Loading...
HomeMy WebLinkAbout35 W St Joseph St - 2023 - DISH WIRELESS CELL SITE MODIFICATIONS-1 TITLE PAGE NO.DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THE SOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWN CASTLE AND ITS AFFILIATES. REPRODUCTION OR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDEN WITHOUT THE WRITTEN PERMISSION OF CROWN CASTLE. SITE NAME: SANTA ANITA BU NUMBER: 877948 WO NUMBER: 2197400 SITE ADDRESS: 35 W. ST JOSEPH ST. ARCADIA, CA 91007 LOS ANGELES COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 01/20/23 BF 01/20/23 BF 01/24/23 MEB 01/24/23 CODE COMPLIANCE . ATTENTION ALL CONTRACTORS, ANYTIME YOU ACCESS A CROWN SITE FOR ANY REASON YOU ARE TO CALL THE CROWN NOC UPON ARRIVAL AND DEPARTURE, DAILY AT 800-788-7011 SAFETY CLIMB: 'LOOK UP' THE INTEGRITY OF THE WIRE ROPE SAFETY CLIMB SYSTEM SHALL BE CONSIDERED DURING ALL STAGES OF DESIGN, INSTALLATION, AND INSPECTION. TOWER REINFORCEMENTS AND EQUIPMENT INSTALLATIONS SHALL NOT COMPROMISE THE INTEGRITY OR FUNCTIONAL USE OF ANY WIRE ROPE SAFETY CLIMB ON THE STRUCTURE. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO: PINCHING OF THE WIRE ROPE, BENDING OF THE WIRE ROPE FROM ITS SUPPORTS, DIRECT CONTACT OR CLOSE PROXIMITY TO THE WIRE ROPE WHICH MAY CAUSE FRICTIONAL WEAR, OR IMPACT TO THE ANCHORAGE POINTS IN ANY WAY. ANY COMPROMISED SAFETY CLIMB MUST BE REPORTED TO YOUR CROWN POC FOR RESOLUTION, INCLUDING EXISTING CONDITIONS. SITE NAME: SANTA ANITA TOWER MODIFICATION DRAWINGS SITE ADDRESS: 35 W. ST JOSEPH ST. ARCADIA, CA 91007 LOS ANGELES COUNTY, USA BU NUMBER: 877948 PROJECT CONTACTS: 1. CROWN PROJECT MANAGER 2. CROWN DESIGN ENGINEER (EOR) SAIJUN ZHOU, P.E., S.E. 2000 CORPORATE DRIVE CANONSBURG, PA 15317 (724) 416-9627 EOR.APPROVAL@CROWNCASTLE.COM SHEET NUMBER DESCRIPTION S-1 S-2 TITLE PAGE MODIFICATION INSPECTION CHECKLIST S-3 & S-4 S-5 POLE MODIFICATION SCHEDULE NOTES DETAILSS-6 - S-8 DRAWINGS INCLUDED HOT WORK INCLUDED NA BASE GRINDING ONLY NA BASE WELDING (AND GRINDING) NA AERIAL GRINDING ONLY NA AERIAL WELDING (AND GRINDING) 0 THIS MODIFICATION DESIGN IS BASED ON THE REQUIREMENTS OF THE TIA-222-H STRUCTURAL STANDARDS FOR STEEL ANTENNA TOWERS AND ANTENNA SUPPORTING STRUCTURES BASED UPON AN ULTIMATE 3-SECOND GUST WIND SPEED OF 95 MPH WITH NO ICE AS REQUIRED BY THE 2022 CBC, 60 MPH UNDER SERVICE LOADS, EXPOSURE CATEGORY C AND RISK CATEGORY II. SEISMIC FORCES WERE CONSIDERED BASED ON SPECTRAL RESPONSE FACTORS SS=1.976 AND S1=0.727. DYLAN BAKER (480) 734-2400 DYLAN.BAKER@CROWNCASTLE.COM 2055 S. STEARMAN DRIVE CHANDLER, AZ 85286 TOWER INFORMATION TOWER MAPPED BY / DOC #: FDH / CCISITES DOC # 2912793 TOWER HEIGHT / TYPE: 59.792 FT MONOPOLE TOWER TOWER LOCATION: LAT 34º 08' 37.20" DATUM: (NAD 1983) LONG -118º 01' 58.30" ELEV 502.3 FT AMSL STRUCTURAL DESIGN DRAWING: CCI / WO # 2197400 STRUCTURAL ANALYSIS REPORT: MH / WO # 2148199 STRUCTURAL ANALYSIS DATE: 08/23/22 ORDER #: 629188 REV # 4 CCISITES DOCUMENT ID: 10537856 SPECIAL INSPECTIONS REQUIRED 1. HIGH STRENGTH BOLTS 06/30/23 01/24/23 Saijun Zhou Digitally signed by Saijun Zhou Date: 2023.01.24 13:29:23 -06'00' S-2. NO.DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THE SOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWN CASTLE AND ITS AFFILIATES. REPRODUCTION OR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDEN WITHOUT THE WRITTEN PERMISSION OF CROWN CASTLE. SITE NAME: SANTA ANITA BU NUMBER: 877948 WO NUMBER: 2197400 SITE ADDRESS: 35 W. ST JOSEPH ST. ARCADIA, CA 91007 LOS ANGELES COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 01/20/23 BF 01/20/23 BF 01/24/23 MEB 01/24/23 GENERAL THE MI IS AN ON-SITE VISUAL AND HANDS-ON INSPECTION OF TOWER MODIFICATIONS INCLUDING A REVIEW OF CONSTRUCTION REPORTS AND ADDITIONAL PERTINENT DOCUMENTATION PROVIDED BY THE GENERAL CONTRACTOR (GC), AS WELL AS ANY INSPECTION DOCUMENTS PROVIDED BY 3RD PARTY INSPECTORS. THE MI IS TO ENSURE THE INSTALLATION WAS CONSTRUCTED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, NAMELY THE MODIFICATION DRAWINGS; IN ACCORDANCE WITH APPLICABLE CROWN STANDARDS; AND AS DESIGNED BY THE ENGINEER OF RECORD (EOR). NO DOCUMENT, CODE OR POLICY CAN ANTICIPATE EVERY SITUATION THAT MAY ARISE. ACCORDINGLY, THIS CHECKLIST IS INTENDED TO SERVE AS A SOURCE OF GUIDING PRINCIPLES IN ESTABLISHING GUIDELINES FOR MODIFICATION INSPECTION. THE MI IS TO CONFIRM INSTALLATION CONFIGURATION AND WORKMANSHIP ONLY AND IS NOT A REVIEW OF THE MODIFICATION DESIGN ITSELF, AND THE MI INSPECTOR DOES NOT TAKE OWNERSHIP OF THE MODIFICATION DESIGN. OWNERSHIP OF THE STRUCTURAL MODIFICATION DESIGN EFFECTIVENESS AND INTEGRITY RESIDES WITH THE EOR AT ALL TIMES. THE MI INSPECTOR SHALL INSPECT AND NOTE CONFORMANCE/NONCONFORMANCE AND PROVIDE TO THE CROWN POINT OF CONTACT (CROWN POC) FOR EVALUATION. ALL MI'S SHALL BE CONDUCTED BY A CROWN APPROVED MI INSPECTOR, WORKING FOR A CROWN APPROVED MI VENDOR. SEE CROWN CED-LST-10173, "APPROVED MI VENDORS". TO ENSURE THAT THE REQUIREMENTS OF THE MI ARE MET, IT IS VITAL THAT THE GENERAL CONTRACTOR (GC) AND THE MI INSPECTOR BEGIN COMMUNICATING AND COORDINATING AS SOON AS A PURCHASE ORDER ( PO) IS RECEIVED. IT IS EXPECTED THAT EACH PARTY WILL BE PROACTIVE IN REACHING OUT TO THE OTHER PARTY. IF CONTACT INFORMATION IS NOT KNOWN THE GC AND/OR INSPECTOR SHALL CONTACT THE CROWN POINT OF CONTACT (POC). REFER TO CROWN CED-SOW-10007, "MODIFICATION INSPECTION SOW", FOR FURTHER DETAILS AND REQUIREMENTS. SERVICE LEVEL COMMITMENT THE FOLLOWING RECOMMENDATIONS AND SUGGESTIONS ARE OFFERED TO ENHANCE THE EFFICIENCY AND EFFECTIVENESS OF DELIVERING AN MI REPORT: x THE GC SHALL PROVIDE A MINIMUM OF 5 BUSINESS DAYS NOTICE, PREFERABLY 10, TO THE MI INSPECTOR AS TO WHEN THE SITE WILL BE READY FOR THE MI TO BE CONDUCTED. x THE GC AND MI INSPECTOR COORDINATE CLOSELY THROUGHOUT THE ENTIRE PROJECT. x WHEN POSSIBLE, IT IS PREFERRED TO HAVE THE GC AND MI INSPECTOR ON-SITE SIMULTANEOUSLY FOR ANY GUY WIRE TENSIONING OR RE-TENSIONING OPERATIONS.x WHEN POSSIBLE, IT IS PREFERRED TO HAVE THE GC AND MI INSPECTOR ON-SITE DURING THE MI TO HAVE ANY MINOR DEFICIENCIES CORRECTED DURING THE INITIAL MI. THEREFORE, THE GC MAY CHOOSE TO COORDINATE THE MI CAREFULLY TO ENSURE ALL CONSTRUCTION FACILITIES ARE AT THEIR DISPOSAL WHEN THE MI INSPECTOR IS ON SITE. REQUIRED PHOTOS BETWEEN THE GC AND THE MI INSPECTOR THE FOLLOWING PHOTOGRAPHS, AT A MINIMUM, ARE TO BE TAKEN AND INCLUDED IN THE MI REPORT: x PRE-CONSTRUCTION GENERAL SITE CONDITION x PHOTOGRAPHS DURING THE REINFORCEMENT MODIFICATION CONSTRUCTION/ERECTION AND INSPECTIONxxRAW MATERIALS xx PHOTOS OF ALL CRITICAL DETAILSxxFOUNDATION MODIFICATIONS xx WELD PREPARATIONxxBOLT INSTALLATION xx FINAL INSTALLED CONDITION xx SURFACE COATING REPAIR x POST CONSTRUCTION PHOTOGRAPHS xx FINAL INFIELD CONDITION PHOTOS OF ELEVATED MODIFICATIONS TAKEN ONLY FROM THE GROUND SHALL BE CONSIDERED INADEQUATE. THIS IS NOT A COMPLETE LIST OF REQUIRED PHOTOS, FOR A COMPLETE LIST OF PHOTOS SEE CED-SOW-10007. MODIFICATION INSPECTION NOTES MODIFICATION INSPECTION CHECKLIST 0 X MI CHECKLIST REQUIRED REPORT ITEM APPLICABLE CROWN DOC #BRIEF DESCRIPTION PRE-CONSTRUCTION MI CHECKLIST DRAWING THIS CHECKLIST SERVES AS A GUIDELINE FOR THE REQUIRED CONSTRUCTION DOCUMENTS AND INSPECTIONS FOR THIS MODIFICATION. EOR APPROVED SHOP DRAWINGS ONCE THE PRE-MODIFICATION MAPPING IS COMPLETE AND PRIOR TO FABRICATION, THE CONTRACTOR SHALL PROVIDE DETAILED ASSEMBLY DRAWINGS AND/OR SHOP DRAWINGS. THESE ARE TO INCLUDE, BUT ARE NOT LIMITED TO, A VISUAL LAYOUT OF NEW REINFORCEMENT, EXISTING REINFORCEMENT CONFIGURATION, PORTHOLES, MOUNTS, STEP PEGS, SAFETY CLIMBS AND ANY OTHER MISCELLANEOUS ITEMS WHICH MAY AFFECT SUCCESSFUL INSTALLATION OF MODIFICATIONS ON THE TOWER. THESE DRAWINGS SHALL BE SUBMITTED TO THE EOR FOR APPROVAL. SHOP DRAWINGS SUBMISSION SHALL INCLUDE THE EOR RFI FORM DETAILING ANY CHANGES FROM THE ORIGINAL DESIGN. FABRICATION INSPECTION A LETTER FROM THE FABRICATOR, STATING THAT THE WORK WAS PERFORMED IN ACCORDANCE WITH INDUSTRY STANDARDS AND THE CONTRACT DOCUMENTS, SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. FABRICATOR CERTIFIED WELD INSPECTION A CWI SHALL INSPECT ALL WELDING PERFORMED ON STRUCTURAL MEMBERS DURING FABRICATION. A WRITTEN REPORT SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. MATERIAL TEST REPORTS (MTR)MATERIAL TEST REPORTS SHALL BE PROVIDED FOR MATERIAL USED AS REQUIRED PER SECTION 9.2.5 OF CED-SOW-10007. MTRS SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. FABRICATOR NDE INSPECTION REPORT CRITICAL SHOP WELDS THAT REQUIRE TESTING ARE NOTED ON THESE CONTRACT DRAWINGS. A CERTIFIED NDT INSPECTOR SHALL PERFORM NON-DESTRUCTIVE EXAMINATION AND A REPORT SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. NDE OF MONOPOLE BASE PLATE A NDE OF THE POLE TO BASE PLATE CONNECTION IS REQUIRED AND A WRITTEN REPORT SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. PACKING SLIPS PACKING/SHIPPING LIST FOR ALL MATERIAL THAT WAS USED DURING CONSTRUCTION OF THE MODIFICATION. ADDITIONAL TESTING AND INSPECTIONS: CONSTRUCTION FOUNDATION INSPECTIONS A VISUAL OBSERVATION OF THE EXCAVATION AND REBAR SHALL BE PERFORMED BEFORE PLACING THE CONCRETE. A VISUAL OBSERVATION OF THE REBAR SHALL BE PERFORMED BEFORE PLACING THE EPOXY. A SEALED WRITTEN REPORT SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. CONCRETE COMP. STRENGTH AND SLUMP TEST THE CONCRETE MIX DESIGN, SLUMP TEST, AND COMPRESSIVE STRENGTH TESTS SHALL BE PROVIDED AS PART OF THE FOUNDATION REPORT. EARTHWORK FOUNDATION SUB-GRADES SHALL BE INSPECTED AND APPROVED BY AN APPROVED FOUNDATION INSPECTOR AND RESULTS INCLUDED AS PART OF THE FOUNDATION REPORT. MICROPILE/ROCK ANCHOR MICROPILES/ROCK ANCHORS SHALL BE INSPECTED BY THE FOUNDATION INSPECTION VENDOR AND SHALL BE INCLUDED AS PART OF THE FOUNDATION INSPECTION REPORT, ADDITIONAL TESTING AND/OR INSPECTION REQUIREMENTS ARE NOTED IN THESE CONTRACT DOCUMENTS. POST-INSTALLED ANCHOR ROD VERIFICATION POST INSTALLED ANCHOR ROD VERIFICATION SHALL BE PERFORMED IN ACCORDANCE WITH CROWN REQUIREMENTS AND A REPORT SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. BASE PLATE GROUT VERIFICATION THE GENERAL CONTRACTOR SHALL PROVIDE DOCUMENTATION TO THE MI INSPECTOR THAT CERTIFIES THAT THE GROUT WAS REMOVED AND/OR INSTALLED IN ACCORDANCE WITH CROWN REQUIREMENTS FOR INCLUSION IN THE MI REPORT. FIELD CERTIFIED WELD INSPECTION A CROWN APPROVED CERTIFIED WELD INSPECTOR SHALL INSPECT AND TEST FIELD WELDS, FOLLOWING ALL PROCEDURES SPECIFIED IN CROWN STANDARD DOCUMENTS APPLICABLE TO WELD INSPECTIONS. A REPORT SHALL BE PROVIDED. NDE OF FIELD WELDS SHALL BE PERFORMED AS REQUIRED BY CROWN STANDARDS AND CONTRACT DOCUMENTS. THE NDE REPORT SHALL BE INCLUDED IN THE CWI REPORT. ON-SITE COLD GALVANIZING VERIFICATION THE GENERAL CONTRACTOR SHALL PROVIDE WRITTEN AND PHOTOGRAPHIC DOCUMENTATION TO THE MI INSPECTOR VERIFYING THAT ANY ON-SITE COLD GALVANIZING WAS APPLIED PER MANUFACTURER SPECIFICATIONS AND APPLICABLE STANDARDS. TENSION TWIST AND PLUMB THE GENERAL CONTRACTOR SHALL PROVIDE A REPORT IN ACCORDANCE WITH APPLICABLE STANDARDS DOCUMENTING TENSION TWIST AND PLUMB. GC AS-BUILT DRAWINGS THE GENERAL CONTRACTOR SHALL SUBMIT A LEGIBLE COPY OF THE ORIGINAL DESIGN DRAWINGS EITHER STATING "INSTALLED AS DESIGNED" OR NOTING ANY CHANGES THAT WERE REQUIRED AND APPROVED BY THE ENGINEER OF RECORD. EOR/RFI FORMS APPROVING ALL CHANGES SHALL BE SUBMITTED. ADDITIONAL TESTING AND INSPECTIONS: POST-CONSTRUCTION CONSTRUCTION COMPLIANCE LETTER A LETTER FROM THE GENERAL CONTRACTOR STATING THAT THE WORKMANSHIP WAS PERFORMED IN ACCORDANCE WITH INDUSTRY STANDARDS AND THESE CONTRACT DRAWINGS, INCLUDING LISTING ADDITIONAL PARTIES TO THE MODIFICATION PROCESS. POST-INSTALLED ANCHOR ROD PULL TESTS POST-INSTALLED ANCHOR RODS SHALL BE TESTED BY A CROWN APPROVED PULL TEST INSPECTOR AND A REPORT SHALL BE PROVIDED INDICATING TESTING RESULTS. PHOTOGRAPHS PHOTOGRAPHS SHALL BE SUBMITTED TO THE MI. PHOTOS SHALL DOCUMENT ALL PHASES OF THE CONSTRUCTION. THE PHOTOS SHALL BE ORGANIZED IN A MANNER THAT EASILY IDENTIFIES THE EXACT LOCATION OF THE PHOTO. BOLT HOLE INSTALLATION VERIFICATION REPORT THE MI INSPECTOR SHALL VERIFY THE INSTALLATION AND TIGHTNESS 10% OF ALL NON PRE-TENSIONED BOLTS INSTALLED AS PART OF THE MODIFICATION. THE MI INSPECTOR SHALL LOOSEN THE NUT AND VERIFY THE BOLT HOLE SIZE AND CONDITION. THE MI REPORT SHALL CONTAIN THE COMPLETED BOLT INSTALLATION VERIFICATION REPORT, INCLUDING THE SUPPORTING PHOTOGRAPHS. PUNCHLIST DEVELOPMENT AND CORRECTION DOCUMENTATION FINAL PUNCHLIST INDICATING ALL NONCONFORMANCE(S) IDENTIFIED AND THE FINAL RESOLUTION/APPROVAL. MI INSPECTOR REDLINE OR RECORD DRAWING(S)THE MI INSPECTOR SHALL OBSERVE AND REPORT ANY DISCREPANCIES BETWEEN THE CONTRACTOR'S REDLINE DRAWING AND THE ACTUAL COMPLETED INSTALLATION. ADDITIONAL TESTING AND INSPECTIONS: X X X X X NA X NA NA NA NA NA NA NA NA X NA X NA X NA X NA X X NA THE MI CHECKLIST SHALL BE REVIEWED PRIOR TO THE START OF CONSTRUCTION. ALL PARTIES TO THE MODIFICATION SHALL UNDERSTAND CROWN REQUIREMENTS AND INSPECTION/DOCUMENTATION THAT IS APPLICABLE TO THE SCOPE OF WORK THEY ARE PERFORMING. ERRORS ON THE MI CHECKLIST SHALL BE BROUGHT TO THE ATTENTION OF THE CROWN POC AND EOR AS SOON AS POSSIBLE. CED-SOW-10007 CED-SOW-10007 CED-SOW-10007 CED-SOW-10007 CED-STD-10069 CED-SOW-10007 CED-SOW-10066 CED-STD-10069 ENG-SOW-10033 CED-SOW-10007 CED-SOW-10144 CED-SOW-10144 CED-SOW-10144 CED-SOW-10144 CED-SOW-10007 ENG-STD-10323 CED-SOW-10066 CED-STD-10069 CON-STD-10149 CED-FRM-10358 CED-PRC-10182 CED-STD-10261 CED-SOW-10007 CED-SOW-10007 CED-FRM-10358 CED-PRC-10119 CED-SOW-10007 CED-SOW-10007 CED-PRC-10283 CED-FRM-10285 CED-SOW-10007 06/30/23 01/24/23 Saijun Zhou Digitally signed by Saijun Zhou Date: 2023.01.24 13:37:31 -06'00' S-3 NOTES . NO.DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THE SOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWN CASTLE AND ITS AFFILIATES. REPRODUCTION OR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDEN WITHOUT THE WRITTEN PERMISSION OF CROWN CASTLE. SITE NAME: SANTA ANITA BU NUMBER: 877948 WO NUMBER: 2197400 SITE ADDRESS: 35 W. ST JOSEPH ST. ARCADIA, CA 91007 LOS ANGELES COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 01/20/23 BF 01/20/23 BF 01/24/23 MEB 01/24/23 0 GENERAL NOTES 1. The General Contractor (GC) shall reference CON-STD-10159, "Tower Modification Construction Specifications", as a continuation of the following General Notes. The GC shall keep a printed or electronic copy of this document with the Structural Design Drawings (SDD) at all times, in a location accessible to all Contractor Personnel, and shall ensure that all Contractor Personnel are aware of the information enclosed within the General Notes and CON-STD-10159. 2. The Contract Documents are the property of Crown Castle (Crown). They are provided to the GC and its Lower Tier Contractors and material suppliers for the limited purpose of use in completing the Work for this Site, and shall be kept in strict confidence and not disclosed to any third parties. The Contract Documents shall not be used for any other purpose whatsoever without the prior written consent of Crown. 3. Detail drawings, including notes and tables, shall govern over general notes and typical details. Contact the Crown Point of Contact (POC) and Engineer of Record (EOR) for clarification as needed. 4. Do not scale drawings. 5. Any Work performed without a prefabrication mapping is done at the risk of the GC and/or fabricator. All dimensions of existing structural elements are assumed based on the available documentation and are preliminary until field-verified by the GC, unless noted otherwise (UNO). Where discrepancies are found, GC shall contact the Crown POC and EOR through RFI. 6. For this analysis and modification, the tower has been assumed to be in good condition without any structural defects, UNO. If the GC discovers any indication of an existing structural defect, contact the Crown POC and EOR immediately. 7. All construction means and methods, including but not limited to erection plans, rigging plans, climbing plans, and rescue plans, shall be the responsibility of the GC responsible for the execution of the Work contained herein, and shall meet ANSI/ASSE A10.48 (latest edition); federal, state, and local regulations; and any applicable industry consensus standards related to the construction activities being performed. All rigging plans shall adhere to ANSI/ASSE A10.48 (latest edition) and Crown standard CED-STD-10253, "Rigging Program", including the required involvement of a qualified engineer for class IV construction to certify the supporting structure(s) in accordance with the ANSI/TIA-322 (latest edition). 8. The structural integrity of the modification design extends to the complete condition only. The GC must be cognizant that the removal of any structural component of an existing tower has the potential to cause the partial or complete collapse of the structure. All necessary precautions must be taken to ensure structural integrity, including, but not limited to, engineering assessment of construction stresses with installation maximum wind speed and/or temporary bracing and shoring. 9. Aerial and underground utilities and facilities may or may not be shown on the drawings. The GC shall take every precaution to preserve and protect these items, which may include aerial or underground power lines, telephone lines, water lines, sewer lines, cable television facilities, pipelines, structures and other public and private improvements within or adjacent to the Work area. The responsibility for determining the actual on-site location of these items shall rest exclusively with the GC. 10. All manufacturer's hardware assembly instructions shall be followed, UNO. Conflicting notes shall be brought to the attention of the EOR and the Crown POC. 11. The GC shall fabricate all required items per the materials specified below, UNO on the detail drawing sheets. If the GC finds for any component that the materials have not been clearly specified, the GC shall submit an RFI to the EOR to confirm the required material. All structural elements shall be new and shall conform to the following requirements, UNO: Monopoles: x Structural shapes and plates: ASTM A572 Grade 65 (FY = 65 KSI) x Welding electrodes, SMAW: E80XX x Welding electrodes, FCAW: E8XT-XX x Welding electrodes, GMAW: ER80S-X Self-Support and Guyed Towers: x Structural shapes and plates: ASTM A572 Grade 50 (FY = 50 KSI) x Welding electrodes, SMAW: E70XX x Welding electrodes, FCAW: E7XT-XX x Welding electrodes, GMAW: ER70S-X All tower types: x Steel angle: ASTM A572 Grade 50 (FY = 50 KSI) x Solid rod: ASTM A36 (FY = 36 KSI) x Pipe/tube (round): ASTM A500 Grade C (FY = 46 KSI) x Pipe/tube (square): ASTM A500 Grade C (FY = 50 KSI) x Bolts: ASTM F3125 Grade A325 Type 1 x U-bolts: ASTM A307 Grade A, or SAE J429 Grade 2 x Nuts: ASTM A563 Grade DH x Washers: ASTM F436 Type 1 x Guy Wires: ASTM A475 Grade EHS x Bridge Strand: ASTM A586 Grade 1 12. After fabrication, hot-dip galvanize all steel items, UNO. Galvanize per ASTM A123, ASTM A153/A153M, or ASTM A653 G90, as applicable. ASTM A490 bolts shall not be hot-dip galvanized, but shall instead be coated with Magni 565 or EOR approved equivalent, per ASTM F2833. 13. Contractor Personnel shall not drill holes in any new or existing structural members, other than those drilled holes shown on structural drawings, without the approval of the EOR. 14. For a list of Crown-approved cold galvanizing compounds, refer to CON-STD-10149, “Tower Protective Coatings Guidelines”. 15. All exposed structural steel as the result of this scope of Work including welds (after final inspection of the weld by the CWI), field drilled holes, and shaft interiors (where accessible), shall be cleaned and two (2) coats cold galvanizing shall be applied by brush in accordance with CON-STD-10149, “Tower Protective Coatings Guidelines”. Photo documentation is required to be submitted to the MI Inspector. 16. If removal of existing modifications is required per the modification scope, the GC shall clean and cold galvanize any existing empty bolt holes, UNO. If additional unexpected, oversized, or slotted holes are found, the GC shall contact the EOR and Crown POC for guidance prior to proceeding with the modifications. 17. All Work involving base plate grout scope items or resulting in disturbance of base plate grout shall reference ENG-STD-10323, "Base Plate Grout", and shall follow any Base Plate Grout Removal Notes contained herein. 18. If scope of modification involves bark removal or installation, the GC shall reference CED-SOW-10265, "Tree Concealment for Monopoles", as well as CED-STD-10395, "Installation Guidelines for Bark Surfaces". 19. If scope of modification involves concealment components including branching, the GC shall reference CED-CAT-10398 “Monopole Concealed Decorative Structures (CDS) Approved Components”. All new branch installations require tethering. 20. If scope of modification involves cathodic protection, the GC shall reference CED-SOW-10397, "Cathodic Protection Installation, Replacement, and Enhancement". 21. All tower grounding affected by the Work shall be repaired or replaced in accordance with OPS-STD-10090, "Tower Grounding", and OPS-BUL-10133, "Grounding Repair Recommendation". 22. If scope of modification requires removal or covering of tower ID tag, the tag must be replaced. 23. Any hardware removed from the existing tower shall be replaced with new hardware of equal size and quality, UNO. No existing fasteners shall be reused. 24. All joints using ASTM A325 or A490 bolts, U-bolts, V-bolts, and threaded rods shall be snug tightened, UNO. 25. A nut locking device shall be installed on all proposed and/or replaced snug tightened ASTM A325 or A490 bolts, U-bolts, V-bolts, and threaded rods. 26. All joints are bearing type connections UNO. If no bolt length is given in the Bill of Materials, the connection may include threads in the shear planes, and the GC is responsible for sizing the length of the bolt. 27. Blind bolts shall be installed per the installation specifications on the corresponding Approved Fastener sheets contained in CON-CAT-10300, "Monopole Standard Drawings and Approved Reinforcement Components". 28. If ASTM A325 or A490 bolts, and/or threaded rods are specified to be pre-tensioned, these shall be installed and tightened to the pretensioned condition according to the requirements of the RCSC Specification for Structural Joints Using ASTM High Strength Bolts. 29. All proposed and/or replaced bolts shall be of sufficient length such that the end of the bolt be at least flush with the face of the nut. It is not permitted for the bolt end to be below the face of the nut after tightening is completed. 06/30/23 01/24/23 Saijun Zhou Digitally signed by Saijun Zhou Date: 2023.01.24 13:38:33 -06'00' S-4 NOTES . NO.DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THE SOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWN CASTLE AND ITS AFFILIATES. REPRODUCTION OR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDEN WITHOUT THE WRITTEN PERMISSION OF CROWN CASTLE. SITE NAME: SANTA ANITA BU NUMBER: 877948 WO NUMBER: 2197400 SITE ADDRESS: 35 W. ST JOSEPH ST. ARCADIA, CA 91007 LOS ANGELES COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 01/20/23 BF 01/20/23 BF 01/24/23 MEB 01/24/23 0 PORT HOLE NOTES 1. All surfaces of the port hole rim itself as well as all exterior structural steel areas affected by welding, including weld metal, shall be galvanized in accordance with ASTM A780. 2. The following criteria are required for adherence to this standard. A. Use rim as template for cutting hole in monopole. Care shall be taken to minimize the root opening (AWS tolerances allow a maximum of 0.19"). B. Provide minimum 24" clear vertical separation between rim and other openings in monopole. Align ports on same azimuth as existing ports. C. Maximum variance of port hole center elevation shall not be greater than 6". D. Provide 90° minimum radial separation or two times the hole width clear circumferential separation between rim and adjacent opening in monopole, whichever is greatest. 18-sided pole with 4 ports shall not be allowed. E. Edge of opening for the exit port must be at least 24" from splice. F. Grind all edges of cut opening, achieving a bevel angle of 45° and removing the zinc from the weld area plus 1/4". Ensure all weld areas and surfaces are clean and free of zinc and loose particles. Zinc shall not be allowed to contaminate the weld. G. Position the rim as required and securely tack weld. Finish welding the rim with bevel weld and reinforcing fillet weld size as determined from the design method. H. Repair with galvanized coating. Both inside and outside should be brush-coated with 2 coats of zinc-rich paint. Apply in strict accordance with the manufacturer's recommendations. Paint over repaired surfaces to match monopole. 06/30/23 01/24/23 Saijun Zhou Digitally signed by Saijun Zhou Date: 2023.01.24 13:39:17 -06'00' POLE SPECIFICATIONS TOWER TAPER: BASE PL STEEL: ANCHOR RODS: N/A ASTM A36 1 1/2"Ø ASTM A36 EXISTING SHAFT SECTION DATA SHAFT SECTION SECTION LENGTH (FT) PLATE THICKNESS (IN) DIAMETER ACROSS FLATS OR OF ROUND SECTION (IN) @ TOP @ BOTTOM SECTION SHAPE SECTION GRADE (KSI) FLANGE PLATE GRADE (KSI) LAP SPLICE (IN) 19.98 0.2500 18.000 18.000 2 25.82 0.2500 N/A 24.000 24.000 NOTE: DIMENSIONS SHOWN DO NOT INCLUDE GALVANIZING TOLERANCES 35 35 36 36 1 ROUND ROUND BASE SEISMIC SHEAR VS= 4.455 kips MOMENT = 236 kips-ft DOWN = 13 kips SHEAR = 4 kips DESIGN LOADS FOUNDATION LOADS EQUIVALENT LATERAL FORCE PROCEDURE PER ASCE 7 SECTION 12.8.1 I = 1 SS = 1.976 S1 = 0.727 SITE CLASS D SDS = 1.5808 SD1 = 0.8239 VS = 4.455 CS = 0.5077 R = 1.5 SEISMIC DESIGN CATEGORY D NON BUILDING STRUCTURE NOT SIMILAR TO BUILDING SEISMIC DESIGN 0.0 FT TOP OF BASE PLATE POLE ELEVATION BASE LEVEL DRAWING 45.8 FT POLE MODIFICATION SCHEDULE ELEVATION (FT) REFERENCE SHEETMODIFICATION PRIOR TO FABRICATION AND INSTALLATION, CONTRACTOR SHALL FIELD VERIFY ALL LENGTHS AND QUANTITIES GIVEN. LENGTH AND QUANTITIES PROVIDED ARE FOR QUOTING PURPOSES ONLY, AND SHALL NOT BE USED FOR FABRICATION. N/A N/APAINT ALL NEW MODIFICATIONS TO MATCH EXISTING TOWER FINISH (PER CON-STD-10149)E FOR PARTS NOT DETAILED WITHIN THE DRAWING AND STARTING WITH "CCI-", SEE THE FOLLOWING CATALOG FOR DETAILS: CON-CAT-10300, MONOPOLE STANDARD DRAWINGS AND APPROVED REINFORCEMENT COMPONENTS NOTE: 1. ALL WORK INVOLVING EXISTING CARRIER EQUIPMENT REQUIRES COORDINATION W/ CROWN CASTLE & EQUIPMENT OWNER. FIELD VERIFY EXISTING FLANGE PLATE GEOMETRY & PERFORM VISUAL INSPECTION OF EXISTING MONOPOLE SHAFT TO EXISTING FLANGE PLATE CONNECTION C 45.8 S-6 B 45.8 S-6REMOVE EXISTING TOP HAT D 45.8 - 59.8 S-6INSTALL NEW TOWER EXTENSION REMOVE & REPLACE CARRIER MOUNT AS REQUIRED. REPLACEMENT OF EXISTING CARRIER T-ARM MOUNT W/ SIMILAR MAY BE REQUIRED. COORDINATE W/ CROWN CASTLE (SEE NOTE 1) A 45.8 S-5 59.8 FT D A B C (OTHER CONSIDERED EQUIPMENT) (5) 1-1/4" TO 46 FT LEVEL (PROPOSED EQUIPMENT CONFIGURATION) (1) 1-3/8" TO 58 FT LEVEL S-5 POLE MODIFICATION SCHEDULE . NO. DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THE SOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWN CASTLE AND ITS AFFILIATES. REPRODUCTION OR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDEN WITHOUT THE WRITTEN PERMISSION OF CROWN CASTLE. SITE NAME: SANTA ANITA BU NUMBER: 877948 WO NUMBER: 2197400 SITE ADDRESS: 35 W. ST JOSEPH ST. ARCADIA, CA 91007 LOS ANGELES COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 01/20/23 BF 01/20/23 BF 01/24/23 MEB 01/24/23 0 01/24/2306/30/23 Saijun Zhou Digitally signed by Saijun Zhou Date: 2023.01.24 13:44:38 -06'00' FIELD VERIFY EXISTING CLIMBING PATH AZIMUTH & ALIGN NEW SHAFT ASSEMBLY A-A S-6 59.8 FT EXISTING MONOPOLE SHAFT NEW 5/8"Ø PRE-TENSIONED BOLT ASSEMBLY (TYP 15) EXISTING 1 1/2" THK x 30.1"Ø FLANGE PLATE (SEE NOTE 2) PRE-TENSIONED BOLT ASSEMBLY FLAT WASHER NUT NOTES: 1. FULLY PRE-TENSION BOLTS USING THE "TURN OF NUT" METHOD IN ACCORDANCE WITH THE AISC STEEL CONSTRUCTION MANUAL (LATEST EDITION). 2. FIELD VERIFY EXISTING FLANGE PLATE GEOMETRY DURING PRE-CON & NOTIFY CROWN EOR OF ANY DEVIATIONS FROM PLANS. 3. CONNECTION BETWEEN EXISTING MONOPOLE SHAFT & EXISTING FLANGE PLATE IS ASSUMED TO BE GREATER THAN OR EQUAL TO A 1/4" FILLET WELD. IF 1/4" FILLET WELD IS NOT FOUND ON EXTERIOR OF FLANGE, CONTACT CROWN EOR WITH TYPE & SIZE OF WELD FOR EVALUATION PRIOR TO INSTALLING NEW TOWER EXTENSION. TYPICAL BOLT ASSEMBLY A325N BOLT LOCK WASHER NUT A325N BOLT SEE NOTE 1 A S-6 COVER PLATE A-A S-6 TOP FLANGE CONNECTION B-B S-6 BOTTOM FLANGE CONNECTION S-6 A NEW 1"Ø BOLT ASSEMBLY (TYP 4) #X1 NEW SHAFT ASSEMBLY REF S-7 FIELD VERIFY EXISTING FLANGE PLATE GEOMETRY & PERFORM VISUAL INSPECTION OF EXISTING MONOPOLE SHAFT TO EXISTING FLANGE PLATE CONNECTION (SEE NOTES 2 & 3) #X1 NEW SHAFT ASSEMBLY #X2 NEW COVER PLATE REF S-8 NEW BOLT ASSEMBLY (TYP)#X1 NEW SHAFT ASSEMBLY ELEVATION VIEW 45.8 FT B-B S-6 EXISTING TOP HAT TO BE REMOVED EXISTING 1/4" THK MONOPOLE SHAFT S-6 DETAILS . NO.DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THE SOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWN CASTLE AND ITS AFFILIATES. REPRODUCTION OR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDEN WITHOUT THE WRITTEN PERMISSION OF CROWN CASTLE. SITE NAME: SANTA ANITA BU NUMBER: 877948 WO NUMBER: 2197400 SITE ADDRESS: 35 W. ST JOSEPH ST. ARCADIA, CA 91007 LOS ANGELES COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 01/20/23 BF 01/20/23 BF 01/24/23 MEB 01/24/23 0 06/30/23 01/24/23 Saijun Zhou Digitally signed by Saijun Zhou Date: 2023.01.24 13:39:48 -06'00' D-D S-7 BOTTOM FLANGE WELD DETAIL STEP BOLT CLIPS OMITTED E70XX CJP INSPECT BY UT TYP 38 E70XX BACK GOUGE - CJP INSPECT BY UT TYP #x1b #x1d (TYP 3) E70XX TYP 516 516 (316) (316) A-A S-7 NEW PORT HOLE (TYP 3) PORT HOLE WELD DETAIL STEP BOLT CLIPS OMITTED E70XX CJP INSPECT BY UT 38 45 #x1b REF S-8 #x1d REF S-8 (TYP) #x1a REF S-8 NEW J-HOOK (TYP) #x1a 45 14 45 14 45 #x1e REF S-8 (TYP 6) #x1a (1) SHAFT ASSEMBLY #X1 / 1432.3# NOTES: 1. REFERENCE CROWN CASTLE APPROVED REINFORCEMENT COMPONENTS CATALOG FOR ADDITIONAL CLIMBING FACILITIES SPECIFICATIONS AND REQUIREMENTS. 2. ALL HOLES TO BE SHOP FABRICATED, UNLESS NOTED OTHERWISE. 3. FOR PORT HOLE INSTALLATION CRITERIA, REFER TO PORT HOLE NOTES ON S-4. 4. ALL PORT HOLES MUST INCLUDE J-HOOKS. 5. FULL ASSEMBLY TO BE HOT-DIP GALVANIZED PER ASTM A153 / A153M OR A123, AS APPLICABLE. 6. STEP BOLT CLIP WELDS ARE SUBJECT TO AWS D1.1 AND MUST BE INSPECTED BY A CWI. REFER TO DOCUMENT "ENG-STD-10069 GC CWI REQUIREMENT STANDARD" FOR CWI REQUIREMENTS. 7. STEP BOLT CLIPS SHALL BE SHOP WELDED. 8. STEP BOLT CLIPS SHALL BE WELDED IN PLACE PRIOR TO HOT DIP GALVANIZING THE WELDMENT. 9. CENTER TO CENTER STAGGERED SPACING SHOULD BE MATCHED TO EXISTING FIELD CONDITIONS. STAGGERED SPACING SHALL BE A MINIMUM OF 10" AND MAXIMUM OF 16", IN THE VERTICAL DIRECTION. 10. HORIZONTAL SPREAD IS NOT TO EXCEED 24". B-B S-7 STEP BOLT CLIP ORIENTATION #CCI-SB-0100 NEW STEP BOLT CLIP (TYP) #x1a STEP BOLT CLIP WELD DETAIL E70XX316 E70XX316 #CCI-SB-0100 NEW STEP BOLT CLIP#x1a #CCI-SB-0100 NEW STEP BOLT CLIP (TYP) 1' - 0 " (T Y P ) (18)14 E70XX TYP 716 45 24 " M I N I M U M 48 " M A X I M U M (T Y P ) 10 ' - 1 " D-D S-7 A-A S-7 B-B S-7 C-C S-7 18" MINIMUM 24" MAXIMUM HORIZONTAL SPREAD (TYP) 10 " M I N I M U M 16 " M A X I M U M (T Y P ) 6" (T Y P ) NEW PORT HOLE 6" x 12" x 5/8" x 3 1/2" MFR: NEWAVE, MFR PART # PORT-6X12H, OR MFR: SABRE, MFR PART # C30-138-153G, Fy=65KSI. INSTALL IN ACCORDANCE WITH PORT HOLE NOTES ON S-4 (TYP) 14 ' - 0 " #x1c REF S-8 1" (T Y P ) 3 1 / 2 " (T Y P ) 120° (TYP) 60° (TYP) 60° (TYP) 120° (TYP) C-C S-7 STEP BOLT CLIP ORIENTATION #CCI-SB-0100 NEW STEP BOLT CLIP (TYP) #x1a (18)14 E70XX TOP & SIDES TYP 716 45 5" (T Y P ) 7" (T Y P ) 120° (TYP) S-7 DETAILS . NO.DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THE SOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWN CASTLE AND ITS AFFILIATES. REPRODUCTION OR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDEN WITHOUT THE WRITTEN PERMISSION OF CROWN CASTLE. SITE NAME: SANTA ANITA BU NUMBER: 877948 WO NUMBER: 2197400 SITE ADDRESS: 35 W. ST JOSEPH ST. ARCADIA, CA 91007 LOS ANGELES COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 01/20/23 BF 01/20/23 BF 01/24/23 MEB 01/24/23 0 06/30/23 01/24/23 Saijun Zhou Digitally signed by Saijun Zhou Date: 2023.01.24 13:40:17 -06'00' NOTE: 1. ALL HOLES TO BE SHOP FABRICATED, UNLESS NOTED OTHERWISE. (1) PL 1 1/2 x 26"Ø (A572-50) #x1c / 160.2# 1 1/8"Ø HOLE 23.5" B.C. (TYP 12) (1) PL 1 1/2 x 30.1"Ø (A572-50) #x1b / 195.1# 14"Ø HOLE SHADED PORTION TO BE REMOVED (TYP) (1) P 18.000 x 0.375 x 13'-9" LONG (A53-B-35) #x1a / 971.4# 1/2" R3/4" (6) SR 1/2 x 7 3/4" LONG (A36) #x1e / 0.4# (3) PL 5/8 x 7 x 2'-3 15/16" LONG (A572-50) #x1d / 34.4# 3/4"Ø HOLE 27.1" B.C. FIELD VERIFY EXISTING B.C. & HOLE SPACING PRIOR TO FABRICATION (TYP 15) (1) PL 1/4 x 26"Ø (A36) #X2 / 37.6# 7" 1/8" (TYP) R3/4" (TYP) 4" 3" 2 1/2" R5/8" (TYP) 18° (TYP) 120° (TYP) 14"Ø HOLE 4" (TYP) 1 1/8"Ø HOLE 23.5" B.C. (TYP 4) 6" 1' - 0 " 45° (TYP) S-8 DETAILS . NO.DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THE SOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWN CASTLE AND ITS AFFILIATES. REPRODUCTION OR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDEN WITHOUT THE WRITTEN PERMISSION OF CROWN CASTLE. SITE NAME: SANTA ANITA BU NUMBER: 877948 WO NUMBER: 2197400 SITE ADDRESS: 35 W. ST JOSEPH ST. ARCADIA, CA 91007 LOS ANGELES COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 01/20/23 BF 01/20/23 BF 01/24/23 MEB 01/24/23 0 01/24/2306/30/23 Saijun Zhou Digitally signed by Saijun Zhou Date: 2023.01.24 13:40:40 -06'00' S-1 TITLE PAGE NO.DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THESOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWNCASTLE AND ITS AFFILIATES. REPRODUCTIONOR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDENWITHOUT THE WRITTEN PERMISSION OFCROWN CASTLE. SITE NAME: SANTA ANITA BU NUMBER: 877948 WO NUMBER: 2197400 SITE ADDRESS: 35 W. ST JOSEPH ST. ARCADIA, CA 91007 LOS ANGELES COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 01/20/23 BF 01/20/23 BF 01/24/23 MEB 01/24/23 CODE COMPLIANCE . ATTENTION ALL CONTRACTORS, ANYTIME YOU ACCESS A CROWN SITE FOR ANY REASON YOU ARE TO CALL THE CROWN NOC UPON ARRIVAL AND DEPARTURE, DAILY AT 800-788-7011 SAFETY CLIMB: 'LOOK UP' THE INTEGRITY OF THE WIRE ROPE SAFETY CLIMB SYSTEM SHALL BE CONSIDERED DURING ALL STAGES OF DESIGN, INSTALLATION, AND INSPECTION. TOWER REINFORCEMENTS AND EQUIPMENT INSTALLATIONS SHALL NOT COMPROMISE THE INTEGRITY OR FUNCTIONAL USE OF ANY WIRE ROPE SAFETY CLIMB ON THE STRUCTURE. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO: PINCHING OF THE WIRE ROPE, BENDING OF THE WIRE ROPE FROM ITS SUPPORTS, DIRECT CONTACT OR CLOSE PROXIMITY TO THE WIRE ROPE WHICH MAY CAUSE FRICTIONAL WEAR, OR IMPACT TO THE ANCHORAGE POINTS IN ANY WAY. ANY COMPROMISED SAFETY CLIMB MUST BE REPORTED TO YOUR CROWN POC FOR RESOLUTION, INCLUDING EXISTING CONDITIONS. SITE NAME: SANTA ANITA TOWER MODIFICATION DRAWINGS SITE ADDRESS: 35 W. ST JOSEPH ST. ARCADIA, CA 91007 LOS ANGELES COUNTY, USA BU NUMBER: 877948 PROJECT CONTACTS: 1. CROWN PROJECT MANAGER 2. CROWN DESIGN ENGINEER (EOR) SAIJUN ZHOU, P.E., S.E. 2000 CORPORATE DRIVE CANONSBURG, PA 15317 (724) 416-9627 EOR.APPROVAL@CROWNCASTLE.COM SHEET NUMBER DESCRIPTION S-1 S-2 TITLE PAGE MODIFICATION INSPECTION CHECKLIST S-3 & S-4 S-5 POLE MODIFICATION SCHEDULE NOTES DETAILSS-6 - S-8 DRAWINGS INCLUDED HOT WORK INCLUDED NA BASE GRINDING ONLY NA BASE WELDING (AND GRINDING) NA AERIAL GRINDING ONLY NA AERIAL WELDING (AND GRINDING) 0 THIS MODIFICATION DESIGN IS BASED ON THE REQUIREMENTS OF THE TIA-222-H STRUCTURAL STANDARDS FOR STEEL ANTENNA TOWERS AND ANTENNA SUPPORTING STRUCTURES BASED UPON AN ULTIMATE 3-SECOND GUST WIND SPEED OF 95 MPH WITH NO ICE AS REQUIRED BY THE 2022 CBC, 60 MPH UNDER SERVICE LOADS, EXPOSURE CATEGORY C AND RISK CATEGORY II. SEISMIC FORCES WERE CONSIDERED BASED ON SPECTRAL RESPONSE FACTORS SS=1.976 AND S1=0.727. DYLAN BAKER (480) 734-2400 DYLAN.BAKER@CROWNCASTLE.COM 2055 S. STEARMAN DRIVE CHANDLER, AZ 85286 TOWER INFORMATION TOWER MAPPED BY / DOC #: FDH / CCISITES DOC # 2912793 TOWER HEIGHT / TYPE: 59.792 FT MONOPOLE TOWER TOWER LOCATION: LAT 34º 08' 37.20" DATUM: (NAD 1983) LONG -118º 01' 58.30" ELEV 502.3 FT AMSL STRUCTURAL DESIGN DRAWING: CCI / WO # 2197400 STRUCTURAL ANALYSIS REPORT: MH / WO # 2148199 STRUCTURAL ANALYSIS DATE: 08/23/22 ORDER #: 629188 REV # 4 CCISITES DOCUMENT ID: 10537856 SPECIAL INSPECTIONS REQUIRED 1. HIGH STRENGTH BOLTS 06/30/23 01/24/23 S-2. NO.DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THESOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWNCASTLE AND ITS AFFILIATES. REPRODUCTIONOR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDENWITHOUT THE WRITTEN PERMISSION OFCROWN CASTLE. SITE NAME: SANTA ANITA BU NUMBER: 877948 WO NUMBER: 2197400 SITE ADDRESS: 35 W. ST JOSEPH ST. ARCADIA, CA 91007 LOS ANGELES COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 01/20/23 BF 01/20/23 BF 01/24/23 MEB 01/24/23 GENERAL THE MI IS AN ON-SITE VISUAL AND HANDS-ON INSPECTION OF TOWER MODIFICATIONS INCLUDING A REVIEW OF CONSTRUCTION REPORTS ANDADDITIONAL PERTINENT DOCUMENTATION PROVIDED BY THE GENERAL CONTRACTOR (GC), AS WELL AS ANY INSPECTION DOCUMENTS PROVIDED BY 3RD PARTY INSPECTORS. THE MI IS TO ENSURE THE INSTALLATION WAS CONSTRUCTED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, NAMELY THE MODIFICATION DRAWINGS; IN ACCORDANCE WITH APPLICABLE CROWN STANDARDS; AND AS DESIGNED BY THE ENGINEER OF RECORD (EOR). NO DOCUMENT, CODE OR POLICY CAN ANTICIPATE EVERY SITUATION THAT MAY ARISE. ACCORDINGLY, THIS CHECKLIST IS INTENDED TO SERVE AS A SOURCE OF GUIDING PRINCIPLES IN ESTABLISHING GUIDELINES FOR MODIFICATION INSPECTION. THE MI IS TO CONFIRM INSTALLATION CONFIGURATION AND WORKMANSHIP ONLY AND IS NOT A REVIEW OF THE MODIFICATION DESIGN ITSELF, AND THEMI INSPECTOR DOES NOT TAKE OWNERSHIP OF THE MODIFICATION DESIGN. OWNERSHIP OF THE STRUCTURAL MODIFICATION DESIGN EFFECTIVENESS AND INTEGRITY RESIDES WITH THE EOR AT ALL TIMES. THE MI INSPECTOR SHALL INSPECT AND NOTE CONFORMANCE/NONCONFORMANCE AND PROVIDE TO THE CROWN POINT OF CONTACT (CROWN POC) FOR EVALUATION. ALL MI'S SHALL BE CONDUCTED BY A CROWN APPROVED MI INSPECTOR, WORKING FOR A CROWN APPROVED MI VENDOR. SEE CROWN CED-LST-10173, "APPROVED MI VENDORS". TO ENSURE THAT THE REQUIREMENTS OF THE MI ARE MET, IT IS VITAL THAT THE GENERAL CONTRACTOR (GC) AND THE MI INSPECTOR BEGINCOMMUNICATING AND COORDINATING AS SOON AS A PURCHASE ORDER ( PO) IS RECEIVED. IT IS EXPECTED THAT EACH PARTY WILL BE PROACTIVE IN REACHING OUT TO THE OTHER PARTY. IF CONTACT INFORMATION IS NOT KNOWN THE GC AND/OR INSPECTOR SHALL CONTACT THE CROWN POINT OF CONTACT (POC). REFER TO CROWN CED-SOW-10007, "MODIFICATION INSPECTION SOW", FOR FURTHER DETAILS AND REQUIREMENTS. SERVICE LEVEL COMMITMENT THE FOLLOWING RECOMMENDATIONS AND SUGGESTIONS ARE OFFERED TO ENHANCE THE EFFICIENCY AND EFFECTIVENESS OF DELIVERING AN MIREPORT: x THE GC SHALL PROVIDE A MINIMUM OF 5 BUSINESS DAYS NOTICE, PREFERABLY 10, TO THE MI INSPECTOR AS TO WHEN THE SITE WILL BE READY FOR THE MI TO BE CONDUCTED.x THE GC AND MI INSPECTOR COORDINATE CLOSELY THROUGHOUT THE ENTIRE PROJECT.x WHEN POSSIBLE, IT IS PREFERRED TO HAVE THE GC AND MI INSPECTOR ON-SITE SIMULTANEOUSLY FOR ANY GUY WIRE TENSIONING OR RE-TENSIONING OPERATIONS.x WHEN POSSIBLE, IT IS PREFERRED TO HAVE THE GC AND MI INSPECTOR ON-SITE DURING THE MI TO HAVE ANY MINOR DEFICIENCIES CORRECTEDDURING THE INITIAL MI. THEREFORE, THE GC MAY CHOOSE TO COORDINATE THE MI CAREFULLY TO ENSURE ALL CONSTRUCTION FACILITIES ARE AT THEIR DISPOSAL WHEN THE MI INSPECTOR IS ON SITE. REQUIRED PHOTOS BETWEEN THE GC AND THE MI INSPECTOR THE FOLLOWING PHOTOGRAPHS, AT A MINIMUM, ARE TO BE TAKEN AND INCLUDED IN THE MI REPORT: x PRE-CONSTRUCTION GENERAL SITE CONDITIONxPHOTOGRAPHS DURING THE REINFORCEMENT MODIFICATION CONSTRUCTION/ERECTION AND INSPECTIONxxRAW MATERIALSxxPHOTOS OF ALL CRITICAL DETAILSxxFOUNDATION MODIFICATIONSxxWELD PREPARATIONxxBOLT INSTALLATIONxxFINAL INSTALLED CONDITIONxxSURFACE COATING REPAIRxPOST CONSTRUCTION PHOTOGRAPHSxxFINAL INFIELD CONDITION PHOTOS OF ELEVATED MODIFICATIONS TAKEN ONLY FROM THE GROUND SHALL BE CONSIDERED INADEQUATE. THIS IS NOT A COMPLETE LIST OF REQUIRED PHOTOS, FOR A COMPLETE LIST OF PHOTOS SEE CED-SOW-10007. MODIFICATION INSPECTION NOTES MODIFICATION INSPECTION CHECKLIST 0 X MI CHECKLIST REQUIRED REPORT ITEM APPLICABLE CROWN DOC #BRIEF DESCRIPTION PRE-CONSTRUCTION MI CHECKLIST DRAWING THIS CHECKLIST SERVES AS A GUIDELINE FOR THE REQUIRED CONSTRUCTION DOCUMENTS AND INSPECTIONS FOR THIS MODIFICATION. EOR APPROVED SHOP DRAWINGS ONCE THE PRE-MODIFICATION MAPPING IS COMPLETE AND PRIOR TO FABRICATION, THE CONTRACTOR SHALL PROVIDE DETAILED ASSEMBLY DRAWINGS AND/OR SHOP DRAWINGS. THESE ARE TO INCLUDE, BUT ARE NOTLIMITED TO, A VISUAL LAYOUT OF NEW REINFORCEMENT, EXISTING REINFORCEMENT CONFIGURATION, PORTHOLES, MOUNTS, STEP PEGS, SAFETY CLIMBS AND ANY OTHER MISCELLANEOUS ITEMS WHICH MAY AFFECT SUCCESSFUL INSTALLATION OF MODIFICATIONS ON THE TOWER. THESE DRAWINGS SHALL BE SUBMITTED TO THE EOR FOR APPROVAL. SHOP DRAWINGS SUBMISSION SHALL INCLUDE THE EOR RFI FORM DETAILING ANY CHANGES FROM THE ORIGINAL DESIGN. FABRICATION INSPECTION A LETTER FROM THE FABRICATOR, STATING THAT THE WORK WAS PERFORMED IN ACCORDANCE WITH INDUSTRY STANDARDS AND THE CONTRACT DOCUMENTS, SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. FABRICATOR CERTIFIED WELD INSPECTION A CWI SHALL INSPECT ALL WELDING PERFORMED ON STRUCTURAL MEMBERS DURING FABRICATION. A WRITTEN REPORT SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. MATERIAL TEST REPORTS (MTR)MATERIAL TEST REPORTS SHALL BE PROVIDED FOR MATERIAL USED AS REQUIRED PER SECTION 9.2.5 OF CED-SOW-10007. MTRS SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. FABRICATOR NDE INSPECTION REPORT CRITICAL SHOP WELDS THAT REQUIRE TESTING ARE NOTED ON THESE CONTRACT DRAWINGS. A CERTIFIED NDT INSPECTOR SHALL PERFORM NON-DESTRUCTIVE EXAMINATION AND A REPORT SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. NDE OF MONOPOLE BASE PLATE A NDE OF THE POLE TO BASE PLATE CONNECTION IS REQUIRED AND A WRITTEN REPORT SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. PACKING SLIPS PACKING/SHIPPING LIST FOR ALL MATERIAL THAT WAS USED DURING CONSTRUCTION OF THE MODIFICATION. ADDITIONAL TESTING AND INSPECTIONS: CONSTRUCTION FOUNDATION INSPECTIONS A VISUAL OBSERVATION OF THE EXCAVATION AND REBAR SHALL BE PERFORMED BEFORE PLACING THE CONCRETE. A VISUAL OBSERVATION OF THE REBAR SHALL BE PERFORMED BEFORE PLACING THE EPOXY. A SEALED WRITTEN REPORT SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. CONCRETE COMP. STRENGTH AND SLUMP TEST THE CONCRETE MIX DESIGN, SLUMP TEST, AND COMPRESSIVE STRENGTH TESTS SHALL BE PROVIDED AS PART OF THE FOUNDATION REPORT. EARTHWORK FOUNDATION SUB-GRADES SHALL BE INSPECTED AND APPROVED BY AN APPROVED FOUNDATION INSPECTOR AND RESULTS INCLUDED AS PART OF THE FOUNDATION REPORT. MICROPILE/ROCK ANCHOR MICROPILES/ROCK ANCHORS SHALL BE INSPECTED BY THE FOUNDATION INSPECTION VENDOR AND SHALL BE INCLUDED AS PART OF THE FOUNDATION INSPECTION REPORT, ADDITIONAL TESTING AND/OR INSPECTIONREQUIREMENTS ARE NOTED IN THESE CONTRACT DOCUMENTS. POST-INSTALLED ANCHOR ROD VERIFICATION POST INSTALLED ANCHOR ROD VERIFICATION SHALL BE PERFORMED IN ACCORDANCE WITH CROWN REQUIREMENTS AND A REPORT SHALL BE PROVIDED TO THE MI INSPECTOR FOR INCLUSION IN THE MI REPORT. BASE PLATE GROUT VERIFICATION THE GENERAL CONTRACTOR SHALL PROVIDE DOCUMENTATION TO THE MI INSPECTOR THAT CERTIFIES THAT THE GROUT WAS REMOVED AND/OR INSTALLED IN ACCORDANCE WITH CROWN REQUIREMENTS FOR INCLUSION IN THE MI REPORT. FIELD CERTIFIED WELD INSPECTION A CROWN APPROVED CERTIFIED WELD INSPECTOR SHALL INSPECT AND TEST FIELD WELDS, FOLLOWING ALL PROCEDURES SPECIFIED IN CROWN STANDARD DOCUMENTS APPLICABLE TO WELD INSPECTIONS. A REPORT SHALL BE PROVIDED. NDE OF FIELD WELDS SHALL BE PERFORMED AS REQUIRED BY CROWN STANDARDS AND CONTRACT DOCUMENTS. THE NDE REPORT SHALL BE INCLUDED IN THE CWI REPORT. ON-SITE COLD GALVANIZING VERIFICATION THE GENERAL CONTRACTOR SHALL PROVIDE WRITTEN AND PHOTOGRAPHIC DOCUMENTATION TO THE MI INSPECTOR VERIFYING THAT ANY ON-SITE COLD GALVANIZING WAS APPLIED PER MANUFACTURER SPECIFICATIONS AND APPLICABLE STANDARDS. TENSION TWIST AND PLUMB THE GENERAL CONTRACTOR SHALL PROVIDE A REPORT IN ACCORDANCE WITH APPLICABLE STANDARDSDOCUMENTING TENSION TWIST AND PLUMB. GC AS-BUILT DRAWINGS THE GENERAL CONTRACTOR SHALL SUBMIT A LEGIBLE COPY OF THE ORIGINAL DESIGN DRAWINGS EITHER STATING "INSTALLED AS DESIGNED" OR NOTING ANY CHANGES THAT WERE REQUIRED AND APPROVED BY THE ENGINEER OF RECORD. EOR/RFI FORMS APPROVING ALL CHANGES SHALL BE SUBMITTED. ADDITIONAL TESTING AND INSPECTIONS: POST-CONSTRUCTION CONSTRUCTION COMPLIANCE LETTER A LETTER FROM THE GENERAL CONTRACTOR STATING THAT THE WORKMANSHIP WAS PERFORMED IN ACCORDANCE WITH INDUSTRY STANDARDS AND THESE CONTRACT DRAWINGS, INCLUDING LISTING ADDITIONAL PARTIES TO THE MODIFICATION PROCESS. POST-INSTALLED ANCHOR ROD PULL TESTS POST-INSTALLED ANCHOR RODS SHALL BE TESTED BY A CROWN APPROVED PULL TEST INSPECTOR AND A REPORT SHALL BE PROVIDED INDICATING TESTING RESULTS. PHOTOGRAPHS PHOTOGRAPHS SHALL BE SUBMITTED TO THE MI. PHOTOS SHALL DOCUMENT ALL PHASES OF THE CONSTRUCTION. THE PHOTOS SHALL BE ORGANIZED IN A MANNER THAT EASILY IDENTIFIES THE EXACT LOCATION OF THE PHOTO. BOLT HOLE INSTALLATION VERIFICATION REPORT THE MI INSPECTOR SHALL VERIFY THE INSTALLATION AND TIGHTNESS 10% OF ALL NON PRE-TENSIONED BOLTS INSTALLED AS PART OF THE MODIFICATION. THE MI INSPECTOR SHALL LOOSEN THE NUT AND VERIFY THE BOLT HOLE SIZE AND CONDITION. THE MI REPORT SHALL CONTAIN THE COMPLETED BOLT INSTALLATION VERIFICATION REPORT, INCLUDING THE SUPPORTING PHOTOGRAPHS. PUNCHLIST DEVELOPMENT AND CORRECTION DOCUMENTATION FINAL PUNCHLIST INDICATING ALL NONCONFORMANCE(S) IDENTIFIED AND THE FINAL RESOLUTION/APPROVAL. MI INSPECTOR REDLINE OR RECORD DRAWING(S)THE MI INSPECTOR SHALL OBSERVE AND REPORT ANY DISCREPANCIES BETWEEN THE CONTRACTOR'S REDLINE DRAWING AND THE ACTUAL COMPLETED INSTALLATION. ADDITIONAL TESTING AND INSPECTIONS: X X X X X NA X NA NA NA NA NA NA NA NA X NA X NA X NA X NA X X NA THE MI CHECKLIST SHALL BE REVIEWED PRIOR TO THE START OF CONSTRUCTION. ALL PARTIES TO THE MODIFICATION SHALL UNDERSTAND CROWN REQUIREMENTS AND INSPECTION/DOCUMENTATION THAT IS APPLICABLE TO THE SCOPE OF WORK THEY ARE PERFORMING. ERRORS ON THE MI CHECKLIST SHALL BE BROUGHT TO THE ATTENTION OF THE CROWN POC AND EOR AS SOON AS POSSIBLE. CED-SOW-10007 CED-SOW-10007 CED-SOW-10007 CED-SOW-10007 CED-STD-10069 CED-SOW-10007 CED-SOW-10066 CED-STD-10069 ENG-SOW-10033 CED-SOW-10007 CED-SOW-10144 CED-SOW-10144 CED-SOW-10144 CED-SOW-10144 CED-SOW-10007 ENG-STD-10323 CED-SOW-10066 CED-STD-10069 CON-STD-10149 CED-FRM-10358 CED-PRC-10182CED-STD-10261 CED-SOW-10007 CED-SOW-10007 CED-FRM-10358 CED-PRC-10119 CED-SOW-10007 CED-SOW-10007 CED-PRC-10283CED-FRM-10285 CED-SOW-10007 06/30/23 01/24/23 S-3 NOTES . NO.DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THESOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWNCASTLE AND ITS AFFILIATES. REPRODUCTIONOR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDENWITHOUT THE WRITTEN PERMISSION OFCROWN CASTLE. SITE NAME: SANTA ANITA BU NUMBER: 877948 WO NUMBER: 2197400 SITE ADDRESS: 35 W. ST JOSEPH ST. ARCADIA, CA 91007 LOS ANGELES COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 01/20/23 BF 01/20/23 BF 01/24/23 MEB 01/24/23 0 GENERAL NOTES 1. The General Contractor (GC) shall reference CON-STD-10159, "Tower Modification Construction Specifications", as a continuation of the following General Notes. The GC shall keep a printed or electronic copy of this document with the Structural Design Drawings (SDD) at all times, in a location accessible to all Contractor Personnel, and shall ensure that all Contractor Personnel are aware of the information enclosed within the General Notes and CON-STD-10159. 2. The Contract Documents are the property of Crown Castle (Crown). They are provided to the GC and its Lower Tier Contractors and material suppliers for the limited purpose of use in completing the Work for this Site, and shall be kept in strict confidence and not disclosed to any third parties. The Contract Documents shall not be used for any other purpose whatsoever without the prior written consent of Crown. 3. Detail drawings, including notes and tables, shall govern over general notes and typical details. Contact the Crown Point of Contact (POC) and Engineer of Record (EOR) for clarification as needed. 4. Do not scale drawings. 5. Any Work performed without a prefabrication mapping is done at the risk of the GC and/or fabricator. All dimensions of existing structural elements are assumed based on the available documentation and are preliminary until field-verified by the GC, unless noted otherwise (UNO). Where discrepancies are found, GC shall contact the Crown POC and EOR through RFI. 6. For this analysis and modification, the tower has been assumed to be in good condition without any structural defects, UNO. If the GC discovers any indication of an existing structural defect, contact the Crown POC and EOR immediately. 7. All construction means and methods, including but not limited to erection plans, rigging plans, climbing plans, and rescue plans, shall be the responsibility of the GC responsible for the execution of the Work contained herein, and shall meet ANSI/ASSE A10.48 (latest edition); federal, state, and local regulations; and any applicable industry consensus standards related to the construction activities being performed. All rigging plans shall adhere to ANSI/ASSE A10.48 (latest edition) and Crown standard CED-STD-10253, "Rigging Program", including the required involvement of a qualified engineer for class IV construction to certify the supporting structure(s) in accordance with the ANSI/TIA-322 (latest edition). 8. The structural integrity of the modification design extends to the complete condition only. The GC must be cognizant that the removal of any structural component of an existing tower has the potential to cause the partial or complete collapse of the structure. All necessary precautions must be taken to ensure structural integrity, including, but not limited to, engineering assessment of construction stresses with installation maximum wind speed and/or temporary bracing and shoring. 9. Aerial and underground utilities and facilities may or may not be shown on the drawings. The GC shall take every precaution to preserve and protect these items, which may include aerial or underground power lines, telephone lines, water lines, sewer lines, cable television facilities, pipelines, structures and other public and private improvements within or adjacent to the Work area. The responsibility for determining the actual on-site location of these items shall rest exclusively with the GC. 10. All manufacturer's hardware assembly instructions shall be followed, UNO. Conflicting notes shall be brought to the attention of the EOR and the Crown POC. 11. The GC shall fabricate all required items per the materials specified below, UNO on the detail drawing sheets. If the GC finds for any component that the materials have not been clearly specified, the GC shall submit an RFI to the EOR to confirm the required material. All structural elements shall be new and shall conform to the following requirements, UNO: Monopoles: x Structural shapes and plates: ASTM A572 Grade 65 (FY = 65 KSI) x Welding electrodes, SMAW: E80XX x Welding electrodes, FCAW: E8XT-XX x Welding electrodes, GMAW: ER80S-X Self-Support and Guyed Towers: x Structural shapes and plates: ASTM A572 Grade 50 (FY = 50 KSI) x Welding electrodes, SMAW: E70XX x Welding electrodes, FCAW: E7XT-XX x Welding electrodes, GMAW: ER70S-X All tower types: x Steel angle: ASTM A572 Grade 50 (FY = 50 KSI) x Solid rod: ASTM A36 (FY = 36 KSI) x Pipe/tube (round): ASTM A500 Grade C (FY = 46 KSI) x Pipe/tube (square): ASTM A500 Grade C (FY = 50 KSI) x Bolts: ASTM F3125 Grade A325 Type 1 x U-bolts: ASTM A307 Grade A, or SAE J429 Grade 2 x Nuts: ASTM A563 Grade DH x Washers: ASTM F436 Type 1 x Guy Wires: ASTM A475 Grade EHS x Bridge Strand: ASTM A586 Grade 1 12. After fabrication, hot-dip galvanize all steel items, UNO. Galvanize per ASTM A123, ASTM A153/A153M, or ASTM A653 G90, as applicable. ASTM A490 bolts shall not be hot-dip galvanized, but shall instead be coated with Magni 565 or EOR approved equivalent, per ASTM F2833. 13. Contractor Personnel shall not drill holes in any new or existing structural members, other than those drilled holes shown on structural drawings, without the approval of the EOR. 14. For a list of Crown-approved cold galvanizing compounds, refer to CON-STD-10149, “Tower Protective Coatings Guidelines”. 15. All exposed structural steel as the result of this scope of Work including welds (after final inspection of the weld by the CWI), field drilled holes, and shaft interiors (where accessible), shall be cleaned and two (2) coats cold galvanizing shall be applied by brush in accordance with CON-STD-10149, “Tower Protective Coatings Guidelines”. Photo documentation is required to be submitted to the MI Inspector. 16. If removal of existing modifications is required per the modification scope, the GC shall clean and cold galvanize any existing empty bolt holes, UNO. If additional unexpected, oversized, or slotted holes are found, the GC shall contact the EOR and Crown POC for guidance prior to proceeding with the modifications. 17. All Work involving base plate grout scope items or resulting in disturbance of base plate grout shall reference ENG-STD-10323, "Base Plate Grout", and shall follow any Base Plate Grout Removal Notes contained herein. 18. If scope of modification involves bark removal or installation, the GC shall reference CED-SOW-10265, "Tree Concealment for Monopoles", as well as CED-STD-10395, "Installation Guidelines for Bark Surfaces". 19. If scope of modification involves concealment components including branching, the GC shall reference CED-CAT-10398 “Monopole Concealed Decorative Structures (CDS) Approved Components”. All new branch installations require tethering. 20. If scope of modification involves cathodic protection, the GC shall reference CED-SOW-10397, "Cathodic Protection Installation, Replacement, and Enhancement". 21. All tower grounding affected by the Work shall be repaired or replaced in accordance with OPS-STD-10090, "Tower Grounding", and OPS-BUL-10133, "Grounding Repair Recommendation". 22. If scope of modification requires removal or covering of tower ID tag, the tag must be replaced. 23. Any hardware removed from the existing tower shall be replaced with new hardware of equal size and quality, UNO. No existing fasteners shall be reused. 24. All joints using ASTM A325 or A490 bolts, U-bolts, V-bolts, and threaded rods shall be snug tightened, UNO. 25. A nut locking device shall be installed on all proposed and/or replaced snug tightened ASTM A325 or A490 bolts, U-bolts, V-bolts, and threaded rods. 26. All joints are bearing type connections UNO. If no bolt length is given in the Bill of Materials, the connection may include threads in the shear planes, and the GC is responsible for sizing the length of the bolt. 27. Blind bolts shall be installed per the installation specifications on the corresponding Approved Fastener sheets contained in CON-CAT-10300, "Monopole Standard Drawings and Approved Reinforcement Components". 28. If ASTM A325 or A490 bolts, and/or threaded rods are specified to be pre-tensioned, these shall be installed and tightened to the pretensioned condition according to the requirements of the RCSC Specification for Structural Joints Using ASTM High Strength Bolts. 29. All proposed and/or replaced bolts shall be of sufficient length such that the end of the bolt be at least flush with the face of the nut. It is not permitted for the bolt end to be below the face of the nut after tightening is completed. 06/30/23 01/24/23 S-4 NOTES . NO.DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THESOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWNCASTLE AND ITS AFFILIATES. REPRODUCTIONOR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDENWITHOUT THE WRITTEN PERMISSION OFCROWN CASTLE. SITE NAME: SANTA ANITA BU NUMBER: 877948 WO NUMBER: 2197400 SITE ADDRESS: 35 W. ST JOSEPH ST. ARCADIA, CA 91007 LOS ANGELES COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 01/20/23 BF 01/20/23 BF 01/24/23 MEB 01/24/23 0 PORT HOLE NOTES 1. All surfaces of the port hole rim itself as well as all exterior structural steel areas affected by welding, including weld metal, shall be galvanized in accordance with ASTM A780. 2. The following criteria are required for adherence to this standard. A. Use rim as template for cutting hole in monopole. Care shall be taken to minimize the root opening (AWS tolerances allow a maximum of 0.19"). B. Provide minimum 24" clear vertical separation between rim and other openings in monopole. Align ports on same azimuth as existing ports. C. Maximum variance of port hole center elevation shall not be greater than 6". D. Provide 90° minimum radial separation or two times the hole width clear circumferential separation between rim and adjacent opening in monopole, whichever is greatest. 18-sided pole with 4 ports shall not be allowed. E. Edge of opening for the exit port must be at least 24" from splice. F. Grind all edges of cut opening, achieving a bevel angle of 45° and removing the zinc from the weld area plus 1/4". Ensure all weld areas and surfaces are clean and free of zinc and loose particles. Zinc shall not be allowed to contaminate the weld. G. Position the rim as required and securely tack weld. Finish welding the rim with bevel weld and reinforcing fillet weld size as determined from the design method. H. Repair with galvanized coating. Both inside and outside should be brush-coated with 2 coats of zinc-rich paint. Apply in strict accordance with the manufacturer's recommendations. Paint over repaired surfaces to match monopole. 06/30/23 01/24/23 POLE SPECIFICATIONS TOWER TAPER: BASE PL STEEL: ANCHOR RODS: N/A ASTM A36 1 1/2"Ø ASTM A36 EXISTING SHAFT SECTION DATA SHAFT SECTION SECTIONLENGTH (FT) PLATE THICKNESS (IN) DIAMETER ACROSS FLATS OR OF ROUND SECTION (IN) @ TOP @ BOTTOM SECTION SHAPE SECTIONGRADE (KSI) FLANGE PLATE GRADE (KSI) LAP SPLICE (IN) 19.98 0.2500 18.000 18.000 2 25.82 0.2500 N/A 24.000 24.000 NOTE: DIMENSIONS SHOWN DO NOT INCLUDE GALVANIZING TOLERANCES 35 35 36 36 1 ROUND ROUND BASE SEISMIC SHEAR VS= 4.455 kips MOMENT = 236 kips-ft DOWN = 13 kipsSHEAR = 4 kips DESIGN LOADS FOUNDATION LOADS EQUIVALENT LATERAL FORCE PROCEDURE PER ASCE 7 SECTION 12.8.1 I = 1 SS = 1.976 S1 = 0.727 SITE CLASS D SDS = 1.5808SD1 = 0.8239 VS = 4.455 CS = 0.5077 R = 1.5 SEISMIC DESIGN CATEGORY D NON BUILDING STRUCTURE NOT SIMILAR TO BUILDING SEISMIC DESIGN 0.0 FT TOP OF BASE PLATE POLE ELEVATION BASE LEVEL DRAWING 45.8 FT POLE MODIFICATION SCHEDULE ELEVATION (FT) REFERENCE SHEETMODIFICATION PRIOR TO FABRICATION AND INSTALLATION, CONTRACTOR SHALL FIELD VERIFY ALL LENGTHS AND QUANTITIES GIVEN. LENGTH AND QUANTITIES PROVIDED ARE FOR QUOTING PURPOSES ONLY, AND SHALL NOT BE USED FOR FABRICATION. N/A N/APAINT ALL NEW MODIFICATIONS TO MATCH EXISTING TOWER FINISH (PER CON-STD-10149)E FOR PARTS NOT DETAILED WITHIN THE DRAWING AND STARTING WITH "CCI-", SEE THE FOLLOWING CATALOG FOR DETAILS: CON-CAT-10300, MONOPOLE STANDARD DRAWINGS AND APPROVED REINFORCEMENT COMPONENTS NOTE: 1. ALL WORK INVOLVING EXISTING CARRIER EQUIPMENT REQUIRES COORDINATION W/ CROWN CASTLE & EQUIPMENT OWNER. FIELD VERIFY EXISTING FLANGE PLATE GEOMETRY & PERFORM VISUAL INSPECTION OF EXISTING MONOPOLE SHAFT TO EXISTING FLANGE PLATE CONNECTION C 45.8 S-6 B 45.8 S-6REMOVE EXISTING TOP HAT D 45.8 - 59.8 S-6INSTALL NEW TOWER EXTENSION REMOVE & REPLACE CARRIER MOUNT AS REQUIRED. REPLACEMENT OF EXISTING CARRIER T-ARM MOUNT W/ SIMILAR MAY BE REQUIRED. COORDINATE W/ CROWN CASTLE (SEE NOTE 1) A 45.8 S-5 59.8 FT D A B C (OTHER CONSIDERED EQUIPMENT) (5) 1-1/4" TO 46 FT LEVEL (PROPOSED EQUIPMENT CONFIGURATION) (1) 1-3/8" TO 58 FT LEVEL S-5 POLE MODIFICATION SCHEDULE . NO. DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THESOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWNCASTLE AND ITS AFFILIATES. REPRODUCTIONOR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDENWITHOUT THE WRITTEN PERMISSION OFCROWN CASTLE. SITE NAME: SANTA ANITA BU NUMBER: 877948 WO NUMBER: 2197400 SITE ADDRESS: 35 W. ST JOSEPH ST. ARCADIA, CA 91007 LOS ANGELES COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 01/20/23 BF 01/20/23 BF 01/24/23 MEB 01/24/23 0 01/24/2306/30/23 FIELD VERIFY EXISTING CLIMBING PATH AZIMUTH & ALIGN NEW SHAFT ASSEMBLY A-A S-6 59.8 FT EXISTING MONOPOLE SHAFT NEW 5/8"Ø PRE-TENSIONED BOLT ASSEMBLY (TYP 15) EXISTING 1 1/2" THK x 30.1"Ø FLANGE PLATE (SEE NOTE 2) PRE-TENSIONED BOLT ASSEMBLY FLAT WASHER NUT NOTES: 1. FULLY PRE-TENSION BOLTS USING THE "TURN OF NUT" METHOD IN ACCORDANCE WITH THE AISC STEEL CONSTRUCTION MANUAL (LATEST EDITION). 2. FIELD VERIFY EXISTING FLANGE PLATE GEOMETRY DURING PRE-CON & NOTIFY CROWN EOR OF ANY DEVIATIONS FROM PLANS. 3. CONNECTION BETWEEN EXISTING MONOPOLE SHAFT & EXISTING FLANGE PLATE IS ASSUMED TO BE GREATER THAN OR EQUAL TO A 1/4" FILLET WELD. IF 1/4" FILLET WELD IS NOT FOUND ON EXTERIOR OF FLANGE, CONTACT CROWN EOR WITH TYPE & SIZE OF WELD FOR EVALUATION PRIOR TO INSTALLING NEW TOWER EXTENSION. TYPICAL BOLT ASSEMBLY A325N BOLT LOCK WASHER NUT A325N BOLT SEE NOTE 1 A S-6 COVER PLATE A-A S-6 TOP FLANGE CONNECTION B-B S-6 BOTTOM FLANGE CONNECTION S-6 A NEW 1"Ø BOLT ASSEMBLY (TYP 4) #X1 NEW SHAFT ASSEMBLY REF S-7 FIELD VERIFY EXISTING FLANGE PLATE GEOMETRY & PERFORM VISUAL INSPECTION OF EXISTING MONOPOLE SHAFT TO EXISTING FLANGE PLATE CONNECTION(SEE NOTES 2 & 3) #X1 NEW SHAFT ASSEMBLY #X2 NEW COVER PLATE REF S-8 NEW BOLT ASSEMBLY (TYP)#X1 NEW SHAFT ASSEMBLY ELEVATION VIEW 45.8 FT B-B S-6 EXISTING TOP HAT TO BE REMOVED EXISTING 1/4" THK MONOPOLE SHAFT S-6 DETAILS . NO.DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THESOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWNCASTLE AND ITS AFFILIATES. REPRODUCTIONOR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDENWITHOUT THE WRITTEN PERMISSION OFCROWN CASTLE. SITE NAME: SANTA ANITA BU NUMBER: 877948 WO NUMBER: 2197400 SITE ADDRESS: 35 W. ST JOSEPH ST. ARCADIA, CA 91007 LOS ANGELES COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 01/20/23 BF 01/20/23 BF 01/24/23 MEB 01/24/23 0 06/30/23 01/24/23 D-D S-7 BOTTOM FLANGE WELD DETAIL STEP BOLT CLIPS OMITTED E70XX CJP INSPECT BY UT TYP 38 E70XX BACK GOUGE - CJP INSPECT BY UT TYP #x1b #x1d (TYP 3) E70XX TYP 516 516 (316) (316) A-A S-7 NEW PORT HOLE (TYP 3) PORT HOLE WELD DETAIL STEP BOLT CLIPS OMITTED E70XX CJP INSPECT BY UT 38 45 #x1b REF S-8 #x1d REF S-8 (TYP) #x1a REF S-8 NEW J-HOOK (TYP) #x1a 45 14 45 14 45 #x1e REF S-8 (TYP 6) #x1a (1) SHAFT ASSEMBLY #X1 / 1432.3# NOTES: 1. REFERENCE CROWN CASTLE APPROVED REINFORCEMENT COMPONENTS CATALOG FOR ADDITIONAL CLIMBING FACILITIES SPECIFICATIONS AND REQUIREMENTS. 2. ALL HOLES TO BE SHOP FABRICATED, UNLESS NOTED OTHERWISE. 3. FOR PORT HOLE INSTALLATION CRITERIA, REFER TO PORT HOLE NOTES ON S-4. 4. ALL PORT HOLES MUST INCLUDE J-HOOKS. 5. FULL ASSEMBLY TO BE HOT-DIP GALVANIZED PER ASTM A153 / A153M OR A123, AS APPLICABLE. 6. STEP BOLT CLIP WELDS ARE SUBJECT TO AWS D1.1 AND MUST BE INSPECTED BY A CWI. REFER TO DOCUMENT "ENG-STD-10069 GC CWI REQUIREMENT STANDARD" FOR CWI REQUIREMENTS. 7. STEP BOLT CLIPS SHALL BE SHOP WELDED. 8. STEP BOLT CLIPS SHALL BE WELDED IN PLACE PRIOR TO HOT DIP GALVANIZING THE WELDMENT. 9. CENTER TO CENTER STAGGERED SPACING SHOULD BE MATCHED TO EXISTING FIELD CONDITIONS. STAGGERED SPACING SHALL BE A MINIMUM OF 10" AND MAXIMUM OF 16", IN THE VERTICAL DIRECTION. 10. HORIZONTAL SPREAD IS NOT TO EXCEED 24". B-B S-7 STEP BOLT CLIP ORIENTATION #CCI-SB-0100 NEW STEP BOLT CLIP (TYP) #x1a STEP BOLT CLIP WELD DETAIL E70XX316 E70XX316 #CCI-SB-0100 NEW STEP BOLT CLIP#x1a #CCI-SB-0100 NEW STEP BOLT CLIP (TYP) 1'- 0 " (T Y P ) (18)14 E70XX TYP 716 45 24 " M I N I M U M 48 " M A X I M U M (T Y P ) 10 ' - 1 " D-D S-7 A-A S-7 B-B S-7 C-C S-7 18" MINIMUM 24" MAXIMUMHORIZONTAL SPREAD (TYP) 10 " M I N I M U M 16 " M A X I M U M (T Y P ) 6" (T Y P ) NEW PORT HOLE 6" x 12" x 5/8" x 3 1/2" MFR: NEWAVE, MFR PART # PORT-6X12H, OR MFR: SABRE, MFR PART # C30-138-153G, Fy=65KSI. INSTALL IN ACCORDANCE WITH PORT HOLE NOTES ON S-4(TYP) 14 ' - 0 " #x1cREF S-8 1" (T Y P ) 3 1 / 2 " (T Y P ) 120° (TYP) 60° (TYP) 60° (TYP) 120° (TYP) C-C S-7 STEP BOLT CLIP ORIENTATION #CCI-SB-0100 NEW STEP BOLT CLIP (TYP) #x1a (18)14 E70XX TOP & SIDES TYP 716 45 5" (T Y P ) 7" (T Y P ) 120° (TYP) S-7 DETAILS . NO.DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THESOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWNCASTLE AND ITS AFFILIATES. REPRODUCTIONOR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDENWITHOUT THE WRITTEN PERMISSION OFCROWN CASTLE. SITE NAME: SANTA ANITA BU NUMBER: 877948 WO NUMBER: 2197400 SITE ADDRESS: 35 W. ST JOSEPH ST. ARCADIA, CA 91007 LOS ANGELES COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 01/20/23 BF 01/20/23 BF 01/24/23 MEB 01/24/23 0 06/30/23 01/24/23 NOTE: 1. ALL HOLES TO BE SHOP FABRICATED, UNLESS NOTED OTHERWISE. (1) PL 1 1/2 x 26"Ø (A572-50) #x1c / 160.2# 1 1/8"Ø HOLE 23.5" B.C. (TYP 12) (1) PL 1 1/2 x 30.1"Ø (A572-50) #x1b / 195.1# 14"Ø HOLE SHADED PORTION TO BE REMOVED (TYP) (1) P 18.000 x 0.375 x 13'-9" LONG (A53-B-35) #x1a / 971.4# 1/2" R3/4" (6) SR 1/2 x 7 3/4" LONG (A36) #x1e / 0.4# (3) PL 5/8 x 7 x 2'-3 15/16" LONG (A572-50) #x1d / 34.4# 3/4"Ø HOLE 27.1" B.C. FIELD VERIFY EXISTING B.C. & HOLE SPACING PRIOR TO FABRICATION (TYP 15) (1) PL 1/4 x 26"Ø (A36) #X2 / 37.6# 7" 1/8" (TYP) R3/4" (TYP) 4" 3" 2 1/2" R5/8" (TYP) 18° (TYP) 120° (TYP) 14"Ø HOLE 4" (TYP) 1 1/8"Ø HOLE 23.5" B.C. (TYP 4) 6" 1'- 0 " 45°(TYP) S-8 DETAILS . NO.DATE DESCRIPTION BY REVISIONS THIS DRAWING IS COPYRIGHTED AND IS THESOLE PROPERTY OF CROWN CASTLE. IT IS PRODUCED SOLELY FOR USE BY CROWNCASTLE AND ITS AFFILIATES. REPRODUCTIONOR USE OF THIS DRAWING AND/OR THE INFORMATION CONTAINED IN IT IS FORBIDDENWITHOUT THE WRITTEN PERMISSION OFCROWN CASTLE. SITE NAME: SANTA ANITA BU NUMBER: 877948 WO NUMBER: 2197400 SITE ADDRESS: 35 W. ST JOSEPH ST. ARCADIA, CA 91007 LOS ANGELES COUNTY, USA ENG/QA BY: DFT BY: DFT/QA BY: APRV'D BY: SCALE: N.T.S. DATE: DATE: DATE: DATE: REV MEB 01/20/23 BF 01/20/23 BF 01/24/23 MEB 01/24/23 0 01/24/2306/30/23 Date: March 31, 2023 B+T Group 1717 S. Boulder, Suite 300 Tulsa, OK 74119 (918) 587-4630 towersupport@btgrp.com Subject: Mount Analysis - Conditional Passing Report Carrier Designation: Dish Network Equipment Co-Locate Carrier Site Number: LALAX04487E Carrier Site Name: Santa Anita Crown Castle Designation: BU Number: 877948 Site Name: Santa Anita JDE Job Number: 727998 Order Number: 629188, Rev.4 Engineering Firm Designation: B+T Group Report Designation: 167744.001.01.0001 Site Data: 35 W. St Joseph St., Arcadia, CA, Los Angeles County, 91007 Latitude 34° 8' 37.20" Longitude -118° 1' 58.30" Structure Information: Tower Height & Type: 59.8 ft. Monopole Mount Elevation: 58 ft. Mount Type: 7 ft. T-Arm Mount B+T Group is pleased to submit this “Mount Analysis - Conditional Passing Report” to determine the structural integrity of Dish Network’s antenna mounting system with the proposed appurtenance and equipment addition on the above-mentioned supporting tower structure. Analysis of the existing supporting tower structure is to be completed by others and therefore is not part of this analysis. Analysis of the antenna mounting system as a tie-off point for fall protection or rigging is not part of this document. The purpose of the analysis is to determine the acceptability of the mount’s stress level. Based on our analysis we have determined the stress level to be: T-Arm Mount (typical) Sufficient *Sufficient upon completion of the changes listed in the 'Recommendations' section of the report. This analysis has been performed in accordance with the 2022 CBC based upon an ultimate 3-second gust wind speed of 95 mph. Applicable Standard references and design criteria are listed in Section 2 - Analysis Criteria. Mount structural analysis prepared by: Joseph Variamparampil Respectfully submitted by: B&T Engineering, Inc. Dinesh Bhat, P.E. 3-31-23 March 31, 2023 7 ft. T-Arm Mount Analysis - Conditional Passing CCI BU No. 877948 Project Number 167744.001.01.0001, Order 629188, Revision 4 Page 2 TABLE OF CONTENTS 1) INTRODUCTION 2) ANALYSIS CRITERIA Table 1 - Proposed Equipment Configuration Table 2 - Documents Provided 3) ANALYSIS PROCEDURE 3.1) Analysis Method 3.2) Assumptions 4) ANALYSIS RESULTS Table 3 - Mount Component Stresses vs. Capacity 4.1) Recommendations 5) APPENDIX A Wire Frame and Rendered Models 6) APPENDIX B Software Input Calculations 7) APPENDIX C Software Analysis Output 8) APPENDIX D Additional Calculations 9) APPENDIX E Supplemental Drawings March 31, 2023 7 ft. T-Arm Mount Analysis - Conditional Passing CCI BU No. 877948 Project Number 167744.001.01.0001, Order 629188, Revision 4 Page 3 1) INTRODUCTION This is a proposed 3 - sector 7 ft. T-Arm Mount, designed by Commscope Part# MC-K6MHDX-9-96. 2) ANALYSIS CRITERIA Building Code: 2022 CBC TIA-222 Revision: TIA-222-H Risk Category: II Ultimate Wind Speed: 95 mph Exposure Category: C Topographic Factor at Base: 1 Topographic Factor at Mount: 1 Ice Thickness: 0 in Wind Speed with Ice: 30 mph Seismic Ss: 1.976 Seismic S1: 0.727 Live Loading Wind Speed: 30 mph Man Live Load at Mid/End-Points: 250 lb. Man Live Load at Mount Pipes: 500 lb. Table 1 - Proposed Equipment Configuration Mount Centerline (ft.) Antenna Centerline (ft.) Number of Antennas Manufacturer Model / Type Mount / Modification Details 58 58 3 JMA Wireless MX08FRO665-21 7 ft. T-Arm Mount 3 Samsung RF4450t-71A 3 Samsung RF4451d-70A 1 Raycap RDIDC-9181-PF-48 Table 2 - Documents Provided Document Remarks Reference Source CCI Order Proposed Loading Date: 08/10/2022 Crown Castle RFDS Date: 10/25/2022 CDs by RLS Date: 12/08/2022 Mount Manufacturer Drawing Commscope (Part# MC-K6MHDX-9-96)Date: 03/24/2021 Commscope 3) ANALYSIS PROCEDURE 3.1) Analysis Method RISA-3D (Version 21.0.0), a commercially available analysis software package, was used to create a three-dimensional model of the antenna mounting system and calculate member stresses for various loading cases. A tool internally developed by B+T Group, was used to calculate wind loading on all appurtenances, dishes and mount members for various loading cases. Selected output from the analysis is included in Appendix B. March 31, 2023 7 ft. T-Arm Mount Analysis - Conditional Passing CCI BU No. 877948 Project Number 167744.001.01.0001, Order 629188, Revision 4 Page 4 This analysis was performed in accordance with Crown Castle’s ENG-SOW-10208 Mount Analysis (Revision E). In addition, this analysis is in accordance with OTHER SOW. Manufacturers drawing were used to create model. 3.2) Assumptions 1. The antenna mounting system was properly fabricated, installed and maintained in good condition in accordance with its original design, TIA Standards, and/or manufacturer's specifications. 2. The configuration of antennas, mounts, and other appurtenances are as specified in Table-1. 3. All member connections are assumed to have been designed to meet or exceed the load carrying capacity of the connected members unless otherwise specified in this report. 4. Mount areas and weights are determined from field measurements, standard material properties, and/or manufacturer product data. 5. Serviceability with respect to antenna twist, tilt, roll or lateral translation is not checked and is left to the carrier or tower owner to ensure conformance. 6. Prior structural modifications to the tower mounting system are assumed to be installed as shown per available data. 7. The analysis will be required to be revised if the existing conditions in the field differ from those shown in the above-referenced documents or assumed in this analysis. No allowance was made for any damaged, missing, or rusted members. 8. The following material grades were assumed (Unless Noted Otherwise): (a) Connection Bolts : ASTM A325 (b) Steel Pipe : ASTM A53 (GR. 35) (c) HSS (Round) : ASTM 500 (GR. B-42) (d) HSS (Rectangular) : ASTM 500 (GR. B-46) (e) Channel : ASTM A36 (GR. 36) (f) Steel Solid Rod : ASTM A36 (GR. 36) (g) Steel Plate : ASTM A36 (GR. 36) (h) Steel Angle : ASTM A36 (GR. 36) (i) UNISTRUT : ASTM A570 (GR. 33) This analysis may be affected if any assumptions are not valid or have been made in error. B+T Group should be notified to determine the effect on the structural integrity of the antenna mounting system. 4) ANALYSIS RESULTS Table 3 - Mount Component Stresses vs. Capacity (Sector Mount) Notes Component Centerline (ft.) Critical Member % Capacity Pass / Fail Mount Pipes 7 10.3 Pass Face Horizontals 2 30.7 Pass Support Arms 1 29.6 Pass 3 Mount to Tower Connection -- 26.2 Pass Structure Rating with Recommendations (max from all components) = 30.7% Notes: 1) Capacities listed are based on recommendations listed in Sec.4.1 being installed 2) See additional documentation in "Appendix C - Software Analysis Output" for calculations supporting the % capacity consumed. 3) See additional documentation in "Appendix D - Additional Calculations" for calculations supporting the % capacity reported. March 31, 2023 7 ft. T-Arm Mount Analysis - Conditional Passing CCI BU No. 877948 Project Number 167744.001.01.0001, Order 629188, Revision 4 Page 5 4.1) Recommendations The proposed mount has sufficient capacity to support the proposed loading configuration. In order for the results of this analysis to be considered valid, the mount listed below shall be installed. 1. Commscope, Part# MC-K6MHDX-9-96 2. Install (1) 2” STD. x 6’-0’’ long mount pipe attached support arm with (1) Commscope Part# XP- 2040 cross over plate. No other structural modifications are required at this time. March 31, 2023 7 ft. T-Arm Mount Analysis - Conditional Passing CCI BU No. 877948 Project Number 167744.001.01.0001, Order 629188, Revision 4 Page 6 APPENDIX A WIRE FRAME AND RENDERED MODELS B+T Group KP 167744.001.01.0001 877948 - Santa Anita SK-1 Mar 31, 2023 at 01:23 PM 167744_001_01_0001_Sant… B+T Group KP 167744.001.01.0001 877948 - Santa Anita SK-2 Mar 31, 2023 at 01:23 PM 167744_001_01_0001_Sant… B+T Group KP 167744.001.01.0001 877948 - Santa Anita SK-3 Mar 31, 2023 at 01:23 PM 167744_001_01_0001_Sant… B+T Group KP 167744.001.01.0001 877948 - Santa Anita SK-5 Mar 31, 2023 at 01:24 PM 167744_001_01_0001_Sant… B+T Group KP 167744.001.01.0001 877948 - Santa Anita SK-6 Mar 31, 2023 at 01:24 PM 167744_001_01_0001_Sant… B+T Group KP 167744.001.01.0001 877948 - Santa Anita SK-7 Mar 31, 2023 at 01:24 PM 167744_001_01_0001_Sant… B+T Group KP 167744.001.01.0001 877948 - Santa Anita SK-8 Mar 31, 2023 at 01:25 PM 167744_001_01_0001_Sant… B+T Group KP 167744.001.01.0001 877948 - Santa Anita SK-9 Mar 31, 2023 at 01:25 PM 167744_001_01_0001_Sant… March 31, 2023 7 ft. T-Arm Mount Analysis - Conditional Passing CCI BU No. 877948 Project Number 167744.001.01.0001, Order 629188, Revision 4 Page 7 APPENDIX B SOFTWARE INPUT CALCULATIONS 167744.001.01.0001 - Santa Anita, CA T-Arm Mount Analysis Tower Type : Ground Elevation zs : ft [ASCE7 Hazard Tool] Tower Height : ft Mount Elevation : ft Antenna Elevation : ft Crest Height : ft Risk Category : [Table 2-1 ] Exposure Category : [Sec. 2.6.5.1.2] Topography Category : [Sec. 2.6.6.2] Wind Velocity V : mph [ASCE7 Hazard Tool] Ice wind Velocity Vi : mph [ASCE7 Hazard Tool] Service Velocity Vs : mph [ASCE7 Hazard Tool] Base Ice thickness ti : in [ASCE7 Hazard Tool] Seismic Design Cat. : [ASCE7 Hazard Tool] SS : S1 : SDS : SD1 : Gust Factor Gh : [Sec. 16.6] Pressure Coefficient Kz : [Sec. 2.6.5.2] Kzt : [Sec. 2.6.6] Elevation Factor Ke : [Sec. 2.6.8] Directionality Factor Kd : [Sec. 16.6] Shielding Factor Ka : [Sec. 16.6] Design Ice Thickness tiz :in [Sec. 2.6.10] Importance Factor Ie : [Table 2-3 ] Response Coefficient Cs : [Sec. 2.7.7.1] Amplification As : [Sec. 16.7] qz :psf B+T Group 1717 S. Boulder, Suite 300 Tulsa, OK 74119 (918) 587-4630 Topography Facto 2.879599 0.291 1 0.00 0.90 0.95 0.98 1.00 PROJECT SUBJECT DATE KSC 03/31/23 Monopole 502 0.00 1.58 0.73 1.98 D 0.00 30 30 95 1.00 C II 0 58.00 58.00 59.80 1.13 1.00 24.32 167744.001.01.0001 - Santa Anita, CA T-Arm Mount Analysis 15.0 15.0 16.6 2.01 1.17 2.01 1.17 0.04 0.03 0.0014.6 8.5 0.00 0.04 0.00 0.0015.0 1.11 1.88 1.11 1.88 0.028.9 4.01 1.61 4.01 1.61 0.010.040.101.614.011.61 B+T Group 1717 S. Boulder, Suite 300 Tulsa, OK 74119 (918) 587-4630 4.01 0.10 0.04 0.01 0.00 0.00 1.52 2.06 1.52 2.06 0.03 0.05 0.00 0.00 SUBJECT DATE 20.0 8.0 82.5 RAYCAP RDIDC-9181-PF-48 1 Samsung RF4451d-70A 1 Samsung RF4450t-71A 1 72.0 PROJECT JMA WIRELESS MX08FRO665-21 0.5 JMA WIRELESS MX08FRO665-21 0.5 Manufacturer 03/31/23 KSC 16.5 11.0 Model Qty Height Width Depth Weight FA (T) Ice (in2)(in2)(in2)(lbs)(ft2)(ft2)(ft2)(ft2) (k) (k) (k) (k) CaAa (N) CaAa (T) CaAa (N) Ice CaAa (T) Ice FA (N)FA (T)FA (N) Ice 94.6 61.3 21.9 March 31, 2023 7 ft. T-Arm Mount Analysis - Conditional Passing CCI BU No. 877948 Project Number 167744.001.01.0001, Order 629188, Revision 4 Page 8 APPENDIX C SOFTWARE ANALYSIS OUTPUT Company Designer Job Number Model Name : : : : B+T Group KP 167744.001.01.0001 877948 - Santa Anita Checked By : 3/31/2023 1:25:50 PM RISA-3D Version 21 [ 167744_001_01_0001_Santa Anita_CA.r… Page 1 Node Coordinates Label X [ft] Y [ft] Z [ft] Detach From Diaphragm 1 1 -0.114029 0 1.303354 2 2 -3.864964 0 4.596595 3 3 3.135036 0 4.596595 4 4 -0.364964 -0.75 4.171561 5 5 -0.364964 0.75 4.171561 6 6 -3.364964 -4 4.930595 7 7 -3.364964 4 4.930595 8 8 -0.364964 0 4.171561 9 9 -3.364964 0 4.596595 10 10 -3.364964 0 4.930595 11 11 -0.364964 -4 4.930595 12 12 -0.364964 4 4.930595 13 13 -0.364964 0 4.596595 14 14 -0.364964 0 4.930595 15 15 2.635036 -4 4.930595 16 16 2.635036 4 4.930595 17 17 2.635036 0 4.596595 18 18 2.635036 0 4.930595 19 19 -0.357484 0 4.086058 20 20 0 0 0 21 21 -0.179396 0 2.0505 22 22 -0.44401 0 2.02735 23 23 -0.44401 3 2.02735 24 24 -0.44401 -3 2.02735 Node Boundary Conditions Node Label X [k/in] Y [k/in] Z [k/in] X Rot [k-ft/rad] Y Rot [k-ft/rad] Z Rot [k-ft/rad] 1 1 Reaction Reaction Reaction Reaction Reaction Reaction 2 20 3 21 4 22 5 23 6 24 Hot Rolled Steel Properties Label E [ksi] G [ksi] Nu Therm. Coeff. [1e⁵°F⁻¹] Density [k/ft³] Yield [ksi] Ry Fu [ksi] Rt 1 A992 29000 11154 0.3 0.65 0.49 50 1.1 65 1.1 2 A36 Gr.36 29000 11154 0.3 0.65 0.49 36 1.5 58 1.2 3 A572 Gr.50 29000 11154 0.3 0.65 0.49 50 1.1 65 1.1 4 A500 Gr.B RND 29000 11154 0.3 0.65 0.527 42 1.4 58 1.3 5 A500 Gr.B Rect 29000 11154 0.3 0.65 0.527 46 1.4 58 1.3 6 A53 Gr.B 29000 11154 0.3 0.65 0.49 35 1.6 60 1.2 7 A1085 29000 11154 0.3 0.65 0.49 50 1.4 65 1.3 8 A500 Gr.C 29000 11154 0.3 0.65 0.49 46 1.4 62 1.3 Hot Rolled Steel Section Sets Label Shape Type Design List Material Design RuleArea [in²] Iyy [in⁴]Izz [in⁴] J [in⁴] 1 MF-P1 PIPE_2.5X.203 Column Pipe A500 Gr.C Typical 1.704 1.53 1.53 3.059 2 MF-H1 PIPE_3.5X.216 Beam Pipe A500 Gr.C Typical 2.228 3.017 3.017 6.034 3 MV-1 PIPE_4.0 Column Pipe A53 Gr.B Typical 2.96 6.82 6.82 13.6 4 F1-ST1 HSS4X4X4 Beam Tube A500 Gr.B Rect Typical 3.37 7.8 7.8 12.8 Company Designer Job Number Model Name : : : : B+T Group KP 167744.001.01.0001 877948 - Santa Anita Checked By : 3/31/2023 1:25:50 PM RISA-3D Version 21 [ 167744_001_01_0001_Santa Anita_CA.r… Page 2 Hot Rolled Steel Section Sets (Continued) Label Shape Type Design List Material Design RuleArea [in²] Iyy [in⁴]Izz [in⁴] J [in⁴] 5 MF-P2 PIPE_2.0 Column Pipe A53 Gr.B Typical 1.02 0.627 0.627 1.25 Member Primary Data Label I Node J Node Section/Shape Type Design List Material Design Rule 1 1 1 19 F1-ST1 Beam Tube A500 Gr.B Rect Typical 2 2 2 3 MF-H1 Beam Pipe A500 Gr.C Typical 3 3 4 5 MV-1 Column Pipe A53 Gr.B Typical 4 4 7 6 MF-P1 Column Pipe A500 Gr.C Typical 5 5 8 13 RIGID None None RIGID Typical 6 6 9 10 RIGID None None RIGID Typical 7 7 12 11 MF-P1 Column Pipe A500 Gr.C Typical 8 8 13 14 RIGID None None RIGID Typical 9 9 16 15 MF-P1 Column Pipe A500 Gr.C Typical 10 10 17 18 RIGID None None RIGID Typical 11 11 8 19 RIGID None None RIGID Typical 12 12 21 22 RIGID None None RIGID Typical 13 13 23 24 MF-P2 Column Pipe A53 Gr.B Typical Member Advanced Data Label Physical Deflection Ratio Options Seismic DR 1 1 Yes N/A None 2 2 Yes N/A None 3 3 Yes ** NA **None 4 4 Yes ** NA **None 5 5 Yes ** NA **None 6 6 Yes ** NA **None 7 7 Yes ** NA **None 8 8 Yes ** NA **None 9 9 Yes ** NA **None 10 10 Yes ** NA **None 11 11 Yes ** NA **None 12 12 Yes ** NA **None 13 13 Yes ** NA **None Hot Rolled Steel Design Parameters Label Shape Length [ft] Lcomp top [ft] Channel Conn. a [ft] Function 1 1 F1-ST1 2.793 Lbyy N/A N/A Lateral 2 2 MF-H1 7 Lbyy N/A N/A Lateral 3 3 MV-1 1.5 Lbyy N/A N/A Lateral 4 4 MF-P1 8 Lbyy N/A N/A Lateral 5 7 MF-P1 8 Lbyy N/A N/A Lateral 6 9 MF-P1 8 Lbyy N/A N/A Lateral 7 13 MF-P2 6 Lbyy N/A N/A Lateral Member Point Loads (BLC 1 : Dead) Member Label Direction Magnitude [k, k-ft] Location [(ft, %)] 1 7 Y -0.041 %15 2 7 Y -0.041 %85 3 7 Y -0.095 %25 4 7 Y -0.061 %25 Company Designer Job Number Model Name : : : : B+T Group KP 167744.001.01.0001 877948 - Santa Anita Checked By : 3/31/2023 1:25:50 PM RISA-3D Version 21 [ 167744_001_01_0001_Santa Anita_CA.r… Page 3 Member Point Loads (BLC 1 : Dead) (Continued) Member Label Direction Magnitude [k, k-ft] Location [(ft, %)] 5 7 Y 0 0 6 13 Y -0.022 %25 7 13 Y 0 0 8 13 Y 0 0 9 13 Y 0 0 10 13 Y 0 0 Member Point Loads (BLC 2 : 0 Wind - No Ice) Member Label Direction Magnitude [k, k-ft] Location [(ft, %)] 1 7 Z -0.097 %15 2 7 Z -0.097 %85 3 7 Z -0.033 %25 4 7 Z -0.024 %25 5 7 Z 0 0 6 13 Z -0.044 %25 7 13 Z 0 0 8 13 Z 0 0 9 13 Z 0 0 10 13 Z 0 0 Member Point Loads (BLC 3 : 90 Wind - No Ice) Member Label Direction Magnitude [k, k-ft] Location [(ft, %)] 1 7 X -0.039 %15 2 7 X -0.039 %85 3 7 X -0.045 %25 4 7 X -0.041 %25 5 7 X 0 0 6 13 X -0.026 %25 7 13 X 0 0 8 13 X 0 0 9 13 X 0 0 10 13 X 0 0 Member Point Loads (BLC 6 : 0 Wind - Service) Member Label Direction Magnitude [k, k-ft] Location [(ft, %)] 1 7 Z -0.01 %15 2 7 Z -0.01 %85 3 7 Z -0.003 %25 4 7 Z -0.002 %25 5 7 Z 0 0 6 13 Z -0.004 %25 7 13 Z 0 0 8 13 Z 0 0 9 13 Z 0 0 10 13 Z 0 0 Member Point Loads (BLC 7 : 90 Wind - Service) Member Label Direction Magnitude [k, k-ft] Location [(ft, %)] 1 7 X -0.004 %15 2 7 X -0.004 %85 Company Designer Job Number Model Name : : : : B+T Group KP 167744.001.01.0001 877948 - Santa Anita Checked By : 3/31/2023 1:25:50 PM RISA-3D Version 21 [ 167744_001_01_0001_Santa Anita_CA.r… Page 4 Member Point Loads (BLC 7 : 90 Wind - Service) (Continued) Member Label Direction Magnitude [k, k-ft] Location [(ft, %)] 3 7 X -0.004 %25 4 7 X -0.004 %25 5 7 X 0 0 6 13 X -0.003 %25 7 13 X 0 0 8 13 X 0 0 9 13 X 0 0 10 13 X 0 0 Member Point Loads (BLC 9 : 0 Seismic) Member Label Direction Magnitude [k, k-ft] Location [(ft, %)] 1 7 Z -0.069 %15 2 7 Z -0.069 %85 3 7 Z -0.079 %25 4 7 Z -0.051 %25 5 7 Z 0 0 6 13 Z -0.018 %25 7 13 Z 0 0 8 13 Z 0 0 9 13 Z 0 0 10 13 Z 0 0 Member Point Loads (BLC 10 : 90 Seismic) Member Label Direction Magnitude [k, k-ft] Location [(ft, %)] 1 7 X -0.069 %15 2 7 X -0.069 %85 3 7 X -0.079 %25 4 7 X -0.051 %25 5 7 X 0 0 6 13 X -0.018 %25 7 13 X 0 0 8 13 X 0 0 9 13 X 0 0 10 13 X 0 0 Member Point Loads (BLC 15 : Maint LL 1) Member Label Direction Magnitude [k, k-ft] Location [(ft, %)] 1 2 Y -0.25 %5 Member Point Loads (BLC 16 : Maint LL 2) Member Label Direction Magnitude [k, k-ft] Location [(ft, %)] 1 2 Y -0.25 %95 Member Point Loads (BLC 17 : Maint LL 3) Member Label Direction Magnitude [k, k-ft] Location [(ft, %)] 1 1 Y -0.25 %50 Company Designer Job Number Model Name : : : : B+T Group KP 167744.001.01.0001 877948 - Santa Anita Checked By : 3/31/2023 1:25:50 PM RISA-3D Version 21 [ 167744_001_01_0001_Santa Anita_CA.r… Page 5 Member Distributed Loads (BLC 2 : 0 Wind - No Ice) Member LabelDirectionStart Magnitude [k/ft, F, ksf, k-ft/ft]End Magnitude [k/ft, F, ksf, k-ft/ft]Start Location [(ft, %)]End Location [(ft, %)] 1 1 Z -0.01 -0.01 0 %100 2 2 Z -0.007 -0.007 0 %100 3 3 Z -0.007 -0.007 0 %100 4 4 Z -0.006 -0.006 0 %100 5 7 Z -0.006 -0.006 0 %100 6 9 Z -0.006 -0.006 0 %100 7 13 Z -0.005 -0.005 0 %100 Member Distributed Loads (BLC 3 : 90 Wind - No Ice) Member LabelDirectionStart Magnitude [k/ft, F, ksf, k-ft/ft]End Magnitude [k/ft, F, ksf, k-ft/ft]Start Location [(ft, %)]End Location [(ft, %)] 1 1 X -0.01 -0.01 0 %100 2 2 X -0.007 -0.007 0 %100 3 3 X -0.007 -0.007 0 %100 4 4 X -0.006 -0.006 0 %100 5 7 X -0.006 -0.006 0 %100 6 9 X -0.006 -0.006 0 %100 7 13 X -0.005 -0.005 0 %100 Member Distributed Loads (BLC 6 : 0 Wind - Service) Member LabelDirectionStart Magnitude [k/ft, F, ksf, k-ft/ft]End Magnitude [k/ft, F, ksf, k-ft/ft]Start Location [(ft, %)]End Location [(ft, %)] 1 1 Z -0.001 -0.001 0 %100 2 2 Z -0.0004 -0.0004 0 %100 3 3 Z -0.0004 -0.0004 0 %100 4 4 Z -0.0003 -0.0003 0 %100 5 7 Z -0.0003 -0.0003 0 %100 6 9 Z -0.0003 -0.0003 0 %100 7 13 Z -0.0003 -0.0003 0 %100 Member Distributed Loads (BLC 7 : 90 Wind - Service) Member LabelDirectionStart Magnitude [k/ft, F, ksf, k-ft/ft]End Magnitude [k/ft, F, ksf, k-ft/ft]Start Location [(ft, %)]End Location [(ft, %)] 1 1 X -0.001 -0.001 0 %100 2 2 X -0.0004 -0.0004 0 %100 3 3 X -0.0004 -0.0004 0 %100 4 4 X -0.0003 -0.0003 0 %100 5 7 X -0.0003 -0.0003 0 %100 6 9 X -0.0003 -0.0003 0 %100 7 13 X -0.0003 -0.0003 0 %100 Member Distributed Loads (BLC 9 : 0 Seismic) Member LabelDirectionStart Magnitude [k/ft, F, ksf, k-ft/ft]End Magnitude [k/ft, F, ksf, k-ft/ft]Start Location [(ft, %)]End Location [(ft, %)] 1 1 Z -0.01 -0.01 0 %100 2 2 Z -0.006 -0.006 0 %100 3 3 Z -0.009 -0.009 0 %100 4 4 Z -0.005 -0.005 0 %100 5 7 Z -0.005 -0.005 0 %100 6 9 Z -0.005 -0.005 0 %100 7 13 Z -0.003 -0.003 0 %100 Company Designer Job Number Model Name : : : : B+T Group KP 167744.001.01.0001 877948 - Santa Anita Checked By : 3/31/2023 1:25:50 PM RISA-3D Version 21 [ 167744_001_01_0001_Santa Anita_CA.r… Page 6 Member Distributed Loads (BLC 10 : 90 Seismic) Member LabelDirectionStart Magnitude [k/ft, F, ksf, k-ft/ft]End Magnitude [k/ft, F, ksf, k-ft/ft]Start Location [(ft, %)]End Location [(ft, %)] 1 1 X -0.01 -0.01 0 %100 2 2 X -0.006 -0.006 0 %100 3 3 X -0.009 -0.009 0 %100 4 4 X -0.005 -0.005 0 %100 5 7 X -0.005 -0.005 0 %100 6 9 X -0.005 -0.005 0 %100 7 13 X -0.003 -0.003 0 %100 Node Loads and Enforced Displacements (BLC 11 : Live Load a) Node Label L, D, M Direction Magnitude [(k, k-ft), (in, rad), (k*s²/ft, k*s²*ft)] 1 9 L Y -0.5 Node Loads and Enforced Displacements (BLC 12 : Live Load b) Node Label L, D, M Direction Magnitude [(k, k-ft), (in, rad), (k*s²/ft, k*s²*ft)] 1 13 L Y -0.5 Node Loads and Enforced Displacements (BLC 13 : Live Load c) Node Label L, D, M Direction Magnitude [(k, k-ft), (in, rad), (k*s²/ft, k*s²*ft)] 1 17 L Y -0.5 Basic Load Cases BLC Description Category Y Gravity Nodal Point Distributed 1 Dead DL -1 10 2 0 Wind - No Ice WLZ 10 7 3 90 Wind - No Ice WLX 10 7 4 0 Wind - Ice WLZ 5 90 Wind - Ice WLX 6 0 Wind - Service WLZ 10 7 7 90 Wind - Service WLX 10 7 8 Ice OL1 9 0 Seismic ELZ 10 7 10 90 Seismic ELX 10 7 11 Live Load a LL 1 12 Live Load b LL 1 13 Live Load c LL 1 14 Live Load d LL 15 Maint LL 1 LL 1 16 Maint LL 2 LL 1 17 Maint LL 3 LL 1 18 Maint LL 4 LL 19 Maint LL 5 LL 20 Maint LL 6 LL 21 Maint LL 7 LL 22 Maint LL 8 LL 23 Maint LL 9 LL 24 Maint LL 10 LL 25 Maint LL 11 LL 26 Maint LL 12 LL 27 Maint LL 13 LL Company Designer Job Number Model Name : : : : B+T Group KP 167744.001.01.0001 877948 - Santa Anita Checked By : 3/31/2023 1:25:50 PM RISA-3D Version 21 [ 167744_001_01_0001_Santa Anita_CA.r… Page 7 Basic Load Cases (Continued) BLC Description Category Y Gravity Nodal Point Distributed 28 Maint LL 14 LL 29 Maint LL 15 LL 30 Maint LL 16 LL 31 Maint LL 17 LL 32 Maint LL 18 LL 33 Maint LL 19 LL 34 Maint LL 20 LL 35 Maint LL 21 LL 36 Maint LL 22 LL 37 Maint LL 23 LL 38 Maint LL 24 LL Load Combinations Description Solve P-Delta BLC Factor BLC Factor BLC Factor BLC Factor 1 1.4 Dead Yes Y 1 1.4 2 1.2 D + 1.0 - 0 W Yes Y 1 1.2 2 1 3 1.2 D + 1.0 - 30 W Yes Y 1 1.2 2 0.866 3 0.5 4 1.2 D + 1.0 - 60 W Yes Y 1 1.2 3 0.866 2 0.5 5 1.2 D + 1.0 - 90 W Yes Y 1 1.2 3 1 6 1.2 D + 1.0 - 120 W Yes Y 1 1.2 3 0.866 2 -0.5 7 1.2 D + 1.0 - 150 W Yes Y 1 1.2 2 -0.866 3 0.5 8 1.2 D + 1.0 - 180 W Yes Y 1 1.2 2 -1 9 1.2 D + 1.0 - 210 W Yes Y 1 1.2 2 -0.866 3 -0.5 10 1.2 D + 1.0 - 240 W Yes Y 1 1.2 3 -0.866 2 -0.5 11 1.2 D + 1.0 - 270 W Yes Y 1 1.2 3 -1 12 1.2 D + 1.0 - 300 W Yes Y 1 1.2 3 -0.866 2 0.5 13 1.2 D + 1.0 - 330 W Yes Y 1 1.2 2 0.866 3 -0.5 14 1.2 D + 1.0 - 0 W/Ice Yes Y 1 1.2 4 1 8 1 15 1.2 D + 1.0 - 30 W/Ice Yes Y 1 1.2 4 0.866 5 0.5 8 1 16 1.2 D + 1.0 - 60 W/Ice Yes Y 1 1.2 5 0.866 4 0.5 8 1 17 1.2 D + 1.0 - 90 W/Ice Yes Y 1 1.2 5 1 8 1 18 1.2 D + 1.0 - 120 W/Ice Yes Y 1 1.2 5 0.866 4 -0.5 8 1 19 1.2 D + 1.0 - 150 W/Ice Yes Y 1 1.2 4 -0.866 5 0.5 8 1 20 1.2 D + 1.0 - 180 W/Ice Yes Y 1 1.2 4 -1 8 1 21 1.2 D + 1.0 - 210 W/Ice Yes Y 1 1.2 4 -0.866 5 -0.5 8 1 22 1.2 D + 1.0 - 240 W/Ice Yes Y 1 1.2 5 -0.866 4 -0.5 8 1 23 1.2 D + 1.0 - 270 W/Ice Yes Y 1 1.2 5 -1 8 1 24 1.2 D + 1.0 - 300 W/Ice Yes Y 1 1.2 5 -0.866 4 0.5 8 1 25 1.2 D + 1.0 - 330 W/Ice Yes Y 1 1.2 4 0.866 5 -0.5 8 1 26 1.2 D + 1.0 E - 0 Yes Y 1 1.2 9 1 27 1.2 D + 1.0 E - 30 Yes Y 1 1.2 9 0.866 10 0.5 28 1.2 D + 1.0 E - 60 Yes Y 1 1.2 10 0.866 9 0.5 29 1.2 D + 1.0 E - 90 Yes Y 1 1.2 10 1 30 1.2 D + 1.0 E - 120 Yes Y 1 1.2 10 0.866 9 -0.5 31 1.2 D + 1.0 E - 150 Yes Y 1 1.2 9 -0.866 10 0.5 32 1.2 D + 1.0 E - 180 Yes Y 1 1.2 9 -1 33 1.2 D + 1.0 E - 210 Yes Y 1 1.2 9 -0.866 10 -0.5 34 1.2 D + 1.0 E - 240 Yes Y 1 1.2 10 -0.866 9 -0.5 35 1.2 D + 1.0 E - 270 Yes Y 1 1.2 10 -1 36 1.2 D + 1.0 E - 300 Yes Y 1 1.2 10 -0.866 9 0.5 37 1.2 D + 1.0 E - 330 Yes Y 1 1.2 9 0.866 10 -0.5 38 1.2 D + 1.5 LL a + Service - 0 W Yes Y 1 1.2 6 1 11 1.5 39 1.2 D + 1.5 LL a + Service - 30 W Yes Y 1 1.2 6 0.866 7 0.5 11 1.5 40 1.2 D + 1.5 LL a + Service - 60 W Yes Y 1 1.2 7 0.866 6 0.5 11 1.5 41 1.2 D + 1.5 LL a + Service - 90 W Yes Y 1 1.2 7 1 11 1.5 Company Designer Job Number Model Name : : : : B+T Group KP 167744.001.01.0001 877948 - Santa Anita Checked By : 3/31/2023 1:25:50 PM RISA-3D Version 21 [ 167744_001_01_0001_Santa Anita_CA.r… Page 8 Load Combinations (Continued) Description Solve P-Delta BLC Factor BLC Factor BLC Factor BLC Factor 42 1.2 D + 1.5 LL a + Service - 120 W Yes Y 1 1.2 7 0.866 6 -0.5 11 1.5 43 1.2 D + 1.5 LL a + Service - 150 W Yes Y 1 1.2 6 -0.866 7 0.5 11 1.5 44 1.2 D + 1.5 LL a + Service - 180 W Yes Y 1 1.2 6 -1 11 1.5 45 1.2 D + 1.5 LL a + Service - 210 W Yes Y 1 1.2 6 -0.866 7 -0.5 11 1.5 46 1.2 D + 1.5 LL a + Service - 240 W Yes Y 1 1.2 7 -0.866 6 -0.5 11 1.5 47 1.2 D + 1.5 LL a + Service - 270 W Yes Y 1 1.2 7 -1 11 1.5 48 1.2 D + 1.5 LL a + Service - 300 W Yes Y 1 1.2 7 -0.866 6 0.5 11 1.5 49 1.2 D + 1.5 LL a + Service - 330 W Yes Y 1 1.2 6 0.866 7 -0.5 11 1.5 50 1.2 D + 1.5 LL b + Service - 0 W Yes Y 1 1.2 6 1 12 1.5 51 1.2 D + 1.5 LL b + Service - 30 W Yes Y 1 1.2 6 0.866 7 0.5 12 1.5 52 1.2 D + 1.5 LL b + Service - 60 W Yes Y 1 1.2 7 0.866 6 0.5 12 1.5 53 1.2 D + 1.5 LL b + Service - 90 W Yes Y 1 1.2 7 1 12 1.5 54 1.2 D + 1.5 LL b + Service - 120 W Yes Y 1 1.2 7 0.866 6 -0.5 12 1.5 55 1.2 D + 1.5 LL b + Service - 150 W Yes Y 1 1.2 6 -0.866 7 0.5 12 1.5 56 1.2 D + 1.5 LL b + Service - 180 W Yes Y 1 1.2 6 -1 12 1.5 57 1.2 D + 1.5 LL b + Service - 210 W Yes Y 1 1.2 6 -0.866 7 -0.5 12 1.5 58 1.2 D + 1.5 LL b + Service - 240 W Yes Y 1 1.2 7 -0.866 6 -0.5 12 1.5 59 1.2 D + 1.5 LL b + Service - 270 W Yes Y 1 1.2 7 -1 12 1.5 60 1.2 D + 1.5 LL b + Service - 300 W Yes Y 1 1.2 7 -0.866 6 0.5 12 1.5 61 1.2 D + 1.5 LL b + Service - 330 W Yes Y 1 1.2 6 0.866 7 -0.5 12 1.5 62 1.2 D + 1.5 LL c + Service - 0 W Yes Y 1 1.2 6 1 13 1.5 63 1.2 D + 1.5 LL c + Service - 30 W Yes Y 1 1.2 6 0.866 7 0.5 13 1.5 64 1.2 D + 1.5 LL c + Service - 60 W Yes Y 1 1.2 7 0.866 6 0.5 13 1.5 65 1.2 D + 1.5 LL c + Service - 90 W Yes Y 1 1.2 7 1 13 1.5 66 1.2 D + 1.5 LL c + Service - 120 W Yes Y 1 1.2 7 0.866 6 -0.5 13 1.5 67 1.2 D + 1.5 LL c + Service - 150 W Yes Y 1 1.2 6 -0.866 7 0.5 13 1.5 68 1.2 D + 1.5 LL c + Service - 180 W Yes Y 1 1.2 6 -1 13 1.5 69 1.2 D + 1.5 LL c + Service - 210 W Yes Y 1 1.2 6 -0.866 7 -0.5 13 1.5 70 1.2 D + 1.5 LL c + Service - 240 W Yes Y 1 1.2 7 -0.866 6 -0.5 13 1.5 71 1.2 D + 1.5 LL c + Service - 270 W Yes Y 1 1.2 7 -1 13 1.5 72 1.2 D + 1.5 LL c + Service - 300 W Yes Y 1 1.2 7 -0.866 6 0.5 13 1.5 73 1.2 D + 1.5 LL c + Service - 330 W Yes Y 1 1.2 6 0.866 7 -0.5 13 1.5 74 1.2 D + 1.5 LL d + Service - 0 W Yes Y 1 1.2 6 1 14 1.5 75 1.2 D + 1.5 LL d + Service - 30 W Yes Y 1 1.2 6 0.866 7 0.5 14 1.5 76 1.2 D + 1.5 LL d + Service - 60 W Yes Y 1 1.2 7 0.866 6 0.5 14 1.5 77 1.2 D + 1.5 LL d + Service - 90 W Yes Y 1 1.2 7 1 14 1.5 78 1.2 D + 1.5 LL d + Service - 120 W Yes Y 1 1.2 7 0.866 6 -0.5 14 1.5 79 1.2 D + 1.5 LL d + Service - 150 W Yes Y 1 1.2 6 -0.866 7 0.5 14 1.5 80 1.2 D + 1.5 LL d + Service - 180 W Yes Y 1 1.2 6 -1 14 1.5 81 1.2 D + 1.5 LL d + Service - 210 W Yes Y 1 1.2 6 -0.866 7 -0.5 14 1.5 82 1.2 D + 1.5 LL d + Service - 240 W Yes Y 1 1.2 7 -0.866 6 -0.5 14 1.5 83 1.2 D + 1.5 LL d + Service - 270 W Yes Y 1 1.2 7 -1 14 1.5 84 1.2 D + 1.5 LL d + Service - 300 W Yes Y 1 1.2 7 -0.866 6 0.5 14 1.5 85 1.2 D + 1.5 LL d + Service - 330 W Yes Y 1 1.2 6 0.866 7 -0.5 14 1.5 86 1.2 D + 1.5 LL Maint (1)Yes Y 1 1.2 15 1.5 87 1.2 D + 1.5 LL Maint (2)Yes Y 1 1.2 16 1.5 88 1.2 D + 1.5 LL Maint (3)Yes Y 1 1.2 17 1.5 89 1.2 D + 1.5 LL Maint (4)Yes Y 1 1.2 18 1.5 90 1.2 D + 1.5 LL Maint (5)Yes Y 1 1.2 19 1.5 91 1.2 D + 1.5 LL Maint (6)Yes Y 1 1.2 20 1.5 92 1.2 D + 1.5 LL Maint (7)Yes Y 1 1.2 21 1.5 93 1.2 D + 1.5 LL Maint (8)Yes Y 1 1.2 22 1.5 94 1.2 D + 1.5 LL Maint (9)Yes Y 1 1.2 23 1.5 95 1.2 D + 1.5 LL Maint (10)Yes Y 1 1.2 24 1.5 96 1.2 D + 1.5 LL Maint (11)Yes Y 1 1.2 25 1.5 Company Designer Job Number Model Name : : : : B+T Group KP 167744.001.01.0001 877948 - Santa Anita Checked By : 3/31/2023 1:25:50 PM RISA-3D Version 21 [ 167744_001_01_0001_Santa Anita_CA.r… Page 9 Load Combinations (Continued) Description Solve P-Delta BLC Factor BLC Factor BLC Factor BLC Factor 97 1.2 D + 1.5 LL Maint (12)Yes Y 1 1.2 26 1.5 98 1.2 D + 1.5 LL Maint (13)Yes Y 1 1.2 27 1.5 99 1.2 D + 1.5 LL Maint (14)Yes Y 1 1.2 28 1.5 100 1.2 D + 1.5 LL Maint (15)Yes Y 1 1.2 29 1.5 101 1.2 D + 1.5 LL Maint (16)Yes Y 1 1.2 30 1.5 102 1.2 D + 1.5 LL Maint (17)Yes Y 1 1.2 31 1.5 103 1.2 D + 1.5 LL Maint (18)Yes Y 1 1.2 32 1.5 104 1.2 D + 1.5 LL Maint (19)Yes Y 1 1.2 33 1.5 105 1.2 D + 1.5 LL Maint (20)Yes Y 1 1.2 34 1.5 106 1.2 D + 1.5 LL Maint (21)Yes Y 1 1.2 35 1.5 107 1.2 D + 1.5 LL Maint (22)Yes Y 1 1.2 36 1.5 108 1.2 D + 1.5 LL Maint (23)Yes Y 1 1.2 37 1.5 109 1.2 D + 1.5 LL Maint (24)Yes Y 1 1.2 38 1.5 Envelope Node Reactions Node Label X [k] LC Y [k] LC Z [k] LC MX [k-ft] LC MY [k-ft] LC MZ [k-ft] LC 1 1 max 0.509 29 1.378 62 0.57 2 -1.714 26 1.651 29 1.929 71 2 min -0.509 35 0.628 32 -0.57 8 -4.49 68 -1.652 35 -2.618 41 3 Totals:max 0.509 29 1.378 62 0.57 2 4 min -0.509 35 0.628 32 -0.57 8 Envelope AISC 15TH (360-16): LRFD Member Steel Code Checks Member Shape Code CheckLoc[ft]LCShear CheckLoc[ft]DirLCphi*Pnc [k]phi*Pnt [k] phi*Mn y-y [k-ft] phi*Mn z-z [k-ft]Cb Eqn 1 1 HSS4X4X4 0.296 0 41 0.205 0 y 71 135.036 139.518 16.181 16.181 1.471 H1-1b 2 2 PIPE_3.5X.216 0.307 3.5 65 0.033 3.5 48 64.977 92.259 8.048 8.048 1 H1-1b 3 3 PIPE_4.0 0 0.75 1 0 0.75 32 92.571 93.24 10.631 10.631 1 H1-1b* 4 4 PIPE_2.5X.203 0.01 4 7 0.001 4 7 35.361 70.548 5.01 5.01 1 H1-1b 5 7 PIPE_2.5X.203 0.103 4 32 0.01 4 32 35.361 70.548 5.01 5.01 1 H1-1b 6 9 PIPE_2.5X.203 0.01 4 8 0.001 4 8 35.361 70.548 5.01 5.01 1 H1-1b 7 13 PIPE_2.0 0.049 3 8 0.006 3 8 20.867 32.13 1.872 1.872 1 H1-1b March 31, 2023 7 ft. T-Arm Mount Analysis - Conditional Passing CCI BU No. 877948 Project Number 167744.001.01.0001, Order 629188, Revision 4 Page 9 APPENDIX D ADDITIONAL CALCULATIONS 167744.001.01.0001 - Santa Anita, CA T-Arm Mount Analysis [REF: AISC 360-05] Reactions at Bolted Connection Tension :k Vertical Shear : k Horizontal Shear : k Torsion : k.ft Moment from Horizontal Forces : k.ft Moment from Vertical Forces : k.ft Bolt Parameters Bolt Grade : Bolt Diameter : in Nominal Bolt Area :in2 Bolt spacing, Horizontal : in Bolt spacing, Vertical : in Bolt edge distance, plate height : in Bolt edge distance, plate width : in Total Number of Bolts : bolts Summary of Forces Shear Resultant Force : k Force from Horz. Moment : k Force from Vert. Moment : k Shear Load / Bolt : k Tension Load / Bolt : k Resultant from Moments / Bolt : k Bolt Checks Nominal Tensile Stress, Fnt :ksi[AISC Table J3.2] Available Tensile Stress, ΦRnt :k/bolt[Eq. J3-1] Unity Check, Bolt Tension :OKAY Nominal Shear Stress, Fnv :ksi[AISC Table J3.2] Available Shear Stress, ΦRnv :k/bolt[Eq. J3-1] Unity Check, Bolt Shear :OKAY Unity Check, Combined :OKAY Available Bearing Strength, ΦRn :k/bolt Unity Check, Bolt Bearing :OKAY PROJECT KSC B+T Group SUBJECT 1717 S. Boulder, Suite 300 Tulsa, OK 74119 (918) 587-4630DATE03/31/23 PAGE 1 OF 1 20.72 0.509 4.49 A325 0.625 1.652 0.307 4 90.00 0.57 1.378 1.5 6 6 2.618 1.5 21.60% 48.00 11.05 4.61% 1.06% 1.47 2.99 8.13 0.37 0.14 4.33 34.66 26.21% March 31, 2023 7 ft. T-Arm Mount Analysis - Conditional Passing CCI BU No. 877948 Project Number 167744.001.01.0001, Order 629188, Revision 4 Page 10 APPENDIX E SUPPLEMENTAL DRAWINGS A B C 13 8 2 1 3DETAIL ASCALE 1 : 6 10 9 9 DETAIL BSCALE 1 : 65 7 6 11 10 DETAIL CSCALE 1 : 64 96'' 131.5'' 151.9'' REVISIONS REV.IPS DESCRIPTION BY DATE A 10539PC NEW RELEASED.XZ1054 3/11/2021 ITEM NO.PART NUMBER DESCRIPTION QTY. 1 MC-RM1550-3 12" - 50" OD RINGMOUNT 1 2 MT197.01 36" SINGLE SUPPORT ARM 3 3 MT197H HARDWARE KIT (NEXT ITEM)3 4 GB-0524A 5/8" X 2-1/2" GALV BOLT KIT (A325)12 5 MT216.13 CENTER BRACKET 3 6 GUB-53560 5/8" X 3-5/8" X 6" GALV U-BOLT 6 7 GUB-5456 5/8" X 4-5/8" X 6½" GALV U-BOLT 6 8 MTC333912 84" X 3-1/2" OD PIPE 3 9 MT219H3501 3.5"OD Clamp Bracket 9 10 GUB-4352 1/2" X 3" X 5-1/4" GALV U-BOLT 18 11 GUB-4356 1/2" X 3-5/8" X 6" GALV U-BOLT 18 13 MT54696 2.875" O.D. X 96 PIPE 9 6 578 4 3 2 1 7 6 345 A B C D A B C D 12 lbs/in³ lbs in³ in² ± 1203.02 1 OF 2WIDTH LENGTH HEIGHT XZ1054 4265.23VOLUME RE BCAMPBELLCON 03/19/2021AD ROGHANSONRW 03/16/202103/08/2021 COMMSCOPE, INC. OF NORTH CAROLINA T-ARM, MCK6, 3, 4” x 84” , 9, 2-7/8"x96 MC-K6MHDX-9-96 AAD00AAD00 INSL 10539PC DENSITY MASS 0.28 UN L E S S O T H E R W I S E S P E C I F I E D DIM E N S I O N S A R E I N I N C H E S IN T E R P R E T P E R A N S I Y 1 4 . 5 M - 1 9 9 4 CE Auth Group ECN DRAWING SHEETMODEL SCALE SIZE ANGLES .X ± .XX ± .XXX ± MATERIAL .12 .06 .032° D 3 PLACE 2 PLACE 1 PLACE REVISION TOLERANCES STATUSVERSION REVISIONSTATUSVERSION DOCUMENT NO.1:32 N/A FINISH SURFACE AREA 35860.22 TITLENAMEDATE SAP MATERIAL MASTER C 2021 CommScope, Inc. Confidential 8 NOTES: 1.0 GENERAL NOTES1.1 ALL METRIC DIMENSIONS ARE IN BRACKETS.2.0 DESIGN NOTES2.1 FOR PATENT INFORMATION: HTTPS://WWW.CS-PAT.COM 3.0 MANUFACTURING/SPECIAL REQUIREMENTS 4.0 TEST5.0 PACKAGING 5.1 PACKAGING SHALL MEET COMMSCOPE REQUIREMENTS PER DOCUMENT IS-PL-3005 1/32±FRACTIONS MC-K6MHDX-9-96 A36, A53 40 1004 50.0015.00 1270.0381.0 11.50 292.196.00 2438.4 1234 1234 A C D D C A B NOTES: 2 OF 2 COMMSCOPE, INC. OF NORTH CAROLINA T-ARM, MCK6, 3, 4” x 84” , 9, 2-7/8"x96 MC-K6MHDX-9-96 AAD00 DRAWING SHEET SCALESIZEC REVISIONSTATUSVERSION DOCUMENT NO.1:32 TITLE C 2021 CommScope, Inc. Confidential B