Loading...
HomeMy WebLinkAboutItem 2h - Hogle-Ireland General Plan Update ContractI ...r.. d .M.." I991 ~S ''\4AIt\\1\ V Of STAFF REPORT Development Services Department DATE: TO: FROM: August 18, 2009 Mayor and City Council Jason Kruckeberg, Development Services Director 2-14- SUBJECT: AMEND THE EXISTING CONTRACT WITH HOGLE-IRELAND, INC. FOR THE GENERAL PLAN UPDATE PROJECT BY REDUCING THE TOTAL PROJECT COMPENSATION FOR THE PROJECT BY $70,252. Recommendation: Approve SUMMARY At a study session related to the Fiscal Year 09-10 budget, the City Council directed a reduction in the projected expenditures for the General Plan Update project. The attached exhibits show recommend cuts from the budget totaling $70,252, which represents 10% of the projected General Fund expenditures for the project. DISCUSSION On February 5, 2008, the City Council approved a contract with Hogle-Ireland Inc. for planning services related to a comprehensive General Plan Update for the City. Hogle- Ireland, Inc. had been selected out of several bidders and is the primary consultant leading a team on this project. The scope of the project includes a comprehensive city- wide analysis of land use, traffic and circulation, economic development, safety, open space and natural resources, and housing. The budget for this two-year project was approved at $843,130, of which $700,000 was General Fund monies and $143,130 was Redevelopment monies. The consultant team and the staff have been working on the project for the past 18 months and the project is scheduled to be completed during the 09-10 Fiscal Year. At a study session related to the Fiscal Year 09-10 budget, the City Council requested that the General Plan Update project be reduced in scope by five to ten percent. This was in reaction to a number of other departmental and programmatic cuts that the Council was considering. Prior to budget adoption, staff from the Development Services Department informed the Council that an approximate ten percent cut in General Fund expenditures ($70,252) had been negotiated between the City and Hogle-Ireland, Inc. This will reduce the total project budget to $772,878. The proposed cuts are reflected in Exhibit A and the overall project budget is shown in Exhibit B. General Plan Update Budget Reduction August 18, 2009 Page 1 FISCAL IMPACT The impact of this action would be to reduce expected General Fund expenditures by $70,252 in Fiscal Year 09-10. RECOMMENDATION Approve an amendment to the existing contract with Hogle-Ireland, Inc. for the General Plan Update Project by reducing the total project compensation by $70,252. Approved By: Donald Penman, City Manager Exhibit A: Proposed Budget Cuts by line item and sub-consultant Exhibit B: Reduction in Project Budget General Plan Update Budget Reduction August 18, 2009 Page 2 EXHIBIT A Arcadia General Plan Proposed Budget Adiustment Per Staff Direction - 06/18/09 Task V Planned Task Reduction Savings Impact: Eliminate remaining community workshop (1) from Hogle-Ireland scope of work- City staff is responsible for workshop preparation, presentation, and materials. 2.6 but retain $1,500 for Hogle-Ireland attendance (L. Stetson, D. Gonzalez) $ 7,505 Hogle-Ireland staff will attend. Eliminate 2 rernalnlrg C: PC joint study sessions from Hogia-Ireland scope of work- but retain $2,500 for Hogle-Irelond attendance I Stetson, D. Gonzalez) City staff is responsible for study sessions (2) preparation, presentation, and 2.7 at 2 meetin s $ 3,270 materials. Hogle-Ireland staff will attend: Reduce public adoption hearings allowance to $3,000 for Hogle-Ireland Staff will be responsible for public hearing (2) preparation, presentation, and 7.1 attendance (L. Stetson, D. Gonzalez) at two hearings each. $ 8,120 materials. Hogle-Ireland staff will attend. Peproducibles and mops for meetings will be cl sely monitored to assure adequate budget for. printing of General Pion drafts and Fnal General Plan, ' Hogle-Ireland will work with City to accommodate prlnitng of General Plan drafts and Final General Plan within allocated budget, Staff maybe responsible for portions of printing of LIP drafts (HI will provide a. reproducible file to City). Hoge. Ireland will work with the City to identify reproduction alternatives to reduce.` 9.1 and Dlnct printing costs such as provisding a portion of drafts as electronic copies on CD- Costs line Reduoe remaining budget for deliverables/materials allowance by 25% - $ 8,325 Rpm in lace of printed hard copies No glossary will be included in HI deliverables, City staff will create this section 5.1 Eliminate GP Glossary $ 3,720 and provide to HI to insert into Final GP. > Port of EIR Consultant .cops LIP - Elhnincte sc.-.p n9 meeting- with ollowance for attendance for one staff Staff will be responsible far EIR scalping maeting; Bonterra cost DOLS NOT member from Bonterra I meeting) 4,675 include t aralion time. Part of EIR consultant scope No initial Study. Consultants will prepare a project description, NOP,and EIR - Reduce Initial Study Budget $ 2,145 distribute. Part of EIR consultant No attendance by Bonterra; no ari-randum su m ozing LIP process cnd scope EIR Eliminate Public Heanngs - wlLh allowance for attends,n-, for one aLi,ff changes will be produced by Bonterra. Bo,to ro atton dance cost DOES NOT rnemb®r from Bonterra 2 h-in s) $ 8,270 include preparation time. Elements will include relevant information from 2000 GP as well as new information as required by State law, and material in existing background reports Reduction of 25% of remaining budget for Conservation, Safety, Open Space, or City reports - goals and policies will be cleaned up - additional optional 5.1 and Noise Elements $ 8,900 information/topics will eliminated or will be provided by staff Staff will assist with implementation plan details such as identifying responsible 5.1 Peduct,or of 25% of remaining budget fcr -)Iementotion Plan $ 4,640 department, funding, and timeline Remaining budget will be used to address comments on material in draft elements. The subsequent addition of topics not required by GP law or additional non. essential exhibits or graphics will be the City's responsibility to edit. Staff will help 5.2 Reduction of 20% for Public Review Draft General Plan $ 3,540 identify sustainability topics to call out with icon. Allowance reduced. Allowance is intended to cover the cost of edits resulting from City Council/Planning Commission direction during adoption hearings and from final staff. review. If allowance is exceeded, City staff may be responsible for 8.1 and 8.2 Reduce Final General Plan bud et 6 30% $ 5,142 portions of the changes and edits prior to final publishing. Geotechnical work was completed under budget; Final $2,000 of subconsultant 3.4 Cost Savings from Geotechnical Stud $ 2,000 t ask will not be billed. Total potential savings $ 70,252 Exhibit B - Compensation (REVISED) Arcadia General Plan COST ESTIMATE OVERVIEW Consultant Original Cost . REVISED COST Ho le-Ireland, Inc. $495,355 $440,193 Keyser, Marston Associates $47,085 $47,085 BonTerra Consulting $168,750 $153,660 The Mobility Group $62,060 $62,060 Veronica Tam & Associates $30,000 $30,000 Urban Crossroads $20,200 $20,200 Wilson Geosciences $19,680 $19,680 TOTAL COST ESTIMATE $843,130 $772,878 Reduced Budget $70,252