HomeMy WebLinkAboutDecision Letter
DEVELOPMENT SERVICES DEPARTMENT
ArcadiaCA.gov | 240 West Huntington Drive, Arcadia, CA 91007 | (626) 574- 5415
Delivered via email
yutong@archturae.com
August 26, 2025
Yutong Xie
112 N. Earle St.
San Gabriel, CA 91775
Subject: Multiple-Family Architectural Design Review No. MFADR 24-04
Project Address: 1015 Sunset Blvd.
Dear Applicant:
The public comment period for the Notice of Pending Decision ended on August 21, 2025.
Staff did not receive any comments during the notification period. After careful review and
consideration, staff determined that the proposed project complies with City’s Multifamily
Residential Design Guidelines and the Development Code. Therefore, the Development
Services Department has conditionally approved the multi-family design review project, for
a new 10-unit, multi-family development which will comprise of three, three-story, Modern-
style buildings with attached two-car garages. Units will have floor areas ranging from
approximately 1,800 square feet to 2,000 square feet. The project will also provide five (5)
guest parking spaces, six (6) bicycle parking stalls, and over 2,000 square feet of total private
open space in compliance with the Development Code. This MFADR 24-04 approval is
subject to the following conditions:
Planning Division
1. The project shall be developed and maintained by the Property Owner/Applicant in a
manner that is consistent with the plans and materials conditionally approved for
Multiple-Family Architectural Design Review No. MFADR 24-04.
2. Any utility or mechanical equipment, such as backfiow devices, visible from the
public right-of-way, shall be screened from public views. Screening may include
landscaping or other methods deemed appropriate for the development. The
placement and height of said screening shall be subject to review and approval by the
Deputy Development Services Director or designee.
Page 2 of 6
Building Services
3. Units 1-4, and 7-10 shall be subject to the Multifamily Housing Accessibility
requirements per Chapter 11A of the California Building Code (CBC §1102 A.1).
4. The project shall comply with the latest adopted edition of the following codes as
applicable:
a. California Building Code
b. California Electrical Code
c. California Mechanical Code
d. California Plumbing Code
e. California Energy Code
f. California Fire Code
g. California Green Building Standards Code
h. California Existing Building Code
i. Arcadia Municipal Code
5. The project shall comply with Chapter 35A Multiple Family Construction Standards
as amended in the Arcadia Municipal Code Section 8130.20.
6. A demolition permit shall be obtained from the Building Services Division prior to the
removal and/or demolition of structures on site.
Public Works Services - Water
7. Prior to building permit issuance, a Water Meter Permit Application shall be
submitted to the Public Works Services Department.
8. A 12” ductile iron water main with 85 psi static pressure on Sunset Blvd. is available
for domestic use and flre service.
9. The Property Owner/Applicant shall provide calculations to determine the maximum
commercial demand and maximum flre demand in order to verify the required water
service size.
10. Domestic water service for residential multi-family use shall be served by a common
master meter.
11. The Property Owner/Applicant shall separate the flre service from domestic water
service at each unit with an approved backfiow prevention device.
Page 3 of 6
12. A separate water service and meter shall be required for landscape irrigation at the
common shared area. A reduced pressure backfiow device shall be installed.
13. The Property Owner/Applicant shall install a new water service in accordance with
the speciflcations of the Public Works Services Department, Engineering Section.
14. The Property Owner/Applicant shall be responsible for the abandonment of existing
water services, if necessary, in compliance with Public Works Services Department,
Engineering Section speciflcations.
Public Works Services - Stormwater Pollution Prevention
15. The Property Owner/Applicant shall:
a) Prepare and submit a Low Impact Development (LID) Plan.
b) Conduct a Stormwater Pollution Prevention Plan (SWPPP) to address
construction Best Management Practices (BMPs) and provide proof to the City.
c) Obtain coverage under the State's Construction General Permit (CGP) and provide
proof to the City before a permit is issued to the project.
Public Works Services – Sewer
16. The Property Owner/Applicant shall coordinate and obtain a “will serve” letter from
the Los Angeles County Sanitation Districts (LACSD). A County sewer line is available
on Sunset Blvd.
17. If possible, the project shall utilize the existing sewer lateral(s).
Engineering Services
18. The Property Owner/Applicant shall coordinate with utility companies to
underground all overhead utilities including but not limited to cable television,
telephone, and electrical systems. Easements shall be provided, as necessary.
19. Any electrical transformer, if required by the utility company, shall be located outside
of the public right-of-way, and on private property.
20. The Property Owner/Applicant shall perform the following off-site improvement:
a) Remove existing driveway approach, curb drain(s) and construct a new
driveway approach per City Standard 801-1.
Page 4 of 6
b) Remove and replace curb and gutter with 2’ slot cut from property line to
property line.
c) Remove and replace sidewalk per City Standard 802-1 through 3 from property
line to property line.
21. Prior to occupancy, the developer shall repair any damages caused by the
development to the street frontages from property line to property line including but
not limited to trench cuts and construction traffic, per the direction of the City
Engineer. If the street is under the City’s pavement moratorium list, the repair may
extend from curb to curb, per the direction of the City Engineer.
Fire Department
22. Fire protection requirements shall be as stipulated by the Arcadia Fire Department
and shall be conformed to Arcadia Standard Plan. A separate flre service with Double
Check Detector Assembly (DCDA) shall be installed for flre service if required.
23. All structures shall be flre sprinklered per the City of Arcadia Fire Department Single
& Multi-Family Dwelling Sprinkler Standard.
24. A public flre hydrant shall be provided adjacent to the main entry driveway.
25. A knox switch shall be provided for any vehicular gate.
General Conditions
26. Prior to building permit issuance, a Landscape Plan in compliance with the City’s
Water Efficient Landscape Ordinance (WELO) shall be submitted to the Building
Serviced Division with the project plans for review and approval.
27. The Property Owner/Applicant shall comply with all City requirements regarding
building safety, flre prevention, detection, suppression, emergency access, public
right-of-way improvements, parking, water supply and water facilities, sewer
facilities, trash reduction and recycling requirements, and National Pollutant
Discharge Elimination System (NPDES) measures to the satisfaction of the Building
Official, Fire Marshal, Public Works Services Director, and Deputy Development
Services Director, or their respective designees. Compliance with these
requirements is to be determined by having fully detailed construction plans
submitted for plan check review and approval by the foregoing City and employees.
28. To the maximum extent permitted by law, Applicant must defend, indemnify, and hold
the City, any departments, agencies, divisions, boards, and/or commissions of the
City, and its elected officials, officers, contractors serving as City officials, agents,
Page 5 of 6
employees, and attorneys of the City (“Indemnitees”) harmless from liability for
damages and/or claims, actions, or proceedings for damages for personal injuries,
including death, and claims for property damage, and with respect to all other actions
and liabilities for damages caused or alleged to have been caused by reason of the
Applicant’s activities in connection with Multiple-Family Architectural Design Review
No. MFADR 24-04 (“Project”) on the Project site, and which may arise from the direct
or indirect operations of the Applicant or those of the Applicant’s contractors, agents,
tenants, employees or any other persons acting on Applicant’s behalf, which relate
to the development and/or construction of the Project. This indemnity provision
applies to all damages and claims, actions, or proceedings for damages, as
described above, regardless of whether the City prepared, supplied, or approved the
plans, speciflcations, or other documents for the Project.
In the event of any legal action challenging the validity, applicability, or interpretation
of any provision of this approval, or any other supporting document relating to the
Project, the City will promptly notify the Applicant of the claim, action, or proceedings
and will fully cooperate in the defense of the matter. Once notifled, the Applicant
must indemnify, defend and hold harmless the Indemnitees, and each of them, with
respect to all liability, costs and expenses incurred by, and/or awarded against, the
City or any of the Indemnitees in relation to such action. Within 15 days’ notice from
the City of any such action, the Applicant shall provide to the City a cash deposit to
cover legal fees, costs, and expenses incurred by City in connection with defense of
any legal action in an initial amount to be reasonably determined by the City Attorney.
The City may draw funds from the deposit for such fees, costs, and expenses. Within
5 business days of each and every notice from City that the deposit has fall en below
the initial amount, Applicant shall replenish the deposit each and every time in order
for City’s legal team to continue working on the matter. The City shall only refund to
the Developer any unexpended funds from the deposit within 30 days of: (i) a flnal,
non-appealable decision by a court of competent jurisdiction resolving the legal
action; or (ii) full and complete settlement of legal action. The City shall have the right
to select legal counsel of its choice that the Applicant reasonably approves. The
parties hereby agree to cooperate in defending such action. The City will not
voluntarily assist in any such third-party challenge(s) or take any position adverse to
the Applicant in connection with such third-party challenge(s). In consideration for
approval of the Project, this condition shall remain in effect if the entitlement(s)
related to this Project is rescinded or revoked, at the request of the Applicant or not.
There is a ten (10) day appeal period for this application. To flle an appeal, a completed
Appeal Application form must be submitted to the Community Development Division along
with a $772.00 appeal fee by 5:30 p.m. on Monday, September 8, 2025. You will be notifled
if an appeal is flled.
Page 6 of 6
Approval of Multiple-Family Architectural Design Review No. MFADR 24-04 shall not go into
effect unless the Property Owner and Applicant have executed and flled the enclosed
Acceptance Form to indicate awareness and acceptance of these conditions of approval.
The Acceptance Form is due now and if it is not received by September 25, 2025, or if the
project is appealed, this approval will become null and void.
This approval shall expire in one year (September 9, 2026) from the effective date unless
plans are submitted to Building Services for plan-check, a building permit is issued and the
construction is diligently pursued, a certiflcate of occupancy has been issued, or the
approval is renewed. The flnal plans must be consistent with the approved design concept
plans and any conditions of approval. Any inconsistency from the approved design concept
plans may preclude the issuance of a building permit.
An extension may be granted by the Development Services Director or designee, or the
Review Authority that approved the project for a maximum period of one (1) year from the
initial expiration date. An extension can only be granted if the required flndings can be made.
Please note that acceptance of an extension request does not indicate approval of an
extension.
A building permit must be obtained prior to any construction activity. Please contact Building
Services at (626) 574-5416 to determine the type of documentation, plans, and fees for the
appropriate permit. This approval letter must be presented to Building Services to initiate the
permitting process.
You may visit the City’s website at www.ArcadiaCA.gov/noticesanddecisions to view this
notice. If you have any questions, please contact me at (626) 574-5422, or by email at
gyesayan@ArcadiaCA.gov. Thank you.
Sincerely,
DEVELOPMENT SERVICES DEPARTMENT
Community Development Division / Planning Services
Gary Yesayan
Associate Planner
c: Provenance Development LLC, Property Owner.
Attachment:
Acceptance Form
CITY OF ARCADIA
ACCEPTANCE FORM
Development Services Department
Community Development Division-Planning Services
240 West Huntington Drive
Arcadia, CA 91007
Issued 8/26/25
APPLICATION NO.: Multiple-Family Architectural Design Review No. MFADR 24-04
SUBJECT PROPERTY: 1015 Sunset Blvd
I am/We are the applicant(s), and the owner(s), or the duly authorized representative(s)
of the owner(s), respectively, of the project and real property that is the subject of the above
application(s).
I am/We are aware of, understand, and accept, all the provisions and conditions
imposed upon the project and real property that is the subject of the above application(s),
and also understand that noncompliance with said provisions and conditions shall
constitute grounds for the immediate suspension or revocation of any approvals granted
through said application(s).
I/We certify and declare under penalty of perjury that the foregoing is true and correct.
APPLICANT’S SIGNATURE DATE
PRINT NAME
PROPERTY OWNER’S SIGNATURE DATE
PRINT NAME
Approval of your application shall not be of effect unless the property owner and
applicant have executed and filed this Acceptance Form to indicate awareness and
acceptance of these conditions of approval. The Acceptance form is due now and if it
is not received by September 25, 2025, this approval will become null and void and all
fees will be forfeited.