Loading...
HomeMy WebLinkAboutC-1672BOW -OUT MODIFICATION ON HUNTINGTON DRIVE BETWEEN SANTA ANITA AVENUE AND FIRST AVENUE NOTICE IS HEREBY GIVEN that City of Arcadia, California will be accepting bids for Bow -out Modification on Huntington Drive between Santa Anita Avenue and FirstAynue, as specified in accordance with the contract documents. Bids will be accepted at the Public Works Services Department, 11800 Goldring Road, Arcadia, CA 91006. Copies of the bid forms and specification documents may be obtained at the Public Works Services Department, 11800 Goldring Road, Arcadia, California. Said specifications, bid forms and contract documents are hereby referred to and incorporated herein and made a part hereof by reference and all bids must strictly comply therewith. The City reserves the right to accept any bid in whole or in part, or to reject any or all bids and to waive any informalities or irregularities in the bids or in the bidding process, and all bids are binding for a period of forty -five (45) days after the bid opening and may be retained by the City for examination and comparison, as specified in the contract documents. CITY OF ARCADIA March 31, 2000 PERRY L. HAGEN p EXP. 12.31.01 No. 04740 CITY OF ARCADIA BOW -OUT MODIFICATION ON HUNTINGTON DRIVE BETWEEN SANTA ANITA AVENUE AND FIRST AVENUE I. GENERAL INSTRUCTIONS A. Each bidder shall be held responsible for familiarizing himself with conditions to be encountered and requirements of the specifications. B. Bids must be made on forms furnished by the City. Do not remove the specifications or any of the pages herein but submit as a complete package. C. Bids must be returned by April 13, 2000 before 4:00 p.m. and the start of work wi I I be on Apri 1 24, 2000. D. The successful bidder and subcontractor will be required to obtain a City of Arcadia Business License ($161.10). Contractor must be a general contractor with a valid license. E. A corporation to which an award is made must furnish evidence of its corporate existence and evidence that the officer signing the contract is duly authorized to do so, along with contract executed by the corporation. F. The contract, if it is awarded, will be to the lowest responsible bidder whose bid complies most closely with the requirements described. The award, if made, will be made within thirty (30) days after the bid opening. No contract will be awarded to other than a contractor who has successfully completed a minimum of two (2) projects similar in nature and quality to this project. II. INSURANCE A. The contractor shall maintain adequate Workers' Compensation Insurance under the laws of the State of California for all labor employed by him or by any subcontractor under him who may come within the protection of such Workers' Compensation Insurance Laws. B. Contractor shall carry commercial liability insurance with combined single limits of at least one million dollars ($1,000,000) naming the City of Arcadia as additional insured. Proof of such insurance in a form and content approved by the Arcadia City Attorney is a condition precedent to execution of this Contract by the City. Insurance shall be maintained with insurers listed "A" or better in Best's Insurance Guide and be authorized to do business in the State of California and shall carry a 10 day Notice of Cancellation clause. Contractor shall also maintain property damage insurance in the amount of five hundred thousand dollars ($500,000). 06 III. WORKING HOURS Work for this job shall be done Monday through Friday, 7:00 a.m. to 4:00 p.m. IV. CONTACT PERSON Should you have any questions, please call Dan Lazo, Assistant Engineer at (626) 256- 6654. 3 SECTION 1 - SPECIAL PROVISIONS 1. Description of Work The intent of these specifications is to prescribe and provide for the complete and finished performance and accomplishment, in every respect, of the entire contemplated work or improvement indicated by the detailed specifications; and it shall be understood that the Contractor undertaking the execution of all or any part of such work or improvement wil I be required to perform, construct and complete the same in a thorough, satisfactory and workmanlike manner in accordance with the provisions of the specifications. It shal I be understood that the Contractor is to furnish and provide in connection therewith all necessary labor, tools, implements, equipment, materials and supplies except such as may otherwise be specified will be furnished by the City. 2. General Description of Work The work performed under this contract shall include the furnishing of all labor, materials, and equipment necessary to perform modification of bow -out , removal of landscaping, curb and gutter; and construction of curb and gutter and A.C. pavement in the City of Arcadia. All work shall be done in accordance with the current edition of the Standard Specifications. 3. Time of Completion The Contractor shall complete all fieldwork in every detail at the locations within five (5) working days. Work will commence on or before April 24, 2000 and will end April 28, 2000. The Contractor shal I not perform any fieldwork prior to said date. 4. Responsible Representative The Contractor shall designate in writing before starting work an authorized representative who shal I have the authority to represent and act for the Contractor, and who shall be authorized by the Contractor to execute all contract related documents including change orders and contract quantity agreements. The designated person shall act as the Contractor's public relations representative to answer and negotiate solutions to resolve public complaints that result from Contractor's activities. The designated representative shall be available at all times during regular working hours throughout the contract duration to respond in person to any party initiating contract related complaints. Said authorized representative shall be present at the site of the work at all times while work is actually in progress on the contract. When work is not in progress and during periods when work is suspended, arrangement acceptable to the Public Works Services Director shall be made for any emergency work which may be required. 4 Whenever the Contractor or his authorized representative is not present on any particular part of the work where it may be desired to give direction, orders will be given by the Public Works Services Director, which shall be received and obeyed by the superintendent or foreman who may have charge of the particular work in reference to which orders are given. Any order given by the Public Works Services Director, not otherwise required by the Specifications to be in writing, will on request of the Contractor, be given or confirmed by the Public Works Services Director in writing. An alternate designated representative shall not be substituted without prior written consent from the Public works Services Director. 5. Bidder's Designation of Subcontractors: Any subcontractors doing work in excess of one -half of one percent (1/2 %) of the total bid shall be designated on this form. The undersign certifies that he has used the sub -bids of the following listed subcontractors in making up his bid and that the subcontractors listed will be used for the work they bid, subject to the approval of the Public Works Services Director, and in accordance with the applicable provisions of the contract documents. WORK STATE SUBCONTRACTED SUBCONTRAC ADDRESS & PHONE LICENSE NO. s 6. Traffic Control Attention is directed to Section 7 -10, "Public Convenience and Safety ", of the Standard Specifications. The Contractor shall construct and maintain barricades, lights and /or other safety measures for the control of public traffic at all times during the construction period. The Contractor shall provide graffiti -free construction signs for the duration of construction. 5 Failure to comply with adequate Traffic Control will result in the Contractor paying the City of Arcadia the sum of Two - Hundred ($200.00) per incident. 7. Standard Drawing Unless otherwise noted on the plans, all standards to be used for curb and gutter, A.C. pavement shall be the latest City Standards. 8. Permits The Contractor shall procure all permits and licenses, and pay all charges and fees as necessary. The contractor shall comply with all provisions of all permits whether obtained by the City or by the Contractor. 0 SECTION 2 - CONSTRUCTION SPECIFICATIONS 1. Removals and Site Maintenance The work covered by this section shall include: saw cutting P.C.C. curb and gutter; saw cutting A.C. pavement; removal and disposal of concrete, asphalt pavement, landscaping, soil, and irrigation pipes as required per plans and specifications; relocation, protection and maintenance of existing improvements, including utilities, within the right -of -way which are to remain in place; and maintenance of the site in a neat and orderly condition throughout the construction period. 2. Relocations and Adjustments to Grade Relocations and adjustments to grade of existing facilities and improvements shall be directed in the field by the Project Engineer. Relocations and adjustments to grade shall include, but are not limited to signs, and irrigation systems. 3. Disposal of Material Removed Contractor shall separate concrete, asphalt and soil during hauling operation of the materials in order for the City to receive credit for recycling. Excavation material determined as unsuitable fill material by the Public Works Services Director or his designee shall become the property of the Contractor and shall be legally disposed of outside the site of the work by and at the expense of the Contractor. Stock piling all unsuitable materials will not be allowed. The Contractor shall remove all unsuitable materials from the work site each and every day. If the Contractor does not comply, a non - compliance fee of Two - Hundred ($200.00) per each calendar day will be paid to the City of Arcadia. If Liquidated Damages are not paid by the Contractor, the City of Arcadia may deduct the amount thereof from any money due or that becomes due the Contractor under the Contract. 4. Site Maintenance A. The Contractor shall provide and maintain graffiti -free construction signs during construction. B. Throughout the period of construction, the Contractor shall maintain the site of the work in a safe, neat, and orderly condition free of any hazardous conditions, trash, debris, surplus materials, and objectionable matter of any kind, all to the satisfaction of the Public Works Services Director. 7 C. Throughout the period of construction, the Contractor shall control dust in accordance with the requirements of the City of Arcadia, and as specified in the Standard Specifications. Dust shall be kept to a minimum at all times during construction operations by watering and such other means, and at such times as may be required by the City. D. During the course of construction, the Contractor shall protect all existing improvements, including underground utilities, which are to remain in place within and adjacent to the right -of -way, from damage resulting from his operations. In the event that an improvement is damaged, the Contractor shall immediately notify its owner and the Public Works Services Director of such damage, and the improvement shall immediately be restored to its original condition to the satisfaction of its owner. E. It is anticipated that nuisance waters, such as storm water runoff and irrigation water, will run in and across the right -of -way at various times throughout the period of construction. It shall be the responsibility of the Contractor, at his own expense, to provide for and protect the work from such waters. In addition, the Contractor's responsibility shall include handling nuisance water so that his operations do not cause them to damage existing improvements or properties adjacent to or near the site of the work. F. At the completion of construction, the Contractor shall clean up the site of the work and leave it in a neat and orderly condition free from trash, debris, and excess construction materials, and other objectionable matter, all to the satisfaction of the Public Works Services Director. G. Business owners shall be notified by placement of door hangers, 72 hours prior to scheduled work. 1 2 3. 4. SECTION 3 - CONSTRUCTION MATERIALS Portland Cement Concrete Portland Cement Concrete shall be Class 520 -C -2500 and shall conform to Section 201 -1 of the Standard Specifications. Bituminous Materials Tack coat material applications shall conform to all applicable sections of the Standard Specifications. Asphalt Concrete Asphalt concrete material placement shall conform to all applicable sections of the Standard Specifications. Untreated Base Materials Untreated Base shall be Crushed Aggregate Base or, as an alternate, processed miscellaneous base meeting the minimum gradation for crushed aggregate base per Section 200 -2 of the Standard Specifications. SECTION 4 - CONSTRUCTION METHODS 1. Unclassified Excavation Unclassified excavation shall consist of all excavation including bituminous pavement, grading and backfill as required to construct A.C. pavement, curb and gutter. 2. Compliance with Laws and Ordinances In addition to complying with the requirements herein, the Contractor shall make and maintain all excavations in strict conformance with the regulations of the division of Industrial Safety of the State of California and all other applicable laws, ordinances and regulations. Such compliance and safety of all persons working in, on and around any excavation shall be the sole responsibility of the Contractor. 3. Requirements Subsection 13.01.03 is hereby added to Section 300 - 1.3.2. of the Standard Specifications as follows: A. Bituminous Pavement. Bituminous pavement shall be removed to neatly sawed edges. Saw cuts shall be to a minimum depth of 1 -1/2 inches. B. Curb and gutter shal I be removed to neatly sawed edges with saw cuts made to minimum depth of 2 -1/2 inches. 4. Compaction Requirements Relative compaction requirements shall be as specified in the Standard Specifications. Subgrade relative compaction shall be a minimum of 95 %. 5. Subgrade Preparation The subgrade shall be prepared in conformance with Section 301 -1 of the Standard Specifications. 0. Crushed Aggregate Base Construction of aggregate base shall conform to the provisions in Section 301 -1, SUBGRADE PREPARATION, and 200 -2, UNTREATED BASE MATERIALS, of the Standard Specifications and the following special provisions: Material shall conform to Section 200 -2.2, "Crushed Aggregate Base" of the Standard Specifications for Public Works Construction, latest edition. 10 Cost for crushed aggregate base shall be included in the price bid for the item to be placed on the base material. 7. Non- Reinforced Portland Cement Concrete Construction of curb and gutter shall be constructed in accordance with the specifications and the City Standards and as modified and shall conform to the provisions in Section 303 -5, CONCRETE CURB and GUTTER of the Standard Specifications and the following Special Provision: A. Saw cutting, root removals, relocations, pavement removals and site maintenance necessary during the construction of these items shall be included in the bid. B. Concrete shown on the specifications to be poured against masonry block wall or other permanent structures shall be separated by a one -half inch wide strip of pre - molded fibrous joint - filler conforming to Section 201 -3.2, JOINT FILLER of the Standard Specifications. C. The contractor is responsible for protecting existing masonry block walls or other permanent structures from concrete being poured which may splash. A plastic liner or vis -queen shall be utilized to protect masonry block walls or other permanent structures. 8. Concrete Curb and Gutter Concrete curb and gutter shall conform to the general provisions of this section and to the appropriate City of Arcadia standards. In the construction of curb and gutter, the concrete shall be tamped sufficiently to bring the fines to the surface after which it shall be finished to the required grade with wooden floats, and troweled with a light broom finish. The Contractor shall repair and clean, at his own expense, all concrete damaged or discolored during construction. Where any curb requires repair before acceptance, repair shall be made by removing and replacing the entire curb between saw cuts. 9. Materials Portland cement shall meet the requirements of the construction materials section of these specifications and shall be low alkali type. 11 BOW -OUT MODIFICATION ON HUNTINGTON DRIVE BETWEEN SANTA ANITA AVENUE AND FIRST AVENUE PUBLIC WORKS SERVICES DEPARTMENT CITY OF ARCADIA Arcadia, CA Gentlemen: Pursuant to the Notice Inviting Bids for the above described work, the undersigned as a bidder, declares that he has carefully examined the location of the proposed above described work and that he has read and examined the contract documents and is familiar with all bid requirements, and hereby proposed and agrees, if this bid is accepted by the City of Arcadia, that within five (5) days, excluding Sundays, after written notice of award of contract is mailed to bidder, bidder will execute and deliver to Public Works Services Department the contract form provided in the contract documents and the insurance certificates required therein in a form approved by the City Attorney. Contractor will also furnish all labor, materials and services necessary to perform and complete all work required by the contract documents and all addenda thereto issued by said City prior to the opening of bids, for the above described work for the unit price set forth in the bidding schedule which is attached hereto and by this reference is incorporated herein. Said bidder further agrees to complete all work required under the contract within the time stipulated in said contract documents and to accept in full payment therefor the price in the Bidding Schedule. Dated: 4— . 00 12 r:1r101111 .� Item Approx. Item with Unit Price Written in Total No. Quantity Written in Words Figures 1. L.S. South side of Huntington Dr. Removal and disposal of 42.5' landscape bow - out, A.C. and concrete; construction of 8" asphalt on 12" CAB, curb and gutter as shown the p and spe ifiedw.he ' e`n � � 2. L.S. North side bf Huntington Dr. Removal and disposal of 34.5' landscape bow - out, A.C. and concrete; construction of 8" asphalt on 12" CAB, curb and gutter a shown thp,plan and p c I ,. / ��" $ $ Total Bid Pr* e $, ?), (Written iq Figures) (Written in Words) r Gt o J 0 1 The undersigned firm does agree to perform all work as required in the attached specifications at the rates as quoted. k Contr 13 REFERENCES ADDRESS CONTACT PHONE NUMBER ?N F U 14 CITY OF ARCADIA BOW -OUT MODIFICATION ON HUNTINGTON DRIVE BETWEEN SANTA ANNTA AVENUE AND FIRST AVENUE CONTRACT THIS CONTRACT, made and executed this 14th day of April 2000, by and between the City of Arcadia, California, herein referred to as "City ", and E. C. Construction hereinafter referred to as "Contractor" and WITNESSETH: City and Contractor do mutually agree as follows: 1. The Notice Inviting Bids, Bid, Specifications and all amendments thereof, when approved by the parties hereto, copies of which are attached hereto, are hereby incorporated in and made a part of this Contract by reference, as though fully set forth herein, and all of the foregoing shall constitute the Contract documents. 2. Contractor agrees to modify the bow -out on Huntington Drive between Santa Anita Avenue and First Avenue in the City within the time frame listed on the bid page and shall be completed no later than April 28, 2000 in strict conformance with the Contract documents. 3. City agrees to pay Contractor the amount specified in the Contract documents and in the manner specified therein. 4. Time is of the essence in this Contract. If Contractor should fail to complete the project, as specified in paragraph 2 above, City may give 30 days' written notice to Contractor to complete said work, and if Contractor fails to do so, Contractor shall be liable to City for damages incurred by such failure, including, but not limited to, the price differential to 15 perform the bow -out modification in conformance with the Contract documents on the open market from another vendor, with or without advertised competitive bidding. 5. Contractor agrees that City is not obligated to make payment until completion of bow -out modification, inspection for compliance, and acceptance by the Public Works Services Director or his designee. 6. Contractor shall obtain adequate liability, collision and property damage insurance to cover the work done at the City and all operators thereof at no cost to the City. Such insurance must be approved by the City Attorney and shall remain in effect until written acceptance of bow -out modification by the Public Works Services Director. 7. Contractor agrees that in the performance of this Contract, Contractor is an independent Contractor, not an employee, agent or officer of the City. 8. This Contract shall be interpreted, construed and given effect in all respects according to the laws of the State of California. 9. Contractor shall not assign this Contract, or any part thereof, or any monies due or to become due thereunder without prior written consent of City. 10. Contractor shall indemnify and hold harmless the City, and its officers and employees, from and against any and all claims, demands, suits, loss, damage, injury and liability, including costs and expenses incurred in connection therewith, however caused, resulting from, arising out of, or in any way connected with the performance of the Contract, including delivery and unloading of the supplies and equipment. 11. Contractor shall hold the City, its officers, agents, and employees, harmless from liability of any nature or kind, including costs and expenses, for infringement or use of any copyrighted or uncopyrighted composition, secret process, patented or unpatented invention, 16 article or appliance furnished or used in connection with the Contract. 12. Contractor warrants that no gratuities (in the form of entertainment, gifts, or otherwise) were offered or given by the Contractor, or any agent or representative of the Contractor, to any officer or employee of the City with a view toward securing the Contract or securing favorable treatment with respect to any determinations concerning the performance of the Contract. For breach or violation of this warranty, the City shall have the right to terminate the Contract, either in whole or in part, and any loss or damage sustained by the City in procuring on the open market any items which the vendor agreed to supply shall be borne and paid for by the Contractor. The rights and remedies of the City provided in this clause shall not be exclusive and are in addition to any other rights and remedies provided by law or under the Contract. 13. Rights and remedies of City for default: (a) In the event any item furnished by the Contractor in the performance of the Contract should fail to conform to the specifications therefor, the City may reject the same and it shall thereupon become the duty of the Contractor to reclaim and remove the same forthwith, without expense to the City and immediately to replace all such rejected items with others confirming to such specifications; provided that should the Contractor fail, neglect or refuse so to do, the City shall thereupon have the right to purchase in the open market, in lieu thereof, a corresponding item and to deduct from any monies due or that may thereafter become due to the Contractor and difference between the price named in the Contract documents and the actual cost thereof to the City. (b) In the event of the cancellation of the Contract, either in whole or in 17 part, by reason of the default or breach thereof by the Contractor, any loss or damage sustained by the City in procuring any items which the Contractor therein agreed to supply shall be borne and paid for by the Contractor. (c) The rights and remedies of the City provided above shall not be exclusive and are in addition to any other rights and remedies provided by law or under the Contract. 14. Subject to the provisions of this Contract, all terms, covenants, conditions and provisions hereof shall insure to and shall bind each of the parties hereto and each of their respective heirs, executors, administrators, successors and assigns. 15. EQUAL OPPORTUNITY: During the performance of this Contract the Contractor /vendor will not discriminate against any employee or applicant for employment because of race, color, religion, sex or national origin. CIVIL RIGHTS ACT OF 1964: Under Title VI of the Civil Rights Act of 1964, no person shall, on the grounds of race, color or national origin, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving federal financial assistance. 16. MINORITY: Minority vendor /contractors are encouraged to bid. Please check if you are one of the following: Black/African-American Hispanic Asian and Pacific Islander American Indian or Alaskan Native Woman Owned Business 18 I(Bidder), JJ-Pk� UU I 1 11 � � -- -, certify that all of the above required documents have been completed. I also understand that failure to submit a completed bid package will result in rejection of bid. tolA V I Contractor Signature Date By: CITY OF ARCA Gary F ewiq/ General Serv Manager Date 19 From. Pamell ,At &!pple-Merrili & Driscoll, Irc, To: Tiffney Fa> (626) 344-21 Date: 4118/2000 02:19 PM Page 3 of 3 ACORDL CERTIFICATE OF LIABILITY INSURANCE OP ID AP ATE (MMODJyya ECCON-1 =0 PRCDJCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Supple-Merrill & Driscoll Inc. ONLY AND CONFERS NO RIGHTS UPON THE CE RTIFICATE lnsuiance Agents and Brokers HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR P. 0. Box 2406 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Pasadena CA 91102 p OUCY DATE (MMIDDfY•) LIMITS Phone: 626-795-9921 Fax2l.ic #0513777 INSURERS AFFORDING COVERAGE r E, CHGCCUPPEIII:L_ ­,000,000 A A00AG08376 03/28/00 Admiral Insurance Company RLI Insurance Compan E.C. Construction Co. Sue C L xj ncc Valley Forge Ins Co 2213 IT Chico - F11371 I � 11 South El Monte CA 91733 N-,;PEPE COVERAGES THE PC _;CIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FCR PC!.ICYPERiOD INDICATED. NOlvvirHSTAN!)ING ANY REOLIiREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS. EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGCREGA'. E LIMITS SHO'AiN II HAVE BEEN REDUCED BY PAID CLAIMS. INSR, POLIC _EFFECT IVE LTR TYPE OF INSURANCE PO LICY NUMBER �R DATE (MMIDDIYYI p OUCY DATE (MMIDDfY•) LIMITS GENERAL LIAGILITY r E, CHGCCUPPEIII:L_ ­,000,000 A A00AG08376 03/28/00 f 03/28/01 rIPeIJaIIn EAIr 8 50,000 C L xj ncc ME D `(P ,An Ole pff­,; I $excluded - F on, () - ,2,000, 000 3 I7A, 1 L PER C,040! S I 000 000 r— PLC' I ECI AUTOMOBILE LIABILITY 'C MBINIED SINGLE LIMIT C X I 0112926956 03/28/00 - 03/23/0.1 1,000, 000 _'VV` EC 4-,l O'S HIPEi- Aijrag j q1 N GARAGE LIABILITY I AJTI- ONLY- EP.H`CIOEHT - ----------- 07HEF rHAN - C WL� C! ERCESS LIABILITY 4,000,000 -7 _IP I Ltjkl�;!d,0E RXL0257829 03/28/00 03/28 1 1 4,000,000 i r r, F tX RETHI 1 110,000 WORKERS COMPENSATION AND EMPLOYERS' LiARI,Tf L L.. G.ASE - PCB IC' UtArr OTHER DGSC;r,IPrION OF OPrRA`NONG1L0CA T ION SNr HICLE;;iG X CLUSIONSAUDED @'I ENDORAIIIIIA0 PROVISIONS Certificate holder is named as additional insured per the attached with reference to Huntington Dr, Parking Improvements- UIER FIFICATE HOLDER Y I ADDITIONAL INSURED; INSURER LETTER; CANCELLATION ARCADIA SHOULD AfJf OF THE A60VE DESCR BED POLICIES BE CANCELLED EEFQRE THE EXPIRATION DATE THEREOF, THE I SSUING INSURER WILL ENDEAVOR 70 MAIL 10 DAYS WRITTEN City of Arcadia NOTICE TC- THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL Attn: Tiffney 11800 Gold-ring Rd. IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER ITS AGENTS OR Arcadia CA 91066-6021 11.1'11ESIENIAIIVEI. ACORD 25-S (7/97) UACORD CORPORATION 1988 Fromi Ardrea Pamel At SUPPle-Morrill & Driscoll, !r c, To Tiffney PolicyNumber: gk CG 20 to If 85 Number: 14 Effective Date: 03128/1999 THIS ENDORSEMENT CHANCES THE POLICY. PLEASE READ IT CARFFIJLLY. A This endorsement -nodhr-c-S insurance provided t.-y-ler the following-. COMMERCIAL GENERAL LIA131LITY COVERAGE PART. SCHEDULE Name of Person or Organization.- City of Arcadia AS REQUIRED BY WRITTEN CONTRACT (If no entry appears above, inforination required to complete this endorsement will be shown in the Declarations as applicable to this endorsement.) WHO IS AN INSURED (Section 11) is aniended to include as an insured the person or organization shown in the Schedule, but only with respect to liability wising out of "your work" for that insured by or for you. If you are required by a written contract to provide primary insurance then this policy shall be primary and Condition 4. Other Insurance does not apply, but only with respect to coverages provided by this policy 'and for the additional insured named in the schedule. Fa (626) 844 -2 Date: 4;1 8/2000 G2:19 PM Page 2 c-f 3 CG 20 10 1185 Copyright, Insurance Services Office, Inc., 1984 Page I of 1 11 Apr 02:54P 323 935 2373 P-02 Sla e of Camomic Co ..rrrer CONTRACTORS STATE LICENSE BOARD � ACME tICINSF 9 ,,,,.,,366814 t , CORP -F C CCNSTRUCTION (,,OMPAN"Y ctmd4",4i? A C-8 C1 2 11/30/2000 L Apr-17 -00 02:54P 323 935 2373 P.03 BUSINESS LICENSE CERTIFICATE CITY OF ARC ADIA The person, firm or corporation named below Is granted this certificate pUTSUanl to the rrcvisions of the City Business Tax Ordinance to engage in, carry on or conduct the business, trade, calling, profession, exhibition or occupation described below. Issuance of certificate is not an endorsement, nor certification of compliance with other ordinances or laws, nor an assurance ?hat the proposed use is in conformance with the city zoning regulations. This certificate is issued without verification that the taxpayer is subject to or exempt from licensing by the State of California. BUSINESS NAME: E C Construction Co BUSINESS TYPE: 15 BUSINESS LOCATION: 2213 Chico Ave DESCRIPTION: General Conimctore S tl Monte CA 91733 BUSINESS OWNER(S); Kenneth D Walters Pres Business License Number: 103891 Carl P Peterson Account Number: 022428 F. C Construction Co License Fee: $ 238.60 ?213 Chico Ave Effective Gate: 0'1 1 13199 S E1 Monte CA 91733 Expiration Date; 0613011 TO BE POSTED IN A CONSPICUOUS PLACE NOT TRANSFERABLE