TheapplicantshallreimbursetheCityfor100%of basefeeplusadditionalstafftimededicatedto additionallots.Additionalstafftimeisbasedon 1/2hourrateofpositionperformingproject. $64.00 EncroachmentPermits 12 EncroachmentPermitͲIssuanceFee $115.00High $117.00 13 EncroachmentPermitͲInspectionBaseFee $172.00High $175.00 14 EncroachmentPermitͲInspectionBaseFeePlusAdditionalInspectionTime $172.00perhourHigh $175.00 ENGINEERING DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 TransportationPermits 15 TransportationPermitͲSingleTrip $57.00High $16.00 16 TransportationPermitͲAnnual $170.00High $90.00 SurfaceReplacementDeposit 17 ExcavationͲanystreet,alley,orotherpublicplacepavedwithconcrete 34.00$ persqftofsurfaceHigh $40.00 18 ExcavationͲanystreet,alley,orotherpublicplacepavedwithasphalt 6.85$ persqftofsurfaceHigh $15.00 AmountofDeposit 19 CashDeposit 2,270.00$High $2,315.00 20 SuretyBond 2,270.00$High $2,315.00 InspectionChargesforstreetwork 21 MondaythroughThursdayandCityHallOpenFridays(RegularlyScheduledWork Hours):172.00$perhour High $175.00 22 MondaythroughThursdayandCityHallOpenFridays(Hoursworkedover RegularlyScheduledWorkHours):259.00$perhour(11/2times) High $264.00 23 Saturdays,Sundays,LegalHolidays,andtheCityHallClosedFridays 259.00$perhour(11/2times) High $264.00 ConstructionTrashReceptaclesonCityStreets 24 ConstructionTrashReceptablePermitͲIssuanceFee $58.00High $59.00 25 ConstructionTrashReceptablePermitͲInspectionBaseFee $172.00High $175.00 26 ConstructionTrashReceptablePermitͲBaseFeePlusAdditionalInspectionTime$172.00perhourHigh $175.00 PermitApplicationEngineeringReview 27 PermitApplicationEngineeringReviewBaseFee $191.00High $195.00 28 PermitApplicationEngineeringReviewBaseFeePlusAdditionalStaffReview $128.00perhourHigh $131.00 High ENGINEERING DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 ConstructionStormwaterPollutionPreventionPlan(SWPPP)Reviewand Inspection 29 Tier1ͲNewprojectequaltooneacreorgreaterofdisturbedareaandadding morethan10,000sfofimperviousarea.Tier1includesthefollowing:1)New projectequaltooneacreorgreaterofdisturbedareaandaddingmorethan 10,000sfofimperviousarea;2)NewIndustrialParkwith10,000sformoreof surfacearea;3)NewCommercialmallwith10,000sformoreofsurfacearea;4) Redevelopmentof5,000sformoreof1),2),and3);5)Redevelopmentof10,000 sformoretoasinglefamilyhome;6)SpecialProvisionprojectslikeGreenstreet, orhillsidesinglefamilyhome. $1,717.00High $1,751.00 30 Tier2includesthefollowing:1)NewRetailGasolineoutletwith5,000sformore ofsurfacearea;2)NewRestaurantwith5,000sformoresurfacearea;3)New parkinglotwitheither5,000ormoreofimperviousareaor25ormoreparking spaces;4)NewAutomotiveServicefacilitywith5,000sformoreofsurfacearea; 5)Projectslocatedinordirectlyadjacentto,ordischargingdirectlyintoa SignificantEcologicalArea;6)Redevelopmentof5,000sformoreofallabove categories $1,460.00High $1,489.00 31 NonͲLIDProjects $191.00High $195.00 32 SWPPPReviewandInspectionͲLessthan2acres $1,515.00High $1,545.00 33 SWPPPReviewandInspectionͲBetween2and5acres $1,816.00High $1,852.00 34 SWPPPReviewandInspectionͲGreaterthan5acres $2,697.00High $2,751.00 STREETVACATIONPERMIT 35 SummaryStreetVacationFee $2,136.00High $2,179.00 36 StreetVacationFee $3,332.00High $3,399.00 LIDSTORMWATERPLANNINGPROGRAM ENGINEERING DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 GRADING GradingPlanCheck 37 0cubicyardsto1,000cubicyards $1,234.00High$1,259.00 38 >1,000cubicyards$128.00perhourHigh0to1,000cubicyardsfeePLUSadditionalper additionalhourdedicatedtoproject.$131.00 GradingPermit 39 0cubicyardsto1,000cubicyards $838.00High$855.00 40 >1,000cubicyards $128.00perhourHigh 0to1,000cubicyardsfeePLUSadditionalper additionalhourdedicatedtoproject.$131.00 41 TechnologyFee 5.5%ofPermit&Plan CheckFees ofPermit&PlanCheck FeesHigh PlanCheck,BuildingPermits,Mech/Elec/Plum Permits,MiscPermits,FirePlanCheck,FirePermit Fees,EngineeringPermitFees,StormWaterPlan &Inspection,OffsitePlanCheck,LandscapePlan Check&Inspection 5.5%ofPermit&Plan CheckFees PLANNING DESCRIPTION CURRENTFEE/ CHARGEUNITCostRecovery LevelNOTESNEWFEESEFFECTIVE JULY1,2024 SITEPLANANDDESIGNREVIEWS COMMERCIAL/INDUSTRIAL 1 PreliminaryPlanReview $1,741.00High $1,776.00 2New $4,641.00High $4,734.00 3 Amendment $1,781.00High $1,817.00 4 Remodel/Addition $1,589.00High $1,621.00 5 Amendment $1,423.00High $1,451.00 6SB330PreliminaryReview $1,741.00High $1,776.00 7SB330MixedUseDevelopment(Upto20Units)$4,641.00High $4,734.00 8SB330MixedUseDevelopment(21ormoreUnits)$7,346.00High $7,493.00 MULTIPLEͲFAMILY 9 PreliminaryPlanReview $1,741.00High $1,776.00 10 Newmultiplefamilyprojects(Upto20DwellingUnits)$2,962.00High $3,021.00 11 Amendmentmultiplefamilyprojects(Upto20DwellingUnits)$1,734.00High $1,769.00 12 NewMultifamilyResidential(21ormoreDwellingUnits)$7,346.00High $7,493.00 13 AmendmentMultifamilyResidential(21ormoreDwellingUnits)$2,575.00High $2,627.00 14 Remodel/Addition $1,742.00High $1,777.00 15 SB330PreliminaryReview $1,741.00High $1,776.00 16 SB330forNewMultiͲFamilyprojects(Upto20units)$2,962.00High $3,021.00 17 SB330forNewMultiͲFamilyprojects(21ormoreUnits)$7,346.00High $7,493.00 18 SB9TwoͲUnitDevelopment $1,741.00High $1,776.00 PLANNING DESCRIPTION CURRENTFEE/ CHARGEUNITCostRecovery LevelNOTESNEWFEESEFFECTIVE JULY1,2024 SINGLEͲFAMILY 19 New $2,418.00High $2,466.00 20 Amendment $1,141.00High $1,164.00 21 Remodel/Addition $1,218.00High $1,242.00 22 Amendment $546.00High AmendmenttoRemodel/Additionapplication$557.00 SIGNS 23 TemporarySignPermit $259.00High $264.00 24 Signs,AwningandCanopySigns $422.00High $430.00 25 ComprehensiveSignProgram $919.00High $937.00 ANTENNAS 26 AntennasandWirelessFacilities $3,186.00High $3,250.00 27 Antennaepanels $618.00High $630.00 28 Wirelessfeewaiver $295.00High $301.00 29 Administrative/OverͲtheͲCounter $47.00High $48.00 30 Appeal–includingHOA/ARBDecision $679.00High $693.00 31 Extension $158.00High $161.00 BANNERS 32 TemporaryBanneronaBuilding $33.00High $34.00 PLANNING DESCRIPTION CURRENTFEE/ CHARGEUNITCostRecovery LevelNOTESNEWFEESEFFECTIVE JULY1,2024 HISTORICPRESERVATION 33 DesignationofaLocalLandmark $1,800.00High $1,800.00 34 DesignationofaHistoricDistrict $2,500.00High $2,500.00 35 MillsActContractApplication $1,500.00High $1,500.00 36 CertificateofAppropriateness(Major) $1,600.00High $1,600.00 37 CertificateofAppropriateness(Minor)$900.00High $900.00 CERTIFICATEOFDEMOLITION 38 CertificateofDemolition(Director’sReview)$201.00High $205.00 39 CertificateofDemolition(ReferredtoPlanningCommission)$1,358.00High plusCEQAfee$1,385.00 40 Appeal $679.00High $693.00 CONDITIONALUSEPERMIT 41 New $3,158.00High $3,221.00 42 Amendment$2,090.00High $2,132.00 43 Extension $143.00High $146.00 44 Appeal $679.00High $693.00 MINORUSEPERMIT 45 New $1,228.00High $1,253.00 46 Amendment $777.00High $793.00 47 Appeal $679.00High $693.00 PLANNING DESCRIPTION CURRENTFEE/ CHARGEUNITCostRecovery LevelNOTESNEWFEESEFFECTIVE JULY1,2024 ADMINISTRATIVEMODIFICATIONS 48 MinorDirector'sReview $675.00High $689.00 49 MajorDirector'sReview $1,197.00High $1,221.00 50 Commission'sReview $2,510.00High $2,560.00 51 Appeal $679.00High $693.00 52 Extension $201.00High $205.00 TREEPERMITS 53 Encroachment $409.00High $417.00 54 RemovalofaDiseasedorHazardousTree $135.00High $138.00 55 RemovalofHealthyTree $1,032.00High $1,053.00 56 Appeal $679.00High $693.00 HOMEOCCUPATIONPERMITS 57 Administrative $45.00High $46.00 58 Hearing $297.00High $303.00 CODEAMENDMENTS 59 DeterminationofUse$2,075.00High $2,117.00 60 SpecificPlan $9,578.00High $9,770.00 61 SpecificPlanAmendment $5,139.00High $5,242.00 62 GeneralPlanAmendment $7,866.00High $8,023.00 63 TextAmendment $5,278.00High $5,384.00 64 ZoneChange $7,306.00High $7,452.00 65 PlannedDevelopments $8,431.00High $8,600.00 66 GeneralPlanUpdateFee 5%ofPlanning ApplicationsHigh 5%ofPlanning Applications PLANNING DESCRIPTION CURRENTFEE/ CHARGEUNITCostRecovery LevelNOTESNEWFEESEFFECTIVE JULY1,2024 SUBDIVISIONS 67 LotLineAdjustmentw/CertificateofCompliance $1,907.00High $1,945.00 68 TentativeorVestingTentativeParcelMap $1,374.00High $1,401.00 69 TentativeorVestingTentativeTractMapforSingleͲFamilyLots $2,542.00BaseFee(first5lots)High $2,593.00 70 TentativeorVestingTentativeTractMapforSingleͲFamilyLotsͲeachadditional lot(over5)$34.00 BaseFee(Item#78)Plus $30peradditionallot addedtobasefee(over 5lots) High $35.00 71 TentativeorVestingTentativeTractMapforCondominiums $1,463.00High $1,492.00 72 Appeal $679.00High $693.00 73 Extension $277.00High $283.00 74 FinalMap $1,522.00High $1,552.00 75 ParcelMapWaiver $821.00High $837.00 76 AmendmenttoanApprovedTentativeMapand/orConditions $1,100.00High $1,122.00 77 LotMerger $1,459.00High $1,488.00 78 CertificateofCompliance $902.00High $920.00 79 TemporaryUsePermit $649.00High $662.00 80 TemporaryUsePermitͲCouncilReview $1,625.00High $1,658.00 81 LotConsolidationIncentiveforamultifamilyresidentialprojectormixedͲuse developmentͲ4orlesslots WaivedHigh Waived 82 SB9LotSplit $1,907.00High $1,945.00 PLANNING DESCRIPTION CURRENTFEE/ CHARGEUNITCostRecovery LevelNOTESNEWFEESEFFECTIVE JULY1,2024 OUTDOORUSEPERMITS 83 MUPͲIncidentalDining(12ormoreseats)$667.00High $680.00 84 OutdoorDiningͲIncidental $249.00High $254.00 85 OutdoorDiningͲSidewalkDining $249.00High $254.00 86 PortableSign $249.00High $254.00 DEVELOPMENTAGREEMENT 87 DevelopmentAgreement AtCostHigh AtCost 88 DevelopmentAgreementAmendment AtCostHigh AtCost 89 DevelopmentAgreementPeriodicReview $1,114.00High $1,136.00 DOCUMENTS 90 CovenantPreparation $352.00High $359.00 91 GeneralPlanDocument $84.00High $86.00 GeneralPlanLandUseMap 92 27X35map $28.00High $29.00 93 11X17map $2.10High $2.15 ZoningMap 94 27X35map $28.00High $29.00 95 11X17map $2.10High $2.15 PLANNING DESCRIPTION CURRENTFEE/ CHARGEUNITCostRecovery LevelNOTESNEWFEESEFFECTIVE JULY1,2024 VARIANCE 96 New$2,761.00High $2,816.00 97 Amendment $1,883.00High $1,921.00 98 Appeal $679.00High $693.00 99 AdultBusinessRegulatoryPermit $2,601.00High $2,653.00 100 REASONABLEACCOMMODATION $ͲHigh $Ͳ AMENDMENT(NEW) 101 AnyAmendmenttoafeethatisnotlistedinthisfeescheduleshallbe50%of thatapplicationfee.$ͲHigh $Ͳ ZONINGCLEARANCES 102 ZONINGCLEARANCE $322.00High $328.00 103 ZONINGCLEARANCEͲADU $650.00High $663.00 FIRE DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 FIRECODEPERMITS&INSPECTIONRATES 1 AerosolProduct $620.00High $632.00 2 Apartments$140.00High $143.00 3 AmusementBuilding$440.00High $449.00 4 AssemblyFacility $415.00High $423.00 5BusinessOccupancy $155.00High $158.00 6BusinessRestaurantOccupancy $180.00High $184.00 7 Candles/OpenFlameinAssembly $130.00High $133.00 8Carnivals&Fairs $620.00High $632.00 9 CombustibleDustProdOps$440.00High $449.00 10 CombustibleFiberStorage $440.00High $449.00 11 CommercialRentalOccupancy$180.00High $184.00 12 CompressedGases $505.00High $515.00 13 CoveredMall $915.00High $933.00 14 Cryogens $440.00High $449.00 15 DryCleaningPlants $440.00High $449.00 16 Exhibits/TradeShows $350.00High $357.00 17 ExplosivesorBlastingAgents $350.00High $357.00 18 CommercialFalseAlarmResponse $640.00High Feesapplicableonlyduring3rdoccurrenceand asubsequentresponseatthesameaddress location $653.00 19 Fireworks/AerialDisplays $980.00High $1,000.00 20 Flammable/CombustibleLiquid $515.00High $525.00 21 HazardousMaterials1to3chemical(s)$430.00High $439.00 22 HazardousMaterials4to6chemicals $515.00High $525.00 23 HazardousMaterials7ormorechemicals $620.00High $632.00 24 HazardousProductionMaterialsFacility $440.00High $449.00 FIRE DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 25 HighPiledCombustibleMaterials $640.00High $653.00 26 HotͲWorkOperations $415.00High $423.00 27 IndustrialBaking/DryingOven $440.00High $449.00 28 LiquidGasFueledVehiclesinAssemblyBuildings$350.00High $357.00 29 LiquefiedPetroleumGases>5gallons$350.00High $357.00 30 LumberYard $440.00High $449.00 31 Manufacturing/IndustrialStorageOccupancy $155.00High $158.00 32 MagnesiumWorking $440.00High $449.00 33 MercantileOccupancy$155.00High $158.00 34 MiscellaneousCombMaterialStorage$440.00High $449.00 35 MotorVehicleFuelDispensingStations $415.00High $423.00 36 OpenBurning $180.00High $184.00 37 OrganicCoatings $440.00High $449.00 38 PyrotechnicalSpecialEffectsMaterial $620.00High $632.00 39 RefrigerationEquipment $440.00High $449.00 40 Spraying/Dipping $440.00High $449.00 41 Tent/Canopy/TemporaryAirSupportedStructure $440.00High $449.00 42 TireStorage $440.00High $449.00 43 WoodProducts $440.00High $449.00 44 ChiefOfficerStandby $355.00perhour High $362.00 45 ElevatorRescueService $550.00High Feesapplicableonlyduring3rdoccurrenceand asubsequentresponseatthesameaddress location $561.00 46 Engine/TruckCompanyStandby $650.00perhourHigh $663.00 47 EMSAssessmentFee $450.00High Updatedannuallybutnotimplemented$459.00 48 Expedite/AŌerhoursInspecƟon(FirePrevenƟonBureau)$515.00perhourHigh $525.00 49 FireStandby(FireMarshal)$240.00perhour High $245.00 FIRE DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 50 FireStandby(FirePreventionSpecialist)$170.00perhour High $173.00 51 Missedappointment $205.00High $209.00 52 WaterEvac(1stresponseincalendaryear)FreeHigh Free 53 WaterEvac(2nd&subsequentresponseswithincalendaryr)$600.00High $612.00 54 ReͲinspections(EngineorTruckCompany)$295.00perhour High $301.00 55 ReͲinspections(FirePreventionBureau)$270.00High $275.00 56 RescueAmbulanceStandby $495.00perhour High $505.00 57 RoofCovering(1stresponseinacalendaryear)FreeHigh Free 58 RoofCovering(2ndandsubsequentresponseswithinacalendaryear)$1,210.00High $1,234.00 59 HighRiseOccupancy $915.00High $933.00 60 HospitalOccupancy $2,805.00High $2,861.00 61 HotelorMotelOccupancy $375.00High $383.00 62 PrivateSchoolOccupancy $320.00High $326.00 63 PublicSchoolOccupancy $515.00perinspection High $525.00 64 CACodeofReg.Title19ͲSprinklerSystemCertifications $80.00High $82.00 65 FireExtinguisherDemonstration $285.00High $291.00 66 KeyBox $80.00High $82.00 67 Failuretoobtainfireconstructionpermit DoublePermitFeeHigh DoublePermitFee 68 FireCodeComplianceInspection $200.00High $204.00 69 CarbonDioxideBeverageDispensingSystemspermit $100.00High $102.00 70 BuildingEvacuation $2,755.00High $2,810.00 71 OccupancyFinalPermitInspection $145.00perhour High $148.00 72 WeedAbatement $215.00High $219.00 FIRE DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 PARAMEDICSERVICES 73 ParamedicAmbulanceService LACountyRates+Pass ThroughFeesMedium LACountyRates+Pass ThroughFees PLANREVIEW 74 ArchitecturalDesignReview $215.00High $219.00 75 Expedite/OTCPlanCheck $215.00High $219.00 76 Flammable/CombustibleTank(Installation&Removal)$350.00High $357.00 77 InͲHouseFireDepartmentPlanCheck$340.00hour High $347.00 78 TractApplication $240.00High $245.00 BUILDINGPLANREVIEW 79 NewCommercial,MultiͲFamilyorIndustrial)0.1%oftheProject ValuationHigh 0.1%oftheProject Valuation AdministrationCitationsforViolationsoftheUniformFireCode 80 FirstViolation $125.00Each High PerUniformFireCode,NotsubjecttoCPI Adjustment$125.00 81 Secondviolationwithin12monthperiod $250.00Each High PerUniformFireCode,NotsubjecttoCPI Adjustment$250.00 82 Thirdandsubsequentviolationwithin12monthperiod$500.00Each High PerUniformFireCode,NotsubjecttoCPI Adjustment$500.00 83 Use,possession,storage,sale,ormanufacturingoffireworks $2,500.00Each High PerUniformFireCode,NotsubjecttoCPI Adjustment$2,500.00 84 Delinquentfines 10%ofamountdueto City,or10%ofthe amountofthefine remainingunpaidtothe Cityifaportionofthe fineamountwastimely paid High 10%ofamountdueto City,or10%oftheamount ofthefineremaining unpaidtotheCityifa portionofthefineamount wastimelypaid 85 Interest 1/2of1%permonth, prorataHigh 1/2of1%permonth,pro rata 86 MovieDetailsFireSafetyOfficeMovieStandby $205.00perhour High $205.00 87 FireCodeAppeal 795.00$High $795.00 FIRE DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 88 ElectronicPatientCareReport(ePCR)processingfee 4.70$ EachHigh BasedonpercallchargedfeebyDigitalEMSto AFD(UpdatedfeeswillnotbeavailableuntilMay orJune2024) $4.70 89 Dispatchfee83.00$ EachHigh BasedonVerdugopercallDispatchFee (UpdatedfeeswillnotbeavailableuntilMayor June2024) $83.00 FIRECODEPERMITS&INSPECTIONRATES 90 AdditiveManufacturing $415.00High BasedonthenewCaliforniaFireCode PermittingRequirements$423.00 91 EnergyStorageSystem $415.00High BasedonthenewCaliforniaFireCode PermittingRequirements$423.00 92 LithiumBatteries $415.00High BasedonthenewCaliforniaFireCode PermittingRequirements$423.00 93 OutdoorAssembly $725.00High BasedonthenewCaliforniaFireCode PermittingRequirements$740.00 94 PlantExtractionSystem $540.00High BasedonthenewCaliforniaFireCode PermittingRequirements$551.00 95 ResidentialFalseAlarm $165.00High BasedonthenewCaliforniaFireCode PermittingRequirements$168.00 PUBLICWORKS DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 1 InspectionCharges 2 Backflowtestandinspection(newconstruction)(Resolution7239,adopted12Ͳ 18Ͳ18)253.00$High $258.00 3 Annualadministrationofbackflowdevice(Resolution7239,adopted12Ͳ18Ͳ18) 40.00$High $41.00 StreetMaintenanceCharges 4Curbnumberpainting 100.00$High $102.00 5Privatestreetsweeping(percurbmile) 65.00$High $66.00 MaintenanceChargesforWaterService 6 Bacteriologicaltestfornewdevelopment'swaterlines113.00$High PlusLabCost$115.00 7 FieldMonitorwatermeter(FloͲSearch)Ͳ1sttimewithin1year) Nocharge High NoChargefor1sttimewithin1yearNocharge 8 FieldMonitorwatermeter(FloͲSearch)Ͳ2ndandsubsequentservicewithin1 year)102.00$High $104.00 9Flowtesthydrant(performtest) 435.00$High $444.00 10 Requesttocheckwaterquality 266.00$High PlusLabCost$271.00 11 SewerDyeTest 130.00$High $133.00 12 StandͲpipeinspection(fordeveloperaccesstowaterduringconst) 254.00$High $259.00 13 WatermeterreͲreadͲ(1stwithin1year) Nocharge High NoChargefor1sttimewithin1yearNocharge 14 WatermeterreͲreadͲ(2ndandsubsequentwithin1year) 57.00$High $58.00 15 WatermeterturnͲonafterserviceshutͲoff(forchangeofownership)113.00$each High $115.00 16 WatermeterturnͲonafterserviceshutͲoff(forchangeofownership)282.00$High afterhours$288.00 17 WaterturnͲoffnoticeforfailuretotestbackflowpreventiondevice 130.00$High $133.00 18 Unauthorizeduseoffirehydrant 136.00$High Pluswatercost $139.00 19 Flowtestmeter 203.00$High $207.00 20 WaterturnͲoff/turnͲonfornonpayment(duringbusinesshours) 147.00$High $150.00 21 WaterturnͲoff/turnͲonfornonpayment(afterbusinesshours) 282.00$High $288.00 22 TurnͲonwaterperrequestduringafterͲhours294.00$High $300.00 23 OffͲsiteimprovementplancheck 227.00$High $135foreachhourafter$232.00 24 Hydrantflowtestperformedwithwatermodel 264.00$High $269.00 25 AbandonExistingServiceͲwaterinspectionfee$153.00High $156.00 26 WaterPermitInspectionFees:PreͲConstructionInspectionͲforPrivate DevelopmentProjectsforwaterpermits.$227.00High $232.00 PUBLICWORKS DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 27 WaterPermitInspectionFees:WaterServiceInspectionofInstallationͲMeter ReadingdocumentationͲsettingupservicefornewdevelopment$198.00High $202.00 28 GIASPNoExposureCertification(NEC)ornonͲfliersͲStormwaterInspectionfee$183.00High $187.00 29 InfrastructureRestorationDepositFeeͲ(PavementRestorationfor ADU/Remodeling)$ͲHigh Depositfeewillberefundedifhomeowner obtainscontractortorestorethestreet$1,500.00 30 WatermeterturnͲonforpropertyrepairs(1sttime)$ͲHigh 1stwithinoneyearFREE 31 WatermeterturnͲonforpropertyrepairs(2ndtime)$ͲHigh 2ndandsubsequentwithinoneyear$58.00 StormwaterandUrbanRunoffServiceFees UrbanStormWaterMitigationPlanCheck 32 NonͲSUSMPprojects(minimumNPDESrequirements) 105.00$High $107.00 StormWaterInspectionFees 33 Restaurants 210.00$High $214.00 34 AutoServiceBusinesses242.00$High $247.00 35 IndustrialCommercial 274.00$High $279.00 36 GIASPsites(largecomplexindustrialprojects)474.00$High $483.00 37 LowImpactDevelopment(LIDannualinspection) 306.00$High $312.00 IndustrialWasteandRelatedServices IndustrialWasteDisposalPermits 38 NewSewerDisposal 302.00$High $308.00 39 SewerDisposalPermitRevision 236.00$High $241.00 40 NewonͲsiteDisposal 434.00$High $443.00 41 OnͲsiteDisposalPermitRevision 238.00$High $243.00 42 NewͲOffSiteDisposal 434.00$High $443.00 43 OffͲSiteDisposalPermitRevision 236.00$High $241.00 IndustrialWastePlanReview DisposaltoSewerͲNew 44 1 434.00$High $443.00 45 2 532.00$High $543.00 46 3 656.00$High $669.00 47 4 809.00$High $825.00 48 5 1,001.00$High $1,021.00 49 6 1,244.00$High $1,269.00 DisposaltoSewerͲRevision 50 1 355.00$High $362.00 51 2 433.00$High $442.00 52 3 532.00$High $543.00 53 4 655.00$High $668.00 54 5 808.00$High $824.00 55 6 1,000.00$High $1,020.00 PUBLICWORKS DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 OnͲsiteDisposalͲNew 56 1 566.00$High $577.00 57 2 698.00$High $712.00 58 3 862.00$High $879.00 59 4 1,068.00$High $1,089.00 60 5 1,325.00$High $1,352.00 61 6 1,646.00$High $1,679.00 OnͲsiteDisposalͲRevision 62 1 461.00$High $470.00 63 2 566.00$High $577.00 64 3 697.00$High $711.00 65 4 861.00$High $878.00 66 5 1,068.00$High $1,089.00 67 6 1,325.00$High $1,352.00 OffͲsiteDisposalͲNew 68 1 434.00$High $443.00 69 2 532.00$High $543.00 70 3 656.00$High $669.00 71 4 809.00$High $825.00 72 5 1,001.00$High $1,021.00 73 6 1,242.00$High $1,267.00 OffͲsiteDisposalͲRevision 74 1 355.00$High $362.00 75 2 433.00$High $442.00 76 3 532.00$High $543.00 77 4 655.00$High $668.00 78 5 808.00$High $824.00 79 6 1,000.00$High $1,020.00 IndustrialWasteAnnualInspections InspectionFeeClass 78 A 132.00$High $135.00 79 B 264.00$High $269.00 80 C 395.00$High $403.00 81 D 527.00$High $538.00 82 E 791.00$High $807.00 83 M 1,581.00$High $1,613.00 84 RDS 197.00$High $201.00 *Immediatelyuponissuanceofanewpermit,thepermittedshallbebilleda percentageoftheaboveinspectionfee,determinedbythedaysremaininginthe billingperiod,asscheduledbelow.Theannualinspectionfeeshallalsobe increasedbyanadditional$138.00foreachapprovedrainwaterdiversion system. 85 Daysremaininginbilling:1Ͳ60 Ͳ$High $Ͳ 86 Daysremaininginbilling:61Ͳ120 0.30$High $0.30 87 Daysremaininginbilling:121Ͳ210 0.55$High $0.55 88 Daysremaininginbilling:211Ͳ300 0.90$High $0.90 PUBLICWORKS DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 89 Daysremaininginbilling:301Ͳ365 1.25$High $1.25 90 WastewatersamplingandanalysisfeeͲperanalysis 197.00$High $201.00 MiscellaneousFees 91 Inspectionofpretreatmentfacilityforpermitcancellation 132.00$High $135.00 92 Reviewofsiteremedialinvestigationandcleanupplantocorrectunauthorized releaseofindustrialwaste,initialdeposit 163.00$High $166.00 93 Additionalsiteremedialinvestigationandcleanupplanreviewandapproval,per hour 163.00$High $166.00 94 Inspectionsoutsideofnormalbusinesshours,perhour 132.00$High $135.00 95 Inspectionforwhichnofeeisspecificallyindicated 132.00$High $135.00 96 Additionalplanrevieworrevisionsofpreviouslyapprovedplans,perhour 163.00$High $166.00 97 Delinquentfees(forfeesnotpaidwithin30calendardaysfromthebillingdate): 10%penaltyfeefor each30dayperiod beyondthebillingdate. High 10%penaltyfeefor each30dayperiod beyondthebillingdate. AnnualInspectionFeeRefunds 98 1Ͳ60(daysfrompreviousbillingdate) 0.80$High $0.80 99 61Ͳ150(daysfrompreviousbillingdate) 0.55$High $0.55 100 151Ͳ240(daysfrompreviousbillingdate) 0.30$High $0.30 101 241ormore(daysfrompreviousbillingdate)Ͳ$High $Ͳ ClassessofBusinesses,ProcessessandIndustriesforPlanReviewand InspectionPlanReviewClassInspectionClass AgriculturalProduction,FoodProcessingandHandling 102 AnimalSlaughtering(exceptfowl) 3.15$DHigh $3.20 103 Bakeryplants 2.10$CHigh $2.10 104 Beverages,canningandbottling 2.10$CHigh $2.10 105 Breweries,wineries 3.15$DHigh $3.20 106 Cannedandpreservedfruitsandvegetables 3.15$BHigh $3.20 107 Coldstorageandrefrigerationplants 1.05$AHigh $1.10 108 Dairiesanddairyproducts 2.10$DHigh $2.10 109 Foodmarkets 1.05$AHigh $1.10 110 Frozenfoods 2.10$BHigh $2.10 111 Hydroponicfarms 2.10$BHigh $2.10 112 Poultry 3.15$EHigh $3.20 113 Preparedmeat,poultry,andfishproducts 2.10$CHigh $2.10 114 Restaurants,publiceatingplacesandplantcafeterias 1.05$AHigh $1.10 115 Rendering 3.15$CHigh $3.20 116 Sugarandconfectioneryproducts 1.05$AHigh $1.10 117 Vegetablefatsandoils 2.10$BHigh $2.10 118 Vegetablepacking 3.15$DHigh $3.20 Mining,ManufacturingandProcessing 119 Aircraft 3.15$CHigh $3.20 120 AircraftEngines,partsandaccessories 3.15$CHigh $3.20 121 Ammunitionandexplosives 2.10$DHigh $2.10 122 asphaltandasphaltproducts 4.25$EHigh $4.30 PUBLICWORKS DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 123 Batterymanufacturing,servicingandreclaiming 3.15$EHigh $3.20 124 Blastfurnaces,steelworks,rollingandfinishingmills 4.25$EHigh $4.30 125 Carpetmillswithdyeing 4.25$DHigh $4.30 126 Carpetmillswithoutdyeing 1.05$AHigh $1.10 127 Cementmanufacturing 3.15$BHigh $3.20 128 Ceramics 2.10$DHigh $2.10 129 Chemicalmilling 5.25$EHigh $5.40 130 Chemicalplants 5.25$EHigh $5.40 131 Coating,electroplating,engraving,andrelatedservices 4.20$EHigh $4.30 132 Concretebatchplants 2.10$DHigh $2.10 133 Cutstoneandstoneproducts 2.10$AHigh $2.10 134 ElectricpowergenerationplantsexceptwasteͲtoͲenergyfacilities 3.15$BHigh $3.20 135 Enameledproducts 2.10$BHigh $2.10 136 Guidedmissiles,spacevehicles,spacevehiclepropulsionunitsandpropulsion unitparts 4.25$DHigh $4.30 137 Ironandsteelfoundriesandheattreating 4.25$DHigh $4.30 138 Linoleum,asphaltͲfeltͲbaseandotherhardͲsurfacefloorcovering 2.10$BHigh $2.10 139 Metalfabrication(nochemicalwaste) 1.05$BHigh $1.10 140 MetalsͲwithchemicalwaste(nototherwiseclassified) 1.05$AHigh $1.10 141 MetalsͲwithnochemicalwastes(nototherwiseclassified) 1.05$BHigh $1.10 142 Motorvehiclespartsandaccessories 2.10$BHigh $2.10 143 Motorvehicles,vehiclebodies,andtrailers 3.15$BHigh $3.20 144 Musicalinstruments(metal) 2.10$CHigh $2.10 145 NonͲmetalsͲwithchemicalwastes(nototherwiseclassified) 3.15$DHigh $3.20 146 NonͲmetalsͲwithnochemicalwastes(nototherwiseclassified) 1.05$AHigh $1.10 147 Oilfieldproduction 2.10$CHigh $2.10 148 Paintmanufacturing 3.15$DHigh $3.20 149 Papermanufacturing 3.15$CHigh $3.20 150 Paperproducts 2.10$BHigh $2.10 151 Pesticides 4.25$DHigh $4.30 152 Petroleumrefiningandprocessing 5.25$EHigh $5.40 153 Pharmaceuticals 4.25$DHigh $4.30 154 Photographicequipmentandsupplies 2.10$CHigh $2.10 155 Pottery,china,earthenware,porcelainandrelatedproducts 2.10$CHigh $2.10 156 Primarysmeltingandrefiningofnonferrousmetals 3.15$BHigh $3.20 157 Printedcircuitboards 4.25$EHigh $4.30 158 Quarryingandrockcrushing 4.25$DHigh $4.30 159 Railroadequipment 2.10$BHigh $2.10 160 Rolling,drawingandextrudingnonferrousmetals 2.10$CHigh $2.10 161 Rubberandplasticsproducts 3.15$CHigh $3.20 162 Sandandgravelwashingandscreening 3.15$DHigh $3.20 163 Secondarysmeltingandrefiningofnonferrousmetals 2.10$CHigh $2.10 164 Semiconductorandrelateddevices3.15$DHigh $3.20 165 Silverware,platedwareandstainlesssteelware 4.25$EHigh $4.30 166 SprayͲpaintingshops 1.05$AHigh $1.10 167 Steelspringsmanufacturing 3.15$EHigh $3.20 168 Tanningandwoolpulling 3.15$DHigh $3.20 169 Textilemills,treatinganddyeing 4.25$DHigh $4.30 PUBLICWORKS DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 170 Woodfabrication(nochemicalwastes) 1.05$AHigh $1.10 RetailTradeandServices 171 Airports,flyingfieldsandairportterminalservices1.05$BHigh $1.10 172 Automotiverepair 1.05$CHigh $1.10 173 Bottleandcanwashing 2.10$BHigh $2.10 174 Carwash 1.05$CHigh $1.10 175 ChemicalLaboratories 1.05$BHigh $1.10 176 Cleaners,retail 1.05$BHigh $1.10 177 Commerciallaundries(notcoinͲoperated) 2.10$BHigh $2.10 178 Cooperages 3.15$DHigh $3.20 179 Drycleaningplants 2.10$DHigh $2.10 180 Filmprocessingplants 2.10$CHigh $2.10 181 Filmprocessing,retail 1.05$AHigh $1.10 182 Kennels,dogandcathospitals 1.05$AHigh $1.10 183 Marineservice 2.10$CHigh $2.10 184 Schools,churchesandinstitutions 1.05$AHigh $1.10 185 ServicestationsͲincidentalcarwashing,repairs,andmaintenance 1.05$AHigh $1.10 186 Tanktruckinteriorwashing 2.10$DHigh $2.10 187 Truckrepairandexteriorwashing 1.05$CHigh $1.10 WasteDisposalFacilities 188 Cogenerationfacilities(nototherwiseclassified) 2.10$CHigh $2.10 189 Hazardouswastetreatment,recycling,storageandtransferfacilities 6.30$MHigh $6.40 190 Injectionwells,nonͲoilfieldwastes(liquids) 3.15$MHigh $3.20 191 Landfillgasrecoveryfacilities 6.30$MHigh $6.40 192 Liquidwastestorageandtransferfacilities,nonͲhazardous 4.25$EHigh $4.30 193 Openfacilities,notused 1.05$AHigh $1.10 194 SolidͲwastetransfer,recyclingandcompostingfacilities 3.15$DHigh $3.20 195 SolidͲwasteincinerators 6.30$MHigh $6.40 196 WasteͲtoͲenergyfacilities 6.30$MHigh $6.40 POLICE DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 1 ViciousandDangerousDogDesignation $140.00High $143.00 2TransferPermitFee $5.00High $5.00 PoliceRecords 3ATMSafetyLaw $28.00perrequest Medium $29.00 4 CitationVerification(EquipmentViolation)ͲResidents $12.00perrequest Medium $12.00 5 CitationVerification(EquipmentViolation)ͲNonͲresidents $28.00perrequest High $29.00 6CopiesofCrimeReports $0.25perpage Low First25pagesfree$0.25 7 FingerprintingͲfirstcard $12.00perperson High $12.00 8 FingerprintingͲeachadditionalcard$12.00perperson High $12.00 8LivescanFingerprinting(DOJStateLevel)$Ͳperperson High PerStateofCaliforniaDOJ$32.00 9LivescanFingerprinting(bothDOJStateLevelandFBIFederalLevel)$Ͳperperson High $49.00 10 MicrofilmReproduction $34.00firstfivepages High $1.00foreachadditionalpagethereafter.$35.00 11 PhotographReproduction $1.05perCDperperson Low nolimittoquantityofpicturesaslongastheyfit ononeCD,ifstoragecapacityisexceededthena secondCDmustbepurchased $1.10 12 RepossessionAdministrativeFee $17.00High $17.00 13 SpecialReportsorResearchFee(forvideo/audioreproduction;blanktapes providedbyrequester)$243.00perhour High withonehourminimum,additionaltime chargedat15Ͳminuteincrements$248.00 14 LocalC.O.R.I.Letter $37.00perrequest High $38.00 15 SexandDrugRegistrants $ͲLow $Ͳ 16 PoliceShootingRange LawEnforcementuse onlyLow LawEnforcementuse only 17 CivilSubpoenaDucesTecum $15.00Low SetbyStateEvidenceCodeSection1563$15.00 18 TrafficAccidentReport $37.00High $38.00 19 AdultBusinessPerformerLicenseAnnualFee $243.00High $248.00 POLICE DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 20 Misdemeanor/InfractionViolation PenaltyforInfraction 21 1stViolation Notmorethan$100High Notmorethan$100 23 2ndViolation(ofsameprovisionwithin1year)Notmorethan$200High Notmorethan$200 24 3rdandanyAdditionalViolation(ofsameprovisionwithin1year)Notmorethan$500High Notmorethan$500 25 Infractionregardingminors SetbythecourtHigh Setbythecourt PoliceTowingServices(accordingtothirdͲpartycontractwithJan'sTowing) 26 RegularTowͲClassA $263.00High $263.00 27 MediumDutyTowͲClassB $315.73High $315.73 28 HeavyDutyTowͲClassC $458.25High $458.25 29 SuperHeavyDutyTowͲClassD $497.35High $497.35 30 MotorcycleTow $263.00High $263.00 31 RegularStorageͲClassA(inside)$68.06day High $68.06 32 MediumStorageͲClassB(inside)$70.13day High $70.13 33 HeavyStorageͲClassC(inside)$72.75day High $72.75 34 HeavyDutyStorageͲClassD(inside)$74.03day High $74.03 35 MotorcycleStorage(inside)$68.06day High $68.06 36 RegularStorageͲClassA(outside)$65.50day High $65.50 37 MediumStorageͲClassB(outside)$67.96day High $67.96 38 HeavyStorageͲClassC(outside)$74.55day High $74.55 39 HeavyStorageͲClassD(outside)$74.03day High $74.03 40 MotorcycleStorage(outside)$65.50day High $65.50 41 HandicapTow $263.00day High $263.00 42 HandicapStorage(indoor)$68.06day High $68.06 43 HandicapStorage(outdoor)$65.50day High $65.50 AnypersonconvictedofamisdemeanorunderanyprovisionofthisCodeshallbepunishablebyafineofnotmorethan $1,000.00orbyimprisonmentintheCity *AllratesareaccordingtolatestCHPrates, whichareexpectedtobeavailablearoundMay orJune2024 POLICE DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 DisorderlyPartyFee 44 FirstResponse NofeeHigh Nofee 44 2ndorsubsequentresponse SpecialAssignmentFee (personneland equipmentcosts, damagetoCityproperty, injuriestoCity personnel) High SpecialAssignmentFee (personneland equipmentcosts, damagetoCityproperty, injuriestoCity personnel) ParkingViolations ArcadiaMunicipalCodeViolations 47 10.1NoStoppingorStandinginParkway $74.00High $75.00 48 10.3NoStoppingorParking $74.00High $75.00 49 10.3(7)NoStoppingorParking(StreetSweeping)$74.00High $75.00 50 10.4UsingStreetStorageofVehicle $113.00High $115.00 51 10.6RepairingorGreasingVehicleonStreet $74.00High $75.00 52 10.7WashingorPolishingVehicleonStreet $74.00High $75.00 53 10.11UnlawfulParkingͲPeddlers/Vendors $94.00High $96.00 54 10.12NoParking(EmergencySigns)$74.00High $75.00 55 11.0GreenCurb(24MinutesOnly)$74.00High $75.00 56 11.2&11.3OvertimeParking(1Hr.Zoneand2Hr.Zone)$74.00High $75.00 57 11.6ParkinSpaceParking $74.00High $75.00 58 11.9OvernightParking(2:30a.m.to5:30a.m.)$74.00High $75.00 59 11.9.1OvernightParking(Vehicleover6,000lbs.)$108.00High $110.00 60 TemporaryAllNightParking$5.00pernight High $5.00 61 12.1ParkinViolationofCurbMarkings(RYW)$74.00High $75.00 62 12.2LoadorUnloadinExcessof20Minutes $74.00High $75.00 63 12.3ParkinLoadingZone $74.00High $75.00 64 12.4ParkinPassengerLoadingZone $74.00High $75.00 65 12.5ParkinAlley $74.00High $75.00 66 3240ParkingonPrivateProperty $74.00High $75.00 67 13.15ParkingCommercialVehicleinResidential $227.00High $232.00 68 13.16CommercialVehicle(truckroute)$272.00High $277.00 69 9402.6(o)ParkonLawn/UnpavedSurface $69.00High $70.00 POLICE DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 CaliforniaVehicleCodeViolations 70 21113aParkingonPublicGrounds $74.00High $75.00 71 22500aParkingWithinanIntersection $74.00High $75.00 72 22500bOnaCrosswalk $74.00High $75.00 73 22500eInFrontofPublicorPrivateDrive $74.00High $75.00 74 22500fOnaSidewalk $74.00High $75.00 75 22500hDoubleParking $74.00High $75.00 76 22500iBusZone $339.00High $346.00 77 22500.1ParkinFireLane/Accessway $339.00High $346.00 78 22502Parkover18"fromR/Curb(orWrongSide)$74.00High $75.00 79 22507.8HandicappedParking(FirstOffenseOnly)$452.00High $461.00 80 22514FireHydrant(Within15feet)$74.00High $75.00 81 22522ParkNearCurbAccessRamp $339.00High $346.00 82 22526BlockingIntersection $119.00High $121.00 83 5200(a)ImproperDisplayofLicensePlates $74.00High $75.00 84 5204(a)ImproperDisplayofTabs $74.00High $75.00 PublicSafetyAlarmFees FalseSecurityAlarmFees 85 Firstandsecondfalsesecurityalarminanyconsecutive365dayperiod(MC SectionͲ3907)NoCostAssessmentHigh NoCostAssessment 86 Thirdfalsesecurityalarminanyconsecutive365dayperiod(MCSection3907b)$227.00Assessment High $232.00 87 Fourthfalsesecurityalarminanyconsecutive365dayperiod(MC3907c)$339.00Assessment High $346.00 88 Fifthandallsubsequentfalsesecurityalarmsinanyconsecutive365dayperiod (MC3907d)(Resolution7047,adopted10Ͳ21Ͳ14)$452.00Assessment High $461.00 89 Eachfalsesecurityalarmwhichspecificallysignalsarobberyorpanicalarm regardlessofanyothercrimeinany365dayperiod $227.00CostAssessment High Commencingwiththe2ndfalsesecurityalarmin anyconsecutive365period3907e$232.00 90 ReactivationFee $227.00High $232.00 POLICE DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 FalseFireAlarm 91 FirstandSecondfalseFireAlarmduringthecalendaryear NoCostAssessmentHigh NoCostAssessment 92 Thirdandallsubsequentfalsefirealarmsduringcalendaryear CostAssessmentof $320High CostAssessmentof $320 93 Fifthandallsubsequentfalsefirealarmsduringcalendaryear Subjectto AdministrativeCitationsHigh Subjectto AdministrativeCitations VehicleImpound/StorageFees 94 VehicleImpound/StorageReleaseFee $192.00High $196.00 95 VehicleImpound/StorageReleaseFeeͲIncidenttoArrestOtherthanDUI $792.00Medium $808.00 96 VehicleImpound/StorageReleaseFeewithDUI $792.00Medium $808.00 97 MassageTherapistPermitApplicationFee $282.00HIgh $288.00 98 MassageTherapistPermitRenewalFee $243.00High $248.00 99 MovieDetail CostVariesHigh CostVaries MiscellaneousPoliceServices 100 SafekeepingofFirearms $150forthefirst weapon$50foreach additionalweapon,and a$2perdayperweapon storagefreebeyondthe 30Ͳdaylimit High $150forthefirst weapon$50foreach additionalweapon,and a$2perdayperweapon storagefreebeyondthe 30Ͳdaylimit 101 AnnualOvernightParkingPermit $140.00High EffectiveJanuary1,2025$143.00 102 AnnualOvernightParkingPermitTransferFee $5.00High EffectiveJanuary1,2025$5.00 103 AlteredDogs $36.00High NewRateswillavailablearoundMayorJune 2024$36.00 104 UnalteredDogs $78.00High NewRateswillavailablearoundMayorJune 2024$78.00 105 AlteredDogsͲSeniorrate $23.00High NewRateswillavailablearoundMayorJune 2024$23.00 106 UnalteredDogsͲSeniorrate $46.00High NewRateswillavailablearoundMayorJune 2024$46.00 107 PetStore/Groomer $125.00High NewRateswillavailablearoundMayorJune 2024$125.00 108 ReplacementTags $25.00High NewRateswillavailablearoundMayorJune 2024$25.00 109 PenaltyFeeforlatepayments $30.00High NewRateswillavailablearoundMayorJune 2024$30.00 POLICE DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 110 TaxiDriverPermitApplication $243.00High $248.00 111 SolicitationPermitApplication$153.00High $156.00 112 Audio/VideoRecording(onCD) $1.00High $1.00 113 ConcealedCarryWeaponLicenseApplication $381.85High $389.00 114 ConcealedCarryWeaponLicenseAmendment $10.00High $10.00 115 ConcealedCarryWeaponLicenseRenewal $25.00High $26.00 116 ConcealedCarryWeaponLicensePsychologicalTest $150.00High $153.00 CPIͲW%@January20242.0% RECREATIONANDCOMMUNITYSERVICES DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 ClassesandActivities 1ClassRegistrationAdministrationFee $6.00each Low $6.00 2KidsNightOutProgram$24.00each Low $24.00 3 AdultBasketballLeagueCostperTeam$910.00teamLow $910.00 4 Processingrefundfeeforcancellationofrecreationactivity $22.00eachLow $22.00 5 IntramuralBasketball,Volleyball,andFootball(includesuniform)$113.00eachLow $115.00 WildernessParkFees 6OvernightYouthCampoutsuptocapacityof50 $320.00dailyLow $320.00 7OvernightYouthCampoutsuptocapacityof100 $640.00dailyLow $640.00 8Securitydepositpergroup(refundable)$116.00dailyLow $120.00 9SchoolPicnics$116.00dailyLow $118.00 10 Groups1Ͳ5 FREELow FREE 11 Groups6Ͳ20 $32.00dailyLow $32.00 12 DayCamp(1weeksession)$169.00weeklyLow $174.00 BonitaPark 13 BonitaParkLightUse $12.00hourlyLow $12.00 DanaGym 14 Badminton,Volleyball,Pickleball(noinstructor)$38.00quaterlyLow $40.00 15 SportsCamp(1weeksession)$169.00weeklyLow $174.00 VariousSites 16 Winter,Spring,Thanksgiving,andTeenCamps $40.00dailyLow $41.00 17 SummerFunNPlay $53.00weeklyLow $54.00 18 HourlyFeeforUseofSyntheticTurfFields$40.00hourlyLow $41.00 19 AnnualSecurityDepositForUseofConcessionStands$286.00annuallyLow $300.00 20 AnnualSecurityDepositForUseofAthleticFields $286.00annuallyLow $300.00 21 MuseumEducationCenterrentals 57.00$hourly Low 2hourminimum$58.00 CommunityCenterMeetingRooms LargeBanquetMeetingRoom(6AͲE) 22 FullBallroom(Capacity260);Priority3 $169.00hourlyLow FULLBALLROOM*Changing6hr.blockto1hr. block*$172.00 23 2/3Ballroom(Capacity230);Priority3 $116.00hourlyLow 2/3Ballroom*Changing6hr.blockto1hr.block*$118.00 24 1/3Ballroom(Capacity130);Priority3 $84.00hourlyLow 1/3Ballroom*Changing6hr.blockto1hr. block*$86.00 25 SecurityDeposit(refundable)$339.00daily Low $350.00 26 Under150people/EmployeeRetirementEvent;Priority2 $225.00flatLow 6hourmaximum,includingsetup/breakdown$250.00 SmallMeetingRooms(7ABorothersmallroom) 27 RentalFee $67.00hourlyLow $70.00 28 SecurityDeposit(refundable)$116.00Low $120.00 CustodialCareofChildrenͲLateFees 29 5minutes FREELow FREE 30 6Ͳ15minutes $22.00Low $20.00 31 16Ͳ30minutes $33.00Low $30.00 32 31Ͳ45minutes $44.00Low $40.00 CPIͲW%@January20242.0% RECREATIONANDCOMMUNITYSERVICES DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 33 46Ͳ60minutes $55.00Low $10.00additionalchargeforeach5minutes$50.00 34 CouncilChambersRoomFacilityRental $57.00hourlyLow 2hourminimum $58.00 35 CouncilChambersRoomFacilityRentalSecurityDeposit $116.00hourlyLow $120.00 36 MECSecurityDeposit$116.00dailyLow $120.00 37 ExtendedCareAM $22.00dailyLow $25.00 38 ExtendedCarePM $22.00dailyLow $25.00 39 ExtendedCareAM&PM $44.00dailyLow $50.00 LIBRARY DESCRIPTION CURRENTFEE/ CHARGEUNIT CostRecovery LevelNOTES NEWFEESEFFECTIVE JULY1,2024 LibraryFees OverdueLibraryMaterials 1 Perday,peritem $0.25Low $0.25 2 Maximumfine,peritem $10.00Low $10.00 3 Referralfeetocollectionagencyperitem $15.00Low $15.00 ItemsLostorDamagedBeyondRepair 4 Replacement CostofItemsLow CostofItems 5 ProcessingCharge(paperback)$5.00Low $5.00 6 ProcessingCharge(allothermaterials)$5.00Low $5.00 Chargers $ͲͲ$  7 Chromebook $ͲLow $40.00 8 Launchpad/PlayawayView $ͲLow $17.00 New:MissingLabels $ͲͲ$  9 Barcodes,peritem $ͲLow $1.00 10 RFIDTags,peritem $ͲLow $1.00 BookReserve 11 Adultmaterials FreeLow Free 12 Children'smaterials FreeLow Free 13 InterlibraryLoanRequests:Eachrequest(pluspostageandotherfeesaddedby$5.00Low $5.00 Photocopies 14 Photocopies(first25pages)FreeLow Free 15 Photocopies(26thandsubsequentpages)$0.15perpageLow $0.15 16 HistoricalMaterialsforPrivateorNotforProfitUse $20.00Low $20.00 17 HistoricalMaterials,commercialuse,publicdisplay,publication $100.00Low $50.00 LibraryCard 18 Firstcard $ͲLow $Ͳ 19 Replacementfeeforlostcard $2.00Low $2.00 LibraryMeetingRoomReservations CayMortensonAuditorium 20 PerHourRentalFee(2hourminimum)$125.00Low $125.00 21 AuditoriumSecurityDeposit(refundable)$150.00Low $150.00 22 CleaningFeeperusewhenfoodisserved$50.00Low $50.00 23 AuditoriumPianoRentalUseFee 50.00$Low $50.00 24 InternetComputerUseGuestPassFreeLow Free MuseumPatio 25 PerHour(2hourminimum) 42.00$Low $43.00 PassportServices 26 PassportFee $35.00Low $35.00 27 PhotoFee 15.00$Low $15.00 28 ExpressMail 28.75$Low $28.75 ClassFees 29 EnglishConversationFee $Ͳ yr/studentLow $Ͳ 30 PerHourRentalFeeImaginationTheater(1hourmin.)$55.00perhourLow $55.00 31 SecurityDeposit(refundable)$55.00Low $55.00