Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout6-23-09PLEDGE OF ALLEGIANCE
ROLL CALL
PLANNING COMMISSION REORGANIZATION
MOTION: To read the Resolutions by title only and waive reading the full text of the Resolutions.
SUPPLEMENTAL INFORMATION FROM STAFF REGARDING AGENDA ITEMS
TIME RESERVED FOR THOSE IN THE AUDIENCE WHO WISH TO ADDRESS THE PLANNING COMMISSION
ON NON PUBLIC HEARING ITEMS 5 minute time limit per person.
All interested persons are invited to appear at the Public Hearing and to provide evidence or testimony concerning any of the
proposed items set forth below for consideration. You are hereby advised that should you desire to legally challenge any
action taken by the Planning Commission with respect to the proposed item for consideration, you may by limited to raising
only those issues and objections, which you or someone else raises at or prior to the time of the Public Hearing.
PUBLIC HEARING
AGENDA
ARCADIA PLANNING COMMISSION
Tuesday, June 23, 2009, 7:00 P.M.
Arcadia City Council Chambers
1. MODIFICATION NO. MP 09 -01 AND SINGLE FAMILY ARCHirI CTURAL DESIGN
REVIEW NO. SFADR 09 -28
1735 Holly Avenue
Sanyao International, Inc. (Designer)
A new, two -story, 5,038 square -foot, "French Country" style residence that requires the following applications:
1. A Modification for a 66' -3" front yard setback as measured to the centerline of Holly Avenue in lieu of the
minimum 70' -0" special setback; and
2. Single- Family Architectural Design Review.
RECOMMENDATION: Conditional Approval
There is a five working day appeal period. Appeals are to be filed by 5:30 p.m. on Tuesday, June 30, 2009.
2. CONDITIONAL USE PERMIT NO. CUP 09 -10
34 E. Huntington Drive
Golden State Education Associates, Inc. Robert Granger (Lessee)
A Conditional Use Permit for a tutoring center with eight (8) students in an existing 2,000 square -foot commercial space.
RECOMMENDATION: Conditional Approval
A Resolution reflecting the decision of the Planning Commission will be presented for adoption at the next Commission
meeting. There is a five working day appeal period after the adoption of the Resolution.
Any writings or documents provided to a majority of the Planning Commission members regarding any item on this agenda will be made
available for public inspection in the Planning Services office at City Hall, 240 W. Huntington Dr., Arcadia, CA 91007, (626)574 -5423.
PC AGENDA
6 -23-09
3. CONDITIONAL USE PERMIT NO. CUP 09 -12
5449 Peck Road
Charles V. Palazzolo, dba C.A.R.S
A Conditional Use Permit for an auto storage warehouse and yard on a 48,000 square -foot industrial -zoned lot.
RECOMMENDATION: Conditional Approval
A Resolution reflecting the decision of the Planning Commission will be presented for adoption at the next Commission
meeting. There is a five working day appeal period after the adoption of the Resolution.
CONSENT ITEM
4. PLANNING COMMISSION DETERMINATION
Finding that the Capital Improvement Program for 2009 -2010 is consistent with the General Plan.
5. RESOLUTION NO. 1794
A Resolution of the Planning Commission of the City of Arcadia, California, denying Conditional Use Permit
No. CUP 09-05 for a 2,477 square -foot tutoring center with up to 30 students on the ground floor of an existing
commercial and residential mixed -use development at 715 S. First Avenue.
RECOMMENDATION: Adopt
There is a five working day appeal period after the adoption of the Resolution. Appeals are to be filed by 5:30 p.m. on
June 30, 2009.
6. RESOLUTION NO. 1795
A Resolution of the Planning Commission of the City of Arcadia, California, approving Conditional Use Permit
No. CUP 09 -06 for an auto garage for the maintenance and storage of collectible vehicles in an existing 6,200
square -foot warehouse at 141 Santa Clara Street.
RECOMMENDATION: Adopt
There is a five working day appeal period after the adoption of the Resolution. Appeals are to be filed by 5:30 p.m. on
June 30, 2009
7. MINUTES OF JUNE 9, 2009
RECOMMENDATION: Approve
MATTERS FROM CITY COUNCIL PLANNING COMMISSION
MODIFICATION COMMITTEE AGENDA
MATTERS FROM STAFF UPCOMING AGENDA ITEMS
ADJOURNMENT
Any writings or documents provided to a majority of the Planning Conunission members regarding any item on this agenda will be made
available for public inspection in the Planning Services office at City Hall, 240 W. Huntington Dr., Arcadia, CA 91007, (626)574 -5423.
PC AGENDA
6 -23 -09
PLANNING COMMISSION
Pursuant to the Americans with Disabilities Act, persons with a disability who require a disability related modification or
accommodation in order to participate in a meeting, including auxiliary aids or services, may request such modification or
accommodation from the City Clerk at (626) 574 -5423. Notification 48 hours prior to the meeting will enable the City to
make reasonable arrangements to assure accessibility to the meeting.
Public Hearing Procedure
1. The public hearing is opened by the Chairman of the Planning Commission.
2. The Planning report is presented by staff.
3. Commissioners' questions relating to the Planning report may be answered at this time.
4. The applicant is afforded the opportunity to address the Commission.
5. Others in favor of the proposal are afforded the opportunity to address the Commission (LIMITED TO 5
MINUTES).
6. Those in opposition to the proposal are afforded the opportunity to address the Commission (LIMITED TO
5 MINUTES).
7. The applicant may be afforded the opportunity for a brief rebuttal (LIMITED TO 5 MINUTES).
8. The Commission closes the public hearing.
9. The Commission members may discuss the proposal at this time.
10. The Commission then acts on the proposal and either approves, approves with conditions or modifications,
denies the application, or continues it to a certain date.
11. Following the Commission's action on Conditional Use Permits and Variances, a resolution reflecting the
decision of the Planning Commission is prepared for adoption by the Commission. (There is a five working
day appeal period after the adoption of the resolution).
12. Following the Commission's action on Modifications and Design Reviews, there is a five working day
appeal period.
13. Following the Commission's review of Zone Changes, Text Amendments and General Plan
Amendments, the Commission's comments and recommendations are forwarded to the City Council for the
Council's consideration at a scheduled public hearing.
14. Following the Commission's action on Tentative Tract Maps and Tentative Parcel Maps (subdivisions) there
is a ten calendar day appeal period.
Any writings or documents provided to a majority of the Planning Commission members regarding any item on this agenda will be made
available for public inspection in the Planning Services office at City Hall, 240 W. Huntington Dr., Arcadia, CA 91007, (626)574 -5423.
PC AGENDA
6 -23-09
June 23, 2009
TO: Arcadia Planning Commission
FROM: Jim Kasama, Community Development Administrator
By: Steven Lee, Assistant Planner
SUBJECT: Modification Application No. MP 09 -01 and Single Family
Architectural Design Review Application No. SFADR 09 -28 for a
new two -story, 5,038 square -foot, "French Country" style residence
at 1735 Holly Avenue
SUMMARY
The applicant is requesting a Modification for a 66' -3" front yard setback as
measured to the centerline of Holly Avenue in lieu of the minimum 70' -0" special
setback required for a new two -story, 5,038 square -foot single family residence.
Concurrent with the Modification, the applicant is requesting Architectural Design
Review approval for the proposed "French Country" style residence. The
Development Services Department is recommending approval of MP 09 -01 and
SFADR 09 -28 subject to the conditions listed on page 4 of this staff report.
GENERAL INFORMATION
STAFF REPORT
Development Services Department
APPLICANT: Sanyao International Inc. (Designer)
LOCATION: 1735 Holly Avenue
REQUEST: A new two -story, 5,038 square -foot, "French Country" style
residence that requires the following applications:
1. A Modification for a 66' -3" front yard setback as measured to
the centerline of Holly Avenue in lieu of the minimum 70' -0"
special setback (9320.39.1)
2. Single Family Architectural Design Review
SITE AREA: 12,495 square feet (0.29 acres)
FRONTAGES: 101.79 feet along Holly Avenue
115.61 feet along Sharon Road
EXISTING LAND USE:
The site is currently developed with a 1,466 square -foot, single
story residence, a detached garage, and a pool.
ZONING: R -1 7,500 Second One Family Zone with a minimum lot size of
7,500 square feet
GENERAL PLAN DESIGNATION:
Single Family Residential at 0 -6 dwelling units per acre
SURROUNDING LAND USES ZONING:
The surrounding properties are developed with single family
residences and are zoned R -1 7,500 and R -0 15,000.
BACKGROUND
This proposal is before the Planning Commission because Section 9252.2.11 of
the Arcadia Municipal Code requires that any side, front, or rear yard setback
Modification request for a new dwelling and /or rebuild shall be subject to approval
by the Planning Commission.
PUBLIC HEARING NOTIFICATION
Public hearing notices of MP 09 -01 and SFADR 09 -28 were mailed on June 12,
2009 to the property owners, tenants and occupants of those properties that are
within 100 feet of the subject property (see attached radius map). Because staff
considers the proposed project exempt from the requirements of the California
Environmental Quality Act (CEQA), the public hearing notice was not published in
the Arcadia Weekly newspaper.
PROPOSAL AND ANALYSIS
The applicant is proposing to demolish the existing single family residence,
garage, and pool to make .way for a new 5,038 square -foot, two -story residence.
The proposal requires a Modification because the proposed residence is set back
only 66' -3" from the centerline of Holly Avenue 3' -9" Tess than the required 70' -0"
special setback (Arcadia Municipal Code Section 9320.39.1). There is no special
setback for Sharon Road and the project complies with all other zoning
regulations.
MP 09 -01 SFADR 09 -28
1735 Holly Avenue
June 23, 2009 page 2
Special setbacks are required by Code to allow for future street widening
dedications but also to ensure neighborhood compatibility. The City Engineer has
reviewed the proposal and has no objections to the requested setback
Modification as there are no plans to widen Holly Avenue. To show that the
proposal is compatible with the neighborhood, the applicant has provided the
setback measurements of all the homes along Holly Avenue between Las Tunas
Drive and Duarte Road. The setbacks, as measured to the property line, range
from 10' -0" to 44' -0 with most homes set back approximately 25' -0" from Holly
Avenue. The requested 66' -3" setback as measured to the centerline of the street
results in a 36' -3" setback when measured to the front property line. Therefore, the
setback request is compatible with the neighborhood and, in fact, exceeds the
setback of most existing homes along Holly Avenue. Additionally, the proposed
residence complies with the regular front yard setback requirement for the R -1
zone. Pursuant to Arcadia Municipal Code Section 9252.2.2, the front yard
setback shall be no less than the average of the two nearest developed lots
which in this case is exactly 36' -3 Given that the proposed setback complies with
the R -1 front yard setback requirement and is consistent with the surrounding
neighborhood, staff believes approval of this Modification would secure an
appropriate improvement and promote uniformity of development.
Architectural Design
Although the proposed residence is larger than most of the homes in the
neighborhood, staff believes the reduced second story floor area and significant
building articulation help to mitigate the mass and scale of the structure.
Furthermore, staff has worked with the applicant to simplify the architectural style
of the house to be more compatible with the modest Ranch -style homes that
dominate the neighborhood. Finally, wrought -iron fencing and landscaping have
been incorporated to reduce the blank wall impact of the 6' -0" -high enclosure
along the Sharon Road street side property line. In staff's opinion, the design of
the residence meets the intent of the City's Single Family Residential Design
Guidelines and is compatible with the surrounding neighborhood.
CODE REQUIREMENTS
The proposed project is required to comply with all other code requirements and
policies as determined to be necessary by the Building Official, Fire Marshal, City
Engineer, Development Services Director, and Public Works Services Director,
which are to be determined by having fully detailed construction plans submitted
for plan check review and approval.
CEQA
Pursuant to the provisions of the California Environmental Quality Act (CEQA), the
Development Services Department has determined that the proposed project is
categorically exempt from CEQA pursuant to Section No. 15305 of the CEQA
MP 09 -01 SFADR 09 -28
1735 Holly Avenue
June 23, 2009 page 3
Guidelines as a Class 5 Exemption for Minor Alterations of Land Use Limitations.
A Preliminary Exemption Assessment is attached.
RECOMMENDATION
The Development Services Department recommends approval of Modification
Application No. MP 09 -01 and Single- Family Architectural Design Review
Application No. SFADR 09 -28, subject to the following conditions:
1. All City requirements regarding building safety, fire prevention, detection,
suppression, emergency access, parking, water supply and water facilities,
sewer facilities, trash reduction and recycling requirements, and National
Pollutant Discharge Elimination System (NPDES) measures shall be
complied with to the satisfaction of the Building Official, Fire Marshal, Public
Works Services Director and Development Services Director. Compliance
with these requirements is to be determined by having fully' detailed
construction plans submitted for plan check review and approval.
2. The applicant shall defend, indemnify, and hold harmless the City of Arcadia
and its officers, employees, and agents from and against any claim, action, or
proceeding against the City of Arcadia, its officers, employees or agents to
attack, set aside, void, or annul any approval or condition of approval of the
City of Arcadia concerning this project and /or land use decision, including but
not limited to any approval or condition of approval of the City Council,
Planning Commission, or City Staff, which action is brought within the time
period provided for in Government Code Section 66499.37 or other provision
of law applicable to this project or decision. The City shall promptly notify the
applicant of any claim, action, or proceeding concerning the project and /or
land use decision and the City shall cooperate fully in the defense of the
matter. The City reserves the right, at its own option, to choose its own
attorney to represent the City, its officers, employees, and agents in the
defense of the matter.
3. Approval of MP 09 -01 and SFADR 09 -28 shall not take effect until the
applicant and property owner have executed and filed an Acceptance Form
available from the Development Services Department to indicate awareness
and acceptance of the conditions of approval, and that all conditions of
approval shall be satisfied prior to final inspection of the project.
PLANNING COMMISSION ACTION
Approval
The Planning Commission should move to approve Modification No. MP 09 -01
and SFADR 09 -28, subject to the conditions set forth above, or as modified by the
Commission, based on at least one of the following findings:
MP 09 -01 SFADR 09 -28
1735 Holly Avenue
June 23, 2009 page 4
1. That the Modification will secure an appropriate improvement of a lot;
2. That the Modification will prevent unreasonable hardship; or
3. That the Modification will promote uniformity of development.
Denial
If the Planning Commission intends to deny this project, the Commission should
move to deny Modification No. MP 09 -01 and /or SFADR 09 -28, based on the
evidence presented and state why the project does not support the above findings.
If any Planning Commissioner or other interested party has any questions or
comments regarding this matter prior to the June 23, 2009 public hearing, please
contact Steven Lee, Assistant Planner at (626) 574 -5444 or via 'email at
slee( ci. arcadia.ca.us.
Approved by:
Jim K
ommunity Development Administrator
Attachments: Aerial Photograph and Vicinity Map
Site and Neighborhood Photographs
Architectural Plans
Holly Avenue Setback Measurements
Public Hearing Notification Radius Map
Preliminary Exemption Assessment
MP 09 -01 SFADR 09 -28
1735 Holly Avenue
June 23, 2009 page 5
Development Services Department
Engineering Division
Prepared by: R.S.Gonzelez, June 2009
1735 Holly Avenue
MP 09.01
SFADR 09-28
(433)
(430)
on
(422)
R
r�Yrw
(424)
on
Development Services Department
Engineering Division
Prepared by: R.S.Gonzelez, June 2009
(418)
R -1
(417)
SHARON RD
(410)
(411)
144 011Y o 160
(1717)
(1725)
(1745) O
(1751)
W r
Q
r (1740)
(379)
(369)
(380)
(379)
(380)
(370)
(370)
R -0
(369)
1735 Holly Avenue
MP 09 -01
SFADR 09 -28
(368)
(36,
(36
(3i
Subject property
Adjacent residence to the south
Adjacent residence to the west
Nearby home on Holly Avenue
Nearby home on HoIIy Avenue
Nearby home on HoIIy Avenue
Nearby home on Sharon Road
Nearby home on Sharon Road
0
050L ifl bx91 i•t
Yffn •90015 00'•IP•O+Y0005 00 0 0 1 0 .0'] six
60 •••Id 1
'3NI1VN011YNN3INI OVANVS
ANUS
v3 vlav3av
•3AVAlIOH SELL
3Sf1OH AIINIVA 3IJNIS
c
rgio
1; dim
91
0.
'9a
LL
1
1 1k i� I k
t 0 4 tt
R R
111 pp 3 1 1 1
1!111:1{!!!! 1[ k k k 6 1
HOLLY AVE 1 10 0000 ®®G'U 0
nrw�-- fit;' N
il
!fig 5
41113
Iwo i pp u
1 RiJ.RmA
I II
a! Tot 41°
tr ti 11111
11 I ME
till
0:0:0;:0:•:.:.:•:•:•:•:.:.:•:•\ ea*. d
\\00000000
e
a
1
z
z
5
0 0
L
a
2
0
O60t•9H (9x9) xa.9 /09•9Y/ (9x9)1.1
Y'9' V3'.IP "90 eyw8 .5„
'3NI 1VNOI1YNa31NI OVAN V S
V3 'VIOVONV
'3AVAT1OH 9£LI.
3Sf1OH AIIIW 13MONIS
L
a
0
080LNM(90)•.4• t /08•9rt (I Pl
yrn '900L6 V3 Vip..V 1103B'10 ••1D •IU.6'3 L96
B••••dl•PU•pp•y
3NI 1YNOI1VN2131N1 OV &NVS
vo 'vlavoav
'3AV A'TIOH S£L6
3S11OH A1IWV 13'1ONIS
N
B 'CC
1
O.ONL.t (.Lel ..d SMas.. (u9)1.1
'Y'S'n Y00t. YQ 1IP.�r'OOLN'76 2gn S SOL
Bop .b •11.01.41
uvNa�Nl 01dANtIS
�NI 1VNO
V0 'VIGV3HV
'3AVA11OH SSL4
3SI1OH AIIINVI 310NIS
1
.wc
deoeyw boas) ma o.oe.' P.
Ys ro'.op..•tl .00 wrio .WW a oa
oul•••I41•11..P1.5
'OM 1VNOUNNIMINI OVANVS
va 'vlavaav
'3AV ATIOH S£1 L
3Sf1OH A1IWtld MONIS
1
1
a
7
ROSEMARIE DR
10' 0''\
32'-TO
LOS ALTOS AVE
15' 0''\
17' -07
PALM DR
/15' -0"
20' 26' —O"
WARREN WAY
16 0
WOODRUFF AVE
/20' -0"
rod
20' -0"
LAS TUNAS DR
SHARON RD
SUBJ. PR.P\
22' 0?
30'76
33' -0"
25'70
15'70
3 -0"
SHARON RD
LEMON AVE
WISTARIA AVE
LAS FLORES AVE
-0"
OA
1 -0"
LONGDEN AVE
/2q' -0"
2+' 0"
WALNUT AVE
/17' -6"
k%;%
CORNER LOT OR REVERSE CORNER LOT 0 HOLLY AVE. (STREET YARD
SETBACK MEASURE) (BETWEEN DUARTE RD. LAS TUNAS DR.)
CHURCH
PROPERTY
19' 6"
LEROY AVE
25' -0"
18' 6"'\
22' -6"
r,;,,
..2,
WINNIE WAY
DUARTE RD
W
J
0
x
SCHOOL
PROPERTY
LEROY AVE
0"
NAOMI AVE
/3
CAMINO REAL AVE
'T MEASURE
2 -0"
NORMAN AVE
/41' —O"
/jj
Ore SUE MORENO
._J 0/Tle i r (626) 350 -5944
OWNERSHIP I OCCUPANTS LIST
RADIUS MAPS LAND USE PLANS
MUNICIPAL COMPLIANCE CONSULTING
2106 LAMBERT AVE.EL MONTE, CA 91732 -FAX(626)350-1532
PROJECT INFORMATION
1735 HOLLY AVE.
ARCADIA, CA.
09 -107
SCALE 1" 100'
5 eh
Nt: pry. O4I
1
80
Z '43.78
,490
4
it
I 5/.41
Ri 390 R °330
/05
P�
60.41 71
13/.4/
60.4/
55.06 /3
3.24
i2,-;veto
0.
71.66
/00
99.95
9995
9.9.95
23
Por. ti
ti
/D0
SHARON
1
389 °0743 iN. M
24
ti
Po r.
/Oo
39.98
19
99.98
t e
0
1 9
Par
D. 47-'A
1. Name or description of project:
4. Staff Determination:
PRELIMINARY EXEMPTION ASSESSMENT
(Certificate of Determination When Attached to Notice of Exemption)
Single- Family Architectural Design Review No. SFADR 09 -28 and Modification No. MP 09 -01 for a 66' -3" front
yard setback as measured to the centerline of Holly Avenue in lieu of the minimum 70' -0" special setback
required for a new two -story 5,038 square -foot "French Country" style residence.
2. Project Location Identify street address and cross streets or attach a map showing project site (preferably a
USGS 15' or 7'/' topographical map identified by quadrangle name):
1735 Holly Avenue (at Sharon Road)
3. Entity or person undertaking project: A. City of Arcadia
B. Other (Private)
(1) Name: Sanvao International Inc.
(2) Address: 255 E. Santa Clara St. #200
Arcadia, CA 91006
(3) Phone: (626) 446 -8048
The City's Staff, having undertaken and completed a preliminary review of this project in accordance with the
City's "Local Guidelines for Implementing the California Environmental Quality Act (CEQA)" has concluded that
this project does not require further environmental assessment because:
a. The proposed action does not constitute a project under CEQA.
b. The project is a Ministerial Project.
c. The project is an Emergency Project.
d. The project constitutes a feasibility or planning study.
e. The project is categorically exempt. Applicable Exemption Class: 5
Section No.: 15305
f. The project is statutorily exempt. Applicable Exemption:
Section No.:
g. The project is otherwise exempt on the following basis:
h. The project involves another public agency which constitutes the Lead Agency.
Name of Lead Agency:
Date: June 12, 2009 Staff: Steven Lee, Assistant Planner
June 23, 2009
TO: Arcadia Planning Commission
FROM: Jim Kasama, Community Development Administrator
By: Thomas Li, Associate Planner
SUBJECT: Conditional Use Permit Application No. CUP 09 -10, and the related
Parking Modification, to operate a tutoring center with a maximum of
eight (8) students in an existing commercial building at 34 E.
Huntington Drive
SUMMARY
Mr. Robert Granger of Golden State Education Associates, Inc. submitted
Conditional Use Permit Application No. CUP 09 -10 to operate a tutoring center at 34
E. Huntington Drive. It is staff's opinion that the limited proposal is appropriate for
the location and will not have any adverse impacts upon the neighboring properties.
The Development Services Department is recommending approval of CUP 09 -10,
and the related Parking Modification, subject to the conditions in this staff report.
GENERAL INFORMATION
APPLICANT:
LOCATION:
REQUEST:
SITE AREA:
FRONTAGES:
Mr. Robert Granger (Lessee, dba: Golden State Education
Associates, Inc. Chyten Educational Services)
34 E. Huntington Drive
A Conditional Use Permit to operate a tutoring center with a
maximum of eight students in an existing 2,250 square -foot
commercial space
7,340 square feet (0.17 acre)
50 feet along Huntington Drive
50 feet along an alley
STAFF REPORT
Development Services Department
EXISTING LAND USE ZONING:
The site is developed with a one -story, 4,500 square -foot
commercial building constructed in 1927 and is zoned CBD
Central Business District
SURROUNDING LAND USES ZONING:
N o rt h Commercial Offices and Retail zoned CBD
South: Multiple Family Dwellings zoned R -3
East: Commercial Offices and Retail zoned CBD
West: Beauty Salon zoned CBD
GENERAL PLAN DESIGNATION:
Commercial
PUBLIC HEARING NOTIFICATION
Public hearing notices of Conditional Use Permit No. CUP 09 -10 were mailed on June
12, 2009 to the property owners, tenants and occupants of those properties that are
within 300 feet of the subject property (see the attached radius map). Because staff
considers the proposed project exempt from the requirements of the California
Environmental Quality Act (CEQA) the public hearing notice was not published in the
Arcadia Weekly newspaper.
PROPOSAL AND ANALYSIS
The proposal is to operate a tutoring center that would occupy a 2,250 square -foot
unit of an existing two -unit, 4,500 square -foot commercial building at 34 E.
Huntington Drive. A tutoring center is a permitted use in the CBD Central Business
District zone with an approved conditional use permit.
The students will be of middle school and high school age, with a maximum
attendance of eight (8) students at any time. Tutoring sessions will occur mostly on
a one -on -one basis with occasional group practice testing sessions. The tutoring
and practice -test taking will occur during the hours of 3:00 p.m. to 9:00 p.m., Monday
through Friday, and 9:00 a.m. to 5:00 p.m. on weekends. Administrative office hours
will be from 9:30 a.m. to 5:30 p.m., Monday through Friday. There will be a
maximum of eight (8) part-time instructors and not more than one (1) administrative
employee at any time.
The 2,250 square -foot commercial unit will be remodeled to provide eight (8) private
tutoring rooms, an administrative office, a lobby, and a test taking room that will be
used for occasional group practice testing. This room will not be used during private
tutoring sessions, and attendance will not exceed a maximum of eight (8) students at
any time.
Parking
There are ten (10) on -site parking spaces accessible from a rear alley, and one (1)
space in the City's public parking lot is allotted to this property. The 2,250 square
foot space for the proposed tutoring center was previously occupied by a printing
shop, and the other 2,250 square -foot space is occupied by a beauty salon. By
Code, these uses required a total of 23 parking spaces. Therefore, there was a
legal- nonconforming parking deficiency of 12 spaces.
For a tutorial center with students of driving age, the Code requires one (1) parking
space per employee plus one (1) space for every three (3) students. Under this
regulation, the proposed tutoring center with a maximum of eight (8) students and
nine (9) employees would require 12 parking spaces. In combination with the beauty
salon in the other 2,250 square -foot space, the total parking requirement is 23
spaces. The proposed tutoring center does not change the parking requirement from
that of the prior occupancies. The proposed tutoring center will not increase the
legal- nonconforming parking deficiency of 12 spaces; however, because the use is
changing, a Parking Modification of 11 spaces in lieu of 23 spaces is being
requested in conjunction with the Conditional Use Permit.
The applicant states in the proposal that the employees will use the City's public
parking lot on the north side of Huntington Drive in order to make the on -site parking
available for customers. In this case, only three (3) on -site parking spaces would be
needed for the students of the tutoring center. In order to alleviate the demand for
the on -site parking, staff recommends a condition of approval requiring that all
employees park their vehicles in the City parking lot.
The applicant has stated that in the student's registration packet, it will be specified
that all drop -off and pick -up of students is to be performed in the rear parking area,
and that it is illegal to double -park on Huntington Drive. Staff recommends that there
be a condition of approval that requires that a draft of the drop -off and pick -up
agreement that is to be signed by the clients be subject to City review and approval.
Given the limited number of students, and the proposed parking arrangement for the
employees, the proposed tutoring center should not have any adverse impact upon
the neighboring businesses. It is staff's opinion that the proposal would satisfy all the
prerequisite conditions for a Conditional Use Permit.
CODE REQUIREMENTS
All City requirements regarding disabled access and facilities, occupancy limits,
building safety, parking and site design shall be complied with to the satisfaction of
the Building Official, Community Development Administrator, Fire Marshal, and
Public Works Services Director.
CUP 09 -10
34 E. Huntington Dr.
June 23, 2009
Page 3
CEQA
Proposed projects that are not approved, are by virtue of being denied, exempt from
any further environmental assessment. If approved, however, and if it is determined
that this project involves negligible or no expansion of the use of the property, then
this project is categorically exempt from further environmental review pursuant to the
provisions of the California Environmental Quality Act, Section 15301. A Preliminary
Exemption Assessment has been prepared and is attached to this staff report.
FINDINGS
Section 9275.1.2 of the Arcadia Municipal Code requires that for a Conditional Use
Permit to be granted, it must be found that all of the following prerequisite conditions
can be satisfied:
1. That the granting of such Conditional Use Permit will not be detrimental to the
public health or welfare or injurious to the property or improvements in such
zone or vicinity.
2. That the use applied for at the location indicated is properly one for which a
Conditional Use Permit is authorized.
3. That the site for the proposed use is adequate in size and shape to
accommodate said use, and all yards, spaces, walls, fences, parking, loading,
landscaping, and other features required to adjust said use with the land and
uses in the neighborhood.
4. That the site abuts streets and highways adequate in width and pavement
type to carry the kind of traffic generated by the proposed use.
5. That the granting of such Conditional Use Permit will not adversely affect the
comprehensive General Plan.
RECOMMENDATION
The Development Services Department recommends approval of Conditional Use
Permit Application No. CUP 09 -10, subject to the following conditions:
1. There shall be no more than eight (8) students and nine (9) employees at any
one time at the tutoring center.
2. The tutoring and practice -test taking sessions shall occur during the hours of
3:00 p.m. to 9:00 p.m., Monday to Friday, and 9:00 a.m. to 5:00 p.m. on
weekends.
3. All employees of the tutoring center shall park in the City's public parking lot.
CUP 09 -10
34 E. Huntington Dr.
June 23, 2009
Page 4
4. The tutoring center shall prepare an agreement to be signed by its clients that
states that the clients acknowledge and accept the requirement that all pick-
ups and drop -offs are to be done at the on -site parking area to the rear of the
tutoring center. A draft of this agreement shall be submitted to the City for
review and approval by the Development Services Director or designee prior
to occupancy.
5. The tutoring center shall be operated and maintained in a manner that is
consistent with the proposal and plans submitted and approved for
Conditional Use Permit No. CUP 09 -10.
6. A Parking Modification for 11 spaces (ten (10) on -site spaces and one (1)
space in the City's public parking lot) in lieu of 23 spaces is granted for this
tutoring center and the existing beauty salon /retail use. This Parking
Modification does not constitute an approval for a general reduction of the
parking requirements for the subject property, but rather only for the tutoring
center that is herein conditionally approved and the existing retail use. Uses
other than this tutoring center and /or retail use may be subject to a new
Conditional Use Permit and /or Parking Modification.
7. All City code requirements regarding accessibility, fire protection, occupancy,
and safety shall be complied with to the satisfaction of Building Services and
the Fire Department.
8. Noncompliance with the plans, provisions and conditions of approval for
Conditional Use Permit No. CUP 09 -10 shall be grounds for immediate
suspension or revocation of any approvals, which could result in the closing of
the tutoring center.
9. Approval of Conditional Use Permit No. CUP 09 -10 shall not take effect until
the property owner(s) and applicant have executed and filed an Acceptance
Form available from the Development Services Department to indicate
acknowledgement and acceptance of these conditions of approval.
10. The applicant shall defend, indemnify, and hold harmless the City of Arcadia
and its officers, employees, and agents from and against any claim, action, or
proceeding against the City of Arcadia, its officers, employees or agents to
attack, set aside, void, or annul any approval or condition of approval of the
City of Arcadia concerning this project and /or land use decision, including but
not limited to any approval or condition of approval of the City Council,
Planning Commission, or City Staff, which action is brought within the time
period provided for in Government Code Section 66499.37 or other provision
of law applicable to this project or decision. The City shall promptly notify the
applicant of any claim, action, or proceeding concerning the project and /or
land use decision and the City shall cooperate fully in the defense of the
matter. The City reserves the right, at its own option, to choose its own
CUP 09 -10
34 E. Huntington Dr.
June 23, 2009
Page 5
attorney to represent the City, its officers, employees, and agents in the
defense of the matter.
PLANNING COMMISSION ACTION
Approval
If the Planning Commission intends to approve this proposal, the Commission should
move to approve Conditional Use Permit Application No. CUP 09 -10, state the
supporting findings; and direct staff to prepare a resolution incorporating the
Commission's decision, specific determinations and findings, and the conditions of
approval for adoption at the next meeting.
Denial
If the Planning Commission intends to deny this proposal, the Commission should
move to deny Conditional Use Permit Application No. CUP 09 -10, state the finding(s)
that the proposal does not satisfy, and direct staff to prepare a resolution
incorporating the Commission's decision and specific findings for adoption at the
next meeting.
If any Planning Commissioner, or other interested party has any questions or
comments regarding this matter prior to the June 23rd public hearing, please contact
Associate Planner, Thomas Li at (626) 574 -5447, or tli @ci.arcadia.ca.us.
Approved by:
Jim ,4ama
Community Development Administrator
Attachments: Aerial Photo Vicinity Map with Zoning Information
300 -foot Radius Map
Site Plan Proposed Floor Plan
Photos of Subject Property
Preliminary Exemption Assessment
Applicant's Information
CUP 09 -10
34 E. Huntington Dr.
June 23, 2009
Page 6
MN
34 E Huntington Dr
Arcadia
cBD, Zone
Development Services Depa►tment
Engineering Division
Prepared by: R.S.Gonzalez, June 2009
34 E Huntington Drive
CUP 09 -10
t
I
(20)
(1345)
(17.19)
(21)
(25)
(50)
(41)
(103)
(101)
(51)
(55)
(21)
PR -3
(30)
R -3
CBD
2
CBD
(25.27)
(o)
(5.7)
(941)
(31-35)
t
(16)
(20)
(26)
(34)
(38)
(50)
(54)
(103)
(101)
nom+)
(51)
(10)
(18)
C BD
CBD
2
(o)
(55) (59) (69
(105)
(107)
(112)
(111)
(14)
(16)
(18-22)
(26)
(30)
1
8- 38A-38
I)
(52)
(54)
(51)
(10)
(18)
C BD
CBD
2
i
rm
(15)
(19)
(11)
(23)
(25)
(19)
9
(51)
(18)
(13)
CBD
J
(o)
(55) (59) (69
100
0 100 200 Feet
L
(31) 1 1 1 1 1 1 J
WHEELER ST
(65)
J
C
HUNTINGTON DR
HUNTINGTON DR.
ALTA ST
ALTA ST
Development Services Department
Engineering Division
Prepared 6y: R.S.Gonzalez, June 2009
(115)
(125)
(1731
34 E Huntington Drive
CUP 09 -10
WHET
(40.50)
(26 -28)
(20-22)
(8-10)
(2)
(30)
(114)
118
124
(102)
AL'
I!S
S0
70
40
78
I4
3 r,
35
v.
33 h yep
air
1
R I 2
ME
IS
IK
't0
50
60
1614
51
50
30
b
78
fI
78
I4
04 al
33 h yep
air
4 elf
ME
IS
/IN
ore SUE MORE
(626)350-5944
OWNERSHIP OCCUPANTS LIST
RADIUS MAPS LAND USE PLANS
MUNICIPAL COMPLIANCE CONSULTING.
12106 LAMBERT AVE.EL MONTE, CA 91732 -FAX(626)350-1
PARS OP
LOT 3
PL .s
O
too'
v
1 1
9
1 a 'G 107g
If0 o
WHEELER
100'
PROJECT INFORMATION
34 E. HUNTINGTON DR.
ARCADIA, CA.
09 -095
RILND
2415
P.M.B. 34.44
a 2
LK.
28 7/
Q
7 �I
8 g
ar v
AVE
>w
YL 2s,
M �y
$6 69
RA a r -ad°1
sa 4..• j O.
r s
3 '!I 10 11 12
Io I 5e M S0
SCALE 1" 200'
SANTA ANITA
I- IUNTINGTON
PARKWAY
SIDEWALK
S r 22i_, i1 22 ,,f t g�
CV
ALLEY
34 E.
Is imA
SCALE
B
/g■ k
ao
z
7k§
o o e
m §2 §b 2
a E $K
ƒ§ §a
°77 S�
:6, m\ a k
R k
E§# o» tu
u g: 4'
3 �Bf g
«e§�a k
Ike w0 k§
HVEgE
-m
m 0 0 -Jk��
OD �j
ct min oa� �k
kkfE f
woz og j
.0 wK
o
/,l-
2.
5
1
Baron :fc'?eaness
34 E. Huntington Dr.
1. Name or description of project:
PRELIMINARY EXEMPTION ASSESSMENT
(Certificate of Determination When Attached to Notice of Exemption)
Conditional Use Permit Application No. CUP 09 -10 to operate a tutoring center with a maximum of eight (8)
students in an existing 2,250 square -foot commercial space.
2. Project Location Identify street address and cross streets or attach a map showing project site (preferably a
USGS 15' or 7%z' topographical map identified by quadrangle name):
34 E. Huntington Drive between Santa Anita Avenue to the west and First Avenue to the east
3. Entity or person undertaking project: A. City of Arcadia
B. Other (Private)
(1) Name: Robert Granger
(2) Address: 806 N. Garsden Avenue
Covina, CA 91724
4. Staff Determination:
(3) Phone: (626) 757 -8201
The City's Staff, having undertaken and completed a preliminary review of this project in accordance with the
City's "Local Guidelines for Implementing the California Environmental Quality Act (CEQA)" has concluded that
this project does not require further environmental assessment because:
a. The proposed action does not constitute a project under CEQA.
b. The project is a Ministerial Project.
c. The project is an Emergency Project.
d. The project constitutes a feasibility or planning study.
e. The project is categorically exempt. Applicable Exemption Class: 1
Section No.: 15301
f. The project is statutorily exempt. Applicable Exemption:
Section No.:
g. The project is otherwise exempt on the following basis:
h. The project involves another public agency which constitutes the Lead Agency.
Name of Lead Agency:
Date: June 10, 2009 Staff: Tom Li, Associate Planner
R edsto ne
s
MEMORANDUM
TO: Planning Department
FROM Carole Walker
DATE: May 1, 2009
RE: Conditional Use Permit 34 East Huntington Drive
I am enclosing an information packet and a letter from Chyten explaining their history and
services. Also, I am enclosing information necessary for obtaining a C.U.P.
The quality and types of Tenants along East Huntington Drive have greatly improved. Chyten
would be another quality Tenant in that area. Pictures of their current facilities show a
professionally designed interior conducive to a learning environment.
One of Chyten's main goals is to be good neighbors and to abide by regulations of the City's in
which they locate. Parking for these facilities have never been an issue in Chyten's other
locations. Their employees will park in the City public parking area on the north side of
Huntington. The other parking at the rear of the building shall be for students that drive to
the location and for pick-up and drop off of the other students brought by parents. In their
registration packet, Chyten will specify that all students dropped off shall be at the rear of the
building and also advise prospective parents and students not to double park on Huntington
Drive.
They have eight one on one tutoring rooms and a testing area which are not used at the same
time. If testing is being administered, there is no tutoring planned.
Chyten's choices of locations are well thought out and planned. Arcadia was chosen for it's
demographics and parent involvement in the student educational process with regard to higher
education.
The owner of the building, Faye Stabler, who has owned the building for 33 years would like to
have Chyten as a Tenant. She is asking the staff and planning commission to consider this use
for her building and that the findings through the Conditional Use Process will be favorable.
For any questions or concerns, please contact Carole Walker, Redstone Commercial Real Estate
At 626- 795 -2255 office or 626- 255 -0100 cell.
301 North Lake Avenue, Suite 810, Pasadena, California 91101 626- 795 -2255
SUBJECT PROPERTY
34 E. Huntington Drive
Arcadia, California
TABLE OF CONTENTS
I SUBJECT PROPERTY AND SURROUNDING BUSINESSES
a) Aerial View
b) Pictures of Subject Property
c) Plat Map
II BUILDING INFORMATION
a) Site Plan
b) "As Built" Plan
c) Proposed Plan
III CONDITIONAL USE PERMIT APPLICATION
IV PICTURES OF CHYTENS CURRENT LOCATIONS
V CHYTEN BOOKLET AND LETTER
North
Arcadia Public Parkin
0
.r
y
0
as
b
0
SCALE
50 0 •0 10.
ET
O
0
Public.
Walkwa
Subject Property
34 E. Huntington Drive
Arcadia, California
Open Walkway Under Construction
Cross location looking South to North
At common walkway
Crosswalk looking from West to East Crosswalk
located West of subject property
34 E. Huntington Drive
Arcadia, California
Public Walkway looking North to South
to Huntington Drive
Crosswalk looking North to South
Public Walkway from City Parking,
looking South to North
City Public Parking area on North side of
Huntington Drive
1903
AVER
x' 0.1 t
66 66 21,
1173 ti N ti 141 1
g I a
66 66 3 9
140 0
I w
8 8
I I
I 1
Cross
Walk
80
p 1 .�„r—
60 66 I
N 0•o0`16•E 180,04
I H C -TRACT NO 53 939
SHEET 3
M B 1292 23.24
160,03
N
—1
80
g SANTA A VITA
160
cri co
-4®
CO 0
160
C -P M ��9734-
Mcoo6SHEE
J
8 A
160
moo
0
jO N N
81ST
w J
W
I
6.
50 66
a-
16 92
a
8
8
w'
35 I
2
60
O
60
8
8
8
0 0
®is
1 ®iu
I. ®0
1. CAN
N
O
gi i re;
18 CAM S
Ht 116 Il!
as 36
Oi
sM
66 55 38 I
AVER
i
I
sn
fp
fp
0 1ST
ti SANTA ANITA AVE.
AVE.Z
1 22' SIDEWALK
a f
I T
ID
NUNTINGTON
PARKWAY
3.4 E.
ALLEY
Eb°A;••;.,...:1
k
6
1
ƒ
x
to)
3
y
W
F-
0
wm§/ k
w8�3 e$ K
m o- m
gkmm
288SW z
$e 8ee
Wou.xo 2 z
I k,_
Q
s
�z am
a m
iiiii 2 yG f 4E>
3 6 0 0 c §E O
Ld
a C) a CL 4T
cnĤtn_
/R
KuF
0,0„,00 u a
WSWO<W §§«s
=&w¥ LOW N
co
1 A
Co 0 .J
W z
1-
MO0
ce �o
CL OL
W
n
0
31
IK
F
%0
O
Z o
F-O
t a m
S U
H I <P
D ...1 0
O tn CnMQ
Z
W
F-p
a l -CY a' rn
1 M
w
o La al HZ o RR
ON
<ZM ti A 3 0
LI
d 0 x R N y o
wt gE
X Z
0 1 Z IAJ
Q R 0 O Vj� a~
w
IX 0 Z O 2 w u
0 CO 0 o2
d F Q II g O *0 m
1- 84_2 tn E ktl
LJ
W Q p w l i 1 im
4a� a
te
0_
2
a5 f- Q
La F- W' Z 0 Q W Q
W X J
CC WI.i0O
2 h Q,Z .ix
ceLuX.. tiW
V•,�� 30 Fy
❑�Qq 2 0 a g z Z oa
qHO 1 4 al
Z W cICXIF �k+ lk 006 f.iP
LL'ZWZ W�JA RWa 2W
O U O
t[ l7 -1 W F- F- 1.- 0 (i
4
CL a rol Cli— L �W
1WZ,�Z MR'
vt�... cl c 2
r r
LAI
y N y
--NM.* no ri
04/08/2009 13:29 9093820506
CAS SBD PAGE 02/10
te
CONDITIONAL USE PERMIT APPLICATION
CUP
k APPLICANT INFORMATION
Name (Dtd6,v S14 tE EIvC4 ho• Cs i/E 2c. iQoi l` (rn.4. c, cs/
Address f?D C AA 4as dew A ✓_c.
(A 9 72
D a y t i m e T e l e p h o n e No. 2 7 7 g 2 0
InteiestinProperty ieccoc
B. PROPERTY OWNER INFORMATION
Name FAyE 8. $r146 -it 7 i s f
Address (11 S. Oa 4/ uF 81vd. t'�lS�ahw.w CAF fi /0f
Daytime Telephone No. C41104 GJrr L kPi 6 C Z fr O /00 a4 k eK a coh1
C. PROPERTY ADDRESS (LOCATION): 3 Y E'. Nvovb ry Ae D
naG4D (4 C4 5VOD.
D. LEGAL DESCRIPTION: /Wiz oodzar 27000 Jr offs E s fo4CC
i Ai 1 144.104. ftfl"neLrr*t /trr y s vo f �'r ,Ffrco r'3vr`I.6.47
E. GENERAL PLAN DESIGNATION:
F. ZONE CLASSIFICATION: C 60
G. Proposed Use (State exactly what use is inoended for the property. Wyatt ace applying for
an eating establishment, restaurant, or place of assembly, include the seating capacity and
hours of operation) e t
r ✓tD41;5 A, 11:4. r Jagj L PA+r.4�i0.. 441E- Al A d/4 c.�Eoa .f
h' L sei.o1 Du e#,Ile14 y�Lid Ad r.�.vtsf%zf�►
4#ii 9.'30...., /-n 30 I�VrLE Jf #7,.y+A.rr�� e)Ge1 4 s c„„„, 3;OO fy
st900 .e f 1 'O y s .e/J ./`nn.N 9 eV) Oar to 1 eras o .v
w�o.sk4•v
a�f ,4pp tolrr rot I L W4 y pot o� r ti f to.:,.. 11 L r-,� �►l
daE o,v,o,✓� a.v5 favcfrp...• 7 4 ws 1 y`leG���r2 rvr6 �eLw4/5 6� g,..i 1 ,gt"
S 4 fF .4‘,4/ wee) k,F.t. tag h,.It /F .H,fft ►w. 0. 6"f sri,44.v1f .cT
4 MY o,,, 'es E
Plo>
04/08/2009 13:29 9093820506 CAS SBD PAGE 03/10
PREREQUISITE CONDITIONS: (The law requires that the conditions set forth below be
dearly established before a conditional use permit cm be granted.)
EXPLAIN IN DETAIL WHEREIN YOUR CASE CONFORMS TQ THE FOLLOWING FIVE
CONDmONS:
I. That the granting of such conditional use permit will mot be detrimental to the public health or
welfare or injudous to the property or improvaQnents in such zone of vicinity.
C frytr<N rive 4 i%t 7 vs 4 5 E4 6 COI YU, A .krF S'c4001 ,,.g, b�
si400L stwdtvts e., 4 e ttg 4 rt esvLt we .atta40/
"Cy r�} iL Iv ri t .tt• jr t r .E�. d ft'',d .s ?o ay. Cg...feAr
The a Edin 44,41 seeed6...io 5ESVC fAtoeiche wr dL �e
f Poiiri i S s f*o,.. t'e tiff Ceti bt4 Ft m F ,4,? a 4dair
2. That the use applied for at the location indicted is one for which a conditional use permit is
authorized.
3. That the site for the proposed use is adequate in size and shape to accommodate said use,
including all yards, spaces, walls, fences, parking, loafing, land- seaping and oohed features
required to adjust said use with the land mid uses in the neighborhood
74 c..r c..t r �1`" 3 y d_ Hv 1- o••r DA_ is how t l h1 A
(h y t�.) r r *'tr*, row fJ.�. o /IC 4 /AG'ofor40 Awl' ,fnr of
EJrpoi vA F 444 r-Alie FY S t�ry era a l A 4 s ..401.../1:414 L d a,. ,CJ
tb 4eecmM ov, vse_ 4I/bavyl4 1' F S" fmcir:..• ,•ma 17-44!
L £ffy 4,04sf T. r ✓hCc.pssk.. ,c".4 rie �a fw"� st *icfO4 ay.d.f+4 ,:•1yro.N/
.4. That the site abuts streets and highways adequate m width and pavement type to carry the kind p 0
of traffic generated by the proposed use.
toe ski' eep off'^ A 34 E H....l D.t. f MbI.z T444.
...../grvot F04 the 4 4 1X a yw....c4.41e1 L y Ch CAppesf•
di.chtte PPElI Lan. r4 AAA/W. tie 44 Fe 44 firs!'/,osrp s.40.4 4 7 ✓f•.vaFttff'
i.v r44/ AsFAVksfre ?Of e+I' ovlt. ltawcA? rs ..ve/• f /t+iJ a.. 1 t vfoa.::, %L%
yi ar Ate 4.4%u94h.v' 4 4,41c.• ve o f e- d �Fiv m stvdfs if .fin. r dere ri•40.,
5. That the granting of such oonditioad use permit will not adversely affect the com- prehensive
General Plan.
NOTE: The PlAni ung Commission is required by law to make a written finding of facts, based upon
the information presented at the time of the public hearing, that beyond a reasonable doubt
the five above enumerated caQdiliens apply.
10 /01/07
04/08/2009 13:29 9093820506
APPLICANT(SY VERIFICATION
I (WE) HEREBY CERTIFY (OR DECLARE) UNDER PENALTY OF PERJURY THAT THE
FOREGOING INFORMATION AND ATTACHED OWNERSHIP LIST ARE TRUE AND
CORRECT.
SIGNATURES:
CAS SBD PAGE 04/10
Applicant
f" 6' 10. G-4acdr, ,4 Co ✓t s, CA /72
Address include street, city, state and zip code)
Applicant (if more than one)
Address (include street, city, state and zip code)
P #;d4ef Telephone No. G 2-e 7 57 Fl 2 0
Tdephonc No.
r 1.4 '.lI i" MekAak' /rr: 111 11 ;4 J' .1 rt.. kW,
Owns c record (signature)
1 1 ,/t1/ t o s t f err sw i� 2 l l OS Address (mdude street state and zip c ode
Owner of record (if more than one)
Address (include street, city, state and zip code)
Telephone No. i L•
Telephone No.
FQ OFI+TCE USE ONLY
QCOMPLETED APP. ()SIGNATURES QREDUCED PLANS
QPLANS ELEV OEM DOC. 42 $50 CHECKS (OFFICE OF THE. COUNTY
CLERK)
()RADIUS MAP ()LABELS INCLUDING 1 FOR ALL INTERESTED PARTIES
(LABELS FOR APPLICANT, OWNER, ENGINEER AND/Olt
ARCHITECT (5 SETS)
Received by Receipt No. Date
10 /01107
04/08/2009 13:29 9093820506 CAS SBD PAGE 05/10
VONPITTONAL'USE PERIIrjIT 4PPLICATION
EMINCLIBMIUNIZESAMMEMISZIM
Incomplete applications will not be accepted for filing. If it is determined atiter an application is
filed that further internalise Is necessary; said bearing will not be scheduled until such time as
the application is deemed to be complete.
Tb�e following are required for filing:
1. Completed application form
2. Envirownernal Information form
3. Filing fee
a, In addition to the filing foe, ftolingagestech in the amount of $50.00 payable to the
Los Angles County Recorder, are required at the time of the Ming. Because the Office of the
County Clerk will not accept any checks that are over 90 -days, please date your $50 checks, the
date of the anticipated public hearing. This will cos= that the County will not return your
check to Planning, thus, delaying the recordation of the documents.
These fees are charged by the County for the filing of the "Public Hearing Notice/Notice of
Indent" and "Notice of Determination/Certificate of Pee Exemption" for your project Your
project is not operative, vested, or final until the handling fee is paid to the Canty and the
documents are filed. If the project is denied, the above mentioned check will be returned to you
5. A 300 foot radius map The $00 foot radius mop accompanying the application must be a dark
line print or ink tracing, correctly prepared. It mush show each lot within 300 feet of the exterior
boundaries of he property involved (including those lots within adjacent cities and county).
Each lot must be consecutively numbered to correspond to the property owners list as explained
in Item
6. Property owners/tenants/occupants lig and Hof the subject property as well as all properties
within the 300' tadius.
a. Mamas of City of Arcadia property owners may be secured from the Pliwni'g Division or
City Cleric's Office, City Hall. Nantes of property owners in are outside the City should
be obtained from the latest County Tax Assessment rolls.
b. The property owness/tenentsioccupantslian should be typewritten and must include the
owner's name, mailing address and assessment number of each lot shown on the aforesaid
map. UtsanzlitestandictillommiliAnt. be aarwfed.
c. Each property owner's/tenant's/occupant's name on this list must be numbered to
correspond with the numbering placed on the aforesaid radius map.
10 /o1Jw
04/08/2009 13:29 9093820506
CAS SBD PAGE 06/10
d. A self- sticking label WIu be provided by the applicant for each name on the property
owners/tenants/occupants list A Wid MUST be provide far any persaais(s) bivalved
with the project; Le., applicant, property owner, architect, engineer, and/or developer.
7. On a separate label sheet, provide 5 labels each for the property owner, applicant, architect and
contractor.
8. Preliminary Plans and Elevations (1S sets) NM BE FOLDED (Maximum size 8 1/2" by
14
Plans must be draws to scale showiag >lil dimensions accessary to deternlae compliance
with the Arcadia Municipal Coda i.e., parldng spaces, driveway areas, landscape areas,
building sides, handbag heights, setbacks from all property linen and verbs of adjacent
arrears:
The following information shall be CLEARLY DELINEATED on all prelimiuUaiy plans:
a. Scale and North arrow
b. Street addresses of lot orlon proposed for development
c. Size and location of lot or lots proposed for development, accurately dimensioned.
d.. Location and size of all proposed structures (new and/or existing).
e. Location, size and number of all parking stalls.
Location of all landscaped areas. Percentage of landscaping shall be identified
g. All existing easements.
h. Zone category in which the lots exists.
i. Ownees name or developer's nacre and telephone number.
j. Architect's or designees name and tolephone number.
9. A reduced set of the proposed plans (8 W'x11
10. You will be advised if photographs of the property involved, on a scale large enough to illustrate
the subjects under discussion, are required as exhibits with this application.
10/01/07
04/08/2009 13:29 9093820506 CAS SBD PAGE 07/10
STATE OF CALIFORNIA
CITY OF ARCADIA
COUNTY OF LOS ANGELES
z, Rod fn.,- G4.4 Efz hereby certify that the
O
attached list contains the names and addresses of all persons to whom all property is assessed as they
appear an the Last available equalized assessment roll of the County of Los Angeles, within the area
described on the attached application and for the rogcdrod distance of notification from the exterior
boundaries of the property described on the attached application.. I also notify that the subject site
described on the attached application contains no illegal lot splits
or other divisions of landnot specifically authorized by the City of Arcadia
I certify under penalty of perjury that the foregoing is true and correct.
(signed)
(date)
(application
AFFIDAVIT
-6-
per-
.i 2c909
10/01/07
04/08/2009 13:29 9093820506
Date Filed:
8. Site size:
CAS SBD
PAGE 08/10
Pile No.
CITY OF ARCADIA
440 WEST HUNTDG?ONMIT
ARC .DL4, CA 91007
AN3111 ONMB11l'I'AL TION R�r
44
1. Applicant's Nazar rro c�E.v S fF tf n Ars cc,; F 1 it sr cs ASr
Address: 12[ N Ccg& rA, 4, Co v., C 4 97 72
2, Property Address(Loadion): 3 F. l /i...h;V v AI. R44.44I14 Cat Q/oo‘
Assessor's Number
3. Name, address sod telephone number of pen= to be contacted concerning this project
G t D k •u/�[ get 12.4' z5 -owe) f 44.,eflen.r6 a /20k,c,f
4. List and describe any other belated permits and other public approvals required for this project, including those
required by city, regional, state and fbdend wades:
4obGI, e
3. Zone Oassirnati C /5 b 6. GetIOCRl Plea Designation:
rEllIELVESIOkifilla
7. Proposed use (isles (project desaoptioci): foR, .t.,ra/ T5 o
aizg2 rL:d l y Z
T
9. Square footage per building: 47,120x tA-Ly Y, 500
ID. N u m b e r o f Boom of construction: 1 (Ex s t• f j3,
11. Amount ofeff provided: r 1 4 c c S.
12. Proposed sdi 4'diog of project:
13. Anticipated metal daveloptnes t:
14. If resideedia1, include the number of units, schedule of unit sizes, .raft of sale prices or rents, and type of
household gam exPected: ,41q
04/08/2009 13:29 9093820506
15. If commercial, indicate tine type, i.e. neighbothood, city or regionally oriented, square footage of sales arm and
loading halides, hours ofoperat on: 4/ /A
16. 1/industrial, indicate type, estiamted employmaa per shift„ and loading batiste
17. If instioniceal, indicate the major Swaim csiao, esti a ted employment per shift, eatintated occupancy, loading
facilities, mod community benefits to be derived from the project
T to ;4/, 4 0 ,1 7 fi atorfg• PO.*
A I61) •A..f. of A4 'rt a IS, p s�Id ar s Ai,(rry .4% •''9F
18. If the project involves a variance, conditional use permit or zoning application, state this and indicate Wady
why the application is required: y/
Are the ,Mowing item able to doe project or Its dues?
anti as unwary).
CAS SBD
PAGE 09/10
Discuss below all i ens checked yes (Mach addiliooal
YES NO
19. Chime in existing femme s of any hills, or substantial alteraatin of graamd contours. 23
20. Change in scenic views or vistas from artistica residential areas or publidaods or roads El
21. C angc in pattern, wale car character of general area of project. 0 3
22. Sigaihaantt amauu s of solid Waft or litter. 13
23. Choy in dust ash, in fimaes or odors in vicinity. Eil
24. Chop in geoamd meteor quality or gaunt ify, or aibereion of awisdng drainage pett+er:a.
25. Substantial change in existing noise or vibration levels ie the vicinity.
26. Is site on Shod land or on any slopes of 10 pa tent or move. 3
27. 'Use or disposal of potentially hazardous materials, such as toxic substances, flammable r
or implosives.
RI R.
11/13/06
Page 2
04/08/2009 13:29 9093820586
CAS SBD PAGE 10/10
28. Substantial change in demand for ntunicipal servLoee (police, fire, water, sewage, etc.)
29. Submerge' israestme is natal f rel cae®usnpoion (may, a1, natural ps, etc.
30. Reiatioamhip to a turner project or mien ofprojaxs.'
31. Sterne water system discharges firm 41•88 fior materials storage, Weirdo or equipment
fueling, vehicle or egaipenent as aoaoce (inch:ding webby), y), waste hendlota, kasandous
onitesials handling or storage delivery or lowing dodre, or other outdoor work areas?
32. A significantly enviroa nentidly harts t inaa a ill the How ate or volume of boon Q'
water rm edf7
33. A significantly onivanmeolally harmful increase in erosion ofthe project site or surr+o mdiog
areas?
34. Storm water discharges that would s14as8a etiy impair the beneficial uses area** waters Q El
or areas that provide water quality benefits (e.g. ripen= corridors, wetlands, eta)?
35. Harm to the biological integrity of drainage systems and at bodies? ,l
Evje,mtme Sell
36. Deaaibe (on a separate sheet) the project site as it codes before the prgjecrt, includes information 00.
topography, soil stability, plants and animas, any cullueal, historical or scenic aspects, any existing structures
on the site, and the use of the evocative. Attack photographs of the sits. Semis or Polaroid photos will k
accepted.
37. Describe (an a separate sheet) the surrounding Porpertiea, S iinfonnatiaa on Plata; animab, any cultural,
biamriee1 or monk aspects. indicate the type of land uses (residential, coenmeroial, etc.), intensity &land use
Y.
apartintat houses, mops, departmot stores, sec.), and scale of devcdopmeat (height, frontal, aet4
backs, teen yards, etc-)- Attach photographs of the vicinity. Snapshots or Polaroid photos win be accepted.
I hereby certify that the statements furnished above and in the attached eadu'bits present the data and information required
for this initial evaluation to t beat of my ability, and that the f le s, atat meat% and information pr+ecicated era tree and
*meet t to the bed of my kovwle ge and belie
Date
Signature f/aEt cidif'V's�
4
S.I.R.
11/13/06
Page 3
(Gaithersburg, MD I
To Whom It May Concern:
C YT E
EDUCATIONAL EXCELLENCE
Chyten Educational Services is the premier tutoring and test preparation company in the greater Boston
area. Neil Chyten, the company's founder and President, has developed, over the past twenty -five years,
very successful learning strategies and test taking strategies which have helped Chyten achieve
unparalleled success and attain a reputation as the finest service of its kind in the country. As stated by
Harvard University Dean of Admissions, Marlyn McGrath Lewis, "I've never heard anything but very
high praise and gratitude from both students and their parents."
Chyten is the only franchise of its kind in America and has established a whole new way of doing
business in the supplemental education industry. Chyten brings to California a new style of curriculum
and individualized one on one tutoring by tutors who all must have at least a Masters Degree and teaching
experience. Chyten has set new standards in the tutoring and test preparation industry.
Chyten centers are professionally designed with an emphasis on providing an educationally conducive
atmosphere and a sense of security for every student. We are very selective about our locations and our
franchise owners. We look for professional people to bring the Chyten methods to students in a
professional manner and in a professional atmosphere.
Our administrative hours are generally 9:30am 5:30prn M -F. Our tutoring takes place primarily from
3pm -9pm M -F and from gam 5pm on weekends. Since 90% of what we do is individualized one on one
tutoring, our centers are always quiet, safe and well kept facilities. The target market for our services is
middle school to high school students who are on a college track. Thus, we generally have a respectful,
intelligent and motivated student in our centers.
As we have opened 16 franchise locations in 8 states in the last 16 months, we have been very careful
about the quality of our franchise owner and in the ability to provide the backup and support to help our
owners successfully operate our franchise locations.
There is nothing like Chyten anywhere in the country and we hope to make our services available to
students in the Arcadia area to help them achieve and hopefully exceed their potential one student at a
time.
I hope this overview provides you with a look into the Chyten philosophy and the Chyten franchise
model. If you have further questions or need additional information, please contact me directly. Email:
ngimpel@ehyten.com Cell: (516) 375 -2686
Sincerely,
06,40
Nick Gimpel
Vice President
1-800-428.T EST WWW.CHY TEN.COM
ruvTe... enl.r ccovgrr< INr
EDUCATIONAL EXCELLENCE
Chyten Educational Services has been recognized as the
SAT service that took "the College Board by surprise"
by "boost[ing] scores to heart thumping numbers"
Boston Globe
Chyten has continually out performed the competition and delivers results
that are unsurpassed in the industry.
The Chyten program provides valuable and highly respected services to
local communities.
A Chyten Educational Services franchise allows franchisees to work in a
vibrant business environment with highly motivated clients and highly
qualified staff.
With the right skills and drive, plus support from the Chyten team, operating
your Chyten Educational Services franchise can be fun, satisfying, and rewarding.
Sincerely,
Neil Chyten
President
Chyten franchising, Inc.
am incredibly excited to offer you this great opportunity l have been
in teaching and academic enrichment since l was fresh out of college.
Having been exposed to many different types of educational programs,
I am very aware of and experienced in identifying and developing techniques
and strategies that are successful. And, l am convinced that highly qualified
and experienced teachers can make a real difference in students' lives.
Now you can join us in our quest to enrich the academic experience for all
our students.
I believe that every child deserves an opportunity to reach his or her
highest performance level and an inspiration to surpass it, That's why
we customize a unique program based on each student's individual
needs. For over 20 years, Chyten Educational Services has been dedicated
to providing students with test preparation skills and specialized tutoring.
Since our beginnings in 1984, we have become one of the fastest growing
private education companies in Massachusetts.
With our commitment to making a positive impact on students' lives,
we want to expand our educational efforts into other areas of the country.
We have seen the need and the demand for educational services grow
tremendously over the years. I am very proud of our specialized programs,
our distinguished reputation, and the positive results we've created over
the years. Now I am looking for people who share my personal commit-
ment to providing quality educational programs and superior student
services. As a Chyten Educational Services franchisee, you can lean on
me and the Chyten team of professionals, and take advantage of all the
years of hard work we have put into developing the concept.
This brochure contains a great deal of information on the Chyten
Educational Services franchise opportunity. Please review its contents
and then contact me to discuss details of owning a franchise.
Thank you for your interest, and I look forward to hearing from you.
oa
ce
Chyten Educational
Services provides
lasting learning
strategies that raise
self- confidence
and enrich the
academic experience
for each and every
student we teach.
C hyten Educational Services provides educational
support for children to help them reach their
academic goals. Of course we want every student
to have an opportunity to obtain better grades, write better
essays, and earn higher test scores. But we also encourage
them when they have doubts, help them overcome their
fears, and get them to believe in themselves.
We assist children from kindergarten through high school
to become better students. We want to not only raise their
standardized test scores but their school grades as well.
We provide lasting learning strategies that raise self
confidence and improve their.learhing experiences.
At Chyten, we work closely with students and their families
to assess past performance in order to build customized
programs that help students reach and exceed their goals.
And we devise a plan to maximize future performance.
Far removed from those who offer no more than canned
programs, we provide tailored tools and
techniques that really Work.
General assistance with
reading, writing, math,
and many other subjects
Homework help and
study skills to improve
study efficiency and grades
Year -round tutoring and
special summer PSAT and
SAT Boot Camps'''
Exclusive lest- taking
techniques, such as:
Chyten Essay Strategy
ZigZag Method
Spy Method
Double Agent Method
Oil and Vinegar
Sheep in Wolf's Clothing
Adaptable Essay Strategy
The Roger Reader Method
Strategic Math Solutions
Grammar Simplification
Strategy
Chyten's Specialized
Services Include:
A Worthwhile
Opportunity...
for students
and for you
THE CHYTEN EDUCATIONAL
SERVICES CONCEPT IS SPECIALIZED,
PROVEN, AND BETTER.
The Chyten Educational Services concept
is different from that of other tutoring
and test preparation services. We only
employ tutors with a minimum of a master's
degree and prior teaching experience, giving
us a competitive advantage versus other
educational programs with lower standards
for instructors. We provide exclusive
programs, sound strategies that are skills
based, customized programs for each
student, and a guaranteed match between
student and teacher,
And, we get results: Chyten students
historically get better grades and higher
scores on standardized tests than those
who learn on their own or through other
programs.
THE CHYTEN EDUCATIONAL
SERVICES CENTER FORMAT IS
FLEXIBLE AND APPEALING.
With appealing, education oriented decor,
Chyten centers create energy and make
students and their parents feel comfortable
and welcomed. The Chyten franchise is best
located in a high visibility site, close to local
schools. Recommended facilities typically
have approximately 1,000 to 2,500 square
feet of space, and are designed to include
a comfortable reception area as well as
tutoring areas and larger classrooms.
CHYTEN EDUCATIONAL SERVICES
IS A REWARDING BUSINESS
OPPORTUNITY.
Private tutoring is a rapidly growing industry.'
The demand for private tutoring is driven by
many factors, including the federal govern-
ment's No Child Left Behind program, and
the desire by students and parents to improve
academic performance as a means of entry
into better universities and careers.' The
Chyten opportunity gives you a chance to
address this growing need and work
with serious, quality- minded education
professionals. It is also a chance to join a
highly respected profession that allows
you to be involved in and give back to
your community.
CHYTEN EDUCATIONAL SERVICES
SYSTEM MAKES RUNNING YOUR
BUSINESS AN EXERCISE IN
SIMPLICITY.
When you join Chyten, you'll benefit from
hundreds of thousands of dollars and
countless man -hours spent in developing
our own specialized curricula, plus our
customized software system, Our Student
Manager software handles student enroll-
ment and scheduling, allows for input of
tutors' hours and notes, and performs many
more important administrative functions.
The Chyten Educational Services curricula
offer numerous proprietary strategies to
assist students, including help with essay
writing, math, and reading, along with
proven test taking techniques. We'll provide
your qualified tutors with exclusive teaching
materials, and we'll provide you with a
respected brand name, documented business
procedures, and more. Everything is
designed to help you run your center
efficiently and to provide the best possible
tools and techniques for your students.
1 Tutoring has grown to a $5 billion to $8 billion professional
service industry. National Association of Secondary School
Principals (NASSP) Bulletin, Edward E. Gordon, 2002.
2 A poll found that 42% of Americans believe there is a
"great need" for children to receive private, outside tutoring.
Newsweek Magazine, 2000.
The Chyten
Educational Services
Support System
OUR PROFESSIONALS WILL PROVIDE THOROUGH PRE- OPENING
AND ONGOING SUPPORT TO HELP YOU RUN YOUR CHYTEN
EDUCATIONAL SERVICES FRANCHISE:
Start -up support to help you get up
and running, including:
Extensive training at our headquarters
covering student programs, business
management, and more
Advice on hiring teachers and tutors
Assistance with planning and ordering
initial supplies and materials
A comprehensive confidential
operations manual, to guide you with:
Day -to -day responsibilities
Staff management
Utilizing teaching tools and materials
Financial controls and reporting
Ongoing support tools and services,
such as:
Operational, managerial, and marketing
assistance through center visits and
remote support
Exclusive Chyten Educational Services
marketing materials for promotional
efforts in your community
Our proprietary Student Manager software
system that helps manage both student
and tutor schedules, and other adminis-
trative functions
Continual development of new and refined
programs, techniques, products, and
services
TM
H _a
EDUCATIONAL EXCELLENCE
rested in. oWiiii
business that 'has orover
AieS, and programs
etogniz:e0 name irt,the growing
rivideeducation?
,u0cOil'a I:cervices team.
ad,
you'r own'
frnchise; contact us today.
e and retiirri an appticationand
next steps toward finding out if
chise pporturiity is ht for
FRANCHISE OPPORTUNITY
IIYTEN
EDUCATIONAL EXCELLENCE
Chyten Franchising, Inc.
1723 MCISSEIChUSett: Avenuo
Lexington, MA 02420
ErniI: franchreGDchyten.com
Plionn 781-541-6279 of 800-428-TEST
Fax 781 511-6281
V Mil chyinn com
Thj ach.itrm.r]t r not an offering
An 0th can only tv un,H hy prospectus
filed first with nt)p,rntr ff,..nCIP^, of the
■t. Surh tiling (fr1PS not
con titoti aptrov.--11
Ccd[e [n<.;i.
iteaciing and
CHYTEN
EDUCATIONAL EXCELLENCE
Chyten is a company of professional educators
who teach essential skills and strategies that can
dramatically improve grades and test scores
of students of all ages. No other company in
the country provides a higher level of service,
better tutors, or better results. To date, Chyten
has helped more than 20,000 students meet or
exceed their educational goals. We encourage
you to research Chyten, because the more you
know about us, the more you will agree that
Chyten is uniquely qualified to help your son
or daughter improve test scores and grades.
Visit us at:
13951 N. Scottsdale Road
Suite 211
Scottsdale, AZ 85254
or
Call:
phone: 480 990 -7374
fax: 866- 990 -3378
for a free personalized consultation.
Look inside for more information
Comparison of Tutors
Kaplan
Princeton
Review
Sylvan
Club Z
Huntington
0
C 11 Y T E N
YES
All tutors have college degrees?
no
no
yes
yes
yes
All tutors have Master's
degrees?
no
no
no
no
no
YES
All tutors have teaching
experience?
no
no
no
no
no
YES
Tutors average at least seven
years teaching experience?
no
no
no
no
no
YES
Guaranteed tutor matching?
no
no
no
no
no
YES
Chyten's Tutor Matching Guarantee
Chyten will fad your child a perfect tutor based on personality, learning style, interests and academic needs. If you don't
agree, then the lesson is free (ask for details).
Chyten Centers are Great Places to Learn
Chyten Centers are distraction free: no dogs, no doorbells and no distracting phone calls.
Each student is taught in a private tutoring room for optimal learning.
ParentNET software gives parents full progress reports following every session.
Flexible Scheduling you do not have to purchase a "package" of sessions. Schedule 1 or 100 and pay one session
at a time. Tutors are available days, evenings and weekends.
Call 480- 990 -7374 Today for Local Class Schedules and Tutoring Availability
Media and Education References
"Prepping high- scoring essays using Chyten's method can be
enough to boost scores to heart- thumping numbers."
Boston Sunday Globe
"If studying up is the name of the game in getting a leg up
over the competition, local students might consider another
name toward that end Chyten Educational Services
Lexington Minuteman
"I've never heard anything but very high praise and gratitude
from both students and their parents."
Marlyn McGrath Lewis
Harvard University Dean of Admissions
"The Chyten course helps (students) focus their attention on
the task at hand, improves preparation, and instills confdence
a needed attribute when one enters some foreboding test
center with #2 pencils at the ready."
Tom Walsh, Jr.
Roxbury Latin School's Director of College Admissions
"So often we hear numbers and guarantees thrown around
frivolously and recklessly. In contrast, Chyten actually deliv-
ered on its promises."
John Antonucci
Westwood, Massachusetts Superintendent of Schools
Chyten's Equation:
Best Tutors Best Strategies Best Results
"My experience with the firm has been on many levels, yet
on each level their professionalism, abilities and results are
unmatched in my ten years of working in the education admis-
sions industry."
Jeff Vernamonti
Lexington Christian Academy's Director of College Advising
"I have been a professor for the last six years, and I have never
witnessed a more devoted, conscientious, hardworking teacher.
You have really amassed an incredibly talented and devoted
group of tutors. I want to thank you and them for all the help
and support!"
Professor Mary Godwyn, PhD
Babson College Department Head
"He worked so hard, but we owe S000000000 much to
you and Chyten. He improved by working with you end of
story. You worked with my daughter Alison a few years ago.
Alison tried Kaplan and it was a waste of time and money.
To know that he was in such good hands with you meant the
world to me I knew that he had a shot. We are absolutely and
completely thrilled."
Name Withheld by Request
Boston College Law School Professor
Call today 48,0-990-7 374
.c irteri.com
Tutoring and Test Preparation Services
Academic Tutoring Grades K -12, Expert Help for All Subjects, All Levels
For Advanced Students
For students who want to stand head and shoulders above the rest, Chyten's tutors provide expert level instruction
in all subjects and at all grade levels. In this ultra-competitive academic climate, Chyten's Master's degree tutors
can make all the difference.
Remediation
Chyten's tutoring programs are more effective than any other in the industry, because, at Chyten, every session is
customized to the unique strengths and struggles of our students. We understand that your child is more than a number
or a grade. He /She is an individual who deserves the type of individualized instruction that only an expert, professional
tutor can offer. Expect the best. Accept no less.
Subjects (offering vary by location)
Arithmetic Trigonometry French Writing Physics
Algebra Pre Calc Calculus Latin Biology US History
Geometry Spanish Reading Chemistry World History
Test Preparation
Option T
Private Tutoring Our premier service. For most tests, eighteen hours of private tutoring is recommended.
Tutors are available days, evenings and weekends by appointment.
Option TT.
Team Tutoring For a group of 3 -4 students of similar ability. Team Tutoring offers many of the advantages of
private tutoring, but at a lower cost.
Option TJT:
Small Classes —An affordable alternative to tutoring. Perfect for students who flourish in group settings.
Available for select tests and test dates.
Note: Call or check online for a list of class dates times.
College Counseling
Chyten College Counselors provide a highly- personalized, full- service experience based on Chyten's own unique, proprietary
college acceptance system. No system has proven more successful at getting students noticed AND ACCEPTED into
colleges of their choice. Chyten manages the whole college acceptance process, from initial evaluation straight through
college transition counseling Chyten's college counselors provide an invaluable service to families in need of assistance in
managing the college admissions process.
Reading and Study Skills
Chyten's RANDD Reading and Study Skills Program may be the most important investment you'll ever make in your child's
academic future. This comprehensive 14- session tutorial program will literally change your student's life with amazingly
effective skills and strategies that will last a lifetime! They will read faster, better and smarter, will study more efficiently,
will be able to memorize facts and figures more thoroughly and will perform better on tests, quizzes, term papers, projects
and more.
PASS Membership Program (available at most locations)
We are proud to introduce our exciting new PASS (Pro- Active Student Strategy) membership program which helps students
achieve better results through advance planning and which gives members free practice tests, free academic advising and
deep discounts on Chyten's College Counseling services, subject tutoring, test preparation tutoring and test preparation
classes. Call for more information or to enroll.
com
CoH to ay 4 g- 990 -737f•
w w w, c h y 1 e n e c o m
CaH today ea'O- 990 -7374
Client References
CHYTEN
EDUCATIONAL EXCELLENCE
Visit us online at: www.chyten.com
email- evogel @chyten.com
"Mark has always left your class with a smile and feeling more conf-
dent about himself. I must say our experience with Chyten has been
exceptional one."
"Your program was recommended to us by another parent and we are
now strong advocates, as well. Our youngest daughter, who is 2 years
behind Alex, will definitely make use of your services."
"Consider yourself a miracle worker. We are SO grateful for all that
you 've done for him! If you or Chyten ever need ringing endorsements,
please let us know. Thank you again and again!!!"
"1 had actually called another company at the same time I called Chy-
ten to compare offerings, but after a short conversation with Flora
and a short conversation with the other company, it was apparent to
me that there was no comparison and I gracefully ended my conver-
sation with the other company. Her attentiveness to my needs is really
what drove me to choose Chyten; the results from Alex's testing is
what will have me coming back."
"Thank you so much for all your help. He very much enjoyed working
with you. Somehow you were able to explain things to him in a way
he could really understand."
"I just wanted to take the time to thank you for everything you did for
me since November. What did you seriously do to me? I honestly can't
believe it. I went from like a 400 -500 score to a high 600 and low
700. I owe these scores to your help and guidance. 1 am thrilled and
extremely happy and my parents are ever so grateful to you."
p r car
l f> µct t. O ring
PJ[ ac L
Cc [e e C( J[ ::eef.<nq
Pac[,ac es or hourly'
"We are so happy with the results. He kept rechecking them just to
make sure they were right. He got a 700 on reading and an 800 on
writing. 1 hope you will also be able to tutor my sophomore daughter
when the time comes."
"I absolutely know that having you as her primary guide for studying
and your tutoring made all the difference. (My daughter) left each
session feeling validated and kind of newly motivated You made all
the difference. Thanks so very much again."
"During the period of time in which I was working with you, I raised
my quarter four grade in Biology from a B+ all other quarters to an
A, and my fnal exam grade was one of the highest in my class. Thank
you so much for motivating me and explaining everything so well."
"I wanted to say thank you for all of your help. Lauren went from a
critical reading score of 610 to a 740! Her writing score was a 700
(she thinks she could have done better) and her essay score was a 12
out of 12. I will sing your praises to all!!"
"I just looked at my score report on collegeboard.com, and I got
an 800 on my SAT Writing test. THANK YOU FOR ALL OF YOUR
HELP! I am s0000 excited about this. 98th percentile is much better
than 17th. Thanks again, and I hope to hear from you soon."
"From Jake's PSAT's that's more than a 300 point improvement and for
the SAT's that's a 200 point improvement."
"What can I say but thank you and everyone else for your assistance.
This will clearly make a difference for Jake being accepted in schools
that I thought were going to be a reach. Neil (Chyten) said this will
be money well spent, and I must say he was right."
HISTORY OF CRYTBN EDUCATIONAL SERVICES
Chyten Educational Services opened its first center in 1999, but Neil Chyten started building his business much earlier.
After graduating from the University of Massachusetts and majoring in English, Neil Chyten took a job working for an education
company teaching a Reading and Study Skills program. Neil found success as a teacher, but he thought the product was mediocre.
In addition, Neil felt strongly that one contributing factor to the program's weakness was that the teachers were not actually trained
how to teach. Neil spent several years studying the finer points of teaching. From 1981 -1984, Neil studied and eventually
produced his own product called "RANDD," Reading and Development. He used this product to teach College Study Seminars. In
these classes, Neil taught high school students as well as new college students how to study more effectively. While Neil was
teaching his College Study Seminars, one school asked him to create a PSAT program. Neil wrote a new program and delivered it
with great success. For Neil, this highlighted his awareness of the great need for a high quality test prep program. In 1985, Neil
began tutoring students one on one for test prep. As his reputation grew, it became impossible for Neil to service all of the students
who came to him. He realized that he needed to hire additional tutors, which he did in 1997. Finally, in 1999, Neil set up an office
where students could come in rather than having tutors going out to various locations.
The first Chyten Educational Services center opened in Newton, Massachusetts in 1999. In its originarconfiguration, all available
rooms were often filled to capacity. So, Neil reconfigured the space to accommodate 4 more students at any one time. Still, there
were many times when all rooms were occupied.
To handle the demand for its services, several additional Chyten Educational Services centers opened throughout Massachusetts in
the following years. The Wellesley location opened in 2000; Lexington opened in June 2002; Concord opened in August 2003
and Westwood opened in February 2005. As the number of locations grew, so did the staff necessary to handle the upsurge in
student activity. Neil Chyten knew his business was booming, but he also realized he needed to create a system to help keep his
business efficient and accessible. He wanted a tool that could collect necessary information and make it accessible to the
appropriate people. In 2002, Neil began to develop an Internet based software system that would maintain student records,
schedule sessions, fulfill accounting needs, and offer tutor selection. This system would eventually become the Student Manager
system. By 2004, Neil was ready to roll out the first piece of the system by offering the scheduling and tutor net system.
The Student Manager software system has continued to improve and grow over the years. To date, Neil has spent over $300,000
and 10,000 hours to develop and perfect this one of a kind system. Today, the proprietary 3 Tier Software System, (Student
Manager, Tutor Net, and Parent Net), available only to the Chyten franchise owner, is the most unique and advanced software
program in the tutoring industry. There is no doubt that this very special software system will be a vital tool for finding success with
the Chyten Educational System franchise program.
Do you have a track record of success?
Do you feel owning a business in an industry driven with the purpose of helping young
people is something you'd enjoy?
If you answered yes to those two questions, then you need to take the time to get to
know Chyten and the people involved in building this wonderful franchise program. It's
not very often you can build your future doing something worthwhile with people who
want to share their talent and experience with you. You'll get all this and more as a
Chyten franchise owner.
HOW IS CHYTEN DIFFERENT FROM
OTHER TUTORING FRANCHISES?
ors a
streams from thes e 6
asters ree a► d all have teach g exp rience.
You will share in the d iscounts afforded to Chyten franchise
have'developed relationships with overtheyears.
stem
u will us o ur press coverage as a sales and marketing tool as you grow your business.
c i a leyeloped over several years with ne
om various vendors.we
Chyten's center based .model Ioc, ations are set up to attract walk in and drive iby business,
a lowing you run profitable classes, tests and seminars in addition to tutoring.
We will show you
ow to enter into partnerships with entire school s
Our. proprietary 3 -tier, software system Student
Manager, Parent Net, and Tutor et performs many
of the functions associated with 'running your business
including:
o Provides a centralized, online database for
information.
o Runs financial reports and projections.
o Helps you pick tutors.
o Performs scheduling.
o Enables you to email schedules to parents.
o Allows tutors to see their schedules, view student
information and capture tutoring =notes from each
session.
o Enables ;parents to check schedules, billing
information, and -tutor- notes.
o Mush morel
EDUCATIONAL EXCELLENCE
We only employ Tutors who have of least a Masters Degree,
making us unique in the tutoring industry.
We have invested more than 4 years and over $300,000 to
provide our franchise owners the finest business management
software program in the industry.
When .o student enrol s at Chyten, our goal is to give that
student, and every student, lifelong learning skills.
The opportunity in supplemental education and tutoring
services is reatertoddy than atany period in America's history.
It is very much a growing, yet under served industry.
There are more students in public schools across America,
yet public schools face on ever increasing shortage of funding
facilities and personnel. These factors are at the core of why
we are so excited about the potential of the Chyten franchise
concept.
Much of the tutoring services market is currently dominated
by
independent operatorrs who do not and cannot provide the
depth of services available at Chyten. We are positioned to
.make a very serious impactin the supplemental education and
tutoring industry.
KEY THOUGHTS
We intend to take the °partnerships we will form with our
franchisees very seriously. They will be the backbone of our
company and our growth and success will be inter related with
their growth and success.
The market for tutoring and supplemental education is
growing significantly. Enrollment in public schools is up and
budgets are down. These facts are what are driving the
tutoring industry to record h iseveryyear.
Because there is o defined need for our services in every
market in the United States, we are committed to building the
Chyten 'Educational Services franchise into a nationally
recognized franchise system.
Anyone looking into purchasing a Chyten franchise can do
so with a great deal of confidence in that the experience and
knowledge we've gained in' the 'roncise industry over the past
30+ years will be working together with the 20+ years of
knowledge and experience that feel Chyten brings to the
tutoring and supplemental education industry. This is truly
unique combination of skills and talentwich con only help the
Chyten franchise owner.
Is there anything more important in life than helping a child?
Owning o Chyten Educational Services franchise will provide
you d :quality of life not found in most businesses, while at the
same time giving you the opportunity to help young people
and give back to the community. It truly is a unique and
rewarding franchise opportunity.
Comparison of Tutor
Qualifications
Kaplan
P
Princeton
Review
Sylvan
y
Club Z
Summit
CHYTEN
EDUCATIONAL EXCELLENCE
College degree
required?
no
no
yes
yes
no
YES
Master's degree
required?
no
no
no
no
no
YES
Teaching experience
required?
no
no
preferred
(not required)
no
YES
Tutors average at least
seven years teaching
experience?
no
no
no
no
no
YES
Offers proprietary
strategies for tests or
homework help?
Yes
yes
yes
no
yes
YES
Dear Parent,
y
TM
EDUCATIONAL EXCELLENCE
In today's more competitive academic environment, a growing number of parents have turned to
private tutoring to help students navigate through an array of difficult courses and tests; but how
does one select not just any tutor, but a great tutor? Making the right decision is so important.
After all, a great tutor can help your child:
Gain greater confidence and self esteem
Gain access to competitive private schools
Gain acceptance into top- choice colleges
Earn higher merit -based scholarships and financial awards
CHYTEN'S TUTORS ARE GREAT TUTORS
Chyten's expert tutors will furnish your child with the tools he or she needs to reach his or her
maximum performance level and the inspiration to surpass it. Our trademarked strategies will
make your child a more confident student and test taker. Before you spend hundreds of
thousands of dollars on private schools and colleges, let Chyten enrich your child's academic
experience. Call Chyten today!
CHYTEN HAS EXPERT TUTORS AVAILABLE FOR
MATH, ENGLISH, SCIENCE, LANGUAGE, COLLEGE APPLICATION ESSAYS
SAT, PSAT, ACT, SSAT, ISEE, COOP, GRE, LSAT
CHYTEN TEST PREPARATION AND TUTORING
THE REGION'S PREMIER TUTORING SERVICE
800 -428 -TEST
WWW.CHYTEN.COM
Franchise Opportunities Available
Quotes and Testimonials
Chyten in the Press
`A number of students in the area have relied very successfully ...on (Chyten 's) services," said Marlyn
McGrath Lewis, an admissions officer at one local college. `I've never heard anything but very high praise and
gratitude from both students and their parents," she said.
(Chyten) is terrific in building skills for the kids and teaching them real solid test taking techniques.
Instructors at Chyten Educational Services Inc. are all experienced educators...
Boston Business Journal
(Centers such) as Chyten 's, where students are taught test taking with results that seem to have taken the
College Board by surprise.
Prepping high- scoring essays using Chyten 's method can be enough to boost scores to heart thumping
numbers.
If studying up is the name of the game in getting a leg up over the competition, local students might
consider another name toward that end Chyten Educational Services.
Hundreds more client testimonials on file
Client Testimonials
Boston Globe
Lexington Minuteman
1 must say our experience with Chyten has been exceptional one.
1 have been a professor for the last six years, and 1 have never witnessed a more devoted, conscientious,
hardworking teacher. You have really amassed an incredibly talented and devoted group of tutors. I want to
thank you and them for all the help and support.
I just wanted to inform you that my son was an early applicant to MIT this year and he just got accepted.
He owes a lot of his success to Chyten. The strategies that Chyten uses in the tests allowed him perfect scores in
his SAT I and lls
When (my daughter's) college counselor asked her about SA tutoring and how she was doing, she said
that she loves it, to which the college counselor said that in her long career she had never heard a student
say this.
I'm sure that the high scores were a result of the "intangibles" that I learned from your tutoring classes.
Thank you so much for motivating me and explaining everything so well.
1 want to thank you so much for your patience and diligence with (her). She loved seeing you every week
for this past year, and that's a testament to your nonjudgmental style and never making her feel stupid for any of
her mistakes and repeat questions. Your strategy of building her confidence was an important and correct one.
You are the reason (she) was able to nail down the basics, learn test strategy and execute as well as she did
Finally someone who motivates (her). She really enjoys working with you.
I just wanted to let you know that (our son) was accepted early decision at the Carnegie Mellon School of
Computer Science. He is in seventh heaven!!! 1 want to thank you again for the terrific job you did of prepping
him for the verbal SAT's and boosting his self esteem. We will both never forget what you did for him.
(10-
CHYTEN
EDUCATIONAL EXCELLENCE.
Let Your
Child
AMAZ
.1:
Specialists in PSAT, SAT, ACT, SAT Subject Tests, AP, LSEE SSAT
RANDD Reading and Study Skills Series
School Subject Tutoring for Most K-12 Subjects
Expert Tutors. 21,000+ Students.
Unparalleled Results.
747 Average SAT Writing score
10.9 Average SAT Essay score
(2-12 scale)
3i 4.4 Average Advanced Placement
(AP) Test score (1-5 scale)
NAI 4114eit"'E C0.171PanY
pad Test PreP
CHYTEN
TUTORS TEST PREPARATION
The premier tutoring and test preparation company in greater Boston is coming here to
Scottsdale! Chyten brings to the area proprietary learning and test taking strategies that are
among the most innovative and successful in the country. Chyten is setting a whole new standard
of doing business in the education industry with a new style curriculum and individualized one on
one tutoring. All Chyten tutors have at least a Masters Degree and teaching experience.
Knowing that high school students are facing the most competitive environment for college
placement in history, Chyten will bring fresh, new, proven ways to help students achieve their
potential. And, in doing so, help students in their quest to get into a college of their choosing.
ABOUT CHYTEN EDUCATIONAL SERVICES
All Chyten tutors hove Masters Degrees and teaching experience.
All Chyten tutors have passed extensive background checks.
Chyten only hires tutors who possess exceptional interpersonal and pedagogical skills.
Chyten has helped more than 20,000 students achieve excellent test scores and grades.
Chyten leaches modem, effective strategies and proprietary solutions t o the PSAT, SAT, ACT,
!SEE, SSAT and other benchmark tests.
Chyien leaches proprietary reading anc study strategies proven to raise GPA.
At 274 points, Chyten has the highest average SAT score increase average in the country, and
has been recognized for excellence by National Public Radio, USA Today, Boston Business
Journal, The Boston Globe, The Lexington Minuteman and several other local and national
publications.
1n1SSlon
students
with
Chyt
lifelong
provide
learning
our
Phone: 480 -990 -7374
finD
13951 Scottsdale Road
Fax: 866- 990 -3378 Suite 211
Toll Free: 1 -800- 428 -TEST wwwichyten.com Scottsdale, AZ 85254
June 23, 2009
STAFF REPORT
SUMMARY
Development Services Department
TO: Arcadia Planning Commission
FROM: Jim Kasama, Community Development Administrator
By: Tim Schwehr, Assistant Planner
SUBJECT: Conditional Use Permit Application No. CUP 09 -12 to operate an auto
storage warehouse and yard on a 48,000 lot that is zoned M -1,
Planned Industrial District.
Mr. Charles V. Palazzolo, owner of Complete Automotive Recovery Service
(C.A.R.S.), submitted Conditional Use Permit Application No. CUP 09 -12 to operate
an auto storage warehouse and yard on a 48,000 square -foot lot zoned for industrial
uses at 5449 Peck Road. The Development Services Department is recommending
approval of the proposed auto storage warehouse and yard subject to the conditions
listed in this staff report.
GENERAL INFORMATION
APPLICANT: Mr. Charles V. Palazzolo, owner of C.A.R.S.
LOCATION: 5449 Peck Road
REQUEST: A Conditional Use Permit to operate an auto storage warehouse and
yard on a 48,000 square -foot lot zoned for industrial uses. Office
hours would be 9:00 a.m. to 5:00 p.m., weekdays, with automobile
drop -off and pick -up happening 24 hours a day, seven days a week.
SITE AREA: 48,000 square feet (1.10 acres)
FRONTAGE: 160 feet along Peck Road
EXISTING LAND USE ZONING:
The site is developed with a 20,301 square -foot warehouse with
approximately 4,000 square feet of incidental office space. The
property is zoned M -1, Planned Industrial District.
SURROUNDING LAND USES ZONING:
North: One -story industrial warehouse— zoned M -1
South: One -story industrial warehouse— zoned M -1
East: Two -story offices— zoned M -1
West: Flood control
GENERAL PLAN DESIGNATION:
Industrial
PUBLIC HEARING NOTIFICATION
Public hearing notices of Conditional Use Permit Application No. CUP 09 -12 were
mailed on June 12, 2009 to the property owners, tenants and occupants of those
properties that are within 300 feet of the subject property (see the attached radius
map). Because Staff considers the proposed project exempt from the requirements of
the California Environmental Quality Act (CEQA) the public hearing notice was not
published in the Arcadia Weekly newspaper.
BACKGROUND INFORMATION
The subject property is developed with a 20,301 square -foot warehouse and an
approximately 16,100 square -foot gated outdoor paved storage yard /parking area.
The warehouse was built in 1961, and contains incidental offices totaling 4,000
square -feet. The property has been owned and occupied by Tomax Fabricating, a
metal fabrication company, since 1980. The owner of Tomax Fabricating, Mr.
Thomas King, is now offering the property for sale.
On October 9, 2001, the Planning Commission voted 4 -0 with one Commissioner
absent, to approve CUP 01 -025 to allow an unmanned wireless communications
facility with a 42 -foot high monopole at the southwesterly corner of the property.
PROPOSAL AND ANALYSIS
The applicant is proposing to purchase the property at 5449 Peck Road and operate
an automotive recovery and storage business. Auto storage is permissible in the M -1
zone with an approved Conditional Use Permit. The warehouse and yard are to be
used for the temporary storage of repossessed vehicles. The outdoor yard would be
utilized for overflow storage when necessary. Automobiles and other repossessed
vehicles would be stored on -site for approximately 15 -30 days before being
transferred to separate locations for reconditioning and resale. While stored at 5449
Peck Road, no maintenance, repair work, or sales of these vehicles would occur.
The proposed office hours of the business are 9:00 a.m. to 5:00 p.m. Monday- Friday.
Drop -off and pick -up of repossessed vehicles would be a 24 -hour operation. This
CUP 09 -12
5449 Peck Road
June 23, 2009
Page 2
business will employ 15 -20 people, half of which would work primarily off -site
collecting and transporting vehicles.
The applicant is proposing to convert a small section of the warehouse to additional
office space, which would result in a total office area of approximately 5,000 square
feet. A new front fence and gate, and rear fence are also proposed, which are
subject to design review approval.
Parking
By code, a warehouse is required to provide two (2) parking spaces per 1,000
square -feet of gross floor area. An outdoor storage yard should also have parking
provided at the same rate. Provided that the incidental office space does not exceed
25% of the warehouse area, no additional parking is required for the office space.
Based on these regulations, a total of 73 parking spaces are required for the
proposed vehicle recovery and storage business.
There are thirteen (13) on -site parking spaces in the front parking lot. Within the
gated yard area there are an additional 20 parking spaces, however some or all of
these spaces are proposed to be utilized for vehicle storage, and therefore cannot be
counted as on -site parking.
It is staff's opinion that there is a potentially significant parking shortage unless some
of the gated yard area is made available for employee parking. The proposed
business plan indicates that up to 20 employees will be working at any given time at
this location, and therefore 20 on -site parking spaces may be necessary for the
employees and there should be some parking available for visitors. Additionally, one
(1) van accessible handicap parking space is required, which may eliminate an
additional regular parking space. To address this deficiency, staff is recommending
a condition of approval that ten (10) employee parking spaces be provided within the
gated yard area.
CODE REQUIREMENTS
All City requirements regarding disabled access and facilities, occupancy limits,
building safety, parking and site design are required to be complied with to the
satisfaction of the Building Official, Community Development Administrator, Fire
Marshal, and Public Works Services Director.
CEQA
Proposed projects that are not approved, are by virtue of being denied, exempt from
any further environmental assessment. If approved, however, and if it is determined
that the project involves negligible or no expansion of the existing use, then this
project is categorically exempt from further environmental review pursuant to the
provisions of the California Environmental Quality Act, Section 15301, existing
CUP 09 -12
5449 Peck Road
June 23, 2009
Page 3
facilities involving negligible or no expansion of an existing use. A Preliminary
Exemption Assessment has been prepared and is attached to this staff report.
FINDINGS
Section 9275.1.2 of the Arcadia Municipal Code requires that for a Conditional Use
Permit to be granted, it must be found that all of the following prerequisite conditions
can be satisfied:
1. That the granting of such Conditional Use Permit will not be detrimental to
the public health or welfare or injurious to the property or improvements in
such zone or vicinity.
2. That the use applied for at the location indicated is properly one for which a
Conditional Use Permit is authorized.
3. That the site for the proposed use is adequate in size and shape to
accommodate said use, and all yards, spaces, walls, fences, parking,
loading, landscaping, and other features required to adjust said use with the
land and uses in the neighborhood.
4. That the site abuts streets and highways adequate in width and pavement
type to carry the kind of traffic generated by the proposed use.
5. That the granting of such Conditional Use Permit will not adversely affect the
comprehensive General Plan.
It is staff's opinion that conditional approval of the proposed vehicle storage
warehouse and yard can satisfy each prerequisite condition.
RECOMMENDATION
The Development Services Department recommends approval of Conditional Use
Permit Application No. CUP 09 -12, subject to the following conditions:
1. The front parking lot, which is in a state of disrepair, shall be resurfaced and
restriped to current parking standards.
2. In addition to the front parking lot, ten employee parking spaces should be
provided in the gated yard area.
3. Any external alterations, including new fencing and gates, shall be subject to
design review approval by the Community Development Administrator or
designee.
4. The use approved by CUP 09 -12 is limited to the proposed vehicle recovery
and storage business, which shall be operated and maintained in a manner
CUP 09 -12
5449 Peck Road
June 23, 2009
Page 4
that is consistent with the proposal and plans submitted and 09 -12. d approved for
5. A Parking Modification for 22 spaces in lieu of 73 spaces
vehicle recovery and storage business. This Parking is granted for this
constitute an approval for a general reduction of the parkingfrequir does not
the subject property, but rather only for the vehicle recovery em stor for
►Y and stor
business that is herein conditionally r
a age
recovery and storage business may be subject to a Con this vehicle
Permit and /or Parking Modification. nditional Use
6. Noncompliance with the plans, provisions and conditions of
09 -12 shall be grounds for immediate suspension or revopcatio for CUP
approvals, which could result in the closing of the business. anon of any
7. All City requirements regarding disabled access and facilities,
limits, building safety, parking and site design shall be complied with to the
satisfaction of the Building Official, Community Development Ad with r the
Fire Marshal, and Public Works Services Director. ministator,
8. The applicant shall defend, indemnify, and hold harmle ss the City of Arcadia
and its officers, employees, and agents from and against any claim, against the City of Arcadia, its officers, employees or agents
attack, set aside, void, or annul any approval ,action, or
City of Arcadia concerning this project and /or land use n decision pproval of the
a d s to
not limited to an a
Y pproval or v
condition of a of th including but
Planning Commission, or City Staff, which action is br ught within the time
period provided for in Government Code Section 66499.37 or other provision
of law applicable to this project or decision. The City shall promptly notify the
applicant of any claim, action, or proceeding concerning the project and/or
land use decision and the City shall cooperate fully in the defense of the
matter. The City reserves the right, at its own option, to choose its own
attorney to represent the City, its officers, employees, and agents in the
defense of the matter.
9. Approval of CUP 09 -12 shall not take effect until the property owner(s) and
applicant have executed and filed an Acceptance Form available from the
Development Services Department to indicate awareness and acceptance of
these conditions of approval.
PLNll'1(NG COMMISSION ACTION
Commission should
incorporating the Commission's decision, specific determinations and findings, and
the conditions of approval.
Denial
If the Planning Commission intends to deny
this proposal, the Commission should
move to deny Conditional Use Permit Application No. CUP 09 -12 state the finding(s)
that the propo
sal does not satisfy with reasons based on nthe de �s rd, on nand direct specific
to prepare a resolution incorporating the Commissio
findings.
Planning Commissioner, or other interested party has any questions or
comments regarding this matter prior to
If any P 9 ease contact
the h June
23rd public hearing, p
Assistant Planner, Tim Schwehr at (626) 574-5422.
Approved by:
Kasama
Community Development Administrator
Attachments: Aerial Photo Vicinity Map with Zoning Information
300 -foot Radius Map
Site Plan
Photos
Preliminary Exemption Assessment
Development Services Department
Engineering Division
Prepared by: R.S.Gonzalez, June 2009
100
0 100
1 r
200 Feet
UNZONED I
Development Services Department
Engineering Division
Prepared by: R.S.Gonzelez, June 2009
(5401)
(5537)
id
5449 Peck Road
CUP 09 -12
(5550) .oZ�
t
'vvv
(5600)
(yet
that is consistent with the proposal and plans submitted and approved for
CUP 09 -12.
5. A Parking Modification for 22 spaces in lieu of 73 spaces is granted for this
vehicle recovery and storage business. This Parking Modification does not
constitute an approval for a general reduction of the parking requirements for
the subject property, but rather only for the vehicle recovery and storage
business that is herein conditionally approved. Uses other than this vehicle
recovery and storage business may be subject to a new Conditional Use
Permit and /or Parking Modification.
6. Noncompliance with the plans, provisions and conditions of approval for CUP
09 -12 shall be grounds for immediate suspension or revocation of any
approvals, which could result in the closing of the business.
7. All City requirements regarding disabled access and facilities, occupancy
limits, building safety, parking and site design shall be complied with to the
satisfaction of the Building Official, Community Development Administrator,
Fire Marshal, and Public Works Services Director.
8. The applicant shall defend, indemnify, and hold harmless the City of Arcadia
and its officers, employees, and agents from and against any claim, action, or
proceeding against the City of Arcadia, its officers, employees or agents to
attack, set aside, void, or annul any approval or condition of approval of the
City of Arcadia concerning this project and /or land use decision, including but
not limited to any approval or condition of approval of the City Council,
Planning Commission, or City Staff, which action is brought within the time
period provided for in Government Code Section 66499.37 or other provision
of law applicable to this project or decision. The City shall promptly notify the
applicant of any claim, action, or proceeding concerning the project and /or
land use decision and the City shall cooperate fully in the defense of the
matter. The City reserves the right, at its own option, to choose its own
attorney to represent the City, its officers, employees, and agents in the
defense of the matter.
9. Approval of CUP 09 -12 shall not take effect until the property owner(s) and
applicant have executed and filed an Acceptance Form available from the
Development Services Department to indicate awareness and acceptance of
these conditions of approval.
PLANNING COMMISSION ACTION
Approval
If the Planning Commission intends to approve this project, the Commission should
move to approve Conditional Use Permit No. CUP 09 -12, state the supporting
findings and environmental determination, and direct staff to prepare a resolution
CUP 09 -12
5449 Peck Road
June 23, 2009
Page 5
incorporating the Commission's decision, specific determinations and findings, and
the conditions of approval.
Denial
If the Planning Commission intends to deny this proposal, the Commission should
move to deny Conditional Use Permit Application No. CUP 09 -12 state the finding(s)
that the proposal does not satisfy with reasons based on the record, and direct staff
to prepare a resolution incorporating the Commission's decision and specific
findings.
If any Planning Commissioner, or other interested party has any questions or
comments regarding this matter prior to the June 23rd public hearing, please contact
Assistant Planner, Tim Schwehr at (626) 574 -5422.
Approved by:
Kasama
Community Development Administrator
Attachments: Aerial Photo Vicinity Map with Zoning Information
300 -foot Radius Map
Site Plan
Photos
Preliminary Exemption Assessment
CUP 09 -12
5449 Peck Road
June 23, 2009
Page 6
�3` are SUE MORENO
-'"e (626) 350 -5944
OWNERSHIP OCCUPANTS UST
RADIUS MAPS LAND USE PLANS
MUNICIPAL COMPLIANCE CONSULTING
2106 LAMBERTAVE.EL MONTE, CA 91732 •FAX(626)350.1532
PROJECT INFORMATIO
5449 N. PECK RD.
ARCADIA, CA.
09 -113
N
A RIO HONDO
SCALE 1" 200'
FROM
gif gwa .47.7giumf,".■ t ?L.A
Ku
(ED)JUN 10 2009 :35/ST. 11:27/No. 6851262814 P 1
JUN 0 8 7.0(1q
u-r1-1 owt,1 Kit
I ,A, r4N NI
saavtoss
Front Elevation
(5449 Peck Road)
Front Elevation
(5449 Peck Road)
Northerly Side Elevation
(5449 Peck Road)
Northerly Side Elevation with Gate
(5449 Peck Road)
Southerly Side Elevation
(5449 Peck Road)
(Gate and parking are part of adjacent property)
Rear Elevation
(5449 Peck Road)
Front Parking Lot
(5449 Peck Road)
Front Parking Lot
(5449 Peck Road)
Rear of subject property looking west
(5449 Peck Road)
Interior Parking Lot/ Overflow Storage Area
(5449 Peck Road)
Interior of Warehouse
Interior of Warehouse
Office- Warehouse connection
Offices
Offices
Office Hallway
Adjacent Neighbor to the North
(5507 Peck Road)
Adjacent Neighbor to the South
(5435 Peck Road)
Across from Subject Property
(5450 Peck Road)
Across from subject property
(5460 Peck)
PRELIMINARY EXEMPTION ASSESSMENT
(Certificate of Determination When Attached to Notice of Exemption)
1. Name or description of project:
Conditional Use Permit Application No. CUP 09 -12 to operate an auto storage warehouse and yard on a 48,000
square -foot industrially zoned lot
2. Project Location Identify street address and cross streets or attach a map showing project site (preferably a
USGS 15' or 7W topographical map identified by quadrangle name):
5449 Peck Road (between McBean Drive and Goldring Road)
3. Entity or person undertaking project: A. City of Arcadia
B. Other (Private)
(1) Name: Charles V. Palazzolo
(2) Address: 9350 Lower Azusa Road
Temple City, CA 91780
(3) Phone: (626) 443 -2277 ext. 811
4. Staff Determination:
The City's Staff, having undertaken and completed a preliminary review of this project in accordance with the
City's "Local Guidelines for Implementing the California Environmental Quality Act (CEQA)" has concluded that
this project does not require further environmental assessment because:
a. The proposed action does not constitute a project under CEQA.
b. The project is a Ministerial Project.
c. The project is an Emergency Project.
d. The project constitutes a feasibility or planning study.
e. The project is categorically exempt. Applicable Exemption Class: 1
Section No.: 15301
f. The project is statutorily exempt. Applicable Exemption:
Section No.:
g. The project is otherwise exempt on the following basis:
h. The project involves another public agency which constitutes the Lead Agency.
Name of Lead Agency:
Date: June 10, 2009 Staff: Tim Schwehr, Assistant Planner
June 23, 2009
TO: Arcadia Planning Commission
FROM: Jim Kasama, Community Development Administratc
L
SUBJECT: Capital Improvement Program for 2009 -2010
SUMMARY
CIP INFORMATION
STAFF REPORT
Development Services Department
Per Section 65403(c) of the Government Code, the Planning Commission is required to make
a finding that each fiscal year's Capital Improvement Program (CIP) is consistent with the
City's General Plan. The Development Services Department is recommending that the
Planning Commission find that the CIP for the 2009 -2010 fiscal year is consistent with the
City's General Plan.
Attached for review are the list and detail forms of the capital improvement projects for the
2009 -2010 fiscal year. The projects are City buildings and facilities maintenance and
improvements, streets and public rights -of -way maintenance and improvements, sewer and
water facilities maintenance and improvements, landscaping and irrigation maintenance and
improvements, and parking and transit enhancements.
The 2009 -2010 CIP projects are consistent with the following goals, objectives,
implementation measures, and strategies set forth in the Municipal Facilities and Services
Element of the City's 1996 General Plan:
Maintain a transportation system that maximizes freedom and safety of movement;
maintains a balance between mobility and cost efficiency of maintenance; and preserves a
sense of comfort and well -being throughout the community by reducing the intrusiveness of
commercial, industrial, and regional traffic on neighborhood streets.
Provide adequate City administrative, community, and social service facilities to carry out
the mission of the City of Arcadia.
Maintain a reliable system of water, sewer and storm drain lines to meet the needs of the
community.
Reducing the number of automobile trips and providing alternatives to automobile use.
Promoting Transportation System Management and Transportation Demand Management
techniques.
Encouraging the use of alternative modes of transportation.
Promote the design of roadways to optimize safe traffic flow within established roadway
configurations by minimizing tuming movements, uncontrolled access, on- street parking,
and frequent stops to the extent consistent with the character and needs of adjacent land
uses.
Reduce the need for vehicular travel by: Supporting the responsible expansion of public
transit services within Arcadia, including the establishment of rail transit and connections
between major destinations within the community and the metropolitan area; and promoting
the use of public transit and ride sharing through development of convenient and attractive
facilities.
Pursue the establishment of rail service to Arcadia, including a transit stop within the
downtown redevelopment area.
Ensure that functional utilities such as water, wastewater and solid waste collection and
disposal meet the service standards presented in Table 6 -B of the General Plan.
Provide local park facilities and recreation areas that are appropriate for the individual
neighborhoods in which they are located, reflect the needs and interests of the population
they serve, and meet the performance standards identified in the General Plan.
Coordinate closely with the Arcadia Unified School District on an ongoing basis to resolve
issues such as expanding the joint use of facilities and the use of vacant or underutilized
school sites.
Pursue implementation of the City's Public Buildings Master Plan.
RECOMMENDATION
It is staff's opinion that the projects set forth in the 2009 -2010 Capital Improvement Program
are consistent with the City's General Plan. Therefore, based on the information set forth
above, the Planning Commission should find that the 2009 -2010 Capital Improvement
Program is consistent with the General Plan.
PLANNING COMMISSION ACTION
The Planning Commission should approve a motion to find that the 2009 -2010 Capital
Improvement Program is consistent with the City's General Plan.
If any Planning Commissioner, or other interested party has any questions or
comments regarding this matter, or any particular capital improvement project, please
contact Jim Kasama at (626) 574 -5423 or ikasama aeci.arcadia.ca.us prior to June 23,
2009 so that specific details can be made available at the Planning Commission
meeting. If necessary, the appropriate staff personnel from other departments may be
available to answer questions regarding specific projects.
Attachment: 2009 -2010 Capital Improvement Program List and Detail Forms
Capital Improvement Program
June 23, 2009
Page 2
aaniv
W
O
1?
W
a
V
N
O
J
n
E
E
1 534,700
1 000'00£
250,000
000'0£
40,000
000'9
O9t'9t
000'0
009'tr
000
938,000 1
83,000 1
45,000
000'06
300,000
213M3S
tZ9
I 10,000
000'L
000
000
97,000 I
22,000 I
000'9L
I 157
PROP C
600,000 I
100,000
XVl SVJ
Zt+t
20,000 I
500,000 1
302
CAPITAL
000'9Z
000'9
OZ8'0£
000'££
285,300
009'L
00L'90t I
000'09
30,000
000'L
meow.
100099
[00'9£
000
000'09
00£'
000'91
000'000
REQUESTING
DEPARTMENT
Public Works
I Public Works
s) ollg
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
svoM oygnd
Public Works
sJoM ollgnd
Public Works
Public Works
Public Works
Public Works
1 mom o8gnd
Public Works 1
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
1
Public Works
Public Works
anj
9.1!A
Development
1
I PROJECT DESCRIPTION
'Annual Meter Replacement Program
I SCADA System Upgrades and Computerized Utilities System Mappinc
V alve Replacement Program
'Greenscape Maintenance and Irrigation Upgrades
1
'Replacement of Calsense Irrigation Controller Components
'Metals Total Maximum Daily Load (Metals TMDL) Special Studiies
Trash Total Maximum Daily Load (Trash TMDL) Catch Basin Devices
Annual Replacement of HVAC Rooftop Units
'City Hall Maintenance Improvements
'Citywide Facility Improvements
I
'Community Center Facility Improvements
Library Facility Improvements
I
l
tlecmcal Wiring Project for Fire Station 105 Emergency Generator
(Fire Station 106 HVAC Relocation
Installation of Eledrical Lighting at First Avenue School
Installation of Vehicle Exhaust Extraction System
1
'Police Department Facility Maintenance Improvements
1
Rewire Signalized Intersections
I
Crown Restoration of City Trees
I
New Exit ADA Ramp at Museum Patio
1
Baldwin Reservoir 2 &3 Repair
L
East Raymond Basin Water Resources Program
L
Flow Meter for St. Joseph Reservoirs
L
Raymond Basin Monitoring Well
L.
Street Lighting Assessment District
4nnual Asphalt and Concrete Programs
Neter Main Replacement
l..
Structural Damage Relining Project
4nnual Sewer Inspections and CCTV Data Review
1.,
fewer System Improvement on Baldwin Avenue Design
L.
'ire Station Maintenance Program
'lymovent Exhaust System
2.
iuntington Drive WB Rehabilitation
I
d1 Ruau nenaomuauon Project From Santa Anita Avenue to El
fonte Avenue
Q
d
P)
)n
m
r
N
f 7
N
U,
N
N
N
t")
M
f�9
t
VI
M
V
n
'7
V )D
l 1
1n
N
CO
t`9
t0
LL
1t1
<D
i
r-
(O
a.
C
OTHER
ld1S
Call for Projects
9 uoq sodawd
snmwgS
snlnwfs
0803
9900
1 000'099
150,000
000'L66
797,000
000'009
000'06
000'41
705
Redevelo ment
f 000'001
50,000
150,000
000'09
520
WATER
a3M3S
129
157
PROP C
120,000
150,000
25,000
463,000
000'001
000'09
142
GAS TAX
25,000
302
CAPITAL
I 1,127,620
REQUESTING
DEPARTMENT
Development 1
Development
Development
Development
Development
Development
Development
Development
luewdelana0
Development
luawdolana0
1 Recreation and Community
PROJECT DESCRIPTION
Duarte Road Rehabilitation Project From Santa Anita Avenue to Fifth 1
n..
Gold Line Betterments (Design Only) 1
Gold Line Transit Plaza
SluawanwdWI ly!oedeO anuO uolfiu!lunH
Miscellaneous Parking Lots
Miscellaneous Traffic Signal Improvements
Pavement Management Program I
0
Santa Anita Avenue Rehabilitation Project From Foothill Boulevard to
o� c..,,. a r n.inn PPM Avenue R 1 nnnden Avenue
i
1
f
0
j
f
1!w!l AG!Q upoN of 'plus II!1400j wwj uogel!I!Qega2I el!uV etueSl
1 Santa Anita Rehabilitation From Longden Avenue to Live Oak
n..
i
I Second Avenue Accessibility
'Recreation Office Community Center ADA Counters
1 .J I
,C1N
1-
t-
I LL I
m
CO
99. I
6 8 I
16 I
E6 I
2
0
a Q
o
Lu
ce
I. PROJECT TITLE: Annual Meter Replacement Program
LOCATION: Various Locations
DEPT:
PUBLIC WORKS SERVICES
1I. LOCATION MAP
ESTIMATED
TOTAL COST 1 ,2 5(3,000
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
S
0
u
R
C
E
FY
2009 2010
250,000
FY
2010 2011
250,000
250,000
FY
2011
1
25Q,0
012
FY
2013
000
250,000
FY
2014
2 0,000
250,000
Estimated To tal
1,250,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
LABOR SOURCE: City Employees X
CONTACT PERSON: Craig Clark
Multi-year Funding Cycle
CAPITAL REQUEST: X Previously Programmed Project FY 2008
On -Going Project
New Project
Map Not Applicable
3
First and Last Name
Contract Services
2009 2010
(YEAR)
III. IMPROVEMENT DESCRIPTION
Annual program to replace approximately 1,000 to 1,200 5/8 to 2 inch meters that are beyond their useful lives with meters
that are able to be read via radio frequency. City crews will replace these meters. This program also includes larger meters
that are not radio read but have reached their useful lives.
5/8" meters 217 EAx$ 197 $42,749
x 1" meters 206 EA x 230 47,380
meters 150 EA x 232 34,800
1 "meters 199 EA x 263 52,337
1.5" meters 122 EA x 435 53,070
2 meters 21 EA x 542 11,382
The total cost is 241,718; total budget will be $250,000.
The increase in cost is due to the low lead brass environmental brass. Assembly Bill 1953 goes into effect January 1, 2010,
requiring the low lead brass. This is an increase of 14,126 from the old prices or 7,718 from the 2008 -09 budgets. The total
number of meters ordered is 1,015.
IV. IMPROVEMENT JUSTIFICATION
Accurate meter measurements and correct readings are vital to maintaining the revenue of the City's water system. The
systems' aging water meters must be replaced with new meters that are capable of being read via radio frequency. This allows
the City to capture precise measurements and readings while drastically reducing labor costs. Aside from the elimination of
misreads, these meters would include leak detection and data logging functions that will enable us to alert our citizens for
possible leaks on their properties and assist them with high bill inquiries and water usage patterns.
The cities of Chino Hills and Ontario have successfully implemented this type of radio read metering systems and are now
reaping the benefits. It would take approximately 15 years to replace the entire system with a total project cost of $2,400,000.
By going with this system, it will allow us to move one of the meter reading positions to assist with Sewer and Storm Drain
Crew.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals Capital Outlay CO
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering Parks P
Construction Prop C PC
Inspection Contingencies Sewer S
Other •lease describe 250,000 Water W 250,000
Solid Waste SW
Redevelopment R
Other •lease describe 0
Total Capital
25
Funding:
4
Total Capital
250.
I. PROJECT TITLE: SCADA System Upgrades and Computerized Utilities System Mapping
LOCATION: Various Locations
DEPT: I PUBLIC WORKS SERVICES
II. LOCATION MAP
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
ESTIMATED
TOTAL COST 200,000
S
0
U
R
C
E
FY
2009 2010
40,000
30.000
10,000
1=Y
2010
2011
40,000
30,000
10,000
FY
2011 2012
40,000
2012
FY
2013
40,000
FY
2013 2014
40,000
30,000
10,000
mated Total
2 00,000
1
50,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
LABOR SOURCE: City Employees X
CONTACT PERSON: Craig Clark
Multi -year Funding Cycle
CAPITAL REQUEST: X Previously Programmed Project FY 2008
On -Going Project
New Project
Map Not Applicable
5
First and last Name
Contract Services
X
2009 2010
(YEAR)
III. IMPROVEMENT DESCRIPTION
1. SCADA System Upgrades improve the current SCADA systems capability that would produce and store reports detailing
well production and water level history by individual well and by entire zone. This type of information would also assist in
system maintenance and overall system planning and support. ($15,000)
2. Computerized Utilities System Mapping the work consists of digitizing new sewer, water and storm drain atlas maps using
the Los Angeles County's parcel maps as a base. The database would include system information such as pipe material,
diameter, and slope; date of installation, inspections and cleaning and the location of physical features established using the
Microsoft Access database software. The database records would be linked with the features on the map and this system
would be available electronically or by hard copy to engineering and field staff. The new digital data is easy to edit and update.
Additionally, the sewer Atlas map would be converted to Map Guide SDF format (manholes and 2 layers for lines). ($25,000)
TOTAL $40,000
IV. IMPROVEMENT JUSTIFICATION
1. SCADA is a computer based automated system that operates the City's water system. Its continued operation and
maintenance are vital to the operation and control of the City's water system. Periodic and timely upgrades of equipment,
battery back -up systems, and software are necessary to maintain dependable water production and distribution to the citizens o
Arcadia.
2. The new system would replace the existing outdated sewer and water atlas maps. Existing atlases are difficult to update
because the lined originals are in poor condition and tear easily. Office staff is not able to support field crews with adequate
sewer/water maps and data information. Also a storm drain system atlas is not complete at this time.
A storm drain atlas and database are essential to the National Pollutant Discharge Elimination System (NPDES) permit
compliance, i.e. catch basin numbering and maintenance. Once this system is complete, the City would be able to efficiently
report activities to the Regional Water Quality Control Board (RWQCB). A sewer system closed circuit TV inspection data
would also be incorporated into the new database.
Assistant Engineers and interns would be digitizing maps and inputting data in close cooperation with field crews. The quality
control and product cost with this arrangement is much more favorable than contracting
work with a private engineer.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals
Land Acquisition
Plans, Specs. /Engineering
Construction
Inspection Contingencies
Other .lease describe
Total Capital
40,000
40,000
Funding:
Capital Outlay
Gas Tax
Parks
Prop C
Sewer
Water
Solid Waste
Redevelopment
Other .lease describe
6
Total Capital
CO
GT
P
PC
S
W
SW
R
0
10,000
30,000
404000
I. PROJECT TITLE: Valve Replacement Program
LOCATION: Various Locations
DEPT: [UBLIC WORKS SERVICES
11. LOCATION MAP
ESTIMATED
TOTAL COST 200,000
LABOR SOURCE: City Employees
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
X
CONTACT PERSON: Craig Clark
First and Last Name
Multi -year Funding Cycle
s
0
u
R
C
E
2009
FY
2010
40,000
40,000
2010
Y
2011
40,000'
40,000
40,000
2012
2013
40,000
40,000
2013
14.
40,000
40,000
tmated Total
240,000
200,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
Contract Services
CAPITAL REQUEST: X Previously Programmed Project FY 2008
On -Going Project
New Project
Map Not Applicable
7
X
20Q9 2010
(YEAR)
III. IMPROVEMENT DESCRIPTION
Valves which have been identified during regular inspection as being broken will be replaced by City crews or contract crews.
The work will involve excavating in the street or right -of -way to expose the valve, temporarily shutting down the water main, anc
removing the broken valve. The new valve will be installed, the watermain turned back on and tested, and the street backfilled
and the asphalt paving repaired.
IV. IMPROVEMENT JUSTIFICATION
Valves in the water main distribution system are important because they allow crews the ability to isolate sections of the system
in order to perform maintenance, repair pipe breaks, or make additions to the system. However, many of the valves in the
system are 50 years or older, and some are broken or stuck in either the open or closed position. This was discovered during
routine inspections as the crews were verying if the valves were operating correctly. The 2008 Water Master Plan also identifies
the need for these valves to be replaced and allows for a certain budget each year to perform this task.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals Capital Outlay CO
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering 3,200 Parks P
Construction 32,000 Prop C PC
Inspection Contingencies 4,800 Sewer S
Other •lease describe Water W 40,000
Solid Waste SW
Redevelopment R
Other •lease describe 0
Total Capital
40000
Funding:
8
Total Capital
I. PROJECT TITLE: Greenscape Maintenance and Irrigation Upgrades
LOCATION:
Various
DEPT: [UBLIC WORKS SERVICES
ESTIMATED
TOTAL COST 13 0,000
S
0
u
R
C
2009
FY
2
10
26000
CO
26,000
2010
FY
111
26,000
CO
W 26,000
2011
FY
2012,
*,000
26,000
FY
2912
2013;
26,000
Estimated Total
2 413 2014
CO
26,000
130,000
CO 26,000
104,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
LABOR SOURCE: City Employees
CAPITAL REQUEST:
II. LOCATION MAP
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
CONTACT PERSON: Clement Flores
First and Last Name
Multi-year Funding Cycle
Previously Programmed Project FY 2008
X On -Going Project
New Project
Map Not Applicable
9
Contract Services
X
2009 2010
(YEAR)
III. IMPROVEMENT DESCRIPTION
Scope of work includes the following:
1. FY 2009 -10: removal of existing dead oleanders along city thoroughfares, and replacement of a comparable hardy shrub
along with irrigation installation ($26,000 each year).
The locations for shrub replacement are as follows: Foothill Blvd. on the north parkway side of the city right -of -way; various
locations from Michillinda to Santa Anita;
2. FY 2010 -12: Baldwin Avenue and Santa Anita Avenue irrigation upgrades (Baldwin Avenue between Camino Real and Live
Oak, Santa Anita from Live Oak Ave. to Grandview Ave.).
Installation of New Hunter rotors or Toro pop -up heads to irrigate the median lawn surfaces in place of the existing brass pop
ups. Also replace plantar spray heads with drip irrigation. ($26,000 each year)
IV. IMPROVEMENT JUSTIFICATION
1. Oleanders have provided greenscape screen walls for the busy streets of Arcadia for many years. Unfortunately, the
oleanders have been dying off for the last several years due to a bacterial infection caused by the bite of the sharpshooter
beetle. As a result, the unsightly dead shrubs are needed to be removed and be replaced by a new viable shrub.
2. The existing brass pop -ups do not pop up high enough to clear the lawn elevation; thus causing water to bounce back from
the grass blades and onto the curb and concrete street paving, and causing the roads to become wet while irrigation occurs.
The brass pop -ups were set at the curb height level while the top of grass has elevated due to years of earth upheaval. The nevi
rotors or pop -up heads will be set at the existing grass height allowing minimal backsplash. In addition, the new irrigation
heads will allow for more efficient lawn coverage during irrigation and thus create water savings.
The drip irrigation will also create a savings of at least 50% in water reduction and avoid overspray backsplash onto the
roadway.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals
Land Acquisition
Plans, Specs. /Engineering
Construction
Inspection Contingencies
Other .lease describe
Total Capital
26,000
2
Funding:
Capital Outlay
Gas Tax
Parks
Prop C
Sewer
Water
Solid Waste
Redevelopment
Other .lease describe
1 0
Total Capital
CO
GT
P
PC
S
W
SW
R
0
26,000
26,000
I. PROJECT TITLE: Replacement of Calsense Irrigation Controller Components
LOCATION: Various Locations
DEPT:
ESTIMATED
TOTAL COST
LABOR SOURCE: City Employees
II. LOCATION MAP
PUBLIC WORKS SERVICES
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
50,000
CONTACT PERSON: Clement Flores
Multi -year Funding Cycle
First and Last Name
S
0
u
R
C
E
FY
2009
2010
10,000
10,000
5 000
5 000
2011
FY
201?
10,000
5,000
5 000
2012
FY
2013
10,000;
5,000
5 000
2013
2014
10,'A
Estimated Total
50,000
CO $25,000
25,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
Contract Services
CAPITAL REQUEST: X Previously Programmed Project FY 2008
On -Going Project
New Project
Map Not Applicable
11
X
2009 2010
(YEAR)
III. IMPROVEMENT DESCRIPTION
Calsense Irrigation Controller equipment replacement components need to be installed due to failures or and to remain up to
date with the current technology. The components are controller boards, local radios, transformers, surge protectors,
enclosures, and hand held transmitters.
IV. IMPROVEMENT JUSTIFICATION
Almost all of our existing Calsense Irrigation Controllers have been in operation in the City for about seven (7) years, with some
controllers as long as ten (10) years. Since then, technology has surpassed the usefulness of our existing controllers. In addition,
due to natural deterioration of equipment from use and aging, some components of the irrigation equipment are now beginning
to fail.
In order to keep the centrally controlled irrigation system functioning effectively, the equipment is in need of replacement to
enhance performance and /or as it begins to fail. An example to updating a controller to current technology will be at the
Community Center a ten year -old controller and although operational, has antiquated equipment that does not render
communication at the site with a hand held transmitter. Since the area encompasses three (3) buildings and the landscaped area
extends to Holly Ave, irrigation monitoring and repair work can be time consuming.. A transmitter and its associated controller
components will reduce the work in half. Two (2) controllers per year with antiquated components are proposed to be replaced
for the landscaped areas of the City.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals
Land Acquisition
Plans, Specs. /Engineering
Construction
Inspection Contingencies
Other •lease describe
Total Capital
10,000
10,000
Funding:
Capital Outlay
Gas Tax
Parks
Prop C
Sewer
Water
Solid Waste
Redevelopment
Other •lease describe
12
Total Capital
CO
GT
P
PC
S
W
SW
R
0
5,000
5,000
1'0,000
I. PROJECT TITLE:
LOCATION:
DEPT: LPUBUC WORKS SERVICES w
ESTIMATED
TOTAL COST
II. LOCATION MAP
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
Metals Total Maximum Daily Load (Metals TMDL) Special Studiies
N/A
S
0
u
R
C
E
FY
2009
20010
46,000
30,820
15,180
011
2010
Y
4,850
CO
9,950
4,900
011
2012
14,
CO 9,950
4,900
FY
2012 2013
2013
FY
2014
Estimated Total
75;700
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
LABOR SOURCE: City Employees
75,700
Contract Services
CAPITAL REQUEST: X Previously Programmed Project FY 2008
On -Going Project
New Project
CONTACT PERSON: Marie Rodriguez
Multi -year Funding Cycle
FY
13
First and Last Name
Sierra Madre
Arcadia
X
2009 2010
(YEAR)
NORTH
III. IMPROVEMENT DESCRIPTION
The Los Angeles River Metals Total Maximum Daily Load (TMDL) was adopted by the Los Angeles Region Water Quality
Control Board in 2006. The Metal TMDL was adopted to address local water body impairments in the LA River and its
tributaries. As part of the LA River watershed, the City of Arcadia is required to participate in additional monitoring and special
studies under the TMDL in three phases of compliance:
1. Coordinated Monitoring Plan to monitor water quality at locations along the LA River and its tributaries (completed FY
2008 -09)
2. Implementation Plan Submit an implementation plan to achieve compliance with the standards set in the TMDL document
(due January 2010)
3. Special Studies to evaluate the uncertainties and assumptions made in the development of the TMDL for the LA River.
This phase will start in the first quarter of 2010 and be completed in 2012
Cost Breakdown 2009/2010 Expenditure
Implementation Plan 38,000
Special Studies: 8.000
Total Cost: $46,000
IV. IMPROVEMENT JUSTIFICATION
A TMDL is a calculation of the maximum amount of a specific pollutant that a body of water can receive without negatively
impacting its beneficial uses. The Los Angeles River is listed as an impaired water body because it does not meet the water
quality standards as a result of pollution. For this reason, the Los Angeles River Metals TMDL (Metals TMDL) was approved as
an amendment to the regional Water Quality Control Plan for the Los Angeles Region (Basin Plan).
The City is required to submit an Implementation Plan by January 2010. The City will be participating with the neighboring cities
in the LA River Watershed to share the cost of putting together the Implementation Plan that will describe the goals and
activities of the watershed to reach compliance with the Metals TMDL.
The Special Studies would quantify current levels of atmospheric deposition to the watershed focusing on open space areas,
and would help quantify the amount of metals in storm water from these areas. Good scientific evidence will be necessary to
engage both the Regional Board in adjusting the TMDL's requirements and approaching Federal government in funding capital
improvements and other programs.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals
Land Acquisition
Plans, Specs. /Engineering
Construction
Inspection Contingencies
Other (please describe):
Special studies will be
conducted by a scientific lab
and consultants. Project
oversight will be handled by a
third party agency.
Total Capital
46,000
46,090 d,
Fundina:
Capital Outlay
Gas Tax
Parks
Prop C
Sewer
Water
Solid Waste
Redevelopment
Other .lease describe
14
Total Capital
CO
GT
P
PC
S
W
SW
R
0
30,820
15,180
;46,090
I. PROJECT TITLE: Trash Total Maximum Daily Load (Trash TMDL) Catch Basin Devices
LOCATION: Various Locations throughout City
II. LOCATION MAP
DEPT:
PUBLIC WORKS SERVICES
ESTIMATED
TOTAL COST 156,000
LABOR SOURCE: City Employees
CAPITAL REQUEST:
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
CONTACT PERSON: Carmen Trujillo
Multi -year Funding Cycle
15
First and Last Name
Contract Services
Previously Programmed Project FY 2008
On -Going Project
X New Project
X
2009 2010
(YEAR)
S
0
u
R
C
E
FY
2009 2010
78,000
FY
2010
2011
78.,000
SW 78,000
291
2011
FY
FY
2012
201$:
Estimated Iota
156,090
CO 156,000
#REF! Source Key: (CO) Capital Outlay, (FC) Facility Construction, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer,
#REF! (SW) Solid Waste, (W) Water, (0) Other
Map Not Applicable
III. IMPROVEMENT DESCRIPTION
The Los Angeles Regional Water Quality Control Board (LARWQCB) adopted the Trash TMDL in August 2007. This TMDL
mandates that cities must reduce their discharge of trash to the LA River by 40 by September 30th, 2008. This will be
achieved by the installation of approximately 261 catch basin devices for the City of Arcadia. The devices must be of a design
that is certified as 100% "full capture" by the LARWQCB. Installation would achieve 100% compliance with the LA River Trash
TMDL for the City of Arcadia. The device ideally allows for full and easy removal by hand from a fixed frame in the unlikely event
that trash /debris fall over the bypass of the unit, while being supported by metal bars to avoid bending and disfiguration in the
event that large objects were to strike it. This will require the unit to be replaced less frequently than a unit that is comprised of
just a screen attached to the basin wall.
IV. IMPROVEMENT JUSTIFICATION
The Los Angeles Regional Water Quality Control Board (LARWQCB) adopted the Trash TMDL in August 2007. This TMDL
mandates that cities must reduce their discharge of trash to the LA River by 40 by September 30th, 2008. Ultimately all cities
must achieve a 100% reduction /compliance with this Trash TMDL by year 2016. The inserts must be of a design that is certified
as 100% "full capture" by the LARWQCB. In staffs opinion, installation of approximately 261 catch basin inserts would achieve
100% compliance with the LA River Trash TMDL for the City of Arcadia. This is Phase 3 of the installation of these devices. In all
there will be four phases to this project, deferring project costs over four fiscal years.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals Capital Outlay CO
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering 78,000 Parks P
Construction Redevelopment R
Inspection Contingencies Sewer S
Other .lease describe Water W
Solid Waste SW
Other .lease describe 0
Total Capital
78,000
Funding:
16
Total Capital
78,000
78,000
1. PROJECT TITLE: Annual Replacement of HVAC Rooftop Units
LOCATION: Various facilities
DEPT: PUBLIC WORKS SERVICES I v
ESTIMATED TOTAL
COST
S
0
U
R
C
E
2010;
50,000
CO 33,000.00
7,000.00
2010
FY
2011
$0,000
CO 33,000.00
S 7,000.00
10,000.00
2011
FY
20
50,000
CO 33,000.00
7 000.00
10,000.00
01
FY 's
2013
50,000
CO 33,000.00
S
7 000.00
10,000.00
2013,
FY
2014
40.000
CO $40,000
ted Total
240,000':
S
CO 172,000
28,000
10,000.00 40,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer (SW) Solid Waste,
(W) Water, (0 Other
LABOR SOURCE: City Employees
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
0,000
CONTACT PERSON: Dave McVey
Multi -year Funding Cycle
First and Last Name
Contract Services
CAPITAL REQUEST: X Previously Programmed Project FY 2008
On -Going Project
New Project
II. LOCATION MAP
PROJECT
LOCATIONS
NORTH
17
2009 2010
(YEAR)
III. IMPROVEMENT DESCRIPTION
1. Replace rooftop HVAC unit #6 (Library) $19,500
2. Replace rooftop HVAC unit #4 (Service Center) $17,000
3. Replace rooftop HVAC unit #10 Community Center) $13,500
TOTAL $50,000
IV. IMPROVEMENT JUSTIFICATION
1.The existing HVAC unit (Library) is eleven (12) years old. It operates on an average of 15 hours a day, six days a week. Motor
bearings, condenser fan motors, and electrical wiring also wear out prematurely due to the extended hours of operation.
2. The existing HVAC unit (Service Center) is over sixteen (16) years old. The cooling coils have reached their maximum
operational life and therefore, need replacement. The HVAC unit operates on an average of twelve (12) hours a day, five days a
week.
3. The existing HVAC unit (Community Center) is over 14 years old with a life expectancy of 12 to 15 years. Since the cooling coils
are close to reaching their maximum operational life, it is necessary to continue the process of replacement. The HVAC unit
operates on an average of 15 hours a day, six days a week, and are critical to the operation of the Community Center.
Additionally, the maintenance costs have increased over the past year due to the age of the units.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals Capital Outlay CO
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering Parks P
Construction 50,000 Prop C PC
Inspection Contingencies Sewer S
Other •lease describe Water W
Solid Waste SW
Redevelopment R
Other lease describe 0
Total Capital
0,900
Funding:
18
33,000
7,000
10,000
Total Capital 50,000
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
I. PROJECT TITLE: City Hall Maintenance Improvements
LOCATION: Upper and Lower City Hall
DEPT:
PUBLIC WORKS SERVICES I v
ESTIMATED TOTAL
COST
CAPITAL REQUEST:
II. LOCATION MAP
LABOR SOURCE: City Employees
,A00
X
CONTACT PERSON: Dave McVey
First and Last Name
Multi -year Funding Cycle
0
U
R
C
E
t1
19
FY
8.$0,000
CO 285,300
0 534,700
10
FY I.
11
235,000
CO 235,000
111
FY
,000
100,000
Y
1
14
100,000
Estimated Total
1,335,
CO 820,300
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid Waste,
(W) Water, (0) Other
Map Not Applicable
19
Contract Services
Previously Programmed Project FY 2008
On -Going Project
New Project
2008
2009 2010
(YEAR)
III. IMPROVEMENT DESCRIPTION
This is the first phase of a multi -year facility improvement to increase the energy efficiency and aesthetics of Upper and Lower
City Hall facility. The scope of work will include the following:
1. Install new gas electric cooling and heating units ($400,000)
2. Install new t -bar ceiling and acoustic panels ($100,000)
3. Abatement ($100,000)
4. Install new double pane insulated windows and frames ($200,000)
In addition, the economic stimulus plan allocated $534,700 to the City of ARcadia via the Energy Efficiency Block Grant
Program; however, an application is still required to fund the City's energy efficiency projects. The application is beyond staffs
expertise and a consultant must be retained to assist in the completion of the application
20,000)
TOTAL $820,000
IV. IMPROVEMENT JUSTIFICATION
1. For the Upper and Lower City Hall, the existing air handler and zone control is over 30 years old. The cooling coil is unable
to provide enough cooling for the building due to the inefficient design of the coil.
For Upper City Hall, there are only five (5) heating and cooling zones for the building. Offices are unable to achieve individual
set points due to the way the building is designed. Six (6) roof top package units totaling 30 tons of cooling will need to be
placed on the roof to condition the following offices: (1) Development Services Department, (2) Engineering, (3) City Attomey,
(4) City Clerk/Cashier, (5) Information Technology, and (6) Purchasing and Code Enforcement.
For the Lower City Hall, a total of six (6) units will be installed along with new ducting and registers. The old steel ducting will
remain in place to minimize removal cost. The new units will greatly reduce the current energy consumption (Kwh) of the facility.
Similarly, units will be placed on the roof to condition the following offices: (1) Finance, (2) Administrative Services /Human
Resources, (3) City Manager, (4) City Manager front offices, (5) Mayor's Office and rear offices, (6) City Hall break room.
The new units will range from four to seven tons and will have energy efficiency rating (16 or higher) that will meet the
standards of Southern California Edison. Also the units will be controlled through the citywide computerized energy
management system to achieve the optimum energy savings for the equipment. Each office or zone will have the capability of
temperature control.
2. Due to construction of the ductwork through the ceilings, a new t -bar ceiling track and panels will be installed.
3. Abatement in the areas of construction will be required per the asbestos study performed by outside contractor.
4. The existing single pane windows were installed when the building was originally constructed. As a result, the windows do
not lock, are no longer air tight and therefore, are no longer energy efficient. New aluminum frames will replace the existing
windows which will be more energy efficient without drastically changing the design integrity of the building.
Since these are considered energy efficient projects, the City may qualify for financing incentives from the Southern California
Edison (SCE) and the U.S. Department of Energy (DOE) as part of the economic stimulus plan. The City will pursue for SCE's
rebate program for the HVAC and ceiling installation and for the window replacement.
In addition, the American Recovery and Funding authorized Congress to appropriate $3.2 billion to DOE's Energy Efficient
Improvement Program. Through this Program, the City of Arcadia has been allocated $534,700 (based on a formula grant
population and energy consumption), which is the maximum funding the City can apply for toward its energy efficiency retrofit
projects.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals
Land Acquisition
Plans, Specs. /Engineering
Construction
Inspection Contingencies
Other lease describe
Total Capital
40,000
780,000
820 000
Fundino:
Capital Outlay
Gas Tax
Parks
Prop C
Sewer
Water
Solid Waste
Redevelopment
Other (please describe):
U.S. Department of Energy's allocation
to City of Arcadia as part of the federal
government's economic stimulus plan
for energy efficient projects.
20
Total Capital
CO
GT
P
PC
S
W
SW
R
0
285,300
534,700
$20,
I. PROJECT TITLE: Citywide Facility Improvements
LOCATION: Various
DEPT:
PUBLIC WORKS SERVICES
II. LOCATION MAP
ESTIMATED
TOTAL COST 75,000
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
CONTACT PERSON: Dave McVey
First and Last Name
Multi -year Funding Cycle
2009 2010
(YEAR)
S
0
u
R
C
E
2000
2010
1
000
CO 7,500
S 3,000
4,500
2910
FY
2011
15,000
7,500
3,000
4,500
FY
2012
15,
2012
FY
013
15,000
CO 7,500
s
3,000
4,500
FY
913 2014
15,000
Estimated Total
75,00
CO 37,500
S 15,000
vv W a,5oo W W 4,500 W 22,500
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
LABOR SOURCE: City Employees X
CAPITAL REQUEST:
On -Going Project
New Project
Contract Services
X Previously Programmed Project FY 2008
Map Not Applicable
21
III. IMPROVEMENT DESCRIPTION
The scope of work involves:
1. Cleaning the lighting fixtures diffuser, lens, and replacing the existing lamps at the following City facilities: City Hall, Council
Chambers, Service Center, Fire Stations 106 and 107. ($6,500)
2. Flooring and door lock repairs ($3,500)
3. Annual paint and carpet replacement Service Center /Fleet Garage ($5,000)
TOTAL $15,000
IV. IMPROVEMENT JUSTIFICATION
With continuous operation, averaging 14 hours a day, six days a week, the existing lamps are in need of replacement. When
lamps reach their average life expectancy, the power to energize the lamp increases and therefore, the lamps would eventually
fail prematurely. By relamping every three (3) years, the lighting ballast power factor remains high which would also increase
the life of the electronic ballast under normal operations. This is an ongoing program. The Service Center is now over 12 years
old and the carpeting and linoleum flooring in the high traffic areas are starting to show wear and tear. This would be an
ongoing program until all painted surfaces are refurnished, carpeting replaced, and linoleum flooring repaired.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Es mated Cost:
Land Appraisals Capital Outlay CO 7,500
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering Parks P
Construction 15,000 Prop C PC
Inspection Contingencies Sewer S 3,000
Other lease describe Water W 4,500
Solid Waste SW
Redevelopment R
Other .lease describe 0
Total Capital
1$
monowomlimost
Funding:
22
Total Capital
15,000
I. PROJECT TITLE: Community Center Facility Improvements
LOCATION: Community Center
DEPT: PUB11C WORKS SERVICES
II. LOCATION MAP
ESTIMATED
TOTAL COST 166,700
LABOR SOURCE: City Employees X
CAPITAL REQUEST:
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
CONTACT PERSON: Dave McVey
Multi -year Funding Cycle
Previously Programmed Project FY 2008
On -Going Project
X New Project
23
First and Last Name
Contract Services
X
2009 2010
(YEAR)
S
0
u
R
C
E
200
FY
10
106,700
CO`
106,700
FY
2010
5,000
CO
15.000
FY
2
201
15,000
FY
2012
01
CO 15,000
FY
13
d
15,
CO 15,000
Estimated Total
166,700
CO 166,700
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
PROJECT
LOCATION
NORTH
III. IMPROVEMENT DESCRIPTION
The Annual Maintenance Program includes:
1. Repair interior walls, flooring, wall coverings, ceiling tiles and replace restroom laminate are necessary due to the extensive
usage of the facility. This is the second year of a multi -year project in maintaining the quality control of the facility. ($10,000)
2. Remove portable wall partitions and disassemble at the factory. Remove existing wall coverings, install new panels, new
seals, new panel sweep, acoustic seals, panel trim, and remount panels. ($65,000)
3. Install electrical service to temporarily connect the portable emergency generator to the Community Center. ($20,000)
4. Lamp and ballast replacement. ($1,200)
5. Replacement of existing three (3) public refrigerated drinking fountains with new stainless Haws type units. ($10,500)
TOTAL $106,700
IV. IMPROVEMENT JUSTIFICATION
1. The laminate in the men's and women's restrooms are failing. For this project, the existing coverings will be removed and
walls will be sealed and painted to match the existing color. Also due to roof leaks over the years, the ceiling tiles have been
damaged or stained. Therefore, portions of the ceiling tiles will need to be replaced over a five (5) year period. In addition,
the existing storage cabinets will be equipped with pullout drawers for easy access. The damaged carpet located in the
Recreation area will also be replaced. The City and contractors will be responsible for the facility upgrades.
2. The existing movable walls will be stripped and a new finish will be provided. Install new panel slides, compressible bulb
seals, sweep seals at panel sill, sweep seals at storage pocket door, acoustic seals at pocket doors where they seal against
operable wall surface, and track mounted sweep seals. Reuse all of the existing panel trim and check assembly for repair and
adjust.
3. The facility electrical switchgear is pre -wired to accept an emergency generator. The project will involve pre- wiring the
generator for connecting the electrical loads to the switchgear. Also the pigtails to be installed will directly connect to the
system for temporary operation. In the event of an earthquake, the Community Center cannot function without back up
emergency power.
4. The existing refrigerated drinking fountains ($3,500 each) are not working properly. The valves are leaking or not shutting
down completely. In addition, parts are no longer available and the new units with available parts will replace the existing
drinking fountains.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals Capital Outlay CO 106,700
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering Parks P
Construction 106,700 Prop C PC
Inspection Contingencies Sewer S
Other .lease describe Water W
Solid Waste SW
Redevelopment R
Other .lease describe 0
Total Capital
106,700
Funding:
24
Total Capital 106,700
I. PROJECT TITLE: Library Facility Improvements
LOCATION: Library
DEPT:
PUBLIC WORKS SERVICES
II. LOCATION MAP
ESTIMATED
TOTAL COST 220,000
LABOR SOURCE: City Employees X
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
CONTACT PERSON: Dave McVey
First and Last Name
Multi -year Funding Cycle
s
O
U
R
C
E
20:10
2009
CO 60,000
2010
fry
2011
40,000
CO 40,000
FY
11
201?
40,000
CO 40,000
CO 40,000
,2914
40,0tt
CO 40,000
Estimated Total
22,0,000
CO 220,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
25
Contract Services
CAPITAL REQUEST: X Previously Programmed Project FY 2008
On -Going Project
New Project
X
2009; 2010
(YEAR)
III. IMPROVEMENT DESCRIPTION
The scope of work includes:
1. Annual interior painting of the Library Phase 4 ($10,000)
2. Annual replacement of existing electronic lighting ballasts/lamps Phase 4 ($20,000)
3. Annual ceiling tile replacement ($5,500)
4. Annual library maintenance (second year) which includes the following: existing locks not opening when security code is
pushed (installing new electric mag type door locks for the employee passage doors); replacing accordion doors since they are
falling apart and not closing properly; storage cabinets and filing units are chipped; carpet is tom and separating in high traffic
areas. ($20,000)
5. Basement lighting fixture replacement ($4,500)
TOTAL $60,000
IV. IMPROVEMENT JUSTIFICATION
1. Due to the extreme usage of the facility, dirt, hand prints, and chipped corners and walls have been prevalent throughout the
facility. Re- coating of wall coverings are required due to chairs being pushed into the walls.
2. Lighting ballasts are failing at a high rate during normal business operation due to extreme heat. The new electronic ballasts
will handle the building's electrical harmonics and extensive heat build -up inside the ballast core.
3. The existing ceiling tiles are in need of replacement due to broken, mismatched and discolored tiles from the HVAC units.
The new tiles will be available through the Armstrong Company since the existing tiles are no longer manufactured.
4. This is the second year of a multi -year project in maintaining the quality control of the facility. Due to the extensive usage of
the facility, interior walls, storage cabinets, displays, doors, carpet replacement and replacement of locksets are in constant
need of repair and replacement.
5. By installing energy efficient lamps and fixtures, Edison will reimburse the City $554 toward the project. The Kilowatt hours
(kwh) saved annually will be 6,930 Kwh or $970 per year in Edison fees. As a result, the project will pay for itself in 3.7 years
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Total Capital
Fundinsa:
Land Appraisals Capital Outlay CO 60,000
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering Parks P
Construction 60,000 Prop C PC
Inspection Contingencies Sewer S
Other .lease describe Water W
Solid Waste SW
Redevelopment R
Other .lease describe 0
80,000 Total Capital
26
80,000
I. PROJECT TITLE: Electrical Wiring Project for Fire Station 105 Emergency Generator
LOCATION: Fire Station 105
DEPT: LPUBLIC WORKS SERVICES
ESTIMATED
TOTAL COST
S
0
u
R
C
E
FY
2009 2010
CO 30,000
2 01 1
FY
2012
FY
2013
FY
2013
2014
Estimated Total
30,Q00
CO'` 30,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
LABOR SOURCE: City Employees
CAPITAL REQUEST:
II. LOCATION MAP
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
30,000
CONTACT PERSON: Dave McVey
First and Last Name
Multi Funding Cycle
Previously Programmed Project FY 2008
On -Going Project
New Project
27
Contract Services
X
2009 2010
(YEAR)
Colorado BI.
Sant nita
Race k
ai
ca
c
co
c
ca
co
Santa
lara Sta
•2#
Campus
Fire Staten 105
Dr.
Q
Ili
LL.
Second Ave.
Project Location
I. PROJECT TITLE: Electrical Wiring Project for Fire Station 105 Emergency Generator
LOCATION: Fire Station 105
DEPT: LPUBLIC WORKS SERVICES
ESTIMATED
TOTAL COST
S
0
u
R
C
E
FY
2009 2010
CO 30,000
2 01 1
FY
2012
FY
2013
FY
2013
2014
Estimated Total
30,Q00
CO'` 30,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
LABOR SOURCE: City Employees
CAPITAL REQUEST:
II. LOCATION MAP
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
30,000
CONTACT PERSON: Dave McVey
First and Last Name
Multi Funding Cycle
Previously Programmed Project FY 2008
On -Going Project
New Project
27
Contract Services
X
2009 2010
(YEAR)
III. IMPROVEMENT DESCRIPTION
Add facility electrical sub panels to the existing dedicated emergency panel and install electronic transfer breakers.
IV. IMPROVEMENT JUSTIFICATION
The existing generator energizes the emergency panel dedicated to operate minimal lighting and wall receptacles. When there
is a power failure the electrical circuits energize only the fuel pumps, apparatus bay doors, and some random ceiling and wall
outlets throughout the building. Personnel is unable to perform their operations due to the lack of electrical circuits needed to
operate when a power failure or a black out occurs in the area.
The existing subpanels that provide electrical power to the building are not part of the emergency panel. The subpanels will be
re -wired to the emergency panel and incorporate shunt trip breakers. The stand -by generator, if started due to power failures,
will energize these circuits to provide electrical power to all offices. The two (2) HVAC units AC1 and AC2 will have a
programmable electronic breaker installed to monitor the load capacity of the building. The primary AC unit for upstairs
dormitories will be programmed to stay on during an outage. If the building load exceeds the generator output, AC1 downstairs
unit will shunt trip off and if required AC2 will shut down only when the load is excessive and the generator can not handle the
Toad. Once building loads stabilize, these breakers will turn back on automatically sustaining the cooling for the building.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals Capital Outlay CO 30,000
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering Parks P
Construction 30,000 Prop C PC
Inspection Contingencies Sewer S
Other •lease describe Water W
Solid Waste SW
Redevelopment R
Other •lease describe 0
Total Capital
30 ,000
Fundinsa:
28
Total Capital
I. PROJECT TITLE: Fire Station 106 HVAC Relocation
LOCATION: Fire Station 106
DEPT: PUBLIC WORKS SERVICES
ESTIMATED
TOTAL COST 35,000
LABOR SOURCE: City Employees
CAPITAL REQUEST:
II. LOCATION MAP
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
CONTACT PERSON: Dave McVey
Multi-year Funding Cycle
First and Last Name
0
u
R
C
E
FY
2009 2010
7,000
CO
7 000
FY
2010 2011
7,000
CO
7,000
FY
2011
201
7 000
2012
FY
213
7,000
CO
7,000
FY
2013 2014
7,000
CO
7,000
Estimated Total
85,000
CO 35,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
Contract Services
Previously Programmed Project FY 2008
On-Going Project
New Project
NORTH
PROJECT
LOCATION
29
2009 2010
(YEAR)
III. IMPROVEMENT DESCRIPTION
In 2006 -07 the design for this project was completed. The plan was to relocate the existing HVAC equipment from the
enclosed attic area. The equipment will be relocated to a concrete enclosure outside the building. In the meantime, if
premature failure of a compressor occurs, funding will be set aside annually to cover the cost of replacement.
IV. IMPROVEMENT JUSTIFICATION
The existing HVAC equipment is in an enclosed room at the Fire Station. Air flow is not sufficient to cool the compressors and
condensing coils of the units. Therefore, it causes the 16 -ton condensing units to operate under discharged pre heated air that
is circulating in the room. As outdoor temperature increases, the condenser and compressor increases with heat pressure,
which can cause a shut down or premature failure of the equipment.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals Capital Outlay CO 7,000
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering Parks P
Construction 7,000 Prop C PC
Inspection Contingencies Sewer S
Other .lease describe Water W
Solid Waste SW
Redevelopment R
Other .lease describe 0
Total Capital
Funding:
7,000 Total Capital
30
7, 000
BONITA 1
AV `d11N`d VIII
CALIFORNIA
1ST AVENUE
JR H S
DIAMOND
aNZ
ST
ELDORADO
ST
Q
Q
FANO
ST
-a
c93
L
I. PROJECT TITLE: Installation of Electrical Lighting at First Avenue School
LOCATION: First Avenue School
DEPT: WORKS SERVICES I
II. LOCATION MAP
ESTIMATED
TOTAL COST 100,000
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
CONTACT PERSON: Dave McVey
Multi-year Funding Cycle
First and Last Name
2009 2010
(YEAR)
S
0
u
R
C
E
01
2009
100,000
FY
2010
2011
2011
FY
FY
1 S
2012, 2012
201
FY
3914
mated Total
100,000
CO 100,000
Source Key: (CO) Capital Outlay, (FC) Facility Construction, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer,
(SW) Solid Waste, (W) Water, (0) Other
LABOR SOURCE: City Employees
CAPITAL REQUEST:
Previously Programmed Project FY 2007
On -Going Project
X New Project
PROJECT
LOCATION
NORTH
31
Contract Services
III. IMPROVEMENT DESCRIPTION
The scope of work includes the following:
Purchase and install Musco Lighting ($50,000)
Install electrical service and all related wiring ($50,000)
TOTAL $100,000
IV. IMPROVEMENT JUSTIFICATION
The Recreation Commission Board requested additional field lighting at First Avenue School since their existing lighting system
is inadequate in fully illuminating the field. This project was originally budgeted in 2007 -08. For the permit, the School District has
the plans at the Office of State Architect.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals Capital Outlay CO
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering Parks P
Construction 100,000 Redevelopment R
Inspection Contingencies Sewer S
Other .lease describe Water W
Solid Waste SW
Other .lease describe 0
Total Capital
Funding:
100, Total Capital
32
100,000
100,000'
I. PROJECT TITLE: Installation of Vehicle Exhaust Extraction System
LOCATION: Fleet Services
DEPT:
PUBLIC WORKS SERVICES
ESTIMATED
TOTAL COST 130,000
LABOR SOURCE: City Employees
CAPITAL REQUEST:
II. LOCATION MAP
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
CONTACT PERSON: Dave McVey
Multi -year Funding Cycle
First and Last Name
S
0
u
R
C
E
FY
2 009 2010
130,900
CO 65,000
26,000
39,000
010
2011
FY
2.011
201
FY
2012
201
FY
01 4
2013
Estimated Total
130,000
CO 65,000
S 26,000
W 39,900
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
Contract Services
x Previously Programmed Project FY 2008
On -Going Project
New Project
Map Not Applicable
33
2009 2010
(YEAR)
III. IMPROVEMENT DESCRIPTION
Install new vehicle exhaust system for the extraction of fumes from engines while performing maintenance and diagnostic work
in the Fleet Services Section's garage service bay area's. The system will also allow power exhaust for the welding area of the
shop where fabrication and welding repairs are performed for all equipment. The system includes exhaust reel assembly
extractors, two (2) exhaust motors mounted on the roof and structural steel support bracing for the extension of ventilation
ducting.
The project was budgeted in fiscal year of 2007 -08 ($65,000) but funding was insufficient to start the project. Due to the extra
support bracing required to the project, it was re- evaluated and budgeted for the following fiscal year for a total of $130,000.
IV. IMPROVEMENT JUSTIFICATION
Currently the Fleet Service vehicle maintenance service bays are not equipped with any means of extracting engine vehicle
exhaust while performing maintenance on vehicles. The new system will extract the exhaust fumes through powered hoses
attached to the exhaust system of all gas and diesel powered vehicles.
The proposed system is capable of capturing 100% of the vehicle exhaust emissions at the point of generation by making an
airtight seal to the tailpipe of the equipment. The system utilizes an auto start electrical control box which is certified to extract
all exhaust emissions out of the building. The system includes EPA particulate emission filter reducing up to 99% of the diesel
exhaust being emitted to the atmosphere.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals Capital Outlay CO 65,000
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering Parks P
Construction 130,000 Prop C PC
Inspection Contingencies Sewer S 26,000
Other .lease describe Water W 39,000
Solid Waste SW
Redevelopment R
Other .lease describe 0
Total Capital
130,000
Funding:
34
Total Capital
130 000
1. PROJECT TITLE: Police Department Facility Maintenance Improvements
LOCATION: Police Department
DEPT:
PUBLIC WORKS SERVICES
CAPITAL REQUEST:
II. LOCATION MAP
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
ESTIMATED
TOTAL COST 75,000
CONTACT PERSON: Dave McVey
Multi -year Funding Cycle
First and Last Name
2009 2010
(YEAR)
S
0
u
R
C
E
FY
2009
10
35,000
2010
FY
2011
10,
CO 10,000
2011
FY
2012
10,000
10,000
FY
2012
1
1%000
CO
10,000
2014
201
FY
10,
st mated Total
X5
CO 75,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
LABOR SOURCE: City Employees X
Contract Services
Previously Programmed Project FY 2008
On -Going Project
New Project
X
35
III. IMPROVEMENT DESCRIPTION
The scope ofwork includes:
As part of the Annual Maintenance Program, this is the second year of a multi -year facility improvement for the Police
Department
1. Paint lobby and high traffic area ($3,000)
2. Install new gate operator motors and chains for both east and west entrance gates ($15,000)
3. Repair roof leaks ($3,000)
4. Install new locking system between the radio and Fleet service bay area's ($1,000)
5. Ongoing lamp and ballast replacement ($1,000)
6. Replace carpet in the EOC room ($12,000)
TOTAL $35,000
IV. IMPROVEMENT JUSTIFICATION
1. The hallway and front lobby area are faded and the paint has been chipped away on the corners of the wall. Damaged areas
will patched primed and painted to match the existing color.
2. Existing gate motors are too small for the weight of gates when opening and closing. The additional stress on the motors has
damaged the gears, chain and sprockets. Installing a larger motor assembly will allow less stress on the operation.
3. South west of the building is moving and patch work is required to seal the roofing membrane.
4. Installation of a new locking system is required for security between radio and Fleet service bays.
5. Fire access doors are needed for yearly inspection of the HVAC fire damper operation.
6. Ongoing lamp and ballast replacement.
7. Installation of new carpet squares is needed due to the condition of the existing carpet. Over the years, the EOC training
room has gone through extensive exercises that have worn and damaged the carpeting also causing a possible tripping
hazard.The new carpet squares will be installed that can withstand the amount of high traffic in the room. The squares can be
changed without replacing the entire rug when it becomes worn.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals Capital Outlay CO 35,000
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering Parks P
Construction 35,000 Prop C PC
Inspection Contingencies Sewer S
Other .lease describe Water W
Solid Waste SW
Redevelopment R
Other .lease describe 0
Total Capital
3®
Funding:
36
Total Capital
35,000
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
I. PROJECT TITLE: Rewire Signalized Intersections
I1. LOCATION MAP
LOCATION:
DEPT: 1 PUBLIC WORKS SERVICES
ESTIMATED
TOTAL COST
Project Locations
20,000
CONTACT PERSON: Dave Thompson
Multi-year Funding Cycle
37
9
First and Last Name
S
O
u
R
C
E
2009
FY
2 010
2 0,000
20,000
011
2012
FY
2013
FY
2013 2014
Estimated Total
20,000
a
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
LABOR SOURCE: City Employees
Contract Services
CAPITAL REQUEST: Previously Programmed Project FY 2008
On -Going Project
X New Project
GOLR n n COURSE ARRA
Ar D
X
AV
2009 2010
(YEAR)
III. IMPROVEMENT DESCRIPTION
This project will replace the electrical wires from the controller to the traffic signals using existing conduits. The improvements
will be made at the following locations:
Duarte Rd. and Baldwin Ave.
Live Oak Ave. and Greenfield Ave.
Michillinda Ave. and Huntington Dr.
IV. IMPROVEMENT JUSTIFICATION
The existing wires that connect the traffic signals to the controller are deteriorated and are subject to frequent electrical shorts,
or ground faults, causing the signals to malfunction. Replacing the wiring will allow the signals to operate correctly and eliminate
the ground fault problem that currently exists. The re- wiring will utilize existing conduits wherever feasible.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals Capital Outlay CO
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering Parks P
Construction 50,000 Prop C PC
Inspection Contingencies Sewer S
Other •lease describe Water W
Solid Waste SW
Redevelopment R
Other •lease describe 0
Total Capital
50,000`!
Funding:
38
Total Capital
20,000
I. PROJECT TITLE: Crown Restoration of City Trees
LOCATION: Highland Oaks, Canyon, and Louise
DEPT: vusuC works SERVICES
ESTIMATED
TOTAL COST 125,000
LABOR SOURCE: City Employees
CAPITAL REQUEST:
II. LOCATION MAP
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
CONTACT PERSON: Dave Thompson
First and Last Name
Multi -year Funding Cycle
Previously Programmed Project FY 2008
On -Going Project
X New Project
39
Contract Services
X
2009, 2010
(YEAR)
s
0
U
R
C
E
2010
2009
Y
25,000
FY
2010
2011
25,000
CO 25,000
FY
2012
2.011
25,000'
CO 25,000
2012
2013
FY
2013
20.14
2v
CO 25,000
Estimated Total
12$,000
CO
25,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
III. IMPROVEMENT DESCRIPTION
This project will utilize a crown restoration method of pruning to help reduce the number of potential limbs from falling from
some of the older trees in the City and provide for a healthy and vigorous future for these majestic trees.
IV. IMPROVEMENT JUSTIFICATION
Many of the existing large Stone Pine and Ash trees are losing limbs due to the age of the trees. A pruning method known as
Crown Restoration will help alleviate the loss of large limbs and preserve the health of these large aging trees. Crown
restoration will also reduce the potential for legal claims due to large tree limbs falling. Additionally, this pro- active approach will
cut down on potential legal claims, and give residents comfort that these trees are being trimmed in this manner.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals Capital Outlay CO 25,000
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering Parks P
Construction 25,000 Prop C PC
Inspection Contingencies Sewer S
Other .lease describe Water W
Solid Waste SW
Redevelopment R
Other .lease describe 0
Total Capital
25000
Funding:
40
Total Capital
20 000
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
I. PROJECT TITLE: New Exit ADA Ram. at Museum Patio
LOCATION:
DEPT: PUBLIC WORKS SERVICES
ESTIMATED
TOTAL COST
Historical Museum
0, 000
CONTACT PERSON: Jan Balanay
First and Last Name
Multi- ear Fundin• C cle
FY
2011 201
2009 2010
(YEAR)
S
0
u
R
C
E
2009
FY
2010
2010
FY.
2011
stlmated ot
60,0198 J�2012 2013 2013 2014
,I1,,1 60 000
60 000
CO 60,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, W Water, 0 Other
LABOR SOURCE: City Employees
Contract Services
CAPITAL REQUEST: Previously Programmed Project FY 2008
On -Going Project
New Project
II. LOCATION MAP
X
41
X
III. IMPROVEMENT DESCRIPTION
Install second exit and ADA access ramp at the Historical Museum patio from North -East corner of the facility towards the
parking lot.
IV. IMPROVEMENT JUSTIFICATION
California Building Code Chapter 11 restricts the maximum occupancy load of the patio to 49 persons due to only one exit. To
increase the maximum occupancy, additional exit is required. With the additional exit, the maximum occupancy will increase to
152 persons. The project also requires improvement to the emergency lighting.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals Capital Outlay CO
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering 4,800 Parks P
Construction 48,000 Prop C PC
Inspection Contingencies 7,200 Sewer S
Other •lease describe Water W
Solid Waste SW
Redevelopment R
Other •lease describe 0
Total Capital
60,000
Fundinsa:
42
Total Capital
60,000
I. PROJECT TITLE: Baldwin Reservoir 2&3 Repair
DEPT: [PUBLIC WORKS SERVICES
ESTIMATED TOTAL
COST
LABOR SOURCE: City Employees
II. LOCATION MAP
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
2009 2010
(YEAR)
LOCATION: Baldwin Reservoir Facility, 670 W. Orange Grove Ave.
938,000
CONTACT PERSON: Ken Herman
First and Last Name
Multi -year Funding Cycle
S
0
U
R
C
E
09 =i
Y
938,000
W 938,000
01 0
FY
11
2012
FY
FY
13
14
Estimated Total
938,000
938,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid Waste, (W)
Water, (0) Other
CAPITAL REQUEST: Previously Programmed Project FY 2008
On -Going Project
X New Project
BALDWIN RESERVOIR NO. 2 3
PROJECT LOCATION
Orange Greve Av
Foothill BL
Handnglon Dr.
Slam Madre BI.
IH 210 Loa
Grandview Ave.
D
N
Colorado
NORTH
43
Contract Services
X
III. IMPROVEMENT DESCRIPTION
The Baldwin reservoir 2 &3 repair project will involve the structural repair of the columns and roof supports of the concrete
reservoirs. Strengthening of the concrete columns that support the concrete roofs of the two reservoirs at the Baldwin facility would
involve adding additional support to the outside perimeter of the columns, either by high strength fiber wrap, or by adding steel
reinforcement and a new concrete outer layer. Repair of the sliding connections of the roof to the walls of the reservoirs would
involve the replacement of the connection plates and the concrete surrounding the connections.
IV. IMPROVEMENT JUSTIFICATION
Cracks in the concrete roof support columns and broken concrete around the seismic roof restraints were observed during a routine
underwater inspection in 2002. In 2003, the reservoirs were drained and a structural inspection and evaluation were performed by
Montgomery Watson Harza Engineers. Their analysis concluded that cracks observed in the columns and broken concrete from
around the roof supports were the result of movement of the roof during past seismic events. Strengthening of the columns and
repair of the seismic roof restraints would be necessary to bring the reservoir up to the required seismic design standards and
improve the ability to withstand a design basis earthquake.
The Baldwin Reservoir Facility is a vital link to the City's water supply system. It provides storage for the domestic and fire protection
water supply serving the west side of the City (Zone 2), between Colorado Boulevard and Duarte Road. The two reservoirs on this
site have a combined storage capacity of 9.3 million gallons, which is approximately 23% of the City's total water storage.
The Water Master Plan 2008 Update identifies this project as necessary to maintain the reliability of the water system to perform in
the event of a catastrophic seismic event.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals Capital Outlay CO
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering 113,000 Parks P
Construction 750,000 Prop C PC
Inspection Contingencies 75,000 Sewer S
Other •lease describe Water W
Solid Waste SW
Redevelopment R
Other .lease describe 0
Total Capital
Fundina:
938,000
938,000 Total Capital 938,000
44
I. PROJECT TITLE: East Raymond Basin Water Resources Program
LOCATION: Various Locations
DEPT: [UBLIC WORKS SERVICES
ESTIMATED TOTAL
COST
LABOR SOURCE: City Employees
CAPITAL REQUEST:
II. LOCATION MAP
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
1,985,000
X
CONTACT PERSON: Ken Herman
Multi -year Funding Cycle
45
First and Last Name
S
0
U
R
C
E
2009
FY
83,000'
83,000
FY
2010 2011
215,000
783,000
FY
2012 2013
597,000
11
FY
2t i144
X27,000
Estimated Total
1,085,.000'`
1,988,000=
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid Waste,
(W) Water, (0) Other
Contract Services
Previously Programmed Project FY 2008
On -Going Project
X New Project
X
2009 2010
(YEAR)
Map Not Applicable
III. IMPROVEMENT DESCRIPTION
Provide funding of the Arcadia share of local funding established in the Cooperative Agreement with the Los Angeles County
Flood Control District and the City of Sierra Madre for the East Raymond Basin Water Resources Program (ERBWRP).
Projects Identified in the ERBWRP in which the City of Arcadia is involved are:
Santa Anita Debris Basin Rehab
Santa Anita Spreading Grounds Rehab
Santa Anita Dam Rehab
Arcadia Extraction Well
Water and Recycled Water System reliability Projects
Arcadia Cost -Share Total
2009/2010
Expenditure
62,300
8,900
0
0
11,800
83,000
2009 -2014
Total Expenditures
836,900
105,600
247,700
385,500
409.300
$1,985,000
IV. IMPROVEMENT JUSTIFICATION
The East Raymond Basin Water Resources Program (ERBWRP) was developed as a part of the Water System Reliability
Program (WSRP) study conducted through the US Army Corps of Engineers in order to find ways to increase water storage and
production in the East Raymond Basin. The total cost of the ERBWRP is $26.7 million, of which the federal government has
approved funding of $20 million through the Water Resources Development Act (WRDA). The Cities of Arcadia, Sierra Madre,
and the County of Los Angeles Flood Control District will fund the remaining $6.7 million through a Cooperative Agreement
approved by the City Council on April 7, 2009. Implementation of the ERBWRP is dependent on final appropriation of the $20
million in funding approved under the WRDA.
The East Raymond Basin Water Resources Program (ERBWRP) has identified five (5) projects in which the City of Arcadia
would participate in cost sharing in cooperation with the City of Sierra Madre and the Los Angeles County Flood Control District.
The purpose of these projects is to increase water storage in the East Raymond Basin through retention of storm runoff from the
Santa Anita watershed, extraction of ground water from one new well, and the implementation of water and recycled water
system reliability projects.
The East Raymond Basin has historically accounted for 15 -28% of the total groundwater pumped by the City. This contribution
dropped dramatically in 2008 due to low groundwater levels in the basin and the City is at risk of losing this basin as a source of
supply if the climate and recharging methods are not improved.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals
Land Acquisition
Plans, Specs. /Engineering
Construction
Inspection Contingencies
Other (please describe):
All work is under the
direction of the ERBWRP
Total Capital
83,000
83,000
Funding:
Capital Outlay
Gas Tax
Parks
Prop C
Sewer
Water
Solid Waste
Redevelopment
Other .lease describe
46
Total Capital
CO
GT
P
PC
S
W
SW
R
0
83,000
83,000
I. PROJECT TITLE: Flow Meter for St. Joseph Reservoirs
LOCATION: St. Joseph Facility
DEPT: [PUBLIC WORKS SERVICES
CAPITAL REQUEST:
II. LOCATION MAP
ESTIMATED
TOTAL COST 45 ,000
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
S
0
u
R
C
E
2009 2
45,000
FY
2
2,011
FY
2011 2012;
13
FY
4
Estimated Total
45,000
45,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
LABOR SOURCE: City Employees
X
CONTACT PERSON: Ken Herman
Mufti-year Funding Cycle
First and Last Name
Contract Services
Previously Programmed Project FY 2008
On -Going Project
New Project
47
X
2009 2010
(YEAR)
III. IMPROVEMENT DESCRIPTION
Install a new flow meter on Zone 4 Intake /Discharge pipeline to St. Joseph Reservoirs in the vault and connect to existing
SCADA system. The new meter is necessary to calculate nitrate levels and blending volumes for system water with St Joseph
well water.
IV. IMPROVEMENT JUSTIFICATION
Requirement of the California Department of Public Health to approve City's nitrate blending plan for St. Joseph Facility and its
well.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals Capital Outlay CO
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering 3,600 Parks P
Construction 36,000 Prop C PC
Inspection Contingencies 5,400 Sewer S
Other •lease describe Water W
Solid Waste SW
Redevelopment R
Other •lease describe 0
Total Capital
Fun in
4,000 Total Capital
48
45,000
45,000
I. PROJECT TITLE: Raymond Basin Monitoring Well
LOCATION: Eisenhower Park
DEPT: PUBLIC woRics SERVICES
LABOR SOURCE: City Employees
CAPITAL REQUEST:
II. LOCATION MAP
ESTIMATED
TOTAL COST 90,000
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
CONTACT PERSON: Ken Herman
Multi -year Funding Cycle
49
First and Last Name
S
O
U
R
C
E
FY
2009 2010
90,000
90,000
2010
FY
2011
201
Estimated Total
90,000
90,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
Contract Services
Previously Programmed Project FY 2008
On -Going Project
New Project
X
2009 2010
(YEAR)
NORTH
PROJECT
LOCATION
0
C.O
a
Q.
Oz
C.)
HAVEN
A
L_
LAUREL
NTRY
SCR
a
V
FLORAL
FOREST AV
HAVEN
NEWMAN
z
AV
AV
AV
AV
COLORADO BL
III. IMPROVEMENT DESCRIPTION
Design and construct monitoring well at Eisenhower Park per requirements form Raymond Basin Water District. The well is
expected to be 8" diameter and approximately 500 feet deep. Detail design will be prepared under the direction of Raymond
Basin Water District hydrogeologist.
IV. IMPROVEMENT JUSTIFICATION
Raymond Basin Water District Engineer and Hydrogeologist suspect that water is spilling over the Raymond Fault from
Raymond Basin to the Main San Gabriel Water Basin at or around Eisenhower Park. The well could potentially be a source of
new water for Arcadia from Raymond Basin.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals
Land Acquisition
Plans, Specs. /Engineering
Construction
Inspection Contingencies
Other lease describe
Total Capital
90,000
90,090
Funding:
Capital Outlay
Gas Tax
Parks
Prop C
Sewer
Water
Solid Waste
Redevelopment
Other •lease describe
50
Total Capital
CO
GT
P
PC
S
W
SW
R
0
90,000
90,000
I. PROJECT TITLE: Street Lighting Assessment District
LOCATION: Citywide
DEPT:
II. LOCATION MAP
PUBLIC WORKS SERVICES Ti
ESTIMATED
TOTAL COST 136,300
LABOR SOURCE: City Employees
CAPITAL REQUEST:
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
CONTACT PERSON: Maria Aquino
Multi-year Funding Cycle
FY
2011 2012
Previously Programmed Project FY 2008
On-Going Project
X New Project
51
First and Last Name
Contract Services
2009 2010
(YEAR)
0
u
R
C
E
FY
2009 2010
136,300
CO 136,300
FY
2010 2011
FY
2012
2013
FY
2013 2914
Estimated Total
136,300
136,300
0
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
Map Not Applicable
III. IMPROVEMENT DESCRIPTION
Re- balloting property owners within the boundaries of the proposed citywide District with approximately 16,500 parcels to be
assessed. Building on the prior assessment balloting, the project will include assessment engineering and balloting services
which will comprise of re- evaluating and possibly modifying the method of apportionment and annual budget, in order to
enhance the chances for a successful formation ($32,600); mailing costs for ballot printing, postage and processing ($12,500)
and as necessary, additional five (5) meetings with the consultant to confer and /or finalize the establishment of a Street
Lighting District ($5,700).
Subtotal Assessment Engineering and Balloting Services $50,800
The project will also include a public relations firm to prepare and execute a more concentrated and strategic public outreach
effort to improve the chances for the formation of a citywide Street Lighting Assessment District ($38,000). In addition to this
approach, a Direct Mail Program can be considered which consists of three (3) mailers of various specifications (bulk postage,
graphics, printing, and mail -house services) to be mailed to approximately 16,500 parcels ($47,500).
Subtotal Public Outreach Program $85,500
TOTAL $136,300
IV. IMPROVEMENT JUSTIFICATION
During the early 1970s, under the Street Lighting Act of 1919, the City's existing street lighting zones were consolidated into one
district. To address the current inequity of assessments within the City and the District's approaching sunset date of June 30,
2010, property owners were balloted on October 2008 for the establishment of a citywide Street Lighting Assessment District
via the Landscaping Lighting Act of 1972; however, the measure failed.
Re- balloting of a citywide Street Lighting Assessment District will be proposed or the City will have to shoulder the entire cost of
the City's street lighting system when the District expires on June 30, 2010.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Public Education /Outreach
Program
Total Capital 136,300 r'
Funding:
Land Appraisals Capital Outlay
Land Acquisition Gas Tax
Plans, Specs. /Engineering 50,800 Parks
Construction Prop C
Inspection Contingencies Sewer
Other (please describe): 85,500 Water
Solid Waste
52
Total Capital
CO
GT
P
PC
S
W
SW
R
0
136,300
136,300
I. PROJECT TITLE: Annual Asphalt and Concrete Programs
LOCATION: Various Street Locations Within the City
DEPT: PUBLIC WORKS SERVICES
ESTIMATED
TOTAL COST 2,900 000
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
CONTACT PERSON: Mark Rynkiewicz
Multi -year Funding Cycle
First and Last Name
2009 2010
(YEAR)
S
0
u
R
C
E
2009
FY
010
,000
500,000
011
2010
600,000
600,000
600,000
FY
2012,
?01
6 0,000
GT
600,000
Olmsted Total
2,900,1
00
GT
2,900,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
LABOR SOURCE: City Employees
1I. LOCATION MAP
X
Contract Services
CAPITAL REQUEST: X Previously Programmed Project FY 2008
On -Going Project
New Project
:4: Ofri A0E 7, 1 1
IA
v STOC<C ligrard4 r4W011PA#41,
DuA
DR
AV
ARCAD
ALTUS
PROJECT LOCATION
r
C
53
III. IMPROVEMENT DESCRIPTION
The work involves removal and replacement of deficient concrete sidewalk, concrete driveways, concrete curbs and gutters,
construction of new handicap ramps, crack sealing, slurry sealing, restriping and painting all pavement markings on various
streets within the community in order to maintain the street pavement integrity and increase the life of the asphalt and concrete.
This work may also include the removal of excessively large trees that may become laterally unstable due to the repair work.
Also regulatory signs will be installed in conjunction with this project ($6,000).
IV. IMPROVEMENT JUSTIFICATION
The existing sidewalk, curbs, gutters and handicap ramps may be raised, depressed, buckled, cracked or missing due to
adverse weather conditions, protruding tree roots or poor soil conditions. Repairs will improve uneven walking surfaces, correct
drainage flow within the gutter and remove tripping conditions that may exist. Slurry sealing and repainting traffic markings have
been an ongoing maintenance program in the City in to maintain the integrity of asphalt pavement and to increase the life of the
pavement surface by rejuvenating the existing asphalt pavement. This is part of an Eight (8) -year program with 1 /8th of the City
being slurry sealed per year as scheduled by the Pavement Management System (PMS). Zone 8 of 8 will be the area for this
year's program. Also installation of regulatory signs will be done to replace damaged signs.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals Capital Outlay CO
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering 40,000 Parks P
Construction 400,000 Prop C PC
Inspection Contingencies 60,000 Sewer S
Other lease describe Water W
Solid Waste SW
Redevelopment R
Other •lease describe 0
Total Capital
.590,000
Funding:
54
Total Capital
500,000
I. PROJECT TITLE: Water Main Replacement
LOCATION: Monte Verde Drive
DEPT:
CAPITAL REQUEST:
II. LOCATION MAP
PUBLIC WORKS SERVICES V
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
ESTIMATED
TOTAL COST 1,400,000
LABOR SOURCE: City Employees X
CONTACT PERSON: Mark Rynkiewicz
Multi -year Funding Cycle
s
O
U
R
C
FY
2009
2010
3000 000
2
FY
2011
5 i
0i
2011
FY
012
5
2012
FY'
2013
100,000
100, 000
2013
FY
2014
Estimated Total
1,4
1,400,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
X Previously Programmed Project FY 2008
On -Going Project
New Project
NORTH
PROJECT
LOCATION
ALTURA
OLANTE
DR
NONTE
LA ROSA
PALOMA
ENCANTO
PANORAMA
DE
NZA
P
a
ae
OR
O,
URIET AA
DR
RD
"AQUERO no
0
k
P 4_
O
co
Lac 0
h
o
55
First and Last Name
Contract Services
2009 2010
(YEAR)
III. IMPROVEMENT DESCRIPTION
Design and construct a new 8" and 10" ductile iron water main to replace existing 6" and 10" cast iron mains at Monte Verde
Drive from Golden West Ave to Altura due to frequent breaks, undersize, recurring leaks and inoperable gate valves.
Monte Verde Drive from Golden West to Altura Rd. 1850 LF $300,000
IV. IMPROVEMENT JUSTIFICATION
The 2008 Water Master Plan Update recommends the replacement of older water mains and water mains that have recorded
frequent leaks. In selecting pipelines for replacement staff considers the number of Teaks that have occurred on a section of
pipe over a period of time, the material the pipe is made of, and the location of the pipe in relation to other street improvement
projects. Many pipes in the City's distribution system are made of cast iron. Prior to 1950, cast iron was the preferred material
because it is strong and resists corrosion, but it is now becoming brittle. The Current City standard requires ductile iron pipe for
distribution pipe. Ductile iron pipe provides the same strength and corrosion protection as cast iron but is more ductile. Projects
are also determined by their location. The locations chosen for this fiscal year are related to frequent breaks along Monte Verde
Drive.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals
Land Acquisition
Plans, Specs. /Engineering
Construction
Inspection Contingencies
Other .lease describe
Total Capital
24,000
240,000
36,000
300,000.
Funding:
Capital Outlay
Gas Tax
Parks
Prop C
Sewer
Water
Solid Waste
Redevelopment
Other .lease describe
56
Total Capital
CO
GT
P
PC
S
W
SW
R
0
300,000
30 ®,900
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
I. PROJECT TITLE: Structural Damage Relining Project
LOCATION:
DEPT: P BLIC WORKS SERVICES
ESTIMATED
TOTAL COST
S
0
u
R
C
E
2009
FY
2010
97,000
97,000
FY
;010
2011
012
FY
013
2013 s'
4
Estimated Total
97,000
97,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
LABOR SOURCE: City Employees
CAPITAL REQUEST: X Previously Programmed Project FY 2008
On -Going Project
New Project
II. LOCATION MAP
97,000
X
CONTACT PERSON: Tiffany Lee
First and Last Name
Multi-year Funding Cycle
FY
57
Contract Services X
2009 2010
(YEAR)
Map Not Applicable
III. IMPROVEMENT DESCRIPTION
Engineering analysis of sewer pipe line cleaning, closed circuit TV (CCTV) and video taping inspections have identified pipe
segments for rehabilitation. The project will reline various segments approximately 1600 LF of broken 8" pipeline on Third
Avenue (612MH055_612MH056, 612MH060_613MH046), Alta Oaks Drive (603MH047_604MH010), Sharon Avenue
(312MH032_312MH033), and Altura Terrace (207MH016_207MH019).
IV. IMPROVEMENT JUSTIFICATION
Sewer pipe CCTV inspections and analysis of the first 50% of the data identified segments for structural relining. Sewer Master
Plan scheduled the first set of segments relining project to start in 2008.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals
Land Acquisition
Plans, Specs. /Engineering
Construction
Inspection Contingencies
Other lease describe
Total Capital
7,760
77,600
11,640
97,000
Funding:
Capital Outlay
Gas Tax
Parks
Prop C
Sewer
Water
Solid Waste
Redevelopment
Other •lease describe
58
Total Capital
CO
GT
P
PC
S
W
SW
R
0
97,000
97,000
I. PROJECT TITLE: Annual Sewer Inspections and CCTV Data Review
LOCATION: Various Locations
DEPT: I PUBLIC WORKS SERVICES
ESTIMATED
TOTAL COST 110,000
LABOR SOURCE: City Employees X
CAPITAL REQUEST:
II. LOCATION MAP
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
CONTACT PERSON: Tiffany Lee
First and Last Name
Multi -year Funding Cycle
S
0
U
R
C
FY
2010
2009
22,000
22,000
FY
2010 2011
22,000
22,000
1 11
22,000
FY
2412 2013.
22,000
013
FY
14
22,000
mated Total
1110,000
110.000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
X Previously Programmed Project FY 2008
On -Going Project
New Project
Map Not Applicable
59
Contract Services
X
2009 2010
(YEAR)
III. IMPROVEMENT DESCRIPTION
The scope of work includes the following:
1. Sewer pipe line cleaning, closed circuit TV (CCTV), and video taping inspections on areas identified by field crews.
($22,000)
IV. IMPROVEMENT JUSTIFICATION
It is necessary to provide positive and reliable information regarding the status of the City's sanitary sewer collection system to
decrease the occurrence of an overflow. The federal government mandates sewer system inspections and these
improvements had been identified by the Sewer Master Plan.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals
Land Acquisition
Plans, Specs. /Engineering
Construction
Inspection Contingencies
Other .lease describe
Total Capital
22,000
2 000
Funding:
Capital Outlay
Gas Tax
Parks
Prop C
Sewer
Water
Solid Waste
Redevelopment
Other .lease describe
60
Total Capital
CO
GT
P
PC
S
W
SW
R
0
22,000
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
I. PROJECT TITLE: Sewer S stem Im•rovement on Baldwin Avenue Desi•n
LOCATION: Baldwin Avenue between Huntin
DEPT: (PUBLIC WORKS SERVICES
ESTIMATED
TOTAL COST
S
0
U
R
C
E
FY
2009 2010
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, W Water, 0 Other
20'10 2011
wry®
LABOR SOURCE: City Employees
CAPITAL REQUEST:
II. LOCATION MAP
22
X
CONTACT PERSON: Tiffany Lee
First and Last Name
Multi- ear Fundin. C cle
Contract Services
Previously Programmed Project FY 2008
On -Going Project
X New Project
PROJECT
LOCATION
HUNTINGTON
OUTHVIEW
a m
AV
AV
ARCADIA
1
FAIRVIEW
HU I NGTON
NORTH
AV
s
61
2009 2010
(YEAR)
III. IMPROVEMENT DESCRIPTION
Design sewer system improvement on Baldwin Avenue between Huntington Drive and Duarte Road. The existing sewer pipe
was found to be deficient for peak flows. The improvement is recommended from the manhole number 309MH030 on Baldwin
Avenue to the manhole number 310MH020 in the intersection of Baldwin Avenue and Duarte Road. The existing 12- inches will
be replaced with a 15- inch pipe.
IV. IMPROVEMENT JUSTIFICATION
The Arcadia Sewer Master Plan Hydraulic Modeling 2005 recommended this improvement and the Arcadia Sewer
Maintenance personnel placed this as high on the priority list.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals Capital Outlay CO
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering 76,000 Parks P
Construction Prop C PC
Inspection Contingencies Sewer S
Other •lease describe Water W
Solid Waste SW
Redevelopment R
Other •lease describe 0
Total Capital
Fundina:
62
Total Capital
76,000
74,0
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
I. PROJECT TITLE: Fire Station Maintenance Program
LOCATION: All Arcadia Fire Facilities
DEPT:
FIRE
ESTIMATED
TOTAL COST
S
0
U
R
C
E
PY
2009
2010
15,000
CO 15,000
15,000
15,000
2011
2Q12,
1
CO 15,000
201
FY
2013
15,
CO 15, 000
FY
2013 2014
15,000
15,000
Estimated Total
75,000
CO 75,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
LABOR SOURCE: City Employees
CAPITAL REQUEST:
II. LOCATION MAP
75,000
CONTACT PERSON: Rick D. Braun
First and Last Name
Multi -year Funding Cycle
PY
Contract Services
X Previously Programmed Project FY 2008
X On -Going Project
New Project
1(
90 LL-
WE o
WE
TEIE
ORANGE GROVE AV
F� EHO
A NTA A
HU�11 INGTON
HUNTINGTON
FIRE
STATION
107
HIGH
ELEM
OR KS HI
DR
ONTAR
R, NG
F
Z
Q
ST
=IRE
ATI
105
ELDORADO
FANO
GENOA
Ir=
ALICE
PROJECT
LOCATIONS
LUCILE ST
to
NORTH
63
X
2009! 2010
(YEAR)
III. IMPROVEMENT DESCRIPTION
The Fire Station Maintenance Program provides for the following:
interior and exterior painting of all Fire facilities every six (6) years or as needed.
replacement of carpet at all Fire facilities every ten (10) years or as needed.
replacement of window coverings at all Fire facilities every ten (10) years or as needed.
replacement of office furniture as needed.
replacement of household appliances as needed.
other miscellaneous repair and replacement of items to maintain the quality of all Fire facilities.
IV. IMPROVEMENT JUSTIFICATION
The Fire Station Maintenance Program allows for planned, systematic replacement and upgrades to vital
components within the Fire Stations. Preventive maintenance, taking place on a periodical basis, controls and reduces costs,
enhances staff efficiency, allows for quality Fire facilities, and ensures fiscal responsibility for the community.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals
Land Acquisition
Plans, Specs. /Engineering
Construction
Inspection Contingencies
Other lease describe
Total Capital
15,000
15 00Q
Funding:
Capital Outlay
Gas Tax
Parks
Prop C
Sewer
Water
Solid Waste
Redevelopment
Other •lease describe
64
Total Capital
CO
GT
P
PC
S
W
SW
R
0
15,000
=15000
I. PROJECT TITLE: Plymovent Exhaust System
CAPITAL REQUEST:
DEPT: [FIRE
II. LOCATION MAP
LOCATION: Fire station 106, 630 S. Baldwin Avenue
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
ESTIMATED
TOTAL COST 100,000
CONTACT PERSON: Dave Haney
65
LABOR SOURCE: City Employees
Multi -year Funding Cycle
First and Last Name
S
0
u
R
C
E
FY
2009 2010
190,,000
CO 100,000
010
FY
2011
FY
011
2012
FY
2012
20
13
FY
2014.
stimated total
100 000
CO 100,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
Contract Services
Previously Programmed Project FY 2008
On -Going Project
X New Project
2009 2010
X
(YEAR)
III. IMPROVEMENT DESCRIPTION
This request is for a Plymovent vehicle exhaust extraction system for the fire apparatus in the engine room at Station 106.
The proposed system is capable of capturing 100% of the vehicle exhaust emissions at the point of generation by making an
airtight seal to the tailpipe of the apparatus. The system utilizes an auto -start electrical control box, which is UL tested
certified, to extract all exhaust emissions out of the building. The system includes an EPA particulate emission filter, reducing
up to 99% of the diesel exhaust being emitted to the atmosphere. This assists the City to comply with the Clean Air Act of
1990, protecting the surrounding community from the airbome contamination. Installation of this equipment will allow us to
comply with NIOSH, OSHA, IMC /BOCA/SBCCI /UMC standards hazardous material exhaust control system codes. This
system meets the needs of emergency response vehicles is fully automatic. It is compatible with all fire apparatus with
standard exhaust systems, which is critical because of our mutual aid system. This system will connect to any vehicle that
meets NFPA 1901 apparatus standards.
IV. IMPROVEMENT JUSTIFICATION
The current vehicle exhaust extraction system at Fire Station 106 is more than 13 years old and it needs to be modemized.
The current system does not capture the exhaust fumes as effectively as the proposed Plymovent does. Station 106 has
utilized a passive system for over 10 years, which is outdated substandard. Potentially harmful emissions are generated by
apparatus during startup and return to quarters in our facility.
Changes in health safety standards have identified that vehicle exhaust emissions are potentially cancer- causing substances.
Pursuing improved options of vehicle exhaust extraction will protect our personnel and the general public visiting our stations
daily. The NIOSH, American Conference of General Industrial Hygienist, and NFPA 1500 -2002 Ed. A.9.1.6. support this
request to improve the health and safety of our personnel and visitors to the fire station.
Visible accumulations of exhaust contamination have developed over the years on surfaces within the station. Installation of the
Plymovent system at Station 106 will reduce the possibility of cross contamination of supplies stored on the apparatus, in the
station, in apparatus bays, in offices and living quarters, and in public meeting rooms.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals Capital Outlay CO 100,000
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering Parks P
Construction 100,000 Prop C PC
Inspection Contingencies Sewer S
Other •lease describe Water W
Solid Waste SW
Redevelopment R
Other •lease describe 0
Total Capital
100,000
Funding:
66
Total Capital 100.000
I. PROJECT TITLE: Huntington Drive W/B Rehabilitation
LOCATION: From Holly to Baldwin
DEPT:
DEVELOPMENT SERVICES
LABOR SOURCE: City Employees X
CAPITAL REQUEST:
II. LOCATION MAP
ESTIMATED
TOTAL COST 600,000
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
CONTACT PERSON: Tim Kelleher
Multi -year Funding Cycle
S
0
U
R
C
E
2009
FY
2010
600,000
PC 600,000
2011
FY
2012
2012
FY
201
2013
FY
014
Estimated Iota
600,000
PC 600,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
Previously Programmed Project FY
On -Going Project
X New Project
67
First and Last Name
Contract Services
2009 2010
(YEAR)
X
NORTH
PROJECT
LOCATION
a
z
in WESTFIELD SANTA ANITA
SANTA ANITA MALL PARK o�
N
,J O N 9 t P y
N
COMMUNITY
HUNTINGTON DR
CENTER
FAIRVIEW A E
t vitu
puARTE"
FAIRVIEW AY
I. PROJECT TITLE: Huntington Drive W/B Rehabilitation
LOCATION: From Holly to Baldwin
DEPT:
DEVELOPMENT SERVICES
LABOR SOURCE: City Employees X
CAPITAL REQUEST:
II. LOCATION MAP
ESTIMATED
TOTAL COST 600,000
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
CONTACT PERSON: Tim Kelleher
Multi -year Funding Cycle
S
0
U
R
C
E
2009
FY
2010
600,000
PC 600,000
2011
FY
2012
2012
FY
201
2013
FY
014
Estimated Iota
600,000
PC 600,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
Previously Programmed Project FY
On -Going Project
X New Project
67
First and Last Name
Contract Services
2009 2010
(YEAR)
X
I11. IMPROVEMENT DESCRIPTION
The project involves grinding the entire street and installing 2 -inch rubberize overlay, AC patching, construction of new Curb
Ramp per ADA standards, miscellaneous concrete work, traffic loops installation and striping.
IV. IMPROVEMENT JUSTIFICATION
Huntington Drive is a major arterial which connects cities in the San Gabriel Valley. Huntington Drive between Holly Avenue
and Baldwin Avenue is showing a considerable amount of stress, cracking, roadway section failure and the development of
many potholes. According to the arterial Pavement Management Program, this section of Huntington Drive has a very low
pavement Pavement Condition Index (PCI) and is one of the highest priorities for pavement rehabilitation.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals Capital Outlay CO
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering 50,000 Parks P
Construction 500,000 Prop C PC
Inspection Contingencies 50,000 Sewer S
Other .lease describe Water W
Solid Waste SW
Redevelopment R
Other .lease describe 0
Total Capital
600,000
Funding:
68
Total Capital
600,000
600,000
I. PROJECT TITLE: Duarte Road Rehabilitation Project -From Santa Anita Avenue to El Monte Avenue
LOCATION: From Santa Anita Avenue to El Monte Avenue
DEPT:
DEVELOPMENT SERVICES
ESTIMATED
TOTAL COST 400,000
S
0
U
R
C
E
FY
2009
010
400
PC 100,000
0 300,000
FY
2010
2011
2011
FY
2012
201
Y
2013,
2013
FY
2014
Estimated To
0,000
PC 100,000
300,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
LABOR SOURCE: City Employees
CAPITAL REQUEST:
II. LOCATION MAP
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
X
CONTACT PERSON: Tim Kelleher
Multi -year Funding Cycle
Previously Programmed Project FY 2008
On -Going Project
X New Project
69
First and Last Name
Contract Services X
2009 2010
(YEAR)
N ORTH
PROJECT
LOCATION
GENOA ET
ALICE
sT
CAMPUS DR
ARCADIA
HIGH SCHOOL
LUCILE ST
DU A RT E RD
LIBRARY
"—NAME RTE RD
al
4 I
z
➢_a
O G
Y
tP
s
IV VINVS
MAGNA
VIST AV
LINDA RAE
MAGNA VISTA AV
R
LA SIERRA DR
LE ROY AV
i
I. PROJECT TITLE: Duarte Road Rehabilitation Project -From Santa Anita Avenue to El Monte Avenue
LOCATION: From Santa Anita Avenue to El Monte Avenue
DEPT:
DEVELOPMENT SERVICES
ESTIMATED
TOTAL COST 400,000
S
0
U
R
C
E
FY
2009
010
400
PC 100,000
0 300,000
FY
2010
2011
2011
FY
2012
201
Y
2013,
2013
FY
2014
Estimated To
0,000
PC 100,000
300,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
LABOR SOURCE: City Employees
CAPITAL REQUEST:
II. LOCATION MAP
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
X
CONTACT PERSON: Tim Kelleher
Multi -year Funding Cycle
Previously Programmed Project FY 2008
On -Going Project
X New Project
69
First and Last Name
Contract Services X
2009 2010
(YEAR)
III. IMPROVEMENT DESCRIPTION
The project involves grinding the entire street and installing 2 -inch rubberize overlay, AC patching, construction of new Curb
Ramp per ADA standards, miscellaneous concrete work, traffic loops installation and striping.
IV. IMPROVEMENT JUSTIFICATION
Duarte Road is an arterial which connects cities in the San Gabriel Valley. Duarte Road between Santa Anita Avenue and El
Monte Avenue is showing a considerable amount of stress, cracking, roadway section failure and the development of many
potholes. According to the arterial Pavement Management Program, this section of Duarte Road has a very low pavement
rating (Pavement Condition Index) and is one of the highest priorities for pavement rehabilitation.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Fundina:
Land Appraisals Capital Outlay
Land Acquisition Gas Tax
Plans, Specs. /Engineering 20,000 Parks
Construction 350,000 Prop C
Inspection Contingencies 30,000 Sewer
Other •lease describe Water
Solid Waste
Redevelopment
Other (please describe):
Total Capital
400,000
Stimulus $300,000
70
CO
GT
P
PC
S
W
SW
R
0
100,000
300,000
Total Capital 4O0,000
I. PROJECT TITLE: Duarte Road Rehabilitation Project From Santa Anita Avenue to Fifth Avenue
LOCATION: From Santa Anita Avenue to Fifth Avenue
DEPT:
DEVELOPMENT SERVICES
ESTIMATED
TOTAL COST 770,000
LABOR SOURCE: City Employees X
CAPITAL REQUEST:
II. LOCATION MAP
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
CONTACT PERSON: Tim Kelleher
Multi -year Funding Cycle
First and Last Name
S
0
u
R
C
E
2008
FY
2010:
0.000
PC 120,000
0 650,000
2010
FY
2011
FY
2011
012,
2012
FY
013
FY
2013
14
Estimated Total
7'i'oAo
PC 120,000
650,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
Contract Services
X Previously Programmed Project FY 2008
On -Going Project
New Project
2009 2010
X
(YEAR)
NORTH
PROJECT
LOCATION
Pr
4
RP
LIBRARY
DR
GENOA
ALICE
LUCILE STS
CHRISTINA ST
MAGNA
LINDA
FANO
A AV
RAE WY
RICHARD H DANA
JRH S�
ST
GR
CRYSTAL
MAGNA
KARI WY
c
ILENE
ALTERN
U ARTE
CHRISTIN
c
VISTA
T
ILENE
Lx]
ST
ST
Qq
ELLEN J WY
LELAND
MAGNA
AV
SIERRA
DR
L GENOA ST
VISTA Q
AV
ILENE
LEDA
ROBBINS
DR
SCOTT
PATRICIA
Q
WY
DR D
rDR�
LN
CONNIE
RAE WY
SIERRA
DR
Q
LEDA LN
PEACH
TREE
LN
71
III. IMPROVEMENT DESCRIPTION
The project involves grinding the entire street and installing 2 -inch rubberize overlay, AC patching, construction of new Curb
Ramp per ADA standards, miscellaneous concrete work, traffic loops installation and striping.
IV. IMPROVEMENT JUSTIFICATION
Duarte Road is a an arterial which connects cities in the San Gabriel Valley. Duarte Road between Santa Anita Avenue and
Fifth Avenue is showing a considerable amount of stress, cracking, roadway section failure and the development of many
potholes. According to the arterial Pavement Management Program, this section of Duarte Road has a very low pavement
Pavement Condition Index (PSI) of 54 and is one of the highest priorities for pavement rehabilitation.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost: Funding:
Land Appraisals
Land Acquisition
Plans, Specs. /Engineering 30,000
Construction 680,000
Inspection Contingencies 60,000
Other lease describe
Total Capital
770,000
Capital Outlay
Gas Tax
Parks
Prop C
Sewer
Water
Solid Waste
Redevelopment
Other (please describe):
STPL $650,000
72
CO
GT
P
PC 120,000
S
W
SW
R
O 650,000
Total Capital 770,000
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
I. PROJECT TITLE: Gold Line Betterments (Design Only)
LOCATION: Various Locations
DEPT:
DEVELOPMENT SERVICES
ESTIMATED TOTAL
COST
LABOR SOURCE:
CAPITAL REQUEST:
11. LOCATION MAP
City Employees
900,000
X
CONTACT PERSON: Phil Wray
Multi -year Funding Cycle
Previously Programmed Project FY
On -Going Project
X New Project
73
First and Last Name
2010
(YEAR)
S
0
U
R
C
E
2
2
100,000
100,000
2019
FY
2011
100,000
911
FY
201
1 0 0;0 011`
12
;Y
201
FY
2013 2914
190,000
Estimated Total
500900
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid Waste, (W)
Water, (0) Other
Contract Services
X
Map Not Applicable
III. IMPROVEMENT DESCRIPTION
This project is for betterments to various elements of the Gold Line construction through Arcadia such as, architectural treatments to
the abutment and retaining walls, facade treatments on the parking structure and bridges, sound walls and others.
IV. IMPROVEMENT JUSTIFICATION
The Gold Line Authority has informed the City that any betterments proposed by the City must be determined as soomas possible and
preferably before the project is advertised for design/build proposals. This project proposes $100,000 over the next several years to
design concepts and designate fundi ng for these improvements.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals
Land Acquisition
Plans, Specs. /Engineering
Construction
Inspection Contingencies
Other .lease describe
Total Capital
100,000
100. 000,
Funding:
Capital Outlay
Gas Tax
Parks
Prop C
Sewer
Water
Solid Waste
Redevelopment
Other .lease describe
74
Total Capital
CO
GT
P
PC
S
W
SW
R
0
100,000
100,000
I. PROJECT TITLE: Gold Line Transit Plaza
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
LOCATION: Northwest Corner of First Avenue and Santa Clara Street
DEPT:
DEVELOPMENT SERVICES
ESTIMATED TOTAL
COST
LABOR SOURCE: City Employees
CAPITAL REQUEST:
II. LOCATION MAP
vi
$0,000;
S
0
U
R
C
E
2009
FY
2910
$0";
011
2011
2012
FY
2012 2
13
PY
014
Estimated Total
50,
0'
50,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid Waste, (W)
Water, (0) Other
X
CONTACT PERSON: Phil Wray
Multi -year Funding Cycle
Previously Programmed Project FY
On -Going Project
X New Project
75
First and Last Name
Contract Services
X
2009 2010
(YEAR)
NORTH
PROJECT
LOCATION
O
cSQ 1
S
ST JOSEPH ST
3AV V1IN
T
SANTA CLARA ST SANTA CLARA ST
.f%%
FIRST AVE
SCR
c
z
u)
WHEELER ST
HUNTINGTON DR
I. PROJECT TITLE: Gold Line Transit Plaza
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
LOCATION: Northwest Corner of First Avenue and Santa Clara Street
DEPT:
DEVELOPMENT SERVICES
ESTIMATED TOTAL
COST
LABOR SOURCE: City Employees
CAPITAL REQUEST:
II. LOCATION MAP
vi
$0,000;
S
0
U
R
C
E
2009
FY
2910
$0";
011
2011
2012
FY
2012 2
13
PY
014
Estimated Total
50,
0'
50,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid Waste, (W)
Water, (0) Other
X
CONTACT PERSON: Phil Wray
Multi -year Funding Cycle
Previously Programmed Project FY
On -Going Project
X New Project
75
First and Last Name
Contract Services
X
2009 2010
(YEAR)
III. IMPROVEMENT DESCRIPTION
This project will conceptually design the Gold Line Transit Plaza located at the northwest corner of First Ave. and Santa Clara St. The
Gold Line Authority will use the design as a basis for their base line improvements. The City will follow the Gold Line construction
with a project to add en hancements to the transit plaza to upgrade the qual ity.
IV. IMPROVEMENT JUSTIFICATION
The purpose of the conceptual design is for the Gold Line Authority to use as a basis for their construction. They will be responsible
for minimal base line improvements. With our conceptual design as the base, the City will then be able to add enhanc ements with
minimal removals or reconstruction in the future.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals
Land Acquisition
Plans, Specs. /Engineering
Construction
Inspection Contingen cies
Other .lease describe
Total Capital
50,000
50,000
Funding:
Capital Outlay
Gas Tax
Parks
Prop C
Sewer
Water
Solid Waste
Redevelopment
Other .lease describe
Prop A
76
Total Capital
CO
GT
P
PC
S
W
SW
R
0
50,000
$0
50,000
I. PROJECT TITLE: Huntington Drive Ca.aci Im.rovements
LOCATION: Huntington Drive Santa Anita Ave., Santa Clara Ave., Colorado Place
DEPT: [DEVELOPMENT SERVICES
ESTIMATED TOTAL
COST 3 660 000
S
0 PC 150,000
u
R O
C
150 000
E R
FY
2009 201,
IV, 0
010
FY
2011
3,360,000
PC
682,000
0 1,946,000
732,000
2011
012
2912
2
13
FY
014
Estimated Total
3,660,000
W PC 832,000
0 2,096,000
3R
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid Waste
S
(W)
Water, (0) Other
LABOR SOURCE: City Employees
CAPITAL REQUEST:
1I. LOCATION MAP
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
X
CONTACT PERSON: Tim Kelleher
Multi -year Funding Cycle
FY
First and Last Name
Contract Services
X Previously Programmed Project FY
On -Going Project
New Project
PROJECT
LOCATIONS
77
2008
X
2010
(YEAR)
NORTH
III. IMPROVEMENT DESCRIPTION
The project involves reconstruction /widening of Huntington D rive between Colorado Place and Santa Anita Avenue to provide: 1)- a third
h of
travel lane in the westbound Hunti ngton Drive approach at Colorado Place. 2)- add a right turn lane in the northbound des approac
Santa to Anita
Huntington Drive at Santa Clara Street, and 3)- a second left tum lane on both northbound and s outhbound app
Avenue at Huntington Drive and reconstruction of median and channelization islands and traffic signal modification.
IV. IMPROVEMENT JUSTIFICATION
Huntington Drive is a major east -west corridor that provides an altenative route to the 1 -210 (Foothill) Freeway through Arcadia and
Monrovia, and serves regional commuter traffic between Downtown City of Los Angeles and several jurisdictions and communities to the
east. Huntington Drive is also a major connector to both passenger and truck vehicles using this eastern segment San Gabriel Valley to
access between Los Angeles and cities to the east. Improvements to this segment of Huntington Drive will enhance regional mobility and
will offer congestion relief in this highly used region of the City.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals
Land Acquisition
Plans, Specs. /Engineering
Construction
Inspection Contingencies
Other •lease describe
Total Capital
300,000
300,000
Funding:
Capital Outlay
Gas Tax
Parks
Prop C
Sewer
Water
Solid Waste
Redevelopment
Other •lease describe
Call For Projects
78
Total Capital
CO
GT
P
PC
S
W
SW
R
0
150,000
150,000
300,000
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
I. PROJECT TITLE: Miscellaneous Parking Lots
LOCATION:
DEPT:
II. LOCATION MAP
DEVELOPMENT SERVICES ICI
ESTIMATED
TOTAL COST 150,000
LABOR SOURCE: City Employees
CAPITAL REQUEST:
X
CONTACT PERSON: Tim Kelleher
Multi-year Funding Cycle
Previously Programmed Project FY
On -Going Project
New Project
79
First and Last Name
Contract Services
X
2009 2010
(YEAR)
S
0
u
R
C
E
FY
2010
2009
15 0,000
150,000
24
FY
2013
stirrtated Total
150,000
150,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
Map Not Applicable
III. IMPROVEMENT DESCRIPTION
The project will construct asphalt parking Tots at the following locations:
The overflow parking for the new Church in Arcadia project located just north of the golf course parking lot
The conversion of the old Church in Arcadia site to a parking lot
IV. IMPROVEMENT JUSTIFICATION
These parking lots are required as part of redevelopment projects to relocate the Church in Arcadia and prepare the old site for
reuse.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals Capital Outlay CO
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering 10,000 Parks P
Construction 120,000 Prop C PC
Inspection Contingencies 20,000 Sewer S
Other •lease describe Water W
Solid Waste SW
Redevelopment R
Other .lease describe 0
Total Capital
150,000
Funding:
80
Total Capital
150,000
150,000
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
I. PROJECT TITLE: Miscellaneous Traffic Signal Improvements
LOCATION: Various
DEPT: [DEVELOPMENT SERVICES
ESTIMATED TOTAL
COST
LABOR SOURCE: City Employees
CAPITAL REQUEST:
II. LOCATION MAP
100,000
X
CONTACT PERSON: Ramiro Gonzalez
First and Last Name
Multi-year Funding Cycle
S
O
U
R
C
E
2009
10
,o00
50,000
1©
2011
012
FY
2013
14
Estimated Total
50
10
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid Waste, (W)
Water, (0) Other
Contract Services
Previously Programmed Project FY
On -Going Project
X New Project
X
2009 2010
(YEAR)
Map Not Applicable
81
III. IMPROVEMENT DESCRIPTION
As part of the City Traffic Signal Improvement Master Plan, this project will: 1) install controller interconnection and communication
upgrades for traffic signals on Huntington Drive through the downtown district; 2) rewire Second Avenue and Huntington Drive traffic
signal; 3) Add a green right turn arrow at Huntington Drive and Santa Anita Avenue; and 4) Video detection at Santa Anita Avenue
and Colorado Boulevard, and other miscellaneous items.
IV. IMPROVEMENT JUSTIFICATION
These improvements have been identified in the City's ongoing Traffic Signal Maintenance and Improvements Master Plan.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals Capital Outlay CO
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering 5,000 Parks P
Construction 35,000 Prop C PC
Inspection Contingencies 10,000 Sewer S
Other .lease describe Water W
Solid Waste SW
Redevelopment R
Other .lease describe 0
Total Capital
50,000
Funding:
82
50,000
Total Capital
I. PROJECT TITLE: Pavement Management Program
LOCATION:
DEPT: [DEVELOPMENT SERVICES
ESTIMATED TOTAL
COST
LABOR SOURCE: City Employees
CAPITAL REQUEST:
II. LOCATION MAP
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
Arterials, Collectors and Residential Streets
1$0,000
X
CONTACT PERSON: Tim Kelleher
Multi -year Funding Cycle
First and Last Name
s
0
u
R
C
E
FY
2009 2010
9,000
10
FY
2011
2011
FY
2912
50,400
GT 25,000
PC 25,000
FY
2012
FY
2014
201:
50,000
Estimated Total
150,000
GT
75,000
Source Key: (CO Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) tolid Waste, (W)
Water, (0) Other
Previously Programmed Project FY
On -Going Project
X New Project
83
Contract Services
X
2010
(YEAR)
Map Not Applicable
III. IMPROVEMENT DESCRIPTION
The City's arterial, collector and residential streets database was integrated to MicroPaver Software which analyzes the Paving
Construction Index (PCI), i.e. the condition of streets. This program will update the PCI for City streets and provide the City with a
database of all street conditions with priorities. The existing MicroPaver computer software will be updated and additional Engineering
staff will be trained on how to util ize the information obtained to operate the progr am software and provide technical /professional
support.
IV. IMPROVEMENT JUSTIFICATION
A Pavement Management Program is a tool that is used to assist City staff in making cost effective decisions and planning for
pavement maintenance repair. As a requirement for receiving Federal and State funding, al I jurisdictions are required to certify that
they have conducted and maintained a Pavement Management Program when proposing to do street and maintenance projects, thus
inspection of the C ity's arterial and collector street conditions is necessary. It is recommended to the City that residential and local
streets be reinspected in two year intervals
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals
Land Acquisition
Plans, Specs. /Engineering
Construction
Inspection Contingen cies
Other .lease describe
Total Capital
50,000
Funding:
Capital Outlay
Gas Tax
Parks
Prop C
Sewer
Water
Solid Waste
Redevelopment
Other .lease describe
84
Total Capital
CO
GT
P
PC
S
W
SW
R
0
25,000
25,000
000
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
Santa Anita Avenue Rehabilitation Project From Foothill Boulevard to 210 Fwy
1. PROJECT TITLE: Camino Real Avenue Longden Avenue
LOCATION: From Foothill Boulevard to 210 Fwy Camino Real Avenue Longden Avenue
DEPT:
1I. LOCATION MAP
DEVELOPMENT SERVICES
ESTIMATED TOTAL
COST 1,500.,000,,
LABOR SOURCE: City Employees x
CONTACT PERSON: Tim Kelleher
Multi -year Funding Cycle
S
0
U
R
C
E
FY
2009
1,460,000;
4910
FY
!011
2
911
FY
FY
2012 2013
Estimated Tatal
1,460,000
4oa,uvu 3 PC 463,000
997,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewe (SW) Solid Waste,
(W) Water, (0) Other
CAPITAL REQUEST: X Previously Programmed Project FY 2008
On -Going Project
New Project
NORTH
PROJECT
LOCATIONS
85
First and Last Name
Contract Services
x
2009 2010
(YEAR)
-J CAMINO R AL AVE
W
L
I L
WINNIE
WY
NORMAN AVE
1
H
Q
LEMON AVE
LEMON AVE
WISTARIA AVE
AR
ATHUR VE
of ARTHURAVE
N
L N AVE
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
Santa Anita Avenue Rehabilitation Project From Foothill Boulevard to 210 Fwy
1. PROJECT TITLE: Camino Real Avenue Longden Avenue
LOCATION: From Foothill Boulevard to 210 Fwy Camino Real Avenue Longden Avenue
DEPT:
1I. LOCATION MAP
DEVELOPMENT SERVICES
ESTIMATED TOTAL
COST 1,500.,000,,
LABOR SOURCE: City Employees x
CONTACT PERSON: Tim Kelleher
Multi -year Funding Cycle
S
0
U
R
C
E
FY
2009
1,460,000;
4910
FY
!011
2
911
FY
FY
2012 2013
Estimated Tatal
1,460,000
4oa,uvu 3 PC 463,000
997,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewe (SW) Solid Waste,
(W) Water, (0) Other
CAPITAL REQUEST: X Previously Programmed Project FY 2008
On -Going Project
New Project
NORTH
PROJECT
LOCATIONS
85
First and Last Name
Contract Services
x
2009 2010
(YEAR)
III. IMPROVEMENT DESCRIPTION
The project involves grinding the entire street and installing 2 -inch rubberize overlay, some full removal and replacement, AC
patching, construction of new curb ramp per ADA compliance, miscellaneous concrete work, traffic signal modification, traffic
loops installation, striping and others.
IV. IMPROVEMENT JUSTIFICATION
According to the Citywide Pavement Program, both sections of Santa Anita Avenue (Foothill Blvd to the 210 Freeway and
Camino Real Avenue to Longden Avenue) have a PCI of 26 which means that the structural integrity of th pavement is below the
average and requires highest maintenance priority.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Funding:
Land Appraisals Capital Outlay
Land Acquisition Gas Tax
Plans, Specs. /Engineering 50,000 Parks
Construction 1,310,000 Prop C
Inspection Contingencies 100,000 Sewer
Other .lease describe Water
Solid Waste
Redevelopment
Other (please describe):
Total Capital
1 46 0, ©00
Proposition 1B
86
CO
GT
P
PC
S
W
SW
R
0
463,000
997,000
Total Capital 1,460,000
I. PROJECT TITLE: Santa Anita Rehabilitation From Foothill Blvd. to North City Limit
LOCATION: From Foothill Blvd. to North City Limit
DEPT:
DEVELOPMENT SERVICES
CAPITAL REQUEST:
1I. LOCATION MAP
ESTIMATED
TOTAL COST 897,000
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
CONTACT PERSON:
Multi -year Funding Cycle
2009 2010
(YEAR)
S
0
U
R
C
E
2009
FY
2010
897,.000.
PC 100 000
0
FY
2010
2011
FY
201
20112
FY
2 2013
Estimated Total
897,000
PC 100,000
797.000 0 797,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
LABOR SOURCE: City Employees X
Previously Programmed Project FY
On -Going Project
X New Project
f �G�tANDVIE WAVF
ANDREA LN
w
L IS
SIERRA MADRE
w
Z
VIRGINIA
CONTINUED BELOW LEFT CONTINUED BELOW LEFT
•IHWHC •P /lU'
�PERKINS D
HACIENDA DR
VIRGINIA
CONTINUED ABOVE RIGHT CONTINUED ABOVE RIGHT
YORKSHIRE v rl
RANGE OR V
N
WOODLAND AVE
SYCAMORE AVE_
PROJECT
LOCATION
NORTH
87
Contract Services
X
III. IMPROVEMENT DESCRIPTION
The project involves grinding the entire street and installing 2 -inch rubberize overlay, AC patching, construction of new Curb
Ramp per ADA standards, miscellaneous concrete work, traffic loops installation and striping.
IV. IMPROVEMENT JUSTIFICATION
Santa Anita Avenue s a major arterial which connects cities in the San Gabriel Valley. Santa Anita Avenue between Foothill
Boulevard and the north City Limit is showing a considerable amount of stress, cracking, roadway section failure and the
development of many potholes. According to the arterial Pavement Management Program, this section of Santa Anita has a 41
PCI (Pavement Condition Index) and is one of the highest priorities for pavement rehabilitation.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost: Fundina:
Land Appraisals
Land Acquisition
Plans, Specs. /Engineering 50,000
Construction 750,000
Inspection Contingencies 97,000
Other 'lease describe
Total Capital
Capital Outlay
Gas Tax
Parks
Prop C
Sewer
Water
Solid Waste
Redevelopment
Other (please describe):
Stimulus $797,000
897,000 Total Capital
88
CO
GT
P
PC 100,000
S
W
SW
R
O 797,000
897,000
I. PROJECT TITLE: Santa Anita Rehabilitation From Longden Avenue to Live Oak Avenue
LOCATION: From Longden Avenue to Live Oak Avenue
DEPT:
DEVELOPMENT SERVICES
ESTIMATED
TOTAL COST
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
0,000:;
CONTACT PERSON: Tim Kelleher
Multi -year Funding Cycle
First and Last Name
2009 2010
(YEAR)
S
0
U
R
C
FY
2009 2010
,000
PC 50,000
0 600,000
2010
FY
2011
2011
FY
2012
2012
FY
2013
JL'Y
2013
14
Estimated Tots!
650,000
PC 50,000
600,000
v 5
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
LABOR SOURCE: City Employees
CAPITAL REQUEST:
II. LOCATION MAP
X
Previously Programmed Project FY
On -Going Project
X New Project
NORTH
BIRCHCROFTST
D.
RODELL
BISHOP
WOODRUFF AVE
PL
CT
LONGDEN AVE
PALM
R
RODELL PL
O
5
O
J
LIVE OAK AVE
NMI
PROJECT
LOCATION
89
Contract Services
X
III. IMPROVEMENT DESCRIPTION
The project involves grinding the entire street and installing 2 -inch rubberize overlay, AC patching, construction of new Curb
Ramp per ADA standards, miscellaneous concrete work, traffic loops installation and striping.
IV. IMPROVEMENT JUSTIFICATION
Santa Anita Avenue s a major arterial which connects cities in the San Gabriel Valley. Santa Anita Avenue between Longden
Avenue and Live Oak Avenue is showing a considerable amount of stress, cracking, roadway section failure and the
development of many potholes. According to the arterial Pavement Management Program, this section of Santa Anita has a 26
PCI (Pavement Condition Index) and is one of the highest priorities for pavement rehabilitation.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Funding:
Land Appraisals Capital Outlay
Land Acquisition Gas Tax
Plans, Specs. /Engineering 20,000 Parks
Construction 580,000 Prop C
Inspection Contingencies 50,000 Sewer
Other .lease describe Water
Solid Waste
Redevelopment
Other (please describe):
Total Capital
650,000
Stimulus $600,000
90
Total Capital
CO
GT
P
PC
S
W
SW
R
0
50,000
600,000
650,Q00
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
I. PROJECT TITLE: Second Avenue Accessibility
LOCATION: From Huntington Drive to Duarte Road
DEPT: I DEVELOPMENT SERVICES
ESTIMATED
TOTAL COST
S
O
U
R
C
E
FY
2009 2010
90,000
90,000
2010
FY
2011
2011
201
2012
FY
2013
13
s014:
Estimated Total
90,000'
90,000
Source Key: (CO) Capital CO Y. (PC) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
P� Outla Pro P C, GT
Waste, (W) Water, (0) Other
LABOR SOURCE: City Employees
CAPITAL REQUEST:
1I. LOCATION MAP
90,000
X
CONTACT PERSON: Tim Kelleher
Multi -year Funding Cycle
Previously Programmed Project FY
On -Going Project
X New Project
CONTINUED BELOW LEFT
ALTA ST
BONITA ST
DIAMOND ST
HUNTINGTON DR
EL DOIZAISO
FANO S
ALICE ST
DU R E RO
EL DORADOS r
CONTINUED ABOVE RIGHT
PROJECT
LOCATION
NORTH
91
First and Last Name
Contract Services X
2009 2010
(YEAR)
III. IMPROVEMENT DESCRIPTION
The project includes the construction of missing sections of sidewalk and new handicapped ramps along Second Avenue
between Huntington Dr. and Duarte Rd.
IV. IMPROVEMENT JUSTIFICATION
The project is part of the Citywide ADA Master Plan. The City receives CDBG funds for the construction of accessibility
projects.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals Capital Outlay CO
Land Acquisition Gas Tax GT
Plans, Specs. /Engineering 5,000 Parks P
Construction 75,000 Prop C PC
Inspection Contingencies 10,000 Sewer S
Other •lease describe Water W
Solid Waste SW
Redevelopment R
Other lease describe 0
Total Capital
Fundina:
90,000 Total Capital
92
90,000
90,000
CITY OF ARCADIA
CAPITAL IMPROVEMENT PROJECT DETAIL FORM
I. PROJECT TITLE: Recreation Office Community Center ADA Counters
LOCATION: Recreation Office Community Center
DEPT:
I1. LOCATION MAP
RECREATION AND COMMUNII
ESTIMATED
TOTAL COST 14,000
SOURCE: City Employees
CAPITAL REQUEST:
CONTACT PERSON: Sara Somogyi
Multi -year Funding Cycle
First and Last Name
S
0
U
R
C
E
009
2010
14,000
14,000
2011
FY
2012
2012
2018
FY
113
4
Estimated Fetal'
14,0(1®
14,000
Source Key: (CO) Capital Outlay, (PC) Prop C, (GT) Gas Tax, (P) Parks, (R)Redevelopment, (S) Sewer, (SW) Solid
Waste, (W) Water, (0) Other
Contract Services
Previously Programmed Project FY 2008
On -Going Project
x New Project
Map Not Applicable
93
x
2009 2010
(YEAR)
III. IMPROVEMENT DESCRIPTION
Install ADA countertops in the recreation office and community center.
IV. IMPROVEMENT JUSTIFICATION
Countertops are not ADA accessible at this time.
V. ESTIMATED COST ITEMIZATION AND FUNDING:
Estimated Cost:
Land Appraisals
Land Acquisition
Plans, Specs. /Engineering
Construction
Inspection Contingencies
Other (please describe):
ADA improvement
Total Capital
14,000
Fundina:
Capital Outlay
Gas Tax
Parks
Prop C
Sewer
Water
Solid Waste
Redevelopment
Other .lease describe
14,000 Total Capital
94
CO
GT
P
PC
S
W
SW
R
0
14,000
14,000
RESOLUTION NO. 1794
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
ARCADIA, CALIFORNIA, DENYING CONDITIONAL USE PERMIT
APPLICATION NO. CUP 09 -05 FOR A 2,477 SQUARE -FOOT TUTORING
CENTER WITH UP TO 30 STUDENTS ON THE GROUND FLOOR OF AN
EXISTING COMMERCIAL AND RESIDENTIAL MIXED -USE
DEVELOPMENT AT 715 S. FIRST AVENUE.
WHEREAS, on March 26, 2009, an application was filed by Eileen Li of UEC
Enterprises, Inc., dba Yale Education Institute, for a 2,477 square -foot tutoring center with up
to 30 students on the ground floor of an existing commercial and residential mixed -use
development; Development Services Department Case No. CUP 09 -05, at 715 S. First
Avenue; and
WHEREAS, a public hearing was held on June 9, 2009, at which time all interested
persons were given full opportunity to be heard and to present evidence.
NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF
ARCADIA HEREBY RESOLVES AS FOLLOWS:
SECTION 1. That the factual data submitted by the Development Services
Department in the attached report is true and correct.
SECTION 2. This Commission finds:
A. That the granting of this Conditional Use Permit would be detrimental to the
public health and welfare and injurious to the property and improvements in such zone or
vicinity because there is inadequate on -site circulation to facilitate the dropping -off and
picking -up of children.
B. That the use applied for at the location indicated is properly one for which a
Conditional Use Permit is authorized.
C. That the site for the proposed use is inadequate in size and shape to accommodate
the proposed use; the site does not provide for a sufficient pick -up and drop -off area.
D. That the site abuts a street that is inadequate in width to carry the kind of traffic
that would be generated by the proposed use.
E. That the granting of such Conditional Use Permit will not adversely affect the
comprehensive General Plan.
F. That the categorical exemption determination is appropriate under the
requirements of the California Environmental Quality Act of 1970, but the project was not
approved, and therefore, a Notice of Exemption is not required.
SECTION 3. That for the foregoing reasons this Commission denies Conditional
Use Permit Application No. CUP 09 -05, for a 2,477 square -foot tutoring center with up to 30
students on the ground floor of an existing commercial and residential mixed -use
development at 715 S. First Avenue.
SECTION 4. The Secretary shall certify to the adoption of this Resolution.
Passed, approved and adopted this 23 day of June, 2009.
ATTEST:
Secretary, Planning Commission
APPROVED AS TO FORM:
Stephen P. Deitsch, City Attorney
Chairman, Planning Commission
2
1794
RESOLUTION NO. 1795
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY
OF ARCADIA, CALIFORNIA, APPROVING CONDITIONAL USE
PERMIT NO. CUP 09 -06 FOR AN AUTO GARAGE FOR THE
MAINTENANCE AND STORAGE OF COLLECTIBLE VEHICLES IN
AN EXISTING 6,200 SQUARE -FOOT WAREHOUSE AT 141 SANTA
CLARA STREET
WHEREAS, on April 17, 2009, a Conditional Use Permit application was filed by
Mr. Ben Reiling for an auto garage for the maintenance and storage of collectible vehicles
in an existing 6,200 square -foot warehouse; Development Services Department Case No.
CUP 09 -06, at property commonly known as 141 Santa Clara Street; and
WHEREAS, a public hearing was held by the Planning Commission on June 9,
2009, at which time all interested persons were given full opportunity to be heard and to
present evidence.
NOW THEREFORE, THE PLANNING COMMISSION OF THE CITY OF
ARCADIA RESOLVES AS FOLLOWS:
SECTION 1. That the factual data submitted by the Development Services
Department in the staff report dated June 9, 2009 is true and correct.
SECTION 2. This Commission finds:
1. That the granting of such Conditional Use Permit will not be detrimental to
the public health or welfare, or injurious to the property or improvements in such zone or
vicinity, and that the project is exempt from the requirements of the California
Environmental Quality Act (CEQA) per Section No. 15301 of the CEQA Guidelines as
existing facilities involving negligible or no expansion of the use beyond that existing at
the time of the lead agency's determination.
2. That the use applied for at the location indicated is a proper one for which a
Conditional Use Permit is authorized.
3. That the site for the proposed use is adequate in size and shape to
accommodate said use. All yards, spaces, walls, fences, loading, landscaping and other
features including the parking are adequate to adjust said use with the land and uses in the
neighborhood. The proposed project complies with all related zoning requirements as set
forth in the Arcadia Municipal Code.
4. That the site abuts streets and highways adequate in width and pavement type
to carry the kind of traffic generated by the proposed use.
5. That the granting of such Conditional Use Permit will not adversely affect the
comprehensive General Plan because the land use and current zoning are consistent with
the General Plan.
6. That the use applied for will not have a substantial adverse impact on the
environment, and that based upon the record as a whole there is no evidence that the
proposed project will have any potential for an adverse effect on wildlife resources or the
habitat upon which the wildlife depends.
SECTION 3. That for the foregoing reasons this Commission grants
Conditional Use Permit No. CUP 09 -02 for an auto garage for the maintenance and
storage of collectible vehicles in an existing 6,200 square -foot warehouse at 141 Santa
Clara Street, subject to the following conditions:
1. The 600 square -foot non permitted temporary canopy structure shall be
removed within 60 days. Any permanent shade structure to replace the canopy shall
2 1795
comply with all applicable Building, Fire, and Safety Codes and shall be subject to
Architectural Design Review approval.
2. The use approved by CUP 09 -06 is limited to the proposed private
automobile garage and storage, which shall be utilized and maintained in a manner that is
consistent with the proposal and plans submitted and approved for CUP 09 -06.
3. Noncompliance with the plans, provisions and conditions of approval for
CUP 09 -06 shall be grounds for immediate suspension or revocation of any approvals,
which could result in the closing of the auto garage and storage.
4. All City requirements regarding disabled access and facilities, occupancy
limits, building safety, parking and site design shall be complied with to the satisfaction
of the Building Official, Community Development Administrator, Fire Marshal, and
Public Works Services Director. The subject property and building shall be inspected by
the Fire Prevention Bureau, and any and all requirements shall be complied with to the
satisfaction of the Fire Marshal.
5. The applicant shall defend, indemnify, and hold harmless the City of Arcadia
and its officers, employees, and agents from and against any claim, action, or proceeding
against the City of Arcadia, its officers, employees or agents to attack, set aside, void, or
annul any approval or condition of approval of the City of Arcadia concerning this project
and/or land use decision, including but not limited to any approval or condition of
approval of the City Council, Planning Commission, or City Staff, which action is
brought within the time period provided for in Government Code Section 66499.37 or
3 1795
other provision of law applicable to this project or decision. The City shall promptly
notify the applicant of any claim, action, or proceeding concerning the project and/or land
use decision and the City shall cooperate fully in the defense of the matter. The City
reserves the right, at its own option, to choose its own attorney to represent the City, its
officers, employees, and agents in the defense of the matter.
6. Approval of CUP 09 -06 shall not take effect until the property owner(s)
and applicant have executed and filed the Acceptance Form available from the
Development Services Department to indicate awareness and acceptance of these
conditions of approval.
SECTION 4. The Secretary shall certify to the adoption of this Resolution.
Passed, approved and adopted this 23rd day of June, 2009.
ATTEST:
Secretary, Planning Commission
APPROVED AS TO FORM:
Stephen P. Deitsch, City Attorney
Chairman, Planning Commission
4 1795
The Planning Commission of the City of Arcadia met in regular session on Tuesday, June 9, 2009
at 7:00 p.m., in the Council Chambers of the City of Arcadia, at 240 W. Huntington Drive, with
Chairman Beranek presiding.
PLEDGE OF ALLEGIANCE
ROLL CALL:
PRESENT: Commissioners Baderian, Baerg, Hsu, Parrille and Beranek
ABSENT: None
OTHERS ATTENDING
MINUTES
ARCADIA PLANNING COMMISSION
Tuesday, June 9, 2009, 7:00 P.M.
Arcadia City Council Chambers
Development Services Director Jason Kruckeberg
City Engineer Phil Wray
Community Development Administrator Jim Kasama
Senior Planner Lisa Flores
Associate Planner Tom Li
Senior Administrative Assistant Billie Tone
SUPPLEMENTAL INFORMATION FROM STAFF REGARDING AGENDA ITEMS
Mr. Kasama said there was a letter given to each Commissioner regarding Item 2.
TIME RESERVED FOR THOSE IN 'IRE AUDIENCE WHO WISH TO ADDRESS THE
PLANNING COMMISSION ON NON PUBLIC HEARING MATTERS Five minute time
limit per person
None
PUBLIC HEARINGS
1. GENERAL PLAN UPDATE REVIEW PROPOSED LAND USE CHANGES
Citywide
The Planning- Commission considered the proposed land use designations and land use
alternatives for the General Plan Study areas in order to make a recommendation to the City
Council.
Senior Planner Lisa Flores presented the staff report. She noted that the preliminary land use
concept was presented to the City Council/Planning Commission in a joint study session on
February 24, 2009. The City Council/Planning Commission agreed that the overall land use
concept was appropriate, but felt that the recommendations for mixed use development were
too aggressive and could result in too much change. The staff report presented at this meeting
addressed these issues.
Mr. Kruckeberg pointed out that the only major changes since this project was first presented
to the Commission on May 12, were in the commercial areas of the City. He noted that the
build out numbers shown on the handout are 2945 units by 2035, and about 2.6 million square
feet of non residential floor area. This amount of growth is consistent with the Southern
California Association of Government's (SCAG) projection for the area. Any significant
changes would mostly be in the Downtown area and along Live Oak Avenue. Most of the
dwellings that make up the new 2,945 units would be in the R -3 zones where the infrastructure
is already in place to support this type of use. This projected growth can be accommodated by
increasing the density in those areas from the existing 24 units per acre to 30 units per acre,
and since many of the existing, older developments are already at this density, there will not be
a noticeable change to the character of the neighborhoods.
Mr. Kruckeberg said that the City's economic consultant has provided some analysis for
prospective development of two lots in the downtown area and one lot on Live Oak. Staff
considered different scenarios for a mixing of residential and commercial development to
determine whether recommendations included in the General Plan Update were economically
practical. It was found that the economic analyses showed that increasing the floor area ratio
and allowing more commercial development in these areas is not the answer to getting
additional development. This is due to the fact that under current zoning it is very difficult to
build new projects at the necessary density because our densities are low and parking
requirements and land costs are high. When the amount of residential units in the equation was
increased in the form of mixed use developments, we found that the projects became more
economically viable and this will more likely encourage new development.
Mr. Kruckeberg noted that the city now has a requirement for three parking spaces per unit
which is very high and said that one of the challenges will be to adjust parking standards and
parking rates in conjunction with the increased density.
Mr. Kruckeberg reminded the Commissioners that the Land Use Concept is only a portion of
the General Plan Update and that the Environmental Impact Report and full Draft General Plan
will be presented for their review at a later date.
Chairman Beranek called for questions from the Commissioners.
There were none.
Chairman Beranek asked if anyone wanted to speak in favor of the project.
Mr. Rich Deluvio, a member of the General Plan Advisory Committee (GPAC), said that he fully
supported the proposal and commended staff for the high quality of their work.
Mr. Robert Lum also commended the consultants and staff for a fantastic job. He said that he
supports this plan for the future growth of Arcadia.
Ms. Mary Dougherty, a GPAC member, said that she is pleased with the focus on the
concentrated plan for development particularly in the Live Oak area. She encouraged support for
the project.
PC MINUTES
6 -9-09
Page 2
Chairman Beranek asked if anyone wanted to speak in opposition to the project.
There were none.
MOTION:
It was moved by Commissioner Baderian, seconded by Commissioner Hsu, to close the public
hearing.
Without objection the public hearing was closed.
Commissioner Baderian asked about the potential displacement of the thrift shops on Live Oak
Avenue. Mr. Kruckeberg said there was nothing in the plan that would make the thrift shops non-
conforming and there was no plan to relocate them.
Commissioner Baderian asked about the Los Angeles County Debris Basin designation. Mr.
Kruckeberg said that there are two designations for open space; one is similar to a park and the
other if for resource protection. The recommendation is that resource protection is the
appropriate designation for this area.
Commissioner Baderian asked if the city's infrastructure would be able to handle the additional
traffic, etc. generated over the coming years. Mr. Kruckeberg explained that the Environmental
Impact Report will address those issues and determine what changes are necessary.
Commissioner Hsu stated his appreciation for the GPAC, city staff and consultants on their many
hours of hard work to develop the General Plan Update.
MOTION:
It was moved by Commissioner Hsu, seconded by Commissioner Parrille, to forward a
recommendation of approval of the Land Use Concept to the City Council.
Chairman Beranek, a GPAC member, said that it was an interesting process and he felt that a
good plan was developed.
Mr. Kruckeberg noted that this project is only a portion of the General Plan and that
development of the update will continue throughout the summer with the final plan being
presented for approval in November or December.
ROLL CALL:
AYES: Commissioners Baderian, Baerg, Hsu, Parrille and Beranek
NOES: None
2. MODIFICATION NO. MC 09 02 AND SINGLE FAMILY ARCHITECTURAL DESIGN
REVIEW NO. SFADR 09 05 Referred by Modification Committee
1227 South Tenth Avenue
Sergio Gonzalez (Architect representing property owner, Helen Yung Wan)
PC MINUTES
6 -9-09
Page 3
The applicant is requesting the following modifications and architectural design review for a
detached accessory living quarter /guest house:
1. A full kitchen where one is not allowed;
2. A livable floor area of 998 square feet in lieu of 600 square feet maximum allowed; and
3. Two (2) bedrooms, a laundry room, and two (2) bathrooms in lieu of one (1) bedroom and
one (1) bathroom allowed.
Associate Planner Tom Li presented the staff report.
Chairman Beranek called for questions from the Commissioners.
There were none.
Chairman Beranek asked if anyone wanted to speak in favor of the project.
Mr. Sergio Gonzalez, the architect on the project, offered to answer questions. Mr. Gonzalez
said that the neighbors' concerns had been taken into consideration. He said that the proposed
structure will not interfere with the solar panels on the neighbor's house and that no windows
were placed facing the neighbor's property.
Commissioner Baerg noted that there is a large new house currently in plan check and he asked
why the elderly relative cannot be accommodated there. Mr. Gonzalez said that there will be
teenage children living in the main house and that the elderly person needs special care and
privacy. He said that the accessory living quarters must also accommodate a nurse.
Commissioner Parrille asked what the distance was from the proposed structure to the pool on
the adjoining property. Mr. Gonzalez said that to the north there is 12 to 14 feet between the
guest house and the pool and to the south there is over 60 feet.
Chairman Beranek asked if anyone wanted to speak in opposition to the project.
Ms. Pat Wolfe, the owner of the property to the north of the proposed guest house, said that at
one time her family considered buying this property, but they were told that they could not join
the properties unless they were prepared to demolish one of the houses, yet this applicant is
proposing to build two houses on the lot. Ms. Wolfe said that she is concerned about the
proximity of the proposed guest house to her stables and wondered if she would still be able to
use those stables. If not, the value of her property would be negatively affected. Ms. Wolfe
also pointed out that when the original use for which the guest house was intended is no longer
necessary, the guest house will probably become a rental unit.
Mr. Gary Wolfe, co -owner of the neighboring property with Ms. Wolfe, said that when they
bought their property, it included a main house and separate guest house which was used as a
rental. As a condition of escrow they removed the kitchen facilities in the guest house. He
asked how the use of this proposed guest house as a rental will be prevented and enforced. Mr.
Wolfe said that his family expects to stay at this address for a long time and they want to
continue to keep horses. He is concerned that the proposed guest house will change the
character of the neighborhood.
PC MINUTES
6 -9-09
Page 4
MOTION:
MOTION:
Ms. Myah Wolfe said she has lived in Arcadia since she was nine years old and that the
original owners of the property were her grandparents. She said they have always maintained
horses on this property. Ms. Wolfe pointed out that the property at 1125 Tenth Avenue used to
have horses too. However, the current owner, Mr. Wong had the stables demolished and she
believes he would love to see this guest house permitted so that he too could add a guest house
to his property. Ms. Wolfe said she has seen many houses in Arcadia overshadowed by denser
housing and large palaces and she hopes that the Commissioners agree with her that this is not
desireable.
Chairman Beranek asked if the applicant wanted to speak in rebuttal.
Mr. Gonzalez stated that his clients have no intention of forcing the neighbors to move their
horses, they are only seeking approval for their project. He pointed out that the proposed guest
house is only one story with no windows facing the neighbor's property. He said that renting
the guest house on a two million dollar property doesn't make sense. He said the applicant is
willing to comply with any regulations on preventing rental of the guest house.
It was moved by Commissioner Parrille, seconded by Commissioner Hsu, to close the public
hearing.
Without objection the public hearing was closed.
Commissioner Hsu asked staff if this guest house will have a negative impact on the neighbor's
use of their stables or on their horses. Mr. Li said there would only be an elderly person and a
nurse in the guest house and he didn't think there would be any impact on the use of the horse
property.
Commissioner Baderian said that he understands the intention of constructing a guest house for
the care of a family member, but current city codes and requirements must be given
consideration. He said that he is not comfortable approving this request because it opens doors
to future requests for the same thing. He suggested adding a room in the main house for the
elderly family member.
Commissioner Parrille asked if this project could change a single- family area to multi family.
Commissioner Baerg said that recommendation 3 stated that if horses are maintained at an
adjacent property, redesign may be necessary, and we know that there are horses on the
property. He pointed out that approval is often based on something unique about a property, but
there is nothing unique about this property to make a separate unit necessary. He said that he
feels it is necessary to examine the impact on the neighbor's property rights.
It was moved by Commissioner Parrille, seconded by Commissioner Baderian, to deny
Modification No. MC 09 -02 and Single Family Architectural Design Review No. SFADR 09-
05.
PC MINUTES
6 -9 -09
Page 5
ROLL CALL:
AYES: Commissioners Baderian, Baerg, Hsu, Parrille and Beranek
NOES: None
There is a five working day appeal period. Appeals are to be filed by 5:30 p.m. on Tuesday,
June 16, 2009.
3. CONDITIONAL USE PERMIT NO. CUP 09 05 Continued from April 28, 2009
715 South First Avenue
UEC Enterprises, Inc., dba Yale Education Institute (Lessee)
The applicant is requesting a Conditional Use Permit for a 2,150 square -foot tutoring center
with up to 30 students on the ground floor of an existing commercial /residential mixed -use
building. The hours of operation will be 10:00 a.m. to 7:00 p.m., seven days a week.
Associate Planner Tom Li presented the staff report.
Chairman Beranek called for questions from the Commissioners.
There were none.
Chairman Beranek asked if anyone wanted to speak in favor of the project.
Mr. William Chang translated for Ms. Judy Chang. Ms. Chang said that where children are
involved safety is most important. She promised to follow all directions of the Commission and
make sure parents pick up their children in the basement and not at the curbside. Ms. Chang
pointed out that it is convenient to drop off children in the basement because there will be six
spaces reserved for this purpose and the elevator and stairway are only a few steps away. She
said the property has been vacant for over six months and she is still making payments on it so
she was glad to finally find a renter.
Ms. Sarah Kuo, real estate broker, said that the applicant is willing to work with staff to develop
the best plan to insure the safety of the children. She also said that even though it is difficult to
monitor, she hopes there will be a way to work this out.
Chairman Beranek asked if anyone wanted to speak in opposition to the project.
There were none.
MOTION:
It was moved by Commissioner Baderian, seconded by Commissioner Hsu, to close the public
hearing.
Without objection the public hearing was closed.
Commissioner Baderian said that the Commission had asked staff and the applicant to devise a
plan to solve the drop off problems at this site. He said it seems that the situation has not been
PC MINUTES
6 -9 -09
Page 6
MOTION:
resolved; in fact, not much has changed since the case was first presented to the Commission
on April 28, 2009.
Commissioner Hsu said that he is also concerned about the drop off plan and that it is
inconvenient to have cars turn into underground parking facilities from First Avenue and this
could impact traffic on First Avenue.
It was moved by Commissioner Baderian, seconded by Commissioner Hsu, to deny
Conditional Use Permit No. CUP 09 -05.
ROLL CALL:
AYES: Commissioners Baderian, Baerg, Hsu, Parrille and Beranek
NOES: None
A Resolution reflecting the decision of the Planning Commission will' be presented for
adoption at the next Commission meeting. There is a five working day appeal period after
the adoption of the Resolution.
4. CONDITIONAL USE PERMIT NO, CUP 09 06
141 Santa Clara Street
Ben Reiling (Property Owner)
The applicant is requesting a Conditional Use Permit to legalize an existing auto garage for
the maintenance and storage of collectible vehicles in an existing 6,200 square -foot
warehouse, and to legalize a non permitted 600 square foot canopy.
Associate Planner Tom Li presented the staff report.
Chairman Beranek called for questions from the Commissioners.
There were none.
Chairman Beranek asked if anyone wanted to speak in favor of the project.
Mr. Ben Reiling, the property owner, said that the property was once used as an auto repair
center but it is now home to his private car collection which is visited by friends and family
only.
Commissioner Parrille asked Mr. Reiling if he was in agreement with staff's recommendations
on the canopy and limited storage. Mr. Reiling said he had no objection.
Chairman Beranek asked if anyone wanted to speak in opposition to the project.
There were none.
PC MINUTES
6 -9 -09
Page 7
MOTION:
MOTION:
It was moved by Commissioner Baderian, seconded by Commissioner Parrille, to close the
public hearing.
Without objection the public hearing was closed.
MOTION:
It was moved by Commissioner Parrille, seconded by Commissioner Baderian, to approve
Conditional Use Permit No. CUP 09 -06, subject to the conditions in the staff report.
ROLL CALL:
AYES: Commissioners Baderian, Baerg, Hsu, Parrille and Beranek
NOES: None
A Resolution reflecting the decision of the Planning Commission wilt be presented for
adoption at the next Commission meeting. There is a five working day appeal period after
the adoption of the Resolution.
CONSENT ITEMS
5. MINUTES OF MAY 12, 2009
It was moved by Commissioner Baderian, seconded by Commissioner Parrille, to approve the
minutes of May 12, 2009, as presented.
Without objection the minutes were approved as presented.
MATTERS FROM CITY COUNCIL AND PLANNING COMMISSION
Chairman Beranek congratulated Commissioner Baderian on his Lifetime Community Service
Award from the City of Pasadena.
Chairman Beranek also announced that the Planning Commission reorganization will be on the
next agenda.
MODIFICATION COMMITTEE MEETING ACTIONS
Commissioner Parrille said there was one item on the Modification Committee agenda this
morning; he described project and said it was approved.
FURTHER MATTERS FROM STAFF
Mr. Kasama reviewed upcoming agenda items.
PC MINUTES
6 -9-09
Page 8
ADJOURNED
ATTEST:
Secret Planning Commission
PC MINUTES
6 -9-09
Page 9