Loading...
HomeMy WebLinkAboutItem 2e: Contract with Downing Construction for Transmission Main Extension Project on Colorado Street A V~ h. ,ntc� t"' 74°7tY °t STAFF REPORT Public Works Services Department DATE: May 17, 2011 TO: Mayor and City Council FROM: Tom Tait, Public Works Services Director Prepared by: Ken Herman, Deputy Public Works Services Director Tiffany Lee, Associate Civil Engineer SUBJECT: AUTHORIZE THE CITY MANAGER TO EXECUTE A CONTRACT WITH DOWNING CONSTRUCTION INC. FOR THE TRANSMISSION MAIN EXTENSION PROJECT ON COLORADO STREET IN THE AMOUNT OF $245,615 Recommendation: Approve SUMMARY The 2008 Water Master Plan Update identified the need to make improvements to the City water distribution system to increase fire flow protection and reduce system pressure losses. The transmission main extension project on Colorado Street was approved in the 2010 -11 Capital Improvement Program. The project involves the installation of a twelve inch (12 ") ductile iron pipe along Colorado Street from Altura Road to Vaquero Road. The extension of the twelve inch (12 ") transmission main will allow for an eight inch (8 ") tie -in to the existing water main at Monte Vista Road and Catalpa Road. Staff recommends that the City Council authorize the City Manager to execute a contract with Downing Construction Inc. for the transmission main extension project on Colorado Street, in the amount of $223,287 and issue a purchase order for the contract amount plus 10% contingency, totaling $245,615. DISCUSSION Recommendations made in the 2008 Water Master Plan Update include identifying areas in the City's water distribution system to reduce system pressure losses and improve fire flow demands. One of the areas where these improvements can be made is along Colorado Street between Baldwin Avenue and the west city limit. Adding a section of pipe in this area will provide a more even distribution of water along the top of Page 1 of 3 Mayor and City Council May 17, 2011 the pressure zone and help to reduce system pressure losses by filling in a gap in the distribution system. The transmission main extension project on Colorado Street involves the installation of a twelve inch (12') ductile iron pipe along Colorado Street from Altura Road to Vaquero Road and make an eight inch (8 ") tie in to the existing distribution system on Monte Vista Rd and Catalpa Road. Notice inviting bids was published in the adjudicated paper and bid packages were acquired by area contractors. The City Clerk publicly opened Seventeen (17) sealed bids on April 26, 2011 with the following results: Rank Firm Location Bid Amount 1 Downing Construction Inc. Yucaipa $223,287.00 2 JA Salazar Construction & Supply Corp. La Habra $232,882.00 3 J. De Sigio Construction Inc. Baldwin Park $266,435.00 4 E & R Construction Inc. Baldwin Park $270,800.00 5 T. E Roberts Inc. Tustin $273,460.00 6 Gentry Brothers Inc. Irwindale $285,330.00 7 J.F Bruce Construction Alta Loma $289,249.00 8 Williams Pipeline Contractors Inc. Ventura $292,141.00 9 Kana Pipeline Inc. Placentia $302,933.00 10 Tomovich & Associates Pico Rivera $309,838.00 11 Atlas Allied Inc. Anaheim $314,910.00 12 Dominguez General Engineering Inc. Rosemead $329,850.00 13 Garcia Juarez Construction Inc. Brea $360,750.00 14 R.Y Engineering Works Inc. Burbank $365,650.00 15 Mike Bubalo Construction Inc. Baldwin Park $388,090.00 16 C.P Construction Inc. Ontario $451,655.00 17 Vido Samarzich Inc. Alta Loma $540,370.00 Staff has reviewed the bid documents for content and investigated the Contractor's background and recent projects for competency. Staff has concluded that Downing Construction, Inc. is the lowest responsible bidder to perform the construction of this project. Coincidently, Downing Construction was the low bid on the various water main replacement project. In staff's opinion this will have no adverse affects on the Contractor's performance. Therefore, staff recommends that the City Council award a contract to Downing Construction, Inc. for the transmission main extension project on Colorado Street in the amount of $223,287 and issue a purchase order for the contract amount plus 10% contingency, totaling $245,615. Page 2 of 3 Mayor and City Council May 17, 2011 ENVIRONMENTAL ANALYSIS This project consists of minor alteration of an existing public utility system with no expansion of the system and therefore qualifies as a Class 1 categorical exemption per 15301 (b) of the California Environmental Quality Act. FISCAL IMPACT Funds in the amount of $320,000 have been budgeted as a part of the 2010 -11 Capital Improvement Program for the Transmission Main Extension on Colorado Street Project. RECOMMENDATIONS 1. Award a contract to Downing Construction Inc. for the Transmission Main Extension on Colorado Street Project in the amount of $245,615. 2. Authorize the City Manager and City Clerk to execute a contract in a form approved by the City Attorney. 3. Waive any informality in the bid or bidding process. Approved by: 3 - Donald Penman, City Manager TT:KH:TL Attachment Page 3 of 3 TRANSMISSION MAIN EXTENSION ON COLORADO STREET r di. . \r ,,, , , 7` Q. NORTH ���'� ��5 i CITY OF ARCADIA f I ELKI `S GRAND VIEW - "_ _ PROJECT LOCATION ° SIE • • DRE BL 4 COLORADO ST. BETWEEN - ° ALTURA RD. & VAQUERO RD. ? 4 t ARC STATOR ORANGE GROVE k _1 j! ° Z ro .. ..,,,.., mi 1 _________......i.,•.•.,.• ----,-,--, , !to 4., itif',61■1= :i swa 1 IA 4 F,--, � •:f24?! PARK \ _� ---..."'-- ..=-9 --+. ,V ., ' wig 10 :- '' A v - 7/ --. 4 • , • : \ .,1„ . 1 y`, ,wtwe71 *,K�R� � Z' 4 r YMA AHfA - W1� 9iL`� r a0V COURSE ,,. . }} c 111111111111 7 N t CO w ¢ ARTE aniimgo y O Z DU WO °III Q m °" , • CAMINO REAL 1 in g Q ri Z ¢ _ III ONG 1.111 TUNAS DR -�� 11111.0:::110111111111111r 1 /1,* • -D 5 LOCATION MAP NOT TO SCALE