HomeMy WebLinkAboutItem 1a: Architectural Design Review for 468 E. Santa Clara - Hale CorporationP*P9.71
�W
DATE:
TO:
FROM:
SUBJECT:
BACKGROUND
September 15, 2009
Redevelopment Agency Board
STAFF REPORT
Arcadia Redevelopment Agency
Jason Kruckeberg, Development Services Director5L
By: Jerry Schwartz, Economic Development Manager)
AGENCY ARCHITECTURAL DESIGN REVIEW FOR A 9,811
SQUARE FOOT OFFICE BUILDING TO BE LOCATED AT 468
EAST SANTA CLARA STREET IN THE CENTRAL
REDEVELOPMENT PROJECT AREA; APPLICANT AND
DEVELOPER — HALE CORPORATION
Recommendation: Approve
The Hale Corporation has developed several office buildings in the City of
Arcadia. In 2001, the Redevelopment Agency approved an Owner Participation
Agreement (OPA) with the Fifth Avenue Group LLP (Dick Hale and partner) to
develop two large office buildings near the intersection of Fifth Avenue and Santa
Clara Street. One building, at 51 North Fifth Street, is 30,000 sq. ft. The other
building, at 488 East Santa Clara Avenue, is 55,800 sq. ft. Both are three story
buildings. As a partner in the development of the first two buildings, the Agency
was able to eliminate blight and generate attractive new office buildings that have
yielded tax increment and brought in several hundred new employees to the
area. These properties are nicely landscaped and well maintained. According to
the developer, they are both fully occupied.
The Hale Corporation is now proposing to develop a one -story, 9,811 sq. ft.
building at 468 East Santa Clara Street, just west of the existing 488 East Santa
Clara Street building. Due to its location in the Central Redevelopment Project
Area, the Agency is responsible for the design review of this new building.
DISCUSSION
The proposed 468 East Santa Clara Street building would be located in the
westernmost portion of the existing parking lot, adjacent to the Santa Anita Wash
flood control area. The proposed site plan is attached. The project is in the
Central Redevelopment Project Area, and as such, is subject to design review by
the Agency Board. The Hale Corporation is proposing to develop this building as
a private project and is not requesting any financial assistance from the
Redevelopment Agency.
The project would require the removal of parking in the off - street lot that has
been provided for the 488 East Santa Clara Avenue building. A parking analysis
and parking utilization survey were prepared by Linscott Law & Greenspan for
the existing two office buildings and the impact of the proposed project. The
study shows that parking utilization during the peak periods is actually
significantly below the parking provided either before or after the proposed
project. The study concludes that after the proposed new office building is
constructed, there will be sufficient parking for the resulting 95,611 sq. ft. of office
space. The project will require a parking modification and this application will be
considered in a public hearing with the Modification Committee pending
completion of the Agency's design review.
Architectural Design
The architectural design of the proposed 9,811 sq. ft. office building is similar to
the two existing buildings. Photos of those two buildings are attached to this staff
report. The current buildings can be described as having gray /beige stucco with
blue tinted windows and yellow /gold accents above the windows and a prominent
cornice running around the building. The building entrances are blue glass, with
the front of each building stepped forward to provide articulation and modulation
along the length of the buildings. Landscaping will cover approximately 24% of
the site. The landscaping for the existing buildings is mature and makes a strong
statement about the overall environment in the development. The addition of this
building within the "campus" created by the other two buildings will provide a
consistent and cohesive appearance.
ENVIROMENTAL IMPACT
The proposed project qualifies under Section 15303 of the California
Environmental Quality Act as a Class 3 Categorical Exemption since it is new
construction in an urbanized area of a small office building (less than 10,000 sq.
ft.) on a site zoned for such use without involving the use of significant amounts
of hazardous substances, where all necessary public services and facilities are
available, and where the surrounding area is not environmentally sensitive. A
Preliminary Exemption Assessment is attached. If the Agency Board agrees with
this determination, no further environmental review will be required.
FISCAL IMPACT
There is no cost to the Agency or City from the development of the proposed
project. If the project is approved, the General Fund will receive plan check,
Staff Report
September 15, 2009
Page 2
permit, and inspection fees. The Agency will receive additional property tax
increment throughout the remainder of the Central Redevelopment Project Area.
RECOMMENDATION
That the Redevelopment Agency approves Architectural Design Review for 468
East Santa Clara Street as proposed, including the Categorical Exemption
required under CEQA for the project.
Approved By: —O
Donald Penman
City Manager /Executive Director
Attachments: Site Map, Aerial Photo of Site, Photos of Current Office
Buildings, and Color Rendering of Existing Office Building
Proposed Site Plan
CEQA Preliminary Exemption Assessment
Staff Report
September 15, 2009
Page 3
100
( �)
0 100 Feet
\\ /
CPD-1
HUNTINGTON DR
(
CPD-1
4
CPD-1
(
210
SANTA CLARA ST
(41 (421)
(444)
(
Development Services Department
Engineering Division
Prepared by R.s.Gonzelez, September 2009
468 E Santa Clara Street
SANTA CLARA ST
468 Santa Clara St
Arcadia
Zone
tt
ci
Pi
0
a
O
►'h
CI
1 (TQ
a a
E. TA
oQ
cr
o0
00
lil
(D CA
Z
n
.1
a a
o' PD
N
o —
O Z
N
P
a
<
a
0
r r r r r
fi
11101u1,,
8111118LI8
a+++mIw INN 'IHS'V]'VIAOIIMOW
MIK ISpI%V/ V 11NS'911tl1N ISIS
fatiff WO
0
muol
-o
I - v
oestouslir
YINUOd17Y3'YIUY3UY
mi+ow= Sxama MN
.1.117fELS VIIr13 WINS SSYi Y96
IDN1LL'W1aLUA O
.uaroa/
11091330d103 OtBH Ma '''
r r r r r
fi
11101u1,,
sezretms
A -2
MOM
.H 1
ate_ 6 -/CbQ
e
"
am.
lb The Hale Corporation
PROJECT •
OITICEDUILDENGI
468 EAST SANTA CLARA STREET
d
a ULDISR9 AND DEMON=
ARCADIA, CALIPORNIA
OM 3u-ora
MirviTte""' MX(04)36141
oreb...Imma
men TITLE
t th
NE: %WOE'
4sx,
111
// "
lb's&
• 0
co 1 .r
11
0
a°
z
1'
1
1wiuma
WO
c mptol rnrWml rya
=rm
Hill •fl vino1NOW
V1AOr "T1.11ANS411
1 V_ =
YI
o w .,, .,,,. '
vm e a�a1a
133f OW
i1WPMW MY 51111011110 51111011110
uoptuothop am atil
111
co 1 .r
11
0
a°
z
Date: September 1, 2009
PRELIMINARY EXEMPTION ASSESSMENT
(Certificate of Determination When Attached to Notice of Exemption)
Preliminary Exemption Assessment \ City of Arcadia 12009
Staff:
Jin7 _a - ama, Community Development Administrator
FORM "A"
1. Name or description of project:
Architectural Design Review No. ADR 09 -13 for a one- story, 9,811
sq. ft. office bldg. at an existing office complex.
2. Project Location — Identify street
address and cross streets or
attach a map showing project site
(preferably a USGS 15' or 7W
topographical map identified by
quadrangle name):
468 E. Santa Clara Street — southwest corner of E. Santa Clara
Street and N. Fifth Avenue.
3. Entity or person undertaking
project:
•
1. Public Entity:
2. Other (Private):
(1) Contact Name
Mr. Dick Hale
(2) Contact
Address
513 S. Myrtle Ave., Suite A
Monrovia, CA 91016
(626) 358 -4523
4. Staff Determination: The City, having undertaken and completed a preliminary review of this project in
accordance with the City's "Local Guidelines for Implementing the California Environmental Quality Act
(CEQA)," has concluded that this project does not require further environmental assessment because:
a. ❑
The proposed action does not constitute a project under CEQA.
b. ❑
The project is a Ministerial Project.
c. ❑
The project is an Emergency Project.
d. ❑
The project constitutes a feasibility or planning study.
a
The project is categorically exempt.
Applicable Exemption Class:
3 (Sec. 15303) New construction of a small structure
(less than 10,000 sq. ft.) in an urbanized area on a
site zoned for such use without involving the use of
significant amounts of hazardous substances where
all necessary public services and facilities are
available and where the surrounding area is not
environmentally sensitive.
The project is statutorily exempt.
Applicable Exemption:
g. ❑
The project is otherwise exempt
on the following basis:
h. ❑
The project involves another public agency which constitutes the Lead Agency.
Name of Lead Agency:
Date: September 1, 2009
PRELIMINARY EXEMPTION ASSESSMENT
(Certificate of Determination When Attached to Notice of Exemption)
Preliminary Exemption Assessment \ City of Arcadia 12009
Staff:
Jin7 _a - ama, Community Development Administrator
FORM "A"