Loading...
HomeMy WebLinkAbout400 S Baldwin Ave - 2023 - Trench Drain  F G MPG CD PIPING DOWN PIPING UP FCO WCO S OR W FS CD SOV CV S OR W V CW HW FIRE G MPG POC FLOOR CLEANOUT POINT OF CONNECTION WALL CLEANOUT DOMESTIC HOT WATER DOMESTIC COLD WATER STORM OR OVERFLOW DRAIN SANITARY VENT CONDENSATE DRAIN FLOOR SINK SHUT OFF VALVE CHECK VALVE UNION SOIL OR WASTE FIRE LINE GAS MEDIUM PRESSURE GAS SOIL OR WASTE BELOW FLOOR OR GRADE STORM OR OVERFLOW DRAIN BELOW FLOOR OR GRADE DESCRIPTIONSYMBOLABBREVIATION   ABBRDESCRIPTION DESCRIPTIONABBR CAST IRON CEILING BELOW ACCESS PANEL ABOVE CONDENSATE DRAIN CONTINUATION CONNECTION EXISTING DRAWINGS FLOOR DOWN FLOOR CLEANOUT FIRE HOSE FIXTURE UNIT FEET CONT CONN CLG CI AP BEL ABV FCO FH FU FT FLR EX DWG DN CD STN STL TYP. W/ WCO AW WALL CLEANOUT TYPICAL WITH POUNDS PER SQUARE INCH STAINLESS STEEL ACID WASTE PHASE (ELECTRICAL) KILOWATT POUNDS HORSEPOWER HERTZ INCHES GALLONS PER MINUTE GALLONS PER FLUSH LBS PSI PH KW IN GPM HZ HP GPF 1.CONTRACTOR VERIFICATION: CONTRACTOR SHALL VERIFY EXACT POINTS OF CONNECTION AND CAPABILITIES OF EXISTING UTILITIES PRIOR TO SUBMITTING BID AND START OF WORK. IMMEDIATELY NOTIFY THE ARCHITECT OF ANY DISCREPANCIES. 2.FIXTURE: ALL MANUFACTURERS, LOCATIONS, MOUNTING HEIGHTS AND COLORS OF PLUMBING FIXTURES SHALL BE OBTAINED FROM THE ARCHITECTURAL DRAWINGS. FIXTURES SPECIFIED BUT NOT ALLOWED MAY BE SUBSTITUTED WITH AN APPROVED EQUAL DURING SUBMITTAL REVIEW PROCESS. 3.DISABLED ACCESS FIXTURE: SEE ARCHITECTURAL DRAWINGS TO VERIFY REQUIREMENT AND MOUNTING HEIGHTS. INSULATE ALL EXPOSED PIPING, INCLUDING TRAP DRAIN OUTLET AND SUPPLIES OF SINK PER FIXTURE SCHEDULE. 4.INTERFERENCE: ALL PLUMBING WORK SHALL BE INSTALLED SO AS TO AVOID STRUCTURAL FRAMING. 5.CLEANOUTS: CLEANOUTS SHALL BE INSTALLED WHERE INDICATED, WHERE ACCESSIBLE AND AS REQUIRED BY CODE. COORDINATE ALL LOCATIONS WITH EQUIPMENT, CABINETS, ETC., AND ARCHITECT PRIOR TO INSTALLATION. 6.VENT TERMINATION: EACH VENT PIPE OR STACK SHALL TERMINATE VERTICALLY NOT LESS THAN SIX INCHES ABOVE ROOF NOR LESS THAN ONE FOOT FROM ANY VERTICAL SURFACE. IN ADDITION, EACH PLUMBING VENT SHALL TERMINATE NOT LESS THAN TEN FEET FROM OR AT LEAST THREE FEET ABOVE ANY WINDOW, DOOR, OPENING, AIR INTAKE OR VENT SHAFT. 7.FULL SIZE: ALL VALVES, UNIONS, ETC. TO BE SAME SIZE AS LINE SIZE UNLESS OTHERWISE INDICATED ON DRAWINGS. 8.LATERAL SUPPORT: ALL EQUIPMENT SHALL BE LATERALLY SUPPORTED IN ALL DIRECTIONS TO RESIST A MIN. OF 50% OF ITS’ OPERATING WEIGHT. 9.CODE COMPLIANCE: ALL WORK AND MATERIAL SHALL BE PERFORMED AND INSTALLED IN COMPLIANCE WITH THE FOLLOWING CODES AS ADOPTED AND AMENDED BY THE INSPECTING AUTHORITY. NOTHING DIAGRAMMATICALLY INDICATED ON THESE DRAWINGS IS TO BE CONSTRUED TO PERMIT WORK NOT CONFORMING TO THESE CODES OR OTHERS APPLICABLE TO THIS PROJECT: NOTE: AS MODIFIED BY THE AUTHORITIES HAVING JURISDICTION. A. 2022 CALIFORNIA BUILDING CODE B. 2022 CALIFORNIA MECHANICAL CODE C. 2022 CALIFORNIA PLUMBING CODE D. AMERICANS WITH DISABILITIES ACT (ADA) E. 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE 10.FIELD VERIFICATION: BEFORE ANY FABRICATION OR INSTALLATION, THIS CONTRACTOR SHALL VERIFY EXACT LOCATIONS OF ALL MECHANICAL AND ELECTRICAL EQUIPMENT, AND ALL EQUIPMENT PROVIDED UNDER ANOTHER SECTION OF SPECIFICATIONS. EXACT AND FINAL ROUGH­IN LOCATIONS AND REQUIREMENTS SHALL BE COORDINATED IN FIELD. 11.COORDINATION: THE PLUMBING CONTRACTOR SHALL COORDINATE ALL REQUIREMENTS FOR ALL POINTS OF CONNECTION WITH THE GENERAL CONTRACTOR AND OTHER TRADES PRIOR TO BID. 12.PIPE SLOPE: ALL WASTE AND VENT PIPING SHALL SLOPE AT 2% MINIMUM. WHERE STRUCTURAL MEMBERS OR EQUIPMENT DICTATES A SLOPE OF 1%OR LESS, THE ARCHITECT SHALL BE NOTIFIED PRIOR TO INSTALLATION. 13.ACCESSIBILITY: ALL VALVES, OR EQUIPMENT SHOWN IN WALLS OR ABOVE NON­ACCESSIBLE CEILINGS SHALL BE INSTALLED WITHIN 24” OF, AND BEHIND, AN ACCESS PANEL. 14.SPECIFICATION: THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH, AND BE CONSIDERED TO BE A PART OF, THE SPECIFICATIONS. 15.PATCHING: THE CONTRACT SHALL BE RESPONSIBLE FOR REPAIRING, PATCHING AND PAINTING ALL AREAS WHICH ARE USED AND/OR DAMAGED BY HIS OPERATION. 16.MATERIAL CONNECTION: CONNECTIONS BETWEEN INCOMPATIBLE MATERIALS ABOVE GRADE AND INSIDE BUILDING SHALL BE MADE THRU THE USE OF TWO (2) DIELECTRIC UNIONS. 17.SUBMITTALS AND SHOP DRAWINGS: THE PLUMBING CONTRACTOR SHALL SUBMIT SHOP DRAWINGS ON ALL WORK AND SUBMITTALS ON ALL VALVES, FIXTURES, EQUIPMENT AND ACCESSORIES FOR REVIEW AND APPROVAL PRIOR TO ORDERING, FABRICATION AND INSTALLATION. 18.ALL PLUMBING FIXTURES AND RELATED EQUIPMENT SHALL HAVE ANGLE STOPS. PROVIDE BALL­TYPE SHUT­OFF VALVE. 19.PLUMBING CONTRACTOR SHALL HIRE A PIPE LOCATOR CONTRACTOR TO FIELD VERIFY BUILDING’S EXISTING SEWER LOCATION, CONDITION, INVERT ELEVATION AND SIZES BELOW THE FIRST FLOOR SLAB USING SEWER CAMERA. FINDINGS INCLUDING SKETCH OF ROUTING SHALL BE FORWARDED TO THE ARCHITECT AND INNOVATIVE ENGINEERING GROUP. 20.ROUTING AND SIZES WERE GATHERED DURING A WALK THRU PROCESS AND MAY NOT BE ACCURATE. CONTRACTOR SHALL FIELD VERIFY PRIOR TO START OF WORK. 21.PLUMBING CONTRACTOR SHALL PROVIDE UNIT PRICES PER LINEAR FOOT FOR GIVEN PIPE SIZES FOR COLD WATER, SEWER, VENT AND GAS THAT MAY HAVE TO BE ADDED BECAUSE OF INACCURATE INFORMATION. 22.PLUMBING CONTRACTOR SHALL VISIT THE JOBSITE AND FAMILIARIZE HIMSELF WITH CONDITIONS ON THE JOBSITE THAT HE MIGHT ENCOUNTER ON THE INSTALLATION OF PLUMBING SYSTEM. FIRST FLOOR CONSTRUCTION AND STRUCTURAL CONDITIONS HAVE TO BE FIELD VERIFY WHICH WILL EFFECT ROUTING OF PLUMBING SYSTEM. 23.LEAD FREE COMPLIANCE REQUIRED PER CALIFORNIA HEATH AND SAFETY CODE SEC. 116875. P.0.0 ­ PLUMBING COVERSHEET P1.0 ­ SITE PLAN P1.1 ­ STORM DRAIN PLAN PLUMBING SHEET LIST SERVICE WATER INDIRECT WASTE SANITARY VENT DRAINAGE SANITARY INSIDE BURIED INSIDE BURIED INSIDE OUTSIDE INSIDE OUTSIDE REMARKS MAT E R I A L TYP E " L " C O P P E R W / L E A D FRE E S O L D E R E D F T G S . TYP E " K " C O P P E R W / L E A D FRE E B R A Z E D F T G S . SC H E D . 4 0 B L A C K S T E E L W/T H R E A D E D F T G S . NO ­ H U B C . I . S O I L P I P E W/S T N . S T L B A N D F T G S . TYP E " M " C O P P E R W / L E A D FRE E S O L D E R E D F T G S . PO L Y P R O P O L E N E TYP E B L U E L I N E   SHEET NO: SE A L SHEET TITLE: RE V I S I O N S Checked By: Date: Scale: Job No.: Drawn By: 2023­04­11 20 2 3 ­ 0 4 ­ 1 1 FO R R E V I E W 20 2 3 ­ 0 8 ­ 0 7 PL A N C H E C K R E S U B M I T T A L 20 2 3 ­ 1 0 ­ 1 7 PL A N C H E C K R E S U B M I T T A L PLUMBING COVERSHEET P0.0 1/4" = 1'­0"