DATE: October 15, 2024
TO: Honorable Mayor and City Council
FROM: Paul Cranmer, Public Works Services Director
By: Carlos Aguilar, General Services Superintendent
SUBJECT: ACCEPT ALL WORK PERFORMED BY CARRIER CORPORATION FOR
THE LIBRARY CHILLER REPLACEMENT PROJECT AS COMPLETE
CEQA: Exempt
Recommendation: Approve
SUMMARY
On October 4, 2022, the City Council approved a contract with Carrier Corporation in the
amount of $318,645, for the Library Chiller Replacement Project. The terms and
conditions of this project have been complied with, and the work has been performed to
the satisfaction of the Project Manager for a total project cost of $318,645. It is
recommended that the City Council accept all work performed by Carrier Corporation for
the Library Chiller Replacement Project as complete.
BACKGROUND
The Fiscal Year 2019-20 Capital Improvement Program (“CIP”) included the replacement
of the 110-ton water-cooled chiller and controller at the Arcadia Public Library. The water-
cooled chiller is responsible for providing cooling to most of the Library building. Over
time, the chiller began presenting numerous maintenance issues, with costly repairs
needed for the compressors that operate the water-cooled chiller. To extend its lifecycle
as long as possible, to keep costs down during a period of economic uncertainty, and to
keep staff and the public safe during the pandemic, this project was placed on hold.
The water-cooled chiller had outlived its useful life and the compressors on the chiller
were beginning to fail. The Arcadia Library Chiller was operating on only three of its four
compressors and replacing it became imperative to ensure the facility was properly
cooled, especially considering the Library is a designated cooling center for the City.
Furthermore, in addition to the limited supply of conditioned air, the chiller was charged
with R-22 refrigerant, which has become restricted by South Coast Air Quality
Management District (“AQMD”). A new Modular Chiller operating on R-410A freon
refrigerant was needed as a replacement to comply with AQMD requirements.
Accept Library Chiller Replacement Project
October 15, 2024
Page 2 of 2
DISCUSSION
On October 4, 2022, the City Council approved a contract with Carrier Corporation for the
Library Chiller Replacement Project. The work included the replacement of the chiller and
all related piping, which was completed within six weeks. As part of this contract, a
temporary trailered chiller unit was utilized to provide cooling for the facility while the
replacement of the chiller was completed. The new chiller system is Title 24 compliant, is
energy efficient, and operates on an R-410A freon refrigerant that meets AQMD
requirements.
All terms and conditions of this contract have been complied with and the work has been
performed to the satisfaction of the Project Manager. Carrier Corporation completed the
work as defined in the project plans and specifications, in an efficient and timely manner.
ENVIRONMENTAL ANALYSIS
This project was considered a Class 1 exemption as defined in Section 15301(d) “Existing
Facilities” projects of the California Environmental Quality Act (“CEQA”), which exempts
projects consisting of the repair and maintenance of existing public structures.
FISCAL IMPACT
Funds in the amount of $150,000 were budgeted in the Fiscal Year 2019-20 CIP for the
Library Chiller Replacement Project. Due to major construction and material cost
increases incurred since the project was originally budgeted, a supplemental budget
appropriation was authorized by the City Council on October 4, 2022, in the amount of
$168,645. The supplemental budget plus the original budget results in total funds in the
amount of $318,645, which is the total cost for this project.
RECOMMENDATION
It is recommended that the City Council determine that this project is exempt under the
California Environmental Quality Act (“CEQA”); and accept all work performed by Carrier
Corporation for the Library Chiller Replacement Project as complete.