Loading...
HomeMy WebLinkAboutHSA020-00_South CAFO Improvement - AS-BUILT - HALA SignedPROJECT LOCATION 210 FOOTHILL FREEWAYFOR SANTA ANITA PARK DEVELOPMENT SERVICES DEPARTMENT CITY OF ARCADIA SOUTH CAFO BASIN & SANTA ANITA PARK UTILITY FACILITIES A S - B U I L T ABBREVIATIONS: ENGINEER: OWNER: SOILS ENGINEER:EARTHWORK: SHEET INDEX SHT NO.DESCRIPTION C-1 TITLE SHEET C-2 DEMOLITION PLAN C-3 GRADING PLAN C-4 STORM DRAIN PROFILES C-5 DETAIL SHEET C-5A OUTLET CONTROL STRUCTURAL SHEETS C-5B OUTLET CONTROL STRUCTURAL SHEETS C-6 DETAIL SHEET C-7 DETAIL SHEET C-8 DETAIL SHEET C-9 DETAIL SHEET C-10 STORM TRAP DETAIL SHEET C-11 STORM TRAP DETAIL SHEET C-12 STORM TRAP DETAIL SHEET C-13 STORM TRAP DETAIL SHEET SS000 GENERAL NOTES SS100 SUPPORT OF EXCAVATION PLAN SS200 ELEVATIONS AND SECTIONS SS201 ELEVATIONS AND SECTIONS SS202 ELEVATIONS AND SECTIONS SS500 TYPICAL DETAILS AND SCHEDULE SOUTH CAFO BASIN SHEET C-1 NOTE: LEGEND: TITLE SHEET HSA010-01 DECLARATION OF ENGINEER OF RECORD: GENERAL NOTES: GRADING NOTES: UTILITY NOTE: SHEET INDEX SHT NO.DESCRIPTION M-1 CIVIL SITE PIPING AND PROFILE M-2 MECHANICAL PLAN M-3 MECHANICAL SECTION M-4 MECHANICAL DETAILS M-5 MECHANICAL SPECIFICATION 1 M-6 MECHANICAL SPECIFICATION 2 M-7 MECHANICAL SPECIFICATION 3 E-1 ELECTRICAL NOTES & LEGEND E-2 SINGLE LINE DIAGRAM E-3 ELECTRICAL SCHEDULES E-4 ELECTRICAL SITE PLAN E-5 CONNECTION & CONDUIT DIAGRAM E-6 ELECTRICAL DETAILS I-1 P&ID LEGEND I-2 P&ID GRADING SCHEDULE AS-BUILT 09/17/2025 HUNSAKER LOS ANGELES, INC. 26074 AVENUE HALL, SUITE 23 VALENCIA, CA 91355 JASON H. FUKUMITSU RCE 40695 DATE DEVELOPMENT SERVICES DEPARTMENT CITY OF ARCADIA SOUTH CAFO BASIN & SANTA ANITA PARK UTILITY FACILITIES A S - B U I L T SHEET C-2 LEGEND: DEMOLITION PLAN HSA010-02 NOTE: AS-BUILT 09/17/2025 HUNSAKER LOS ANGELES, INC. 26074 AVENUE HALL, SUITE 23 VALENCIA, CA 91355 JASON H. FUKUMITSU RCE 40695 DATE DEVELOPMENT SERVICES DEPARTMENT CITY OF ARCADIA SOUTH CAFO BASIN & SANTA ANITA PARK UTILITY FACILITIES A S - B U I L T SHEET C-3 GRADING PLAN NOTE: HSA010-03 LEGEND: AS-BUILT 09/17/2025 HUNSAKER LOS ANGELES, INC. 26074 AVENUE HALL, SUITE 23 VALENCIA, CA 91355 JASON H. FUKUMITSU RCE 40695 DATE DEVELOPMENT SERVICES DEPARTMENT CITY OF ARCADIA SOUTH CAFO BASIN & SANTA ANITA PARK UTILITY FACILITIES A S - B U I L T SHEET C-4 STORM DRAIN PROFILE HSA010-04 NOTE: NOTE: AS-BUILT 09/17/2025 HUNSAKER LOS ANGELES, INC. 26074 AVENUE HALL, SUITE 23 VALENCIA, CA 91355 JASON H. FUKUMITSU RCE 40695 DATE DEVELOPMENT SERVICES DEPARTMENT CITY OF ARCADIA SOUTH CAFO BASIN & SANTA ANITA PARK UTILITY FACILITIES A S - B U I L T SHEET C-5 DETAIL SHEET HSA010-05 NOTE: AS-BUILT 09/17/2025 HUNSAKER LOS ANGELES, INC. 26074 AVENUE HALL, SUITE 23 VALENCIA, CA 91355 JASON H. FUKUMITSU RCE 40695 DATE DEVELOPMENT SERVICES DEPARTMENT CITY OF ARCADIA SOUTH CAFO BASIN & SANTA ANITA PARK UTILITY FACILITIES SHEET C-5A DETAIL SHEET HSA010-05 10" 10" 10" STD HOOK, TYP PRECAST MANHOLE SHAFT AND MANHOLE FRAME & COVER PER CIVIL PRECAST MANHOLE SHAFT AND MANHOLE FRAME & COVER PER CIVIL PRECAST MANHOLE SHAFT AND MANHOLE FRAME & COVER PER CIVIL 2" CLR, TYP, U.O.N. 3" CLR #4 BARS @ 9" O.C. EA WAY, T&B, TYP #4 BARS @ 9" O.C. EA WAY, T&B, TYP 10" 10" 2" CLR, TYP, U.O.N. REINF CONC SLAB, TYP @ T&B REINF CONC WEIR PIER PER SECTION, REINF NOT SHOWN FOR CLARITY REINF CONC WALL PER PLAN, TYP REINF CONC SLAB PER SECTION B-B, TYP @ T&B 3" CLR 10" #6 HOOPS @ 9" O.C., TYP 10" WATERPROOFING & DRAINAGE PER CIVIL, TYP WATERPROOFING & DRAINAGE PER CIVIL, TYP ADD'L BAR @ BEND AS REQ'D, TYP ADD'L BAR @ BEND AS REQ'D, TYP ADD'L BAR @ BEND AS REQ'D, TYP DOWELS TO MATCH SIZE & SPACING OF WALL REINF, TYP DOWELS TO MATCH SIZE & SPACING OF WALL REINF, TYP BAR LAP SPLICE, TYP BAR LAP SPLICE, TYP STD HOOK, TYP STD HOOK, TYP STD HOOK, TYP 10" THK REINF CONC WEIR W/ #4 BARS @ 9" O.C. EA WAY, EA FACE 16" (3) CONT #6 BARS, T&B #6 HOOPS @ 9" O.C. TYP REINF CONC BM 16" MIN TYP (3) CONT #6 BARS, T&B, TYP NOTES: 1. MINIMUM CONCRETE COMPRESSIVE STRENGTH OF 3000PSI AND REINFORCING STEEL YEILD STRENGTH OF 60KSI ARE REQUIRED. 2. SEE ADDITIONAL DETAILS ON THE FOLLOWING SHEET FOR REINFORCING STEEL DETAILING REQUIREMENTS. REINF CONC WALL PER PLAN, TYP AS-BUILT 09/17/2025 HUNSAKER LOS ANGELES, INC. 26074 AVENUE HALL, SUITE 23 VALENCIA, CA 91355 JASON H. FUKUMITSU RCE 40695 DATE DEVELOPMENT SERVICES DEPARTMENT CITY OF ARCADIA SOUTH CAFO SANTA ANITA PARK BASIN & UTILITY FACILITY DETAIL SHEET 6d F O R # 3 TH R U # 5 , 12 d F O R # 6 TH R U # 8 135° 135° BEND DIAMETER, D BAR OFFSET STD HOOKS & BENDS 90° 180° 90° 90° TIES & HOOKS 135° BAR SIZE #9 THRU #11 #6 THRU #8 #3 THRU #5 #14 THRU #18 6 1 10d 8d NA NA STD HOOKS & BENDS 6d 6d STIRRUPS TIES & HOOPS 4d 6d T Y PD MI N 12 d D D 6d > 3"6d > 3" D D DD 6d > 3" . 1 PC STIRRUP 2 PC STIRRUP TIE, WHERE OCCURS NOTE: DO NOT FIELD BEND REINFORCEMENT PARTIALLY EMBEDDED IN CONCRETE. D DTY Pd 4d > 2 1/2" HOOKS & BENDS N.T.S. A - BAR SPACING FOR NON-SPLICED BARS B - BAR SPACING FOR BARS SPLICED W/ NON-CONTACT LAP d WHICHEVER IS LARGER MIN BAR SPACING 1 1/2" OR 1 1/2d . LESSER OF Ls/5 OR 6" MAX BAR SPACING: BAR SPACING N.T.S. CONCRETE REINFORCING DEVELOPMENT & SPLICE LENGTHS (INCHES) BAR LOCATION f'c > 3ksi fy=60ksi f'c > 3ksi fy=60ksi f'c > 3ksi fy=60ksi LWC NWC NWC #6TYPE CONCRETE STRENGTH #3 #4 #5 #7 BAR SIZE #8 #9 #10 #11 #14 #18 CONC WALL HORIZ REINF, CONC WALL BOUNDARY & TRIM REINF, FTG TOP & SIDE REINF, BEAM TOP & SIDE REINF FILL ON METAL DECK 16 821 22 28 35 16 33 43 53 69 27 66 86 32 75 97 39 84 46 93 121 54 112 REBAR SPACING, CLEAR < 6" > 6" N/A 71 d s dh 149 N/A 109 16 721 22 28 35 11 32 42 44 57 17 48 62 20 51 66 24 63 46 75 97 54 72 N/A 71 116 N/A 109 21 827 28 36 35 45 16 43 56 69 90 27 86 112 32 97 126 39 109 46 121 157 54 145< 6" > 6" N/A 71 193 N/A 109 42 54 57 74 17 62 80 20 66 86 24 81 105 46 97 126 54 93 N/A 71 150 N/A 10921 727 28 36 35 45 11 22 1028 29 37 36 46 21 44 57< 6" > 6"22 28 9 28 29 37 36 46 15 43 55 18 71 92 35 88 114 43 99 129 51 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A59 76 22 63 82 27 68 88 32 d s dhd s dhd s dhd s dhd s dhd s dhd s dhd s dhd s dhd s dh 12 9 12 9 16 12 27 27 13 21 13 21 109 81 142 CONC WALL VERT REINF, COLUMNS, BEAM BOT REINF, SLAB-ON-GRADE, FOOTING BOT REINF, FILL ON METAL DECK s = LAP SPLICE LENGTH NOTES: dh = HOOK DEVELOPMENT LENGTH COUPLER OR WELDED SPLICE d s dh 2. WHEN SPLICING BARS OF DIFFERENT SIZE, USE LAP SPLICE LENGTH OF LARGER BAR, U.O.N.s MIN 2'-0ʺ CLR s MIN 2'-0ʺ CLR 3. STAGGER EA SPACE AS FOLLOWS: 4. MULTIPLY THE TABLE LENGTHS ABOVE BY 1.5 FOR EPOXY COATED REINF. 5. BARS LARGER THAN #9 SHOULD NOT BE USED IN CONCRETE FILL OVER METAL DECK. 1. d = DEVELOPMENT LENGTH REINFORCING DEVELOPMENT & SPLICE LENGTHS N.T.S. KEY SCHEDULE TD 12"± TO SUIT REINFORCING > 16" < 8" 3/4" 2 1/2" W D 'T'/3 TO SUIT REINFORCING 12"±W 'D'/2 D 'T'/3 NOTE: DETAILS APPPLY TO BOTH(H) AND (V) CONSTR JOINTS 8"-16" 1 1/2" ROUGHEN ALL CONST JOINT SURFACES TO 1/4" AMPLITUDE, MIN BEVEL EDGES 45° KEY TYPE #1 TYPICAL FOR WALLS KEY TYPE #2 FOR SLABS, RETAINING WALLS, & EXTERIOR WALLS BELOW GRADE 12"± 12"± CONSTRUCTION JOINTS IN CONCRETE WALLS & SLABS N.T.S. TRIM RINFORCING SCHEDULE MIN TRIM REINFWALL THICKNESS 't'DIAGONAL REINF DOUBLE CURTAIN SINGLE CURTAIN A -PLAN ELEV A -PLAN ELEV 2 - #8 2 - #7 2 - #6 2 - #5 12" < t < 16" t > 16" 6" < t < 9" 9" < t < 12" #5 #7 #5 #5 OPEN A DIAG REINF, SEE SCHED (OMIT DIAG AT FNDN) PROVIDE STD HK AT END OF WALL OR EDGE OF OPNG, SEE NOTE 7 TRIM REINF SEE SCHED 180° HK TURN TO PROVIDE MIN CLR TRIM REINF TYP WALL REINF STD HK ROTATE TO PROVIDE MIN CLR TRIM REINF TYP WALL REINF A A ALL SIDES 3" CLR MAX M I N 4 8ʺ d d SEE NOTES 3 & 7 d T Y P 24 " MI N SEE NOTES 3 & 7 d TYP 24" MIN . END OF HKS ONLY) 2" CLR MAX 1" CLR MIN (TO 't'CLR 2" NOTES: 1. SCHEDULE REINF APPLIES TO ALL OPNGS, UNLESS OTHERWISE SHOWN. 2. MIN TRIM REINF TO BE LARGER OF TYP WALL REINF OR SIZE SHOWN IN SCHEDULE. 3. AT SERIES OF OPENINGS WHERE PIER OR SPANDREL IS NARROWER THAN THREE TIMES d, RUN TRIM REINF CONTINUOUS. 4. MAY OMIT DIAGONALS IF THE LARGEST OPENING DIMENSION IS LESS THAN 3'-0". 5. DETAIL IS NOT REQUIRED FOR OPENING SMALLER THAN THE WALL THICKNESS OR 12", WHICHEVER IS SMALLER. 6. COORDINATE OPNG LOCATIONS AND SIZES w/ OTHER TRADES INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING. 7. WHERE TRIM REINFORCING IS NOT ABLE TO EXTEND THE GREATER OF ld AND 24" AS SHOWN, TRIM REINFORCING IS TO TERMINATE IN A STANDARD HOOK. 4" 2" 4" CLR2"'t' TOP OF WALL OR EDGE OF ADJACENT OPENING, WHERE OCCURS END OF WALL OR EDGE OF ADJACENT OPENING, WHERE OCCURS WALL REINFORCING AT OPENINGS N.T.S. (1) #5X6'-0" DIAGONAL REINF @ EA CORNER OF OPNGS & DEPRESSIONS, PLACE @ CENTER OF SLAB, NOT REQ'D FOR OPNGS & DEPRESSIONS LESS THAN 2'-0" IN BOTH DIRECTIONS, U.O.N. STD 180° HK @ INTERRUPTED SLAB REINF @ OPNG, T&B WHERE OCCURS, TYP OPPOSITE FACE OF BEAM, WALL, OR SLAB, SEE NOTE PROVIDE HALF OF INTERRUPTED SLAB REINF @ EA SIDE OF OPNG OR DEPRESSION @ 3" O.C., T&B, MIN OF (2) BARS, NONE REQ'D IF NO SLAB REINF INTERRUPTED TYP, U.O.N. 6' - 0ʺ MAX CLR, TYP 3" MAX NOTE: HOOK REINF AT EDGE OF SLAB LOCATIONS. WHERE OCCURS, HOOK REINF INTO OPPOSITE FACE OF WALL OR BEAM. E Q E Q TYP s SLAB OPENING OR DEPRESSION IN SLAB STD HOOK, TYP PLAN N.T.S. OPENINGS IN SUSPENDED CONCRETE SLAB -OVER CONCRETE FRAMING SHEET C-5B 2 3 4 5 8 10 AS-BUILT 09/17/2025 HUNSAKER LOS ANGELES, INC. 26074 AVENUE HALL, SUITE 23 VALENCIA, CA 91355 JASON H. FUKUMITSU RCE 40695 DATE DEVELOPMENT SERVICES DEPARTMENT CITY OF ARCADIA SOUTH CAFO BASIN & SANTA ANITA PARK UTILITY FACILITIES A S - B U I L T SHEET C-6 DETAIL SHEET HSA010-06 AS-BUILT 09/17/2025 HUNSAKER LOS ANGELES, INC. 26074 AVENUE HALL, SUITE 23 VALENCIA, CA 91355 JASON H. FUKUMITSU RCE 40695 DATE DEVELOPMENT SERVICES DEPARTMENT CITY OF ARCADIA SOUTH CAFO BASIN & SANTA ANITA PARK UTILITY FACILITIES A S - B U I L T SHEET C-7 DETAIL SHEET HSA010-07 AS-BUILT 09/17/2025 HUNSAKER LOS ANGELES, INC. 26074 AVENUE HALL, SUITE 23 VALENCIA, CA 91355 JASON H. FUKUMITSU RCE 40695 DATE DEVELOPMENT SERVICES DEPARTMENT CITY OF ARCADIA SOUTH CAFO BASIN & SANTA ANITA PARK UTILITY FACILITIES A S - B U I L T SHEET C-8 DETAIL SHEET HSA010-08 NOTE:AS-BUILT 09/17/2025 HUNSAKER LOS ANGELES, INC. 26074 AVENUE HALL, SUITE 23 VALENCIA, CA 91355 JASON H. FUKUMITSU RCE 40695 DATE DEVELOPMENT SERVICES DEPARTMENT CITY OF ARCADIA SOUTH CAFO BASIN & SANTA ANITA PARK UTILITY FACILITIES A S - B U I L T SHEET C-9 DETAIL SHEET HSA010-09 NOTE: AS-BUILT 09/17/2025 HUNSAKER LOS ANGELES, INC. 26074 AVENUE HALL, SUITE 23 VALENCIA, CA 91355 JASON H. FUKUMITSU RCE 40695 DATE DEVELOPMENT SERVICES DEPARTMENT CITY OF ARCADIA SOUTH CAFO BASIN & SANTA ANITA PARK UTILITY FACILITIES A S - B U I L T STORM TRAP DETAIL SHEET SHEET C-10 HSA010-10 AS-BUILT 09/17/2025 HUNSAKER LOS ANGELES, INC. 26074 AVENUE HALL, SUITE 23 VALENCIA, CA 91355 JASON H. FUKUMITSU RCE 40695 DATE DEVELOPMENT SERVICES DEPARTMENT CITY OF ARCADIA SOUTH CAFO BASIN & SANTA ANITA PARK UTILITY FACILITIES A S - B U I L T STORM TRAP DETAIL SHEET SHEET C-11 HSA010-11 AS-BUILT 09/17/2025 HUNSAKER LOS ANGELES, INC. 26074 AVENUE HALL, SUITE 23 VALENCIA, CA 91355 JASON H. FUKUMITSU RCE 40695 DATE DEVELOPMENT SERVICES DEPARTMENT CITY OF ARCADIA SOUTH CAFO BASIN & SANTA ANITA PARK UTILITY FACILITIES A S - B U I L T SHEET C-12 STORM TRAP DETAIL SHEET HSA010-12 AS-BUILT 09/17/2025 HUNSAKER LOS ANGELES, INC. 26074 AVENUE HALL, SUITE 23 VALENCIA, CA 91355 JASON H. FUKUMITSU RCE 40695 DATE DEVELOPMENT SERVICES DEPARTMENT CITY OF ARCADIA SOUTH CAFO BASIN & SANTA ANITA PARK UTILITY FACILITIES A S - B U I L T SHEET C-13 STORM TRAP DETAIL SHEET HSA010-13 AS-BUILT 09/17/2025 HUNSAKER LOS ANGELES, INC. 26074 AVENUE HALL, SUITE 23 VALENCIA, CA 91355 JASON H. FUKUMITSU RCE 40695 DATE SHORING PROCEDURE - DRILLED 1.DRILL VERTICAL SOLDIER PILE SHAFT. 2.PLACE SOLDIER BEAMS IN SHAFT. 3.FILL THE TOE OF THE SOLDIER PILE SHAFT WITH 2,500 PSI CONCRETE. 4.FILL BALANCE OF SHAFT WITH A SLURRY MIX. ALLOW SLURRY TO SET 1 DAY BEFORE EXCAVATING. 5.PERFORM ABOVE STEPS FOR BALANCE OF SOLDIER PILES. 6.BEGIN EXCAVATION IN LIFTS AS MAY BE DETERMINED BY THE GRADING INSPECTOR. CLEAN SOLDIER PILES AS REQUIRED. PLACE WOOD LAGGING AS GRADE DESCENDS. PROVIDE SLURRY BEHIND LAGGING IN AREAS OF CAVING. OTHERWISE BACKFILL WITH GRANULAR MATERIAL. 7.CONTINUE EXCAVATION TO THE STAGE 1 ELEVATION IN THE CASE OF A TIEBACK, RAKER OR CORNER BRACED SOLDIER PILE. IN THE CASE OF CANTILEVER PILE, OMIT STAGE 1 AND CONTINUE TO THE BOTTOM OF EXCAVATION. 8.IN THE CASE OF TIEBACK SOLDIER PILES, DRILL SHAFT FOR TIEBACK AND INSTALL TENDONS PER THE "TIEBACK INSTALLATION PROCEDURE" SHOWN. IN THE CASE OF RAKER BRACED SOLDIER PILE, INSTALL RAKER BRACE IN ACCORDANCE WITH "RAKER INSTALLATION PROCEDURE" SHOWN. FOR A CORNER BRACE INSTALL AT THIS STAGE IN ACCORDANCE WITH THE SPECIFIED DETAIL. 9.REPEAT STEPS 7 AND 8 FOR THE REST OF THE TIEBACK/RAKER/CORNER BRACE LOCATIONS. 10.COMPLETE EXCAVATION. DRILLED SHAFTS 1.VERTICAL SHAFTS ARE TO BE MACHINE DRILLED AND ACCURATELY LOCATED SO THAT SOLDIER PILES ARE IN PROPER RELATION TO THE NEW BASEMENT WALL AND FOOTINGS. 2.TOLERANCE FOR INSTALLATION OF SOLDIER PILES IS ±1 INCH FOR VARIATION OF PLAN LOCATION AND 0.5 PERCENT OF PILE LENGTH FOR OUT OF PLUMB. 3.LOCATE SOLDIER PILES AS REQUIRED OUTSIDE OF BUILDING WALLS TO INSURE PILE DOES NOT INTRUDE INTO FINISHED WALL DUE TO OUT OF PLUMB OR VARIATION IN PLAN LOCATION. 4.IT WILL NOT BE NECESSARY TO DEWATER THE HOLES FOR SOLDIER PILES SHOULD GROUNDWATER BE ENCOUNTERED PROVIDED THE CONCRETE IS TREMIED INTO POSITION WITH APPROVED DEVICES. 5.SOLDIER PILE SHAFTS CLOSER THAN 2 SHAFT DIAMETERS ON CENTER SHALL BE DRILLED AND POURED IN AN ALTERNATING SEQUENCE SUCH THAT THE ALTERNATE SHAFT IS NOT DRILLED UNTIL THE ADJACENT PILE HAS CURED FOR AT LEAST 24 HOURS. 6.PROVIDE PROTECTION OF SHAFT AGAINST SLOUGHING OR CAVING, AS REQUIRED. 7.WHERE CAVING OCCURS, DRILLED HOLES SHALL BE CASED AND ALL BACKFILL SHALL BE PRESSURE PUMPED SO THAT ALL VOIDS ARE FILLED. 8.ALL SHAFTS LEFT OPEN MORE THAN 12 HOURS SHALL BE CASED. 9.WHEN WATER OVER 3 INCHES IN DEPTH IS PRESENT IN DRILLED PILE HOLES, A CONCRETE MIX WITH A STRENGTH OF 1,000 PSI OVER THE DESIGN PSI SHALL BE TREMIED FROM THE BOTTOM UP. STRUCTURAL STEEL 1.ALL STRUCTURAL STEEL (EXCLUDING PIPES AND PLATES) SHALL CONFORM TO THE REQUIREMENTS OF ASTM A572 GR. 50 OR ASTM A992 SPECIFICATIONS. 2.ALL STRUCTURAL STEEL PIPE SHALL CONFORM TO ASTM A53 GR. B SPECIFICATIONS. 2.ALL STRUCTURAL STEEL ANGLES AND CHANNELS SHALL CONFORM TO ASTM A36 SPECIFICATIONS. 3.ALL STRUCTURAL STEEL PLATE SHALL CONFORM TO ASTM A572 GR 50 SPECIFICATIONS UNLESS OTHERWISE NOTED. 4.ELECTRIC ARC WELDING SHALL UTILIZE ELECTRODES APPROVED BY BUILDING DEPARTMENT (E 70-XX) AND PLACED BY WELDERS PROPERLY CERTIFIED BY THE BUILDING OFFICIAL. GENERAL 1.THESE SHORING PLANS SHALL BE REVIEWED BY THE PROJECT GEOTECHNICAL ENGINEER PRIOR TO BEGINNING WORK. 2.CONTRACTOR TO VERIFY ALL DIMENSIONS AND CONDITIONS AT THE SITE. 3.ALL CONSTRUCTION SHALL CONFORM TO REQUIREMENTS OF THE 2022 CALIFORNIA BUILDING CODE (CBC) 4.CONTRACTOR SHALL COORDINATE SHORING WITH DRAWINGS OF RECORD TO ENSURE PROVISIONS FOR POCKETS, BLOCKOUTS, OFFSETS, STEPPED FOOTINGS AND ANY OTHER ITEMS AFFECTED BY THE SHORING. 5.ENGINEER HAS NOT BEEN HIRED TO PERFORM ANY SERVICES RELATING TO, OR IN CONNECTION WITH, WATERPROOFING AND DRAINAGE. ENGINEER ASSUMES NO RESPONSIBILITY FOR PROJECT WATERPROOFING AND DRAINAGE DESIGN. IF WATERPROOFING IS TO BE USED ON THE PROJECT, PROPER COORDINATION OF SAID WATERPROOFING IS TO BE DONE BY OTHERS. 6.CEFALI & ASSOCIATES ASSUMES NO RESPONSIBILITY FOR CONSTRUCTION MEANS AND METHODS. 7.CLIENT AGREES NOT TO USE OR PERMIT ANY OTHER PERSON TO USE PLANS, DRAWINGS, OR OTHER WORK PRODUCT PREPARED BY CEFALI & ASSOCIATES WHICH ARE NOT FINAL AND DO NOT BEAR A SIGNED CEFALI & ASSOCIATES ENGINEER'S STAMP OR SEAL. CLIENT AGREES TO BE LIABLE AND RESPONSIBLE FOR ANY SUCH USE OF NON-FINAL PLANS, DRAWINGS, OR OTHER WORK PRODUCT NOT SIGNED AND STAMPED OR SEALED BY CEFALI & ASSOCIATES AND WAIVES LIABILITY AGAINST CEFALI & ASSOCIATES FOR THEIR USE 8.HEAVY EQUIPMENT OR CRANES SHALL NOT BE LOCATED ADJACENT TO THE SHORING BULKHEAD EXCEPT WHERE SPECIFICALLY PROVIDED FOR IN THE DESIGN. STOCKPILING OF EXCAVATED MATERIALS SHALL NOT BE ALLOWED ATOP THE EXCAVATION. 9.TEMPORARY BUILDING SHORING IF REQUIRED SHALL BE PROVIDED BY THE CONTRACTOR. 10.NO EXCAVATION OR GRADING SHALL COMMENCE UNTIL 10 DAYS AFTER ADJOINING PROPERTY OWNERS HAVE BEEN NOTIFIED IN WRITING AS REQUIRED BY SECTION 3307.1 OF THE CALIFORNIA BUILDING CODE. 11.ALL MEMBER SIZES SHALL BE AS SHOWN OR EQUAL. AS APPROVED BY CEFALI & ASSOCIATES, EQUIVALENT OR STRONGER MEMBERS MAY BE SUBSTITUTED TO SUIT THE AVAILABILITY OF MATERIALS. CONCRETE 1.ALL CONCRETE CONSTRUCTION SHALL CONFORM WITH CHAPTER 19 OF THE CBC AND TO THE PROVISIONS OF ACI 318, LATEST EDITION. 2.CONCRETE MIXES SHALL BE DESIGNED BY A QUALIFIED TESTING LABORATORY AND APPROVED BY CEFALI & ASSOCIATES. 3.SLURRY SHALL BE A MIX OF WATER, CEMENT AND SAND; 1-1/2 SACK CEMENT PER YARD OF MIX. 4.DRYPACK SHALL BE A MIX OF WATER, CEMENT AND SAND; 1 PART CEMENT TO 3 PARTS SAND WITH JUST ENOUGH WATER FOR WORKABILITY. 5.PORTLAND CEMENT SHALL CONFORM TO ASTM C150, TYPE V. 6.AGGREGATE FOR HARD ROCK CONCRETE SHALL CONFORM TO ALL REQUIREMENTS AND TESTS OF ASTM C33 AND PROJECT SPECIFICATIONS. 7.ADMIXTURES SHALL CONFORM TO ALL REQUIREMENTS AND TESTS OF ASTM C845, C260, C494, C 1017 OR C618 CLASSES N OR F AND PROJECT SPECIFICATIONS. 8.CONCRETE MIXING OPERATION, ETC. SHALL CONFORM TO ASTM C94. 9.A SPECIAL CONCRETE MIX SHALL BE USED FOR CONCRETE TO BE PLACED BELOW WATER. THE CONCRETE STRENGTH SHALL BE INCREASED BY 1,000 PSI OVER THE INITIAL SPECIFICATION PROVIDED IN THE TABLE BELOW. AN ADMIXTURE THAT REDUCE SEGREGATION OF PASTE/AGGREGATES AND DILUTION OF PASTE SHALL BE INCLUDED. THE ADMIXTURE SHALL BE SUBMITTED TO AND APPROVED BY CEFALI & ASSOCIATES. 10.SCHEDULE OF STRUCTURAL CONCRETE 28-DAY STRENGTH AND TYPES: UNDERGROUND STRUCTURES 1.ALL UNDERGROUND UTILITIES OR STRUCTURES REPORTED BY THE OWNER OR OTHERS ARE INDICATED WITH THEIR APPROXIMATE LOCATION AND EXTENT IN THESE DRAWINGS. THE OWNER, BY ACCEPTING THESE PLANS OR PROCEEDING WITH CONSTRUCTION IN ACCORDANCE WITH THESE DRAWINGS, AGREES TO ASSUME LIABILITY AND TO HOLD CEFALI & ASSOCIATES HARMLESS FOR ANY DAMAGES RESULTING FROM THE EXISTENCE OF UNDERGROUND UTILITIES OR STRUCTURES NOT REPORTED TO CEFALI & ASSOCIATES. 2.THE OWNER SHALL LOCATE ALL UTILITIES AND STRUCTURES WITHIN THE PROPOSED EXCAVATION AND MAKE APPROPRIATE ARRANGEMENTS FOR THEIR RELOCATION OR PROTECTION, PRIOR TO THE START OF CONSTRUCTION. 3.THE OWNER IN LOCATING ALL EXISTING UTILITIES AND STRUCTURES SHALL INSURE THAT NO CONFLICT EXISTS BETWEEN SHORING PILES AND EXISTING UTILITIES. IF ANY CONFLICT IS FOUND TO EXIST, IT SHALL BE PROMPTLY BROUGHT TO THE ATTENTION OF CEFALI & ASSOCIATES AND CONSTRUCTION SHOULD NOT START UNTIL A RESOLUTION OF THE CONFLICT IS ACCOMPLISHED. 4.THE OWNER SHALL LOCATE AND CAP-OFF ALL SEWER LATERALS BEHIND THE PROPOSED LOCATION OF SOLDIER BEAMS PRIOR TO THE INSTALLATION OF SOLDIER BEAMS. 5.AN UNDERGROUND SERVICE ALERT INQUIRY IDENTIFICATION NUMBER (USA II NO.) MUST BE OBTAINED AT LEAST TWO WORKING DAYS BEFORE STARTING WORK WITH THIS PERMIT. TELEPHONE NUMBER 811. TIMBER LAGGING 1.TIMBER LAGGING SHALL BE ROUGH-CUT DOUGLAS FIR LARCH, SIZE AND GRADE AS PER LAGGING DETAIL. 2.TIMBER LAGGING THAT IS NOT REMOVED AT THE COMPLETION OF THE SHORING PROJECT SHALL BE PRESSURE TREATED WITH 0.15 LB/CUFT CA-C IN ACCORDANCE WITH AWPA U1. GEOTECHNICAL DESIGN CRITERIA 1.THESE SHORING PLANS WERE PREPARED WITH CONFORMANCE TO THE GEOTECHNICAL DESIGN RECOMMENDATIONS AS PRESENTED WITHIN THE SOILS REPORT BY GROUP DELTA, PROJECT NUMBER LA1641, DATED MARCH 14, 2024. 2.THE GEOTECHNICAL DESIGN VALUES USED ARE AS FOLLOWS: A.ACTIVE PRESSURE: A.A.CANTILEVER (TRIANGULAR):32 PCF B.PASSIVE PRESSURE: B.A.CONTINUOUS FOOTING 300 PCF B.B.ISOLATED PILES (2.5Ø o.c.)600 PCF C.COEFFICIENT OF FRICTION:0.4 D.LAGGING PRESSURE:32 PCF OR 400 PSF (MAX) H 32 pcf 10' 100 psf 600 pcf ACTIVE PASSIVE CANTILEVER d TRAFFIC SURCHARGE THIS PLAN HAS BEEN REVIEWED AND CONFORMS TO THE RECOMMENDATIONS OF THE SOILS ENGINEERING/GEOLOGIC REPORTS DATED BY GROUP DELTA, PROJECT NUMBER LA1641, DATED MARCH 14, 2024. SIGNATURE_______________________________ DATE ____________________ INSPECTIONS 1.CONTINUOUS INSPECTION BY THE SOILS ENGINEER/GEOLOGIST OR THEIR REPRESENTATIVE IS REQUIRED FOR ALL SHORING AND EXCAVATION OPERATIONS. 2.A SOILS/GRADING INSPECTOR SHALL VERIFY THAT THE SIZE, DEPTH AND LOCATIONS OF EACH DRILLED HOLE COMPLIES WITH THE APPROVED PLANS. A LOG OF DEPTH READING FOR EACH DRILLED HOLE SHALL BE AVAILABLE FOR THE BUILDING DEPARTMENT INSPECTOR. THIS DOES NOT WAIVE INSPECTION BY THE BUILDING DEPARTMENT. 3.A CONCRETE INSPECTOR CERTIFIED IN REINFORCED CONCRETE SHALL BE PRESENT FOR POURING OF ALL CONCRETE AND TAKING OF SAMPLES. 4.THE CONCRETE INSPECTOR IS REQUIRED TO VERIFY THAT THE CONCRETE MIX REQUIREMENTS, ARE IN ACCORDANCE WITH THE APPROVED PLANS. T. 5.PRIOR TO POURING CONCRETE OR GROUT IN THE DRILLED HOLES THE GEOTECHNICAL ENGINEER SHALL POST WRITTEN CERTIFICATION AT THE JOB SITE FOR THE CITY BUILDING INSPECTOR, STATING THAT THE SOIL CONDITIONS ENCOUNTERED IN EACH DRILLED HOLE IS IN CONFORMITY WITH THE CONDITIONS INCLUDED IN HIS REPORT. 6.ALL FIELD WELDING SHALL BE CONDUCTED BY A CITY CERTIFIED WELDER AND BE CONTINUOUSLY INSPECTED BY A REGISTERED INSPECTOR CERTIFIED IN STRUCTURAL WELDING. 7.ALL SHOP WELDING SHALL BE PERFORMED IN A CITY APPROVED FABRICATORS SHOP. MONITORING 1.SHORING PILES SHALL BE SURVEY MONITORED FOR LINE AND GRADE AT THE TOP OF THE SOLDIER PILE. 2.CONTROL POINTS SHALL BE ESTABLISHED OUTSIDE THE AREA OF INFLUENCE OF THE SHORING SYSTEM TO ENSURE THE ACCURACY OF THE MONITORING READINGS. 3.THE PERIODIC BASIS OF SHORING MONITORING, AS A MINIMUM, SHALL BE AS FOLLOWS: 3.1.INITIAL MONITORING SHALL BE PERFORMED PRIOR TO ANY EXCAVATION. 3.2.ONCE EXCAVATION HAS BEGUN, THE PERIODIC READINGS SHALL BE TAKEN WEEKLY UNTIL THE BOTTOM OF EXCAVATION HAS BEEN REACHED. 3.3.IF PERFORMANCE OF THE SHORING IS WITHIN THE LIMITS SET FORTH BELOW AND THERE OCCURS A 3-WEEK PERIOD WHERE THE MOVEMENT IS LESS THAN 0.3 INCHES, THE MONITORING INTERVAL MAY BE INCREASED TO MONTHLY INTERVALS. 3.4.THE PERIODIC MONITORING OF THE SOLDIER PILES CAN BE DISCONTINUED ONCE THE PERMANENT STRUCTURE IS CAPABLE OF RESISTING THE EARTH LOAD AND THIS HAS BEEN CONFIRMED IN WRITING BY THE STRUCTURAL ENGINEER. 3.5.ADDITIONAL READINGS SHALL BE TAKEN WHEN REQUESTED BY CEFALI & ASSOCIATES OR THE GEOTECHNICAL ENGINEER. 4.ANY 1 INCH MOVEMENT SHALL BE ANALYZED BY THE GEOTECHNICAL ENGINEER. ANY 2 INCH MOVEMENT SHALL BE CAUSE FOR REMEDIAL SHORING TO PREVENT ADDITIONAL MOVEMENT PRIOR TO FURTHER CONSTRUCTION. 5.IF IN THE OPINION OF CEFALI & ASSOCIATES, MONITORING DATA INDICATE EXCESSIVE MOVEMENT OR OTHER DISTRESS, ALL EXCAVATION SHALL CEASE UNTIL THE GEOTECHNICAL ENGINEER AND CEFALI & ASSOCIATES INVESTIGATES THE SITUATION AND MAKES RECOMMENDATIONS FOR REMEDIATION OR CONTINUING. 6.MONITORING READING SHALL BE SUBMITTED TO CEFALI & ASSOCIATES AND THE GEOTECHNICAL ENGINEER WITHIN 3 WORKING DAYS AFTER THEY ARE CONDUCTED. MONITORING READINGS SHALL BE ACCURATE TO WITHIN 0.01 FEET. RESULTS ARE TO BE SUBMITTED IN TABULAR FORM SHOWING AT LEAST THE INITIAL DATE OF MONITORING AND READING, CURRENT MONITORING DATE AND READING AND DIFFERENCE BETWEEN THE 2 READINGS. 7.PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL COMPLETE A PHOTOGRAPHIC LOG OF ALL ADJACENT PROPERTIES AND STRUCTURES WITHIN A 1:1 OF THE BOTTOM OF EXCAVATION. 7.1.THE CONTRACTOR SHALL DOCUMENT THE EXISTING CONDITIONS OF WALL CRACKS ADJACENT TO SHORING BULKHEADS PRIOR TO START OF CONSTRUCTION. ELEMENT SLURRY BACKFILL SOLDIER PILE TOES STRENGTH (PSI) N/A 2,500 DENSITY (PCF) N/A 150 SLUMP (IN) N/A 1-3 SHORING PROCEDURE - VIBRATORY 1.OPTIONAL STEP: PRE-DRILL VERTICAL SHAFT. 2.VIBRATE STEEL BEAM TO REQUIRED TIP ELEVATION. 3.PERFORM ABOVE STEP FOR BALANCE OF SOLDIER PILES. 4.BEGIN EXCAVATION IN LIFTS AS MAY BE DETERMINED BY THE GRADING INSPECTOR. CLEAN SOLDIER PILES AS REQUIRED. PLACE WOOD LAGGING AS GRADE DESCENDS. PROVIDE SLURRY BEHIND LAGGING IN AREAS OF CAVING. OTHERWISE BACKFILL WITH GRANULAR MATERIAL. 5.CONTINUE EXCAVATION TO THE STAGE 1 ELEVATION IN THE CASE OF A TIEBACK, RAKER OR CORNER BRACED SOLDIER PILE. IN THE CASE OF CANTILEVER PILE, OMIT STAGE 1 AND CONTINUE TO THE BOTTOM OF EXCAVATION. 6.IN THE CASE OF TIEBACK SOLDIER PILES, DRILL SHAFT FOR TIEBACK AND INSTALL TENDONS PER THE "TIEBACK INSTALLATION PROCEDURE" SHOWN. IN THE CASE OF RAKER BRACED SOLDIER PILE, INSTALL RAKER BRACE IN ACCORDANCE WITH "RAKER INSTALLATION PROCEDURE" SHOWN. FOR A CORNER BRACE INSTALL AT THIS STAGE IN ACCORDANCE WITH THE SPECIFIED DETAIL. 7.REPEAT STEPS 4 AND 5 FOR THE REST OF THE TIEBACK/RAKER/CORNER BRACE LOCATIONS. 8.COMPLETE EXCAVATION. VIBRATED PILES 1.SOLDIER PILES ARE TO BE MECHANICALLY VIBRATED INTO POSITION TO THE PILE EMBEDMENT ELEVATION AND ACCURATELY LOCATED SO THAT SOLDIER PILES ARE IN PROPER RELATION TO THE NEW BASEMENT WALL AND FOOTINGS. 2.TOLERANCE FOR INSTALLATION OF SOLDIER PILES IS ±1 INCH FOR VARIATION OF PLAN LOCATION AND 0.5 PERCENT OF PILE LENGTH FOR OUT-OF-PLUMB. 3.LOCATE SOLDIER PILES AS REQUIRED OUTSIDE OF BUILDING WALLS TO INSURE PILE DOES NOT INTRUDE INTO FINISHED WALL DUE TO OUT OF PLUMB OR VARIATION IN PLAN LOCATION. 4.GROUND VIBRATIONS (PPV) SHALL BE MONITORED DURING SHORING INSTALLATION. 5.SETTLEMENT MONITORING MONUMENTS SHALL BE SURVEYED DURING THE PILE INSTALLATION. 6.THE LEVEL OF VIBRATION (PPV) SHALL NOT EXCEED THE THRESHOLD OF 0.5 IN/SEC. PEAK PARTICLE VELOCITY. 7.IN THE EVENT ANY PPV EXCEEDS THIS VALUE, THE SHORING CONTRACTOR SHOULD MODIFY THE INSTALLATION PROCEDURE TO REDUCE THE VALUES TO BELOW THE THRESHOLD. IF THE CONTRACTOR CANNOT REDUCE THE VALUES BELOW THE THRESHOLD THEN THE PILE SHALL BE INSTALLED VIA THE DRILLED PROCEDURE. 8.LOOSENING OF THE SOIL IS PERMITTED FOR EASE OF VIBRATING THE PILES INTO PLACE BY PRE-DRILLING AND BACKSPINING THE AUGER TAKING CARE NOT TO REMOVE SOIL WHEN WITHDRAWING THE AUGER. 9.THE SHAFT SHALL NOT BE AN OPEN HOLE SHAFT. THE AUGER DIAMETER SHOULD BE AT LEAST 2 INCHES LESS OR 75 PERCENT OF THE DEPTH OF THE WEB OF THE BEAM (WHICHEVER IS LESS). (e.g. A W18x SOLDIER PILE MAY BE PRE-DRILLED WITH A 14 INCH AUGER). PRE-DRILLING MAY EXTEND TO THE PROPOSED BOTTOM OF EXCAVATION BUT MAY NOT EXTEND INTO THE PILE TOE. CONSULTANTS: GEOTECHNICAL ENGINEER CIVIL ENGINEER SHEET DRAFTER: PROJECT NO.: DRAWING NO.: DATE: SCALE: OF 6 SHEET NAME: PROJECT NAME: 03/27/2024 24-014 285 W.HUNTINGTON DRIVE ARCADIA CA. 91007 MARK DATE DESCRIPTION PIT REVISION04/22/20241 SANTA ANITA PARK GROUP DELTA 310.320.5100 HUNSAKET & ASSOCIATES 661.294.2211 COPYRIGHT, 2024 CEFALI & ASSOCIATES, INC. ALL RIGHTS RESERVED This structural system and details are proprietary and the exclusive product of Cefali & Associates, Inc. No part of these drawings shall be reproduced, copied or used without the knowledge and written consent of Cefali & Associates, Inc. Cefali & Associates, Inc. 4344 Laurel Canyon Blvd, Suite 3 Studio City, CA 91604 818.752.1812 engineering@cefali.com www.cefali.com 1994-2024 30 ANNIVERSARYYE A R DEPTH REVISION05/16/20242 GENERAL NOTES L.S. SS000 1 1" = 1'-0" 470 47 0 475 466.2 466.3 466.6 465.7 467.7 467.6 467.6 468.6 468.6 469.6 469.7 470.6 466.6 466.4 466.8 466.1 467.4 467.5 468.4 471.4 472.7 (SS) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E) (E) (E) (E) (SD) (SD) (444.34 INV) (S D ) (S D ) (SD) (SD)(SD)(SD)(SD) (455.91 INV) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (SD) (SD) (SD ) (SD ) (SD ) (SD) (SD) SMH EX I S T . 8 " W (SD)(SD)(SD) (SD)(SD)(SD)(SD) (T ) ( E ) ( E ) (E ) (E ) (E ) (SS ) (SS ) (SS ) (SS ) (S S ) (S S ) (S S ) (SD ) (S D ) (SD ) (SD) (SD) EXIST. 10" SEWER SMH EXIST. 1 2 " W (T) (T) (T) (E) (E) (E) (E) (E) (SS ) (SS ) (SS) (SS) (SS) (SS) (S S ) (S S ) (SS)(SS)(SS)(SS)(SS)(SS)(SS)(SS)(SS)(SS)(SS)(SS)(SS)(SS)(SS)(SS)(SS)(SS)(SS)(SS)(SS)(SS)(SS)(SS) (SS)(SS) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) ( S S ) ( S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (S S ) (SS ) (SS)(SS)(SS)(SS)(SS)(SS) (SS) (SS) (SS) (S S ) (S S ) (SS ) (SS ) (S S ) (SS ) (SS ) (S D ) (S D ) (S D ) (S D ) (S D ) (S D ) (S D ) (S D ) (S D ) (S D ) (S D ) (S D ) (SD ) (SD ) (SD) (S D ) (S D ) (S D ) (S D ) (E)(E)(E) (E ) (E) (E) (E) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E ) (E)(E)(E) (G)(G)(G)(G)(G)(G)(G)(G) 3" G (G ) 32 " D N (G ) (G ) (G ) (G ) 3" G (G ) (G ) (G ) (G ) (G ) (G ) (G ) (G ) (G ) (G ) (G ) (G ) (G ) (G ) (G ) (G ) (G ) (G ) (G ) (G ) 33 " S D 27" (SD ) (SD ) (SD ) (SD ) (SD ) (SD ) (SD ) (SD ) (SD ) (SD ) (SD ) (SD ) (SD ) (SD ) (SD ) (SD ) (SD ) (SD ) (SD ) (SD ) (SD ) (SD ) (G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G)(G) (G) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (E ) (E ) (E ) (E ) (E ) (E ) (SD ) (SD ) (SD ) (SD ) (SD ) (SD ) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T)(T) (T ) (T ) (T ) (T ) (T ) (T) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (E)(E)(E)(E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (E) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (W) (SD ) (SD ) (SD ) (SD ) (SD ) (SD ) P 47 1 46 9 46 8 46 7 470 46 6 47 2 4 7 1 4 7 0 4 6 9 469 46 8 46 7 46 6 46 6 466.1 464.11 INV 464.10 INV 468.19 INV 463.20 INV 465.59 INV 465.69 INV 8" S S 8'-0"5 SPACES @ 7'-0"o.c.17 SPACES @ 8'-0"o.c.7'-8"6 SPACES @ 7'-0"o.c. 8' - 0 " 7' - 8 " 4 S P A C E S @ 7 ' - 0 " o . c . 14 S P A C E S @ 8 ' - 0 " o . c . 8'-0"7'-8"3 SP @ 7'-0"o.c.24 SPACES @ 8'-0"o.c. 8' - 0 " 14 S P A C E S @ 8 ' - 0 " o . c . 7' - 8 " 4 S P A C E S @ 7 ' - 0 " o . c . 1 SS201 1 SS200 3 SS201 2 SS202 UTILITIES TO BE RELOCATED 1 5 10 15 20 25 30 31 35 40 45 50 51556065707579 80 85 90 95 99 2 SS200 2 SS201 1 SS202 3 SS202 CONSULTANTS: GEOTECHNICAL ENGINEER CIVIL ENGINEER SHEET DRAFTER: PROJECT NO.: DRAWING NO.: DATE: SCALE: OF 6 SHEET NAME: PROJECT NAME: 03/27/2024 24-014 285 W.HUNTINGTON DRIVE ARCADIA CA. 91007 MARK DATE DESCRIPTION PIT REVISION04/22/20241 SANTA ANITA PARK GROUP DELTA 310.320.5100 HUNSAKET & ASSOCIATES 661.294.2211 COPYRIGHT, 2024 CEFALI & ASSOCIATES, INC. ALL RIGHTS RESERVED This structural system and details are proprietary and the exclusive product of Cefali & Associates, Inc. No part of these drawings shall be reproduced, copied or used without the knowledge and written consent of Cefali & Associates, Inc. Cefali & Associates, Inc. 4344 Laurel Canyon Blvd, Suite 3 Studio City, CA 91604 818.752.1812 engineering@cefali.com www.cefali.com 1994-2024 30 ANNIVERSARYYE A R DEPTH REVISION05/16/20242 SUPPORT OF EXCAVATION PLAN L.S. SS100 2 1/16" = 1'-0" SUPPORT OF EXCAVATION PLAN 16'8'0 32' 1/16" = 1'-0" NORTH BULKHEAD ELEVATION LOOKING NORTH 1 470 469 468 467 EL. 466.0 BOE. 449.0 BOE. 449.0 471 1 5 10 15 20 25 30 31 2 SS200 B.O. BASIN EL. 450.0 DIRT FILLED NORTH SECTION 2 d H SEE SCHEDULE 468.33 BOE. 449.0 CONSULTANTS: GEOTECHNICAL ENGINEER CIVIL ENGINEER SHEET DRAFTER: PROJECT NO.: DRAWING NO.: DATE: SCALE: OF 6 SHEET NAME: PROJECT NAME: 03/27/2024 24-014 285 W.HUNTINGTON DRIVE ARCADIA CA. 91007 MARK DATE DESCRIPTION PIT REVISION04/22/20241 SANTA ANITA PARK GROUP DELTA 310.320.5100 HUNSAKET & ASSOCIATES 661.294.2211 COPYRIGHT, 2024 CEFALI & ASSOCIATES, INC. ALL RIGHTS RESERVED This structural system and details are proprietary and the exclusive product of Cefali & Associates, Inc. No part of these drawings shall be reproduced, copied or used without the knowledge and written consent of Cefali & Associates, Inc. Cefali & Associates, Inc. 4344 Laurel Canyon Blvd, Suite 3 Studio City, CA 91604 818.752.1812 engineering@cefali.com www.cefali.com 1994-2024 30 ANNIVERSARYYE A R DEPTH REVISION05/16/20242 ELEVATIONS & SECTIONS L.S. SS200 3 1/8" = 1'-0" 2 2 2 2 EL. 466.0 EAST BULKHEAD ELEVATION LOOKING EAST 1 EL. 467.0 31 35 40 45 50 51 2 SS201 B.O. BASIN. EL. 450.0BOE. 449.0 BOE. 449.0 DIRT FILLED EAST SECTION 2 d H SEE SCHEDULE 466.41 BOE. 449.0 EL. 467.0 SOUTH BULKHEAD ELEVATION LOOKING SOUTH 3 467 468 469 470 471 51 55 60 65 70 75 79 80 1 SS202 BOE. 446.0 BOE. 449.0 B.O. BASIN. EL. 450.0 BOE. 449.0 CONSULTANTS: GEOTECHNICAL ENGINEER CIVIL ENGINEER SHEET DRAFTER: PROJECT NO.: DRAWING NO.: DATE: SCALE: OF 6 SHEET NAME: PROJECT NAME: 03/27/2024 24-014 285 W.HUNTINGTON DRIVE ARCADIA CA. 91007 MARK DATE DESCRIPTION PIT REVISION04/22/20241 SANTA ANITA PARK GROUP DELTA 310.320.5100 HUNSAKET & ASSOCIATES 661.294.2211 COPYRIGHT, 2024 CEFALI & ASSOCIATES, INC. ALL RIGHTS RESERVED This structural system and details are proprietary and the exclusive product of Cefali & Associates, Inc. No part of these drawings shall be reproduced, copied or used without the knowledge and written consent of Cefali & Associates, Inc. Cefali & Associates, Inc. 4344 Laurel Canyon Blvd, Suite 3 Studio City, CA 91604 818.752.1812 engineering@cefali.com www.cefali.com 1994-2024 30 ANNIVERSARYYE A R DEPTH REVISION05/16/20242 ELEVATIONS & SECTIONS L.S. SS201 4 1/8" = 1'-0" 22 2 2 22 2 DIRT FILLED SOUTH SECTION 1 d H SEE SCHEDULE 468.33 BOE. 449.0 WEST BULKHEAD ELEVATION LOOKING WEST 2 471 471 80 85 90 95 99 1 1 SS202 33"SD33"SD8"SS 8"SS BOE. 449.0 BOE. 449.0 B.O. BASIN. EL. 450.0 DIRT FILLED WEST SECTION 3 d H SEE SCHEDULE 471.0 33"SD 463.79± 8"SS 464.87 BOE. 449.0 CONSULTANTS: GEOTECHNICAL ENGINEER CIVIL ENGINEER SHEET DRAFTER: PROJECT NO.: DRAWING NO.: DATE: SCALE: OF 6 SHEET NAME: PROJECT NAME: 03/27/2024 24-014 285 W.HUNTINGTON DRIVE ARCADIA CA. 91007 MARK DATE DESCRIPTION PIT REVISION04/22/20241 SANTA ANITA PARK GROUP DELTA 310.320.5100 HUNSAKET & ASSOCIATES 661.294.2211 COPYRIGHT, 2024 CEFALI & ASSOCIATES, INC. ALL RIGHTS RESERVED This structural system and details are proprietary and the exclusive product of Cefali & Associates, Inc. No part of these drawings shall be reproduced, copied or used without the knowledge and written consent of Cefali & Associates, Inc. Cefali & Associates, Inc. 4344 Laurel Canyon Blvd, Suite 3 Studio City, CA 91604 818.752.1812 engineering@cefali.com www.cefali.com 1994-2024 30 ANNIVERSARYYE A R DEPTH REVISION05/16/20242 ELEVATIONS & SECTIONS L.S. SS202 5 1/8" = 1'-0" 2 22 2 2 d SEE SCHEDULE H FI L L B A L A N C E W I T H S L U R R Y 25 0 0 P S I C O N C . H d TYP. CANTILEVER BULKHEAD SECTION DRILLED 1A 1 VIBRATORY 1B 1/4" = 1'-0" BOTTOM OF FOOTING (BOF)/ BOTTOM OF EXCAVATION (BOE) EXISTING GRADE (EG) BOTTOM OF FOOTING (BOF)/ BOTTOM OF EXCAVATION (BOE) EXISTING GRADE (EG)SOLDIER PILE SOLDIER PILE LAGGING3 -LAGGING3 - TYPICAL WOOD LAGGING DETAIL 3 LC SOLDIER PILE NOTE: 1.ANY WOOD LEFT IN THE GROUND SHALL BE TREATED WITH PRESERVATIVE. 2.WOOD LAGGING EXTENTS OF AND HEIGHT OF LIFTS AS DETERMINED BY GEOTECHNICAL ENGINEER'S REPRESENTATIVE. CORNER 1" MIN. (TYP.) 1" MIN. PROVIDE SLURRY BACKFILL BEHIND WOOD LAGGING FOR FULL BEARING WOOD LAGGING1 3x DF #2 FULL DEPTH FOR SPANS ≤ 8'-0". 4x DF #2 FULL DEPTH FOR SPANS > 8'-0" WALL BY OTHERS PLACE LAGGING AS GRADE DESCENDS2 3/4" = 1'-0" SOLDIER PILE 23/4" = 1'-0" SECTION SOLDIER PILE CJP SPLICE DETAIL CONSULTANTS: GEOTECHNICAL ENGINEER CIVIL ENGINEER SHEET DRAFTER: PROJECT NO.: DRAWING NO.: DATE: SCALE: OF 6 SHEET NAME: PROJECT NAME: 03/27/2024 24-014 285 W.HUNTINGTON DRIVE ARCADIA CA. 91007 MARK DATE DESCRIPTION PIT REVISION04/22/20241 SANTA ANITA PARK GROUP DELTA 310.320.5100 HUNSAKET & ASSOCIATES 661.294.2211 COPYRIGHT, 2024 CEFALI & ASSOCIATES, INC. ALL RIGHTS RESERVED This structural system and details are proprietary and the exclusive product of Cefali & Associates, Inc. No part of these drawings shall be reproduced, copied or used without the knowledge and written consent of Cefali & Associates, Inc. Cefali & Associates, Inc. 4344 Laurel Canyon Blvd, Suite 3 Studio City, CA 91604 818.752.1812 engineering@cefali.com www.cefali.com 1994-2024 30 ANNIVERSARYYE A R DEPTH REVISION05/16/20242 TYP. DETAILS & SCHEDULE L.S. SS500 6 AS NOTED PILE SCHEDULE2 DEVELOPMENT SERVICES DEPARTMENT CITY OF ARCADIA SOUTH CAFO BASIN & SANTA ANITA PARK UTILITY FACILITIES SHEET M-1 STORM WATER PUMP STATION CIVIL SITE PIPING AND PROFILE HSA010-XX DEVELOPMENT SERVICES DEPARTMENT CITY OF ARCADIA SOUTH CAFO BASIN & SANTA ANITA PARK UTILITY FACILITIES SHEET M-2 STORM WATER PUMP STATION MECHANICAL PLAN HSA010-XX DEVELOPMENT SERVICES DEPARTMENT CITY OF ARCADIA SOUTH CAFO BASIN & SANTA ANITA PARK UTILITY FACILITIES SHEET M-3 STORM WATER PUMP STATION MECHANICAL SECTION HSA010-XX DEVELOPMENT SERVICES DEPARTMENT CITY OF ARCADIA SOUTH CAFO BASIN & SANTA ANITA PARK UTILITY FACILITIES SHEET M-4 STORM WATER PUMP STATION MECHANICAL DETAILS HSA010-XX DEVELOPMENT SERVICES DEPARTMENT CITY OF ARCADIA SOUTH CAFO BASIN & SANTA ANITA PARK UTILITY FACILITIES SHEET M-5 STORM WATER PUMP STATION MECHANICAL SPECIFICATION 1 HSA010-XX ” ”” ” ”” ” DEVELOPMENT SERVICES DEPARTMENT CITY OF ARCADIA SOUTH CAFO BASIN & SANTA ANITA PARK UTILITY FACILITIES SHEET M-6 STORM WATER PUMP STATION MECHANICAL SPECIFICATION 2 HSA010-XX ” · · · · · · · · · DEVELOPMENT SERVICES DEPARTMENT CITY OF ARCADIA SOUTH CAFO BASIN & SANTA ANITA PARK UTILITY FACILITIES SHEET M-7 STORM WATER PUMP STATION MECHANICAL SPECIFICATION 3 HSA010-XX