December 17, 2024
Page 1 of 3
DATE: December 17, 2024
TO: Honorable Mayor and City Council
FROM: Paul Cranmer, Public Works Services Director
By: Tiffany Lee, P.E. Senior Civil Engineer
SUBJECT: ACCEPT ALL WORK PERFORMED BY DOMINGUEZ GENERAL
ENGINEERING, INC. FOR THE WATER MAIN REPLACEMENT
PROJECT AS COMPLETE
CEQA: Exempt
Recommendation: Approve
SUMMARY
On July 16, 2024, the City Council approved a contract with Dominguez General
Engineering, Inc. in the amount of $323,450 for the Water Main Replacement Project
along Camino Real Avenue, between Tenth Avenue and Loganrita Avenue. The terms
and conditions of this project have been complied with and the work has been performed
to the satisfaction of the Project Manager for a total project cost of $269,860. This amount
reflects the original contract amount of $323,450, minus quantity changes totaling
$53,590, or 16.6%, less than the original contract amount.
It is recommended that the City Council accept all work performed by Dominguez General
Engineering, Inc. for the Water Main Replacement Project as complete, and authorize the
final payment to be made in accordance with the contract documents, subject to the
retention of $13,493.
BACKGROUND
The 6-inch cast iron water main along Camino Real Avenue, between Tenth Avenue and
Loganrita Avenue, was installed in 1954. In recent years, Public Works Services
maintenance crews have made several emergency repairs to this water main, primarily
due to the age and material of the pipe. Cast iron was a common pipe material used for
municipal water mains due to its strength and corrosion resistance. Unfortunately, as cast
iron ages, it becomes brittle and susceptible to leaks, limiting its durability and reliability.
Pressure fluctuations combined with minor geological movement and settlement can
cause cast iron pipes to break.
Accept Water Main Replacement Project
December 17, 2024
Page 2 of 3
The Fiscal Year 2023-24 Capital Improvement Program (“CIP”) included the replacement
of the existing 6-inch cast iron water main along Camino Real Avenue, between Tenth
Avenue and Loganrita Avenue, with a 10-inch ductile iron water main. This Project was
intended to improve the reliability of the City’s water distribution system, as ductile iron
has corrosion resistance and strength characteristics of cast iron, but can tolerate
movement or deflection without breaking.
DISCUSSION
On July 16, 2024, the City Council approved a contract with Dominguez General
Engineering, Inc. for the Water Main Replacement Project. During the course of work, the
City received credits for reducing the quantities of several bid items. Below is a breakdown
of the contract change orders.
CCO Description Amount
1. Deleted (3 LF) - Installation of 10-Inch Ductile Iron Pipe ($960)
2. Added (4 LF) – Installation of 8-inch Ductile Iron Pipe $640
3. Deleted (29 LF) – Installation of 6-Inch Ductile Iron Pipe ($4,060)
4. Deleted (1,050 SF) – Asphalt Pavement ($15,750)
5. Deleted (635 SF) – Concrete Pavement ($25,400)
6. Deleted (44 LF) – Curb and Gutter ($5,280)
7. Deleted (1) – Temporary Water Service ($2,500)
8. Deleted (28 LF) – Removal and Disposal of Existing or Abandoned Pipe ($280)
Total: ($53,590)
The change orders listed reduced the overall contract amount by $53,590, or 16.6%, less
than the original contract amount. All terms and conditions of this contract have been
complied with and the work has been performed to the satisfaction of the Project
Manager. Dominguez General Engineering, Inc. completed the work as defined in the
project plans and specifications, in an efficient and timely manner.
ENVIRONMENTAL ANALYSIS
This project involved the replacement and minor alteration of an existing utility system
with no expansion of the system, and therefore, qualifies as a Class 2 categorical
exemption per Section 15302(2) of the California Environmental Quality Act (“CEQA”).
Accept Water Main Replacement Project
December 17, 2024
Page 3 of 3
FISCAL IMPACT
Funds in the amount of $520,000 were budgeted in the Fiscal Year 2023-24 Capital
Improvement Program for the Water Main Replacement Project. The total cost for the
Water Main Replacement Project is $269,860. This amount reflects the original contract
amount of $323,450, minus quantity changes totaling $53,590, or 16.6%, less than the
original contract amount.
RECOMMENDATION
It is recommended that the City Council determine that this project is exempt under the
California Environmental Quality Act (“CEQA”); and accept all work performed by
Dominguez General Engineering, Inc. for the Water Main Replacement Project as
complete; and authorize the final payment to be made in accordance with the contract
documents, subject to the retention of $13,493.